Attachment L4 Technical Experience Reference.pdf

PDF 768 KB Posted

Attached to
MACC FY22 Eglin, Hurlburt, Tyndall DRAFT Review
Solicitation number
FA282322R0004
Issued by

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment L4 – Technical Experience Project Reference (Present as many projects as requested by the agency in the

RFP)

EXAMPLE PROJECT KEY NUMBER

Project No.

PROJECT SAMPLE REFERENCE FOR:

Prime Joint Venture Teaming Partner Designer of Record

TITLE AND LOCATION (City and State) Contract No. Task Order (if applicable)

DoD Agency or Private/Commercial Entity: Project

Title:

Location (i.e. Eglin AFB, Hulburt AFB, Tyndall AFB)

COMPLETE THE TYPE OF PROJECT INFORMATION

Divisions/Trades Included as part of the Scope of Project:

Electrical Carpentry Insulation Roofing Plumbing

Flooring (Tile) Cement/Concrete Work Flooring (Carpet/Laminate)

Fire Suppression HVAC Repair/Installation Dry Wall/Ceiling Installation

HazMat Abatement Remediation (Asbestos/Mold/Lead-based Paint)

Other (Explain):

Disciplines Included as part of the Scope of Project:

Architectural Structural Mechanical Fire Protection

Electrical Civil Work Other (explain):

PROJECT INFORMATION

Award Date Completion Date Period of Performance (Actual)

Award Amount Final Contract Amount Project Size (Sq. Ft) to

DRAFT

If Final Amount is different from Contract Amount, please explain reason.

If PoP had to be extended beyond original PoP on Award, please explain reason.

Project Owner Point Of Contact Name Point Of Contact (Email & Telephone Number)

Enter Owner (i.e. 502 CES;

JBSA Lackland)

Enter validated/current POC Enter validated/current information DRAFT

k. Provide a detailed description of the project and the relevancy to the project requirements of this RFP. Include a description of the design-effort.

Provide a detailed description of the work your firm self-performed on this project.

Provide a detailed description of challenges faced, actions taken, and results achieved.

Project No:
Award DateRow1:
Completion DateRow1:
Award AmountRow1:
Final Contract AmountRow1:
Project Size Sq FtRow1:
If Final Amount is different from Contract Amount please explain reasonRow1:
If PoP had to be extended beyond original PoP on Awardee please explain reasonRow1:
Enter Owner ie 502 CES JBSA Lackland:
Enter validatedcurrent POC:
Enter validatedcurrent information:
k Provide a detailed description of the project and the relevancy to the project requirements of this RFP Include a description of the designeffortRow1:
Provide a detailed description of what work your firm selfperformed on this projectRow1:
Provide a detailed description of challenges faces actions taken and result achievedRow1:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Text25:
Text26:
Text27:
Text28:
Text29:
Text30:
Date31_af_date:
Date32_af_date:

File details come from the government source that posted it. Updated .