Attachment L4 Technical Experience Reference.pdf
PDF 768 KB Posted
- Attached to
- MACC FY22 Eglin, Hurlburt, Tyndall DRAFT Review
- Solicitation number
- FA282322R0004
- Issued by
-
Department of the Air Force
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment L4 – Technical Experience Project Reference (Present as many projects as requested by the agency in the
RFP)
EXAMPLE PROJECT KEY NUMBER
Project No.
PROJECT SAMPLE REFERENCE FOR:
Prime Joint Venture Teaming Partner Designer of Record
TITLE AND LOCATION (City and State) Contract No. Task Order (if applicable)
DoD Agency or Private/Commercial Entity: Project
Title:
Location (i.e. Eglin AFB, Hulburt AFB, Tyndall AFB)
COMPLETE THE TYPE OF PROJECT INFORMATION
Divisions/Trades Included as part of the Scope of Project:
Electrical Carpentry Insulation Roofing Plumbing
Flooring (Tile) Cement/Concrete Work Flooring (Carpet/Laminate)
Fire Suppression HVAC Repair/Installation Dry Wall/Ceiling Installation
HazMat Abatement Remediation (Asbestos/Mold/Lead-based Paint)
Other (Explain):
Disciplines Included as part of the Scope of Project:
Architectural Structural Mechanical Fire Protection
Electrical Civil Work Other (explain):
PROJECT INFORMATION
Award Date Completion Date Period of Performance (Actual)
Award Amount Final Contract Amount Project Size (Sq. Ft) to
DRAFT
If Final Amount is different from Contract Amount, please explain reason.
If PoP had to be extended beyond original PoP on Award, please explain reason.
Project Owner Point Of Contact Name Point Of Contact (Email & Telephone Number)
Enter Owner (i.e. 502 CES;
JBSA Lackland)
Enter validated/current POC Enter validated/current information DRAFT
k. Provide a detailed description of the project and the relevancy to the project requirements of this RFP. Include a description of the design-effort.
Provide a detailed description of the work your firm self-performed on this project.
Provide a detailed description of challenges faced, actions taken, and results achieved.
| Project No: |
| Award DateRow1: |
| Completion DateRow1: |
| Award AmountRow1: |
| Final Contract AmountRow1: |
| Project Size Sq FtRow1: |
| If Final Amount is different from Contract Amount please explain reasonRow1: |
| If PoP had to be extended beyond original PoP on Awardee please explain reasonRow1: |
| Enter Owner ie 502 CES JBSA Lackland: |
| Enter validatedcurrent POC: |
| Enter validatedcurrent information: |
| k Provide a detailed description of the project and the relevancy to the project requirements of this RFP Include a description of the designeffortRow1: |
| Provide a detailed description of what work your firm selfperformed on this projectRow1: |
| Provide a detailed description of challenges faces actions taken and result achievedRow1: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Date31_af_date: |
| Date32_af_date: |
File details come from the government source that posted it. Updated .