This document is a set of bid documents for a U.S. Department of Veterans Affairs construction project.

The project involves replacing patient care sanitary pipe in the interstitial spaces of the 3rd and 5th floors at the Richard L. Roudebush VA Medical Center located at 1481 W. 10th Street, Indianapolis, Indiana 46202. The project number is 583-23-102, and the building is fully sprinklered. The design architect/engineer of record is West Point Engineers LLC located in Louisville, Kentucky. The bid documents include general information sheets, life safety and infection control risk assessments, quality assurance protocols, phasing plans across multiple floors (3rd through 8th), riser diagrams for four sanitary stacks (1B, 2E, 3E, and 4F), and detailed plumbing plans showing existing conditions for both the 3rd and 5th floor interstitial areas across multiple zones (Areas A, B, E, and F). The plumbing drawings include abbreviations, symbols, and general notes for sanitary and vent piping systems. The documents specify that contractors must replace all degrading pipe beginning with the first riser band at each floor, with horizontal drainage pipe installed in uniform locations and proper slope. Support piping must be installed at prescribed intervals, and the contractor is required to adjust existing hangers and ensure all connections meet specifications outlined in the general information drawings. The project emphasizes infection control and life safety considerations throughout the construction phases.

View the file

Other files

File Type Posted
36C25026B0036 0003.docx DOCX document
36C25026B0036 0002.docx DOCX document
Drawing.pdf PDF
Combined RFI.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
36C25026B0036 0001.docx DOCX document
Attachment II - Specifications.pdf PDF
Attachment I - DBA WD.pdf PDF
36C25026B0036_1.docx DOCX document
Attachment IV - VAAR 852.219-75.pdf PDF
Attachment V - RFI Form.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

321 4 5 6 7 8 9 10

Revisions: Date:

BID DOCUMENTS

FOR CONSTRUCTION

REPLACE PATIENT CARE SANITARY

PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

583-23-102

03-01-2024 FULLY SPRINKLERED Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Submission Project TitleDrawing Title

INDIANAPOLIS VA MEDICAL CENTER

1481 W. 10TH STREET, INDIANAPOLIS, IN 46202

Project LocationApproved: Project Director

INDIANAPOLIS

VA

MEDICAL

CENTER

ARCHITECT/ENGINEER OF RECORDCONSULTANT

RICHARD L. ROUDEBUSH VA MEDICAL CENTER

1481 W. 10TH STREET

INDIANAPOLIS, IN 46202

PROJECT #583-23-102

REPLACE PATIENT SANITARY PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

U.S. Department of Veterans Affairs

INDIANA - VISN 10

COVER SHEET

GI-00

BVG MMF

SIGNATURE BLOCKPROJECT LOCATION MAP PROJECT SITE MAP

AutoCAD SHX Text

CHIEF, ENGINEERING SERVICES

AutoCAD SHX Text

SAFETY OFFICER

AutoCAD SHX Text

CHIEF, FACILITIES MANAGEMENT SERVICES

AutoCAD SHX Text

INFECTION CONTROL OFFICER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CONTRACTING OFFICER REP.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text GENERAL INFORMATION GI-00 COVER SHEET COVER SHEET GI-01 LIFE SAFETY PLAN/ICRA PLAN - 3RD FLOOR INTERSTITIAL LIFE SAFETY PLAN/ICRA PLAN - 3RD FLOOR INTERSTITIAL GI-02 LIFE SAFETY PLAN/ICRA PLAN - 5TH FLOOR INTERSTITIAL LIFE SAFETY PLAN/ICRA PLAN - 5TH FLOOR INTERSTITIAL GI-03 PHASING PLAN NOTES / QUALITY ASSURANCE NOTES PHASING PLAN NOTES / QUALITY ASSURANCE NOTES GI-04 PHASING PLAN - 3RD FLOOR INTERSTITIAL PHASING PLAN - 3RD FLOOR INTERSTITIAL GI-05 PHASING PLAN - 4TH FLOOR WITH 3RD FLOOR INTERSTITIAL PIPING SHOWN PHASING PLAN - 4TH FLOOR WITH 3RD FLOOR INTERSTITIAL PIPING SHOWN GI-06 PHASING PLAN - 5TH FLOOR INTERSTITIAL PHASING PLAN - 5TH FLOOR INTERSTITIAL GI-07 PHASING PLAN - 6TH FLOOR WITH 5TH FLOOR INTERSTITIAL PIPING SHOWN PHASING PLAN - 6TH FLOOR WITH 5TH FLOOR INTERSTITIAL PIPING SHOWN GI-08 PHASING PLAN - 7TH FLOOR PHASING PLAN - 7TH FLOOR GI-09 PHASNG PLAN - 8TH FLOOR PHASNG PLAN - 8TH FLOOR GI-10 PHASING PLAN - RISER DIAGRAM - STACK 1B + 2E PHASING PLAN - RISER DIAGRAM - STACK 1B + 2E GI-11 PHASING PLAN - RISER DIAGRAM - STACK 3E PHASING PLAN - RISER DIAGRAM - STACK 3E GI-12 PHASING PLAN - RISER DIAGRAM - STACK 4F PHASING PLAN - RISER DIAGRAM - STACK 4F PLUMBING P-00 ABBREVIATIONS, SYMBOLS AND GENERAL NOTES ABBREVIATIONS, SYMBOLS AND GENERAL NOTES P-01 3RD FLOOR INTERSTITIAL AREA A, B AND J - EXISTING CONDITIONS 3RD FLOOR INTERSTITIAL AREA A, B AND J - EXISTING CONDITIONS P-02 3RD FLOOR INTERSTITIAL AREA E - EXISTING CONDITIONS 3RD FLOOR INTERSTITIAL AREA E - EXISTING CONDITIONS P-03 3RD FLOOR INTERSTITIAL AREA F - EXISTING CONDITIONS 3RD FLOOR INTERSTITIAL AREA F - EXISTING CONDITIONS P-04 5TH FLOOR INTERSTITIAL AREA A AND B - EXISTING CONDITIONS 5TH FLOOR INTERSTITIAL AREA A AND B - EXISTING CONDITIONS P-05 5TH FLOOR INTERSTITIAL AREA E - EXISTING CONDITIONS 5TH FLOOR INTERSTITIAL AREA E - EXISTING CONDITIONS P-06 5TH FLOOR INTERSTITIAL AREA F - EXISTING CONDITIONS5TH FLOOR INTERSTITIAL AREA F - EXISTING CONDITIONS

AutoCAD SHX Text

DRAWING INDEX

AutoCAD SHX Text

DIRECTOR

AutoCAD SHX Text

DATE

AutoCAD SHX Text

INDIANAPOLIS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

321 4 5 6 7 8 9 10

Revisions: Date:

BID DOCUMENTS

FOR CONSTRUCTION

REPLACE PATIENT CARE SANITARY

PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

583-23-102

03-01-2024 FULLY SPRINKLERED Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Submission Project TitleDrawing Title

INDIANAPOLIS VA MEDICAL CENTER

1481 W. 10TH STREET, INDIANAPOLIS, IN 46202

Project LocationApproved: Project Director

INDIANAPOLIS

VA

MEDICAL

CENTER

ARCHITECT/ENGINEER OF RECORDCONSULTANT LIFE SAFETY,

INFECTION CONTROL RISK ASSESSMENT

3RD FLOOR INTERSTITIAL

GI-01

BVG JDF

AutoCAD SHX Text

AutoCAD SHX Text

GI-01

AutoCAD SHX Text

3RD FLOOR INTERSTITIAL PLAN

AutoCAD SHX Text 3/32" = 1' - 0"

AutoCAD SHX Text

GENERAL LIFE SAFETY NOTES

AutoCAD SHX Text A. LIFE SAFETY DRAWINGS ARE REPRODUCED FROM LATEST LIFE SAFETY LIFE SAFETY DRAWINGS ARE REPRODUCED FROM LATEST LIFE SAFETY STATEMENT OF CONDITIONS DRAWINGS AS PROVIDED BY VAMC AND DATED JAN 2021. B. CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS AND NOTIFY COR CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS AND NOTIFY COR IMMEDIATELY OF ANY DISCREPANCY BETWEEN EXISTING AS-BUILT CONDITIONS AND THE CONFIGURATIONS SHOWN BY THE CONSTRUCTION DRAWINGS. C. ALL PLUMBING OR ELECTRICAL PENETRATIONS OCCURRING THROUGH ALL PLUMBING OR ELECTRICAL PENETRATIONS OCCURRING THROUGH EXISTING FIRE-RATED PARTITIONS OR FLOOR SHALL BE FIRE AND/OR SMOKE SEALED PER UL DESIGN REQUIREMENTS FOR THE CORRESPONDING UL ASSEMBLY. (REFER TO LIFE SAFETY PLAN LEGEND AND FIRE STOPPING SPECIFICATION) D. CONTRACTOR SHALL MAINTAIN EGRESS PATHWAYS TO EXIT ROUTES CONTRACTOR SHALL MAINTAIN EGRESS PATHWAYS TO EXIT ROUTES DURING ALL PHASES OF DEMOLITION AND CONSTRUCTION ACTIVITIES. E. CONTRACTOR SHALL PATCH ANY RATED WALLS DISTURBED DURING CONTRACTOR SHALL PATCH ANY RATED WALLS DISTURBED DURING CONSTRUCTION TO THE SAFETY REQUIREMENTS OF THE CORRESPONDING UL ASSEMBLY. F. CONTRACTOR SHALL SEAL ANY PENETRATION THROUGH A RATED CONTRACTOR SHALL SEAL ANY PENETRATION THROUGH A RATED ASSEMBLY TO SAFETY REQUIREMENTS OF THE CORRESPONDING UL ASSEMBLY DESIGN. G. THE FIRE RATING OF EXISTING FLOOR CONSTRUCTION IS 2-HOURS. ANY THE FIRE RATING OF EXISTING FLOOR CONSTRUCTION IS 2-HOURS. ANY PATCHING OR INFILL OF EXISTING FLOOR CONSTRUCTION WITH NEW FLOOR CONSTRUCTION SHALL ALSO BE 2-HOUR RATED. SEALING OF PLUMBING PENETRATIONS THROUGH FLOOR SHALL MEET THE UL REQUIREMENTS FOR 2-HR. FIRE RATING. (REFER TO FIRE STOPPING SPECIFICATION.)

AutoCAD SHX Text

NTS

AutoCAD SHX Text

KEY PLAN - THIRD FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text

AMERICA WING

AutoCAD SHX Text F

AutoCAD SHX Text F.3

AutoCAD SHX Text G.5

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

PARTITION LEGEND

AutoCAD SHX Text

2-HOUR FIRE BARRIER 1-HOUR FIRE BARRIER SMOKE-RESISTIVE HAZARDOUS ROOM ENCLOSURE

AutoCAD SHX Text

LIFE SAFETY SYMBOL LEGEND

FIRE EXTINGUISHER CABINET ILLUMINATED EXIT SIGN - SHADED AREA INDICATES FACE(S) OF SIGN

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

321 4 5 6 7 8 9 10

Revisions: Date:

BID DOCUMENTS

FOR CONSTRUCTION

REPLACE PATIENT CARE SANITARY

PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

583-23-102

03-01-2024 FULLY SPRINKLERED Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Submission Project TitleDrawing Title

INDIANAPOLIS VA MEDICAL CENTER

1481 W. 10TH STREET, INDIANAPOLIS, IN 46202

Project LocationApproved: Project Director

INDIANAPOLIS

VA

MEDICAL

CENTER

ARCHITECT/ENGINEER OF RECORDCONSULTANT

GI-02

BVG MMF

LIFE SAFETY,

INFECTION CONTROL RISK ASSESSMENT

5TH FLOOR INTERSTITIAL

AutoCAD SHX Text

AutoCAD SHX Text

GI-02

AutoCAD SHX Text

5TH FLOOR INTERSTITIAL PLAN

AutoCAD SHX Text 3/32" = 1' - 0"

AutoCAD SHX Text

NTS

AutoCAD SHX Text

KEY PLAN - FIFTH FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text

AMERICA WING

AutoCAD SHX Text F

AutoCAD SHX Text F.3

AutoCAD SHX Text G.5

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL LIFE SAFETY NOTES

AutoCAD SHX Text A. LIFE SAFETY DRAWINGS ARE REPRODUCED FROM LATEST LIFE SAFETY LIFE SAFETY DRAWINGS ARE REPRODUCED FROM LATEST LIFE SAFETY STATEMENT OF CONDITIONS DRAWINGS AS PROVIDED BY VAMC AND DATED JAN 2021. B. CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS AND NOTIFY COR CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS AND NOTIFY COR IMMEDIATELY OF ANY DISCREPANCY BETWEEN EXISTING AS-BUILT CONDITIONS AND THE CONFIGURATIONS SHOWN BY THE CONSTRUCTION DRAWINGS. C. ALL PLUMBING OR ELECTRICAL PENETRATIONS OCCURRING THROUGH ALL PLUMBING OR ELECTRICAL PENETRATIONS OCCURRING THROUGH EXISTING FIRE-RATED PARTITIONS OR FLOOR SHALL BE FIRE AND/OR SMOKE SEALED PER UL DESIGN REQUIREMENTS FOR THE CORRESPONDING UL ASSEMBLY. (REFER TO LIFE SAFETY PLAN LEGEND AND FIRE STOPPING SPECIFICATION) D. CONTRACTOR SHALL MAINTAIN EGRESS PATHWAYS TO EXIT ROUTES CONTRACTOR SHALL MAINTAIN EGRESS PATHWAYS TO EXIT ROUTES DURING ALL PHASES OF DEMOLITION AND CONSTRUCTION ACTIVITIES. E. CONTRACTOR SHALL PATCH ANY RATED WALLS DISTURBED DURING CONTRACTOR SHALL PATCH ANY RATED WALLS DISTURBED DURING CONSTRUCTION TO THE SAFETY REQUIREMENTS OF THE CORRESPONDING UL ASSEMBLY. F. CONTRACTOR SHALL SEAL ANY PENETRATION THROUGH A RATED CONTRACTOR SHALL SEAL ANY PENETRATION THROUGH A RATED ASSEMBLY TO SAFETY REQUIREMENTS OF THE CORRESPONDING UL ASSEMBLY DESIGN. G. THE FIRE RATING OF EXISTING FLOOR CONSTRUCTION IS 2-HOURS. ANY THE FIRE RATING OF EXISTING FLOOR CONSTRUCTION IS 2-HOURS. ANY PATCHING OR INFILL OF EXISTING FLOOR CONSTRUCTION WITH NEW FLOOR CONSTRUCTION SHALL ALSO BE 2-HOUR RATED. SEALING OF PLUMBING PENETRATIONS THROUGH FLOOR SHALL MEET THE UL REQUIREMENTS FOR 2-HR. FIRE RATING. (REFER TO FIRE STOPPING SPECIFICATION.)

AutoCAD SHX Text

PARTITION LEGEND

AutoCAD SHX Text

2-HOUR FIRE BARRIER 1-HOUR FIRE BARRIER SMOKE-RESISTIVE HAZARDOUS ROOM ENCLOSURE

AutoCAD SHX Text

LIFE SAFETY SYMBOL LEGEND

FIRE EXTINGUISHER CABINET ILLUMINATED EXIT SIGN - SHADED AREA INDICATES FACE(S) OF SIGN

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

321 4 5 6 7 8 9 10

Revisions: Date:

BID DOCUMENTS

FOR CONSTRUCTION

REPLACE PATIENT CARE SANITARY

PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

583-23-102

03-01-2024 FULLY SPRINKLERED Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Submission Project TitleDrawing Title

INDIANAPOLIS VA MEDICAL CENTER

1481 W. 10TH STREET, INDIANAPOLIS, IN 46202

Project LocationApproved: Project Director

INDIANAPOLIS

VA

MEDICAL

CENTER

ARCHITECT/ENGINEER OF RECORDCONSULTANT GENERAL PHASING /

QUALITY ASSURANCE

GI-03

BVG MMF

AutoCAD SHX Text

GENERAL PHASING NOTES

AutoCAD SHX Text QUALITY CONTROL PHOTOGRAPHS / RECORDS THE CONTRACTOR SHALL MAINTAIN A QC PERSON ON-SITE WHILE WORK IS BEING PREFORMED. THE QC PERSON SHALL HAVE PASSED THE CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS (CQM-C) COURSE PROVIDED BY THE US ARMY CORP OF ENGINEERS. A PROJECT SUPERINTENDENT MAY PERFORM THE QC ROLE IF THEY HAVE A CQM-C CERTIFICATE. INSTALLERS DIRECTING AND PERFORMING THE WORK CAN NOT WORK AS THE QC SITE PERSON. . PROGRESS PHOTO AND FILE STORAGE THE QC PERSON SHALL BE RESPONSIBLE FOR ALL CAPTURED PHOTOS USING A 50 MEGA PIXEL CAMERA CAPABLE OF CAPTURING INSTALLATION DETAIL. QC PERSON SHALL SUBMIT FOR APPROVAL A TAG AND TESTING PROCEDURE TO INCLUDE: A) INSTALLING A 3 1/2" X 5" WHITE TAG ATTACHED USING NYLON ZIP TIES. SEE INSTALLING A 3 1/2" X 5" WHITE TAG ATTACHED USING NYLON ZIP TIES. SEE TEST TAG THIS PAGE. B) USING PROCORE OR PROCORE LIKE SOFTWARE THE CONTRACTOR SHALL USING PROCORE OR PROCORE LIKE SOFTWARE THE CONTRACTOR SHALL CREATE AND FILL OUT THE DIGITAL TESTING FORM MATCHING THE INFORMATION ON THE TEST TAG. C) ATTACH A PHOTO OF THE TESTING TAG TO THE PROCORE FORM. ATTACH A PHOTO OF THE TESTING TAG TO THE PROCORE FORM. D) UPDATE AND PROVIDE A GENERAL LOCATION ON THE PROJECT AS-BUILT UPDATE AND PROVIDE A GENERAL LOCATION ON THE PROJECT AS-BUILT DRAWINGS INCLUDE A REFERENCE SNIPPET ON THE TEST REPORT SHOWING THE LOCATION AND 10'-0" IN ALL DIRECTIONS. E) PRINT THIS FORM AND STORE IN A CLOUD BASED SOFTWARE USING AN PRINT THIS FORM AND STORE IN A CLOUD BASED SOFTWARE USING AN APPROVED FILE IDENTIFICATION FORMAT. THIS SUBMITTAL TO THE COR WILL REQUIRE A MEETING AT THE COR'S OFFICE TO REVIEW THE QC'S PROCESS AND THE ABILITY FOR THE COR TO ACCESS THIS PROCESS. THE QC PERSON WILL PROVIDE TRAINING AS NEEDED TO THE VA. ALL PHOTOS SHALL BE KEPT ON A CLOUD BASE SERVER. THE BASIS OF DESIGN IS PROCORE. THE PHOTO LOCATION SHALL BE TRACKED USING FILE NAMES AND MULTIVISTA LOCATION POINTS (COLOR CODED ARROWS) SUPERIMPOSED ON THE DRAWINGS. A PDF COMPLETE COPY OF THE PROCORE TEST SHALL HAVE THE FOLLOWING FILE LAYOUT AND SHALL BE SAVED ON A CLOUD BASED SYSTEM SEPARATE THAN THE PROCORE OR PROCORE LIKE SOFTWARE AND SHALL BE ACCESSIBLE TO THE COR: 1. DATE "01012024" DATE "01012024" 2. FLOOR NUMBER FLOOR NUMBER 3. RISER NUMBER RISER NUMBER 4. TEST NUMBER TEST NUMBER FILE NAME: DATE _ FLOOR NUMBER _ RISER NUMBER _ TEST NUMBER .PDF PHOTOGRAPH RECORDS EXPECTATIONS ARE ONE PHOTO FOR EACH PROGRESS PHOTO AREAS. IF CONTENT REQUIRES MORE THAN ONE PHOTO THE QC PERSON IS ENCOURAGED TO CAPTURE THAT CONTENT IN ADDITIONAL PHOTOS USING THE SAME LABELING SYSTEM. ALL FILES WILL BE SAVED USING A CONTRACTOR-SUBMITTED AND COR-APPROVED FILING SYSTEM. UPON COMPLETION OF THE PROJECT SUPPLY THE COR WITH A DIGITAL COPY OF THE FILE FOLDER AND ALL OF THE PHOTO CONTENT ORGANIZED IN THE COR APPROVED FILE FOLDER SYSTEM

AutoCAD SHX Text DATE: ______________ FLOOR:______________ RISER:_______________ TEST NUMBER:__________ TORQUE: _____________ SLOPE OF PIPE: ________ TEST PASSED:__________ TEST FAILED:___________

AutoCAD SHX Text

FREE STANDING SIGN: 20" WIDE BY 36" TALL

AutoCAD SHX Text

INSPECTION TAG 3 1/2" X 5"

AutoCAD SHX Text

ROOM OUT OF SERVICE

AutoCAD SHX Text

DO NOT USE

AutoCAD SHX Text "ROOM OUT OF SERVICE" SIGNAGE THE CONTRACTOR SHALL PROVIDE AT EACH LOCATION A YELLOW FREE STANDING SIGN IN LIKE NEW CONDITION. SIGN TO BE COMMERCIALLY PRODUCED WITH A 1/4" YELLOW SINTRA APPLIED OR DIRECT PRINTED "ROOM OUT OF SERVICE" IN BLACK 3" TALL LETTERS. AT EACH LOCATION ALSO APPLY AN "X" PATTERN OF 3" WIDE "DO NOT USE" CAUTION TAPE APPLIED OVER THE FIXTURE AND WHEN POSSIBLE DISABLE THE WATER SOURCE AND USING RED TAPE. TAPE OFF THE DRAIN TO PREVENT WATER FROM PASSING. QC PERSON TO DOCUMENT FIXTURE CLOSURES AND REOPENING. 1. ASSOCIATE REPORT WITH PROJECT SCHEDULE TASK ASSOCIATE REPORT WITH PROJECT SCHEDULE TASK 2. PHOTOGRAPH CLOSE AND OPENED CONDITIONS. PHOTOGRAPH CLOSE AND OPENED CONDITIONS. 3. RECORD CONTRACTORS SIGNED MEETING NOTES TAKEN WITH VA.RECORD CONTRACTORS SIGNED MEETING NOTES TAKEN WITH VA.

AutoCAD SHX Text GENERAL NOTES: TO ENSURE OPTIMAL QUALITY AND SAFETY STANDARDS, A DESIGNATED QUALITY CONTROL PERSON (QC) WILL COMMENCE EACH SHIFT BY THOROUGHLY DOCUMENTING THE WORKSITE USING A CONTRACTOR-PROVIDED AND COR-APPROVED CUSTOMIZED FORM ON RELIABLE SOFTWARE SUCH AS PROCORE. ADDITIONALLY, THE QC WILL DILIGENTLY OBSERVE ANY SAFETY CONCERNS AND PROMPTLY MAKE A RECORD OF THEM. THE QC RECORDS WILL BE TRANSMITTED TO THE PROJECT SAFETY OFFICER WITHIN 24 HOURS OF EACH SHIFT AND WILL NOTIFY THE SITE SUPERINTENDENT AT THE TIME OF INSPECTION. THE CONTRACTOR MUST PROVIDE A COMPREHENSIVE LIST OF INSPECTION POINTS TO THE SAFETY OFFICER AND, SUBSEQUENTLY, TO THE COR. THE QC PERSON IS RESPONSIBLE FOR NOTING AND MONITORING THE SITE'S CONDITIONS FOR THE GENERAL TRADES CONTRACTOR TO ADDRESS. 1. SCAFFOLDING AND LADDERS IF IN USE HAVE THE THE SAFETY INSPECTORS SCAFFOLDING AND LADDERS IF IN USE HAVE THE THE SAFETY INSPECTORS APPROVAL TAG. 2. GROUND FAULT (GFCI) ARE BEING USED ON ALL CORDS. GROUND FAULT (GFCI) ARE BEING USED ON ALL CORDS. 3. POWER CORDS DO NOT PASS THROUGH DOORS. POWER CORDS DO NOT PASS THROUGH DOORS. 4. DURING DEMOLITION, QC WILL CONFIRM THE PROPER COFFER DAM CONSTRUCTION DURING DEMOLITION, QC WILL CONFIRM THE PROPER COFFER DAM CONSTRUCTION AND AVAILABILITY OF EMERGENCY SPILL CLEANUP EQUIPMENT. 5. AN OVERFLOW TANK WITH NO LESS THAN A 35 GALLON OF CAPACITY IS AN OVERFLOW TANK WITH NO LESS THAN A 35 GALLON OF CAPACITY IS AVAILABLE IF NEEDED. 6. DURING QC, ENSURE CONTRACTORS FOLLOW SAFETY PROGRAM AND USE PROPER DURING QC, ENSURE CONTRACTORS FOLLOW SAFETY PROGRAM AND USE PROPER PPE SUCH AS GOGGLES, FACE SHIELDS, COVERALLS, GLOVES, AND BOOTS RESISTANT TO WATER. 7. IN CASE OF SPILLS OR ACCIDENTS, THE QUALITY CONTROL PERSON MUST IN CASE OF SPILLS OR ACCIDENTS, THE QUALITY CONTROL PERSON MUST PHOTOGRAPH THE AREA AND DOCUMENT THE EVENT. THIS DOCUMENTATION SHOULD BE SUPPLIED TO THE COR WITHIN 24 HOURS. 8. TEST THE EMPLOYEE WASH STATION EACH SHIFT AND CONFIRM THAT THESE TEST THE EMPLOYEE WASH STATION EACH SHIFT AND CONFIRM THAT THESE CONDITIONS MEET THE CONTRACTORS LISTED ITEMS. TOWELS, FRESH WATER, SANITIZING SOAPS, EYE WASH. 9. DOCUMENT THE MATERIALS BEING REMOVED ARE PROPERLY COVERED WHEN DOCUMENT THE MATERIALS BEING REMOVED ARE PROPERLY COVERED WHEN LEAVING THE PROJECT SITE. 10. DOCUMENT ALL MATERIALS USED WITH THEIR RESPECTIVE SUBMITTAL NUMBERS. DOCUMENT ALL MATERIALS USED WITH THEIR RESPECTIVE SUBMITTAL NUMBERS. 11. NOTE STICKY MATS ARE CLEAN AND USABLE. NOTE STICKY MATS ARE CLEAN AND USABLE. 12. TAKE A PHOTOGRAPH OF THE CORRIDORS AT THE END OF THE SHIFT AND TAKE A PHOTOGRAPH OF THE CORRIDORS AT THE END OF THE SHIFT AND CATEGORIZE THEM AS EITHER "APPROVED" OR "DISAPPROVED" ACCORDING TO THE CLEANING STANDARD AGREED UPON BY COR AND QC. 13. THE PLUMBING CONTRACTOR SHALL INSTALL THE SANITARY PIPING WHILE THE PLUMBING CONTRACTOR SHALL INSTALL THE SANITARY PIPING WHILE OBSERVING THE HORIZONTAL DRAINAGE REQUIREMENTS REGARDING PIPE SLOPE. SEE PLUMBING DRAWINGS. THIS REQUIREMENT SHALL BE STRICTLY ENFORCED.

AutoCAD SHX Text

QUALITY ASSURANCE NOTES

1. PHASING PLANS ARE CONCEPTUAL IN NATURE AND DO NOT RELIEVE THE PHASING PLANS ARE CONCEPTUAL IN NATURE AND DO NOT RELIEVE THE CONTRACTOR OF PREPARING SITE SPECIFIC PHASING PLANS FOR IMPLEMENTATION OF THE FULL SCOPE OF WORK IDENTIFIED BY THE CONTRACT DOCUMENTS. (REFER TO SPECIFICATION SECTION 01 00 00, GENERAL REQUIREMENTS FOR CONTRACTOR PHASING RESPONSIBILITY.) 2. THE GOAL OF THE PROJECT IS TO REPLACE APPROXIMATELY 9,000 LINEAL THE GOAL OF THE PROJECT IS TO REPLACE APPROXIMATELY 9,000 LINEAL FEET (CONTRACTOR TO VERIFY) OF SANITARY PIPING IN THE INTERSTITIAL SPACES OF THE 3RD AND 5TH FLOOR OF THE AMERICA WING. 3. THE GOAL OF THE PHASING PLAN IS TO INDICATE WHICH PLUMBING FIXTURES THE GOAL OF THE PHASING PLAN IS TO INDICATE WHICH PLUMBING FIXTURES WILL BE EFFECTED WHILE PIPE SECTIONS IN THE INTERSTITIAL SPACES ARE BEING REPLACED. THIS IS TO ALLOW THE CONTRACTOR ALONG WITH THE COR TO DETERMINE THE MOST EFFICIENT AND LEAST DISRUPTIVE WAY TO COMPLETE THE WORK. WITH THAT, IT IS THE CONTRACTORS RESPONSIBILITY IT IS THE CONTRACTORS RESPONSIBILITY TO CONFIRM THE EFFECTED FIXTURES. 4. IN ORDER TO EXPEDITE THE INSTALLATION, PRIOR TO THE START OF EACH IN ORDER TO EXPEDITE THE INSTALLATION, PRIOR TO THE START OF EACH PHASE, THE CONTRACTOR SHALL HAVE ON-SITE ALL EQUIPMENT, TOOLS, AND MATERIAL NECESSARY FOR THE PHASED WORK - NO EXCEPTIONS. CONSULT WITH THE COR FOR STAGING LOCATIONS, CONTRACTOR RESTROOMS, DUMPSTER LOCATIONS, AND TRAVEL PATHS TO AND FROM THE INTERSTITIAL SPACES, THE CONTRACTOR SHALL UTILIZE SERVICE ELEVATOR #11 FOR PIPE TRANSPORT. 5. THE INDIANAPOLIS VAMC HOSPITAL OPERATIONS MUST CONTINUE WITHOUT THE INDIANAPOLIS VAMC HOSPITAL OPERATIONS MUST CONTINUE WITHOUT DISRUPTIONS THROUGHOUT THE LIFE OF THE CONSTRUCTION CONTRACT. TYPICAL OPERATION HOURS FOR THE BUILDING ARE BETWEEN 6:00 AM TO 5:00 PM MONDAY THRU FRIDAY. HOWEVER, PORTIONS OF THE FACILITY INCLUDED WITHIN THE SCOPE OF WORK ARE IN USE 24 HOURS PER DAY, SEVEN DAYS PER WEEK. TEMPORARY OUTAGES AND DISRUPTIVE CONSTRUCTION OR DEMOLITION SHALL BE SCHEDULED DURING COR-APPROVED HOURS. THE CONTRACTOR IS TO MAKE ALL REQUESTS AT LEAST 14 DAYS BEFORE THE PROPOSED WORK IS TO BEGIN. OUTAGES AND DISRUPTIONS WILL BE NOTED ON THE PROJECT SCHEDULE. 6. ALL CONTRACT WORK SHALL OCCUR OUTSIDE OF NORMAL VAMC BUSINESS ALL CONTRACT WORK SHALL OCCUR OUTSIDE OF NORMAL VAMC BUSINESS OUTSIDE OF NORMAL VAMC BUSINESS HOURS. (NORMAL HOURS ARE 6:00 AM TO 5:00 PM EST MONDAY THROUGH FRIDAY. a. WEEKENDS AND HOLIDAYS MAY BE AVAILABLE FOR CONTRACT WORK IF PERMITTED BY, AND COORDINATED WITH, THE VAMC CONTRACTING OFFICER REPRESENTATIVE (COR). 7. SHOULD ANY OF THE WORK REQUIRE THE CLOSURE OF EXISTING EMERGENCY SHOULD ANY OF THE WORK REQUIRE THE CLOSURE OF EXISTING EMERGENCY EXIT STAIRS OR DOORS THAT SERVE OTHER PARTS OF THE FACILITY, THE CONTRACTOR IS REQUIRED TO NOTIFY THE COR AT LEAST 30 DAYS BEFORE THE CLOSURE OF THESE AREAS TO ENSURE THE COR CAN MAKE ARRANGEMENTS TO RE-ROUTE EGRESS FROM THESE OTHER SPACES. THE CONTRACTOR SHALL PROVIDE TEMPORARY SIGNAGE FOR ALTERNATE EGRESS TO BE POSTED FOLLOWING THE VA SAFETY OFFICER POLICIES. 8. LOADING AND UNLOADING OF MATERIALS SHALL BE NOTED ON THE PROJECT LOADING AND UNLOADING OF MATERIALS SHALL BE NOTED ON THE PROJECT SCHEDULE AND BE AFTER HOURS OR IN CONJUNCTION WITH VAMC SCHEDULES. DUMPSTER LOCATIONS TO BE PLACED ON-SITE SHALL BE COORDINATED WITH THE COR. 9. PERSONAL AND COMPANY VEHICLE PARKING SHALL BE COORDINATED WITH PERSONAL AND COMPANY VEHICLE PARKING SHALL BE COORDINATED WITH THE COR. THE CONTRACTOR SHALL PREPARE AND SUBMIT FOR APPROVAL A MAP AND PARKING GUIDELINES FOR EMPLOYEES. 10. PHASES (OR EFFECTED AREAS) INDICATED ON THE GI-XX SHEETS ARE PHASES (OR EFFECTED AREAS) INDICATED ON THE GI-XX SHEETS ARE INTENDED TO BE USED BY THE CONTRACTOR AS A GUIDE FOR PHASING. THE CONTRACTOR SHALL COORDINATE A FULL LIST OF PHASED AREAS TO THE COR BEFORE SUBMITTING THEIR PROJECT SCHEDULE. THE DESIGN PLANS INDICATE ANTICIPATED PHASING AREAS (OR EFFECTED AREAS) TO BE ACCOMPLISHED WHILE MAINTAINING, FOR AS MUCH AS POSSIBLE, THE OPERATION OF THE EXISTING BUILDING'S SANITARY SYSTEM. THE CONTRACTOR'S PHASING PLAN SHALL BE BROKEN DOWN INTO SUB-PHASES FOR ADDITIONAL CLARITY. THE CONTRACTOR SHALL PROVIDE A DETAILED PHASING PLAN WHICH DETAILS THAT PORTION OF THE SANITARY SYSTEM AND FIXTURES TO BE INOPERABLE. DO NOT PROCEED IN UNCERTAINTY. 11. TEMPORARY SIGNAGE IS REQUIRED AT ALL AREA WHERE STAFF OR PEDESTRIAN TEMPORARY SIGNAGE IS REQUIRED AT ALL AREA WHERE STAFF OR PEDESTRIAN TRAFFIC FLOW IS AFFECTED. 12. AT THEIR DISCRETION, THE CONTRACTOR MAY PROVIDE AN ALTERNATE PHASING AT THEIR DISCRETION, THE CONTRACTOR MAY PROVIDE AN ALTERNATE PHASING PLAN AND SEQUENCING OF THE WORK. THIS PLAN MUST BE APPROVED IN WRITING BY THE COR BEFORE THE START OF WORK. 13. PRIOR TO BEGINNING EACH PHASE, THE CONTRACTOR IS REQUIRED TO MEET PRIOR TO BEGINNING EACH PHASE, THE CONTRACTOR IS REQUIRED TO MEET WITH THE COR TO DISCUSS THE PROGRESS OF EACH WORK AREA. THE CONTRACTOR WILL THEN PROVIDE A PROGRESS REPORT TO THE COR ON A WEEKLY BASIS. THE CONTRACTOR AND COR WILL COLLABORATE TO ESTABLISH A TIMETABLE FOR PROVIDING THESE UPDATES. THIS MEETING SHOULD BE INCLUDED AS A TASK ON THE PROJECT SCHEDULE. 14. FOR EACH PHASE, INCLUDE THE FOLLOWING: FOR EACH PHASE, INCLUDE THE FOLLOWING: A.1 DATE OF COMMENCEMENT AND COMPLETION A.2 PLANS SHOWING THE LIMITED WORK, TEMPORARY BARRIERS, ACCESS POINTS, AND ALTERATIONS TO EGRESS FOR OCCUPIED PORTIONS OF THE BUILDING AS MAY BE REQUIRED. A.3 LIST OF ANTICIPATED ACTIVITIES OR TASKS ON THE PROJECT SCHEDULE. UTILIZE UNIQUE ID NUMBERS FOR EACH TASK. THESE TASK ID'S WILL MATCH UP TO THE ACTIVITY HAZARD ANALYSIS (AHA) REPORTS. A.4 PROVIDES A LIST OF ANTICIPATED INTERRUPTIONS AND DURATIONS OF ACTIVITIES IN EACH PORTION OF THE BUILDING. 15. FOR THE ENTIRE PROJECT, INCLUDE THE FOLLOWING: FOR THE ENTIRE PROJECT, INCLUDE THE FOLLOWING: B.1 LIMITS OF WORK FOR EACH PHASE B.2 THE PROPOSED LAY-DOWN AND STORAGE AREAS FOR EACH PHASE. THE CONTRACTOR SHALL COORDINATE THE REQUEST FOR A LAY-DOWN AND STORAGE AREA ALONG WITH ANY CRANE OR LIFT SETUP WITH THE COR, ACCESS, AND SECURITY, AND SHALL BE APPROVED BY COR BEFORE ANY WORK BEGINS. B.3 DURING CONSTRUCTION, THE PROPOSED BUILDING ACCESS-WAYS WILL REMAIN AVAILABLE FOR THE OCCUPANTS TO USE. TO ENSURE THE SAFETY OF THE OCCUPANTS, TEMPORARY BARRIERS AND PROTECTIONS MAY BE NEEDED AND MAINTAINED. B.4 IF, DURING THE WORK, THE CONTRACTOR DEEMS IT NECESSARY TO SUBMIT REVISIONS TO THE PHASING PLANS. SUCH REVISIONS SHALL INCLUDE LOCATIONS AND SEQUENCE OF PHASES FOR APPROVAL BY THE COR, AND APPROVAL MUST BE REQUESTED AT LEAST 14 DAYS BEFORE IMPLEMENTATION. 16. WORK FOR EACH AREA MUST BE COMPLETED AND ACCEPTED BY THE COR WORK FOR EACH AREA MUST BE COMPLETED AND ACCEPTED BY THE COR FOR BENEFICIAL USE BY THE OCCUPANTS. THIS PROJECT MAY HAVE MORE THAN ONE PHASE OPERATING AT ANY TIME. 17. UNLESS NOTED OTHERWISE, THE VAMC SHALL BE RESPONSIBLE FOR UNLESS NOTED OTHERWISE, THE VAMC SHALL BE RESPONSIBLE FOR TEMPORARILY RELOCATING, STORING, AND PROTECTING EXISTING FURNISHINGS AND EQUIPMENT DURING THE CONSTRUCTION. THE VAMC SHALL RELOCATE THESE ITEMS BACK TO THEIR ORIGINAL LOCATIONS AT EACH PHASE END. THE CONTRACTOR WILL REPRESENT THE VAMC MOVING TASKS ON THE PROJECT SCHEDULE. ALLOWING 10 WORKING DAYS PER MOVE FOR REMOVAL AND 10 WORKING DAYS FOR THEIR INSTALLATION. 18. VAMC IS RESPONSIBLE FOR THE RELOCATION OF ALL ELECTRONIC OFFICE VAMC IS RESPONSIBLE FOR THE RELOCATION OF ALL ELECTRONIC OFFICE DEVICES LIKE: PHONES, COMPUTERS, FAX, AND PRINTERS / SCANNERS. THE CONTRACTOR IS TO NOTE THESE ITEMS AND PROVIDE TASKS ON THE PROJECT SCHEDULE OF 5 WORKING DAYS FOR THEIR REMOVAL AND 5 WORKING DAYS FOR THEIR INSTALLATION. 19. THE CONTRACTOR SHALL BE REQUIRED TO SET UP TEMPORARY DUST/DIRT THE CONTRACTOR SHALL BE REQUIRED TO SET UP TEMPORARY DUST/DIRT CONTROL BARRICADES WITHIN EACH AREA AS WELL AS MAINTAIN ALL INFECTIOUS CONTROL REQUIREMENTS DURING CONSTRUCTION. SEE SPEC SECTION 01 00 00 GENERAL REQUIREMENTS. THE WORK SHALL BE CONDUCTED SUCH THAT EXISTING INTERIOR FINISHES ARE PROTECTED FROM DAMAGE DURING THE WORK. ANY ADJACENT FINISHES DAMAGED DURING DEMOLITION AND CONSTRUCTION SHALL BE RETURNED TO THEIR ORIGINAL CONDITION BEFORE THE COMPLETION OF EACH PHASE. 20. ALL DEMOLISHED MATERIAL WILL BE REMOVED FROM THE BUILDING THROUGH ALL DEMOLISHED MATERIAL WILL BE REMOVED FROM THE BUILDING THROUGH THE BUILDING CORRIDORS WILL BE IN CLEAN, COVERED AND SEALED LIKE NEW CONTAINERS. WHEELS WILL BE CLEANED BEFORE LEAVING THE CONSTRUCTION AREA. THIS ACTIVITY WILL TAKE PLACE AFTER REGULAR HOSPITAL OPERATING HOURS. 21. EACH PHASE SHALL NOTE ANY ROOM CLOSURES REQUIRED. ROOM CLOSURE EACH PHASE SHALL NOTE ANY ROOM CLOSURES REQUIRED. ROOM CLOSURE BY NAME AND NUMBER SHALL BE STATED AS INDIVIDUAL TASKS ON THE PROJECT SCHEDULE. ALL ROOM CLOSURE REQUESTS SHALL BE COORDINATED WITH THE COR. 22. LOADING DOCK AREAS CAN BE USED AFTER VAMC REGULAR HOURS. LOADING DOCK AREAS CAN BE USED AFTER VAMC REGULAR HOURS. SCHEDULE THESE MOVES AS TASKS ON THE PROJECT SCHEDULE AND ALLOW 30 DAYS FOR APPROVAL OF ANY CHANGES TO THIS LOADING DOCK. CONTRACTOR TO BE AWARE OF THE BURIED TANKS/UTILITIES IN AND AROUND THE VA BEFORE SETTING UP ANY CRANES OR LARGE TRUCKS. WORK WITH THE COR WHILE DEVELOPING THE AHA PLANS FOR EQUIPMENT SETUP. 23. STORAGE OR STAGING OF MATERIALS TO BE REMOVED FROM THE BUILDING STORAGE OR STAGING OF MATERIALS TO BE REMOVED FROM THE BUILDING MUST NOT BLOCK VAMC EQUIPMENT OR EMERGENCY EGRESS. 24. RESTROOM FOR ALL PHASES WILL BE MAINTAINED BY THE CONTRACTOR. SEE RESTROOM FOR ALL PHASES WILL BE MAINTAINED BY THE CONTRACTOR. SEE SPECIFICATION 01 00 00 SECTION 1.15 TEMPORARY TOILET. THE CONTRACTOR WILL MAINTAIN THIS RESTROOM, CLEAN AND STOCK AS NEEDED. THE CONTRACTOR WILL MAINTAIN A CLEANING SIGNOFF SHEET ATTACHED TO THE INSIDE OF THE RESTROOM DOOR. 25. BEFORE SUBMISSION, THE QC WILL REVIEW AND APPROVE THE ACTIVITY BEFORE SUBMISSION, THE QC WILL REVIEW AND APPROVE THE ACTIVITY ACTIVITY HAZARD ANALYSIS (AHA'S), WHICH MUST INCLUDE THE PROJECT SCHEDULE'S UNIQUE ID NUMBER FOR EACH PHASE OF THE PROJECT. THE SUBMISSION AND APPROVAL OF AHA'S FOR EACH PHASE SHOULD BE INCLUDED AS TASKS ON THE PROJECT SCHEDULE. 26. REFER TO PLUMBING CONSTRUCTION DOCUMENTS FOR WORK REQUIRED WITHIN REFER TO PLUMBING CONSTRUCTION DOCUMENTS FOR WORK REQUIRED WITHIN FER TO PLUMBING CONSTRUCTION DOCUMENTS FOR WORK REQUIRED WITHIN THE INTERSTITIAL SPACES.

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

321 4 5 6 7 8 9 10

Revisions: Date:

BID DOCUMENTS

FOR CONSTRUCTION

REPLACE PATIENT CARE SANITARY

PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

583-23-102

03-01-2024 FULLY SPRINKLERED Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Submission Project TitleDrawing Title

INDIANAPOLIS VA MEDICAL CENTER

1481 W. 10TH STREET, INDIANAPOLIS, IN 46202

Project LocationApproved: Project Director

INDIANAPOLIS

VA

MEDICAL

CENTER

ARCHITECT/ENGINEER OF RECORDCONSULTANT PHASING PLAN

3RD FLOOR INTERSTITIAL

GI-04

BVG MMF

AutoCAD SHX Text

AutoCAD SHX Text

GI-04

AutoCAD SHX Text

3RD FLOOR INTERSTITIAL - AMERICA WING

AutoCAD SHX Text 3/32" = 1' - 0"

AutoCAD SHX Text

NTS

AutoCAD SHX Text

KEY PLAN - THIRD FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text

AMERICA WING

AutoCAD SHX Text F

AutoCAD SHX Text F.3

AutoCAD SHX Text G.5

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL PHASING NOTES

AutoCAD SHX Text PHASING PLANS ARE CONCEPTUAL IN NATURE AND DO NOT RELIEVE THE CONTRACTOR OF PREPARING SITE SPECIFIC PHASING PLANS FOR IMPLEMENTATION OF THE FULL SCOPE OF WORK IDENTIFIED BY THE CONTRACT DOCUMENTS. (REFER TO SPECIFICATION SECTION 01 00 00, GENERAL REQUIREMENTS FOR CONTRACTOR PHASING RESPONSIBILITY.)

AutoCAD SHX Text

LINETYPE LEGEND

AutoCAD SHX Text EXISTING TO BE REPLACED - SANITARY EXISTING TO BE REPLACED - SANITARY VENT EXISTING TO REMAIN - SANITARY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

KEYED NOTES

A STACK "A" STACK "A" B STACK "B" STACK "B" C STACK "C" STACK "C"

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

321 4 5 6 7 8 9 10

Revisions: Date:

BID DOCUMENTS

FOR CONSTRUCTION

REPLACE PATIENT CARE SANITARY

PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

583-23-102

03-01-2024 FULLY SPRINKLERED Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Submission Project TitleDrawing Title

INDIANAPOLIS VA MEDICAL CENTER

1481 W. 10TH STREET, INDIANAPOLIS, IN 46202

Project LocationApproved: Project Director

INDIANAPOLIS

VA

MEDICAL

CENTER

ARCHITECT/ENGINEER OF RECORDCONSULTANT PHASING PLAN

4TH FLOOR

WITH 3RD FLOOR INTERSTITIAL PIPING SHOWN

GI-05

BVG MMF

AutoCAD SHX Text

AutoCAD SHX Text

GI-05

AutoCAD SHX Text

4TH FLOOR - AMERICA WING

AutoCAD SHX Text 3/32" = 1' - 0"

AutoCAD SHX Text

NTS

AutoCAD SHX Text N

AutoCAD SHX Text

GENERAL PHASING NOTES

AutoCAD SHX Text PHASING PLANS ARE CONCEPTUAL IN NATURE AND DO NOT RELIEVE THE CONTRACTOR OF PREPARING SITE SPECIFIC PHASING PLANS FOR IMPLEMENTATION OF THE FULL SCOPE OF WORK IDENTIFIED BY THE CONTRACT DOCUMENTS. (REFER TO SPECIFICATION SECTION 01 00 00, GENERAL REQUIREMENTS FOR CONTRACTOR PHASING RESPONSIBILITY.) A. REFER TO SHEET GI-03 FOR GENERAL PHASING NOTES APPLICABLE TO REFER TO SHEET GI-03 FOR GENERAL PHASING NOTES APPLICABLE TO THIS SHEET.

AutoCAD SHX Text

KEY PLAN - FOURTH FLOOR

AutoCAD SHX Text

AMERICA WING

AutoCAD SHX Text NOTE: THE PURPOSE OF THIS SHEET IS TO CORRELATE 3RD FLOOR PIPING WITH 4TH FLOOR FIXTURES. PIPE SHOWN ON THIS SHEET IS IDENTICAL TO PIPE SHOWN ON SHEET GI-04 AND SHOULD NOT BE CONSTRUED AS ADDITIONAL SCOPE. THIS PLAN SHOWS 3RD FLOOR (INTERSTITIAL) PIPE WITH 4TH FLOOR PLAN AND FIXTURES OVERLAIN. THIS SHEET IS FOR REFERENCE ONLY.

AutoCAD SHX Text

MOP SINK

AutoCAD SHX Text

MOP SINK

AutoCAD SHX Text

KEYED NOTES

AutoCAD SHX Text

A STACK "A" STACK "A" B STACK "B" STACK "B" C STACK "C" STACK "C"

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

LINETYPE LEGEND

EXISTING TO BE REPLACED - SANITARY EXISTING TO BE REPLACED - SANITARY VENT EXISTING TO REMAIN - SANITARY

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

321 4 5 6 7 8 9 10

Revisions: Date:

BID DOCUMENTS

FOR CONSTRUCTION

REPLACE PATIENT CARE SANITARY

PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

583-23-102

03-01-2024 FULLY SPRINKLERED Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Submission Project TitleDrawing Title

INDIANAPOLIS VA MEDICAL CENTER

1481 W. 10TH STREET, INDIANAPOLIS, IN 46202

Project LocationApproved: Project Director

INDIANAPOLIS

VA

MEDICAL

CENTER

ARCHITECT/ENGINEER OF RECORDCONSULTANT

GI-06

BVG MMF

PHASING PLAN

5TH FLOOR INTERSTITAL

AutoCAD SHX Text

AutoCAD SHX Text

GI-06

AutoCAD SHX Text

5TH FLOOR INTERSTITIAL - AMERICA WING

AutoCAD SHX Text 3/32" = 1' - 0"

AutoCAD SHX Text

NTS

AutoCAD SHX Text

KEY PLAN - FIFTH FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text

AMERICA WING

AutoCAD SHX Text F

AutoCAD SHX Text F.3

AutoCAD SHX Text G.5

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL PHASING NOTES

AutoCAD SHX Text

KEYED NOTES

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1-23 KEYED NOTES INDICATE STACKS THAT SERVE FIXTURES ON 7TH AND 8TH KEYED NOTES INDICATE STACKS THAT SERVE FIXTURES ON 7TH AND 8TH FLOORS. REFER TO SHEETS GI-08 AND GI-09 FOR ROOMS/FIXTURES ASSOCIATED WITH THE INDICATED STACK. A STACK "A" STACK "A" B STACK "B" STACK "B" C STACK "C" STACK "C"

AutoCAD SHX Text PHASING PLANS ARE CONCEPTUAL IN NATURE AND DO NOT RELIEVE THE CONTRACTOR OF PREPARING SITE SPECIFIC PHASING PLANS FOR IMPLEMENTATION OF THE FULL SCOPE OF WORK IDENTIFIED BY THE CONTRACT DOCUMENTS. (REFER TO SPECIFICATION SECTION 01 00 00, GENERAL REQUIREMENTS FOR CONTRACTOR PHASING RESPONSIBILITY.) A. REFER TO SHEET GI-03 FOR GENERAL PHASING NOTES APPLICABLE TO REFER TO SHEET GI-03 FOR GENERAL PHASING NOTES APPLICABLE TO THIS SHEET.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LINETYPE LEGEND

EXISTING TO BE REPLACED - SANITARY EXISTING TO BE REPLACED - SANITARY VENT

PHASING PLAN

6TH FLOOR

WITH 5TH FLOOR INTERSTITIAL PIPING SHOWN

GI-07

BVG MMF

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

321 4 5 6 7 8 9 10

Revisions: Date:

BID DOCUMENTS

FOR CONSTRUCTION

REPLACE PATIENT CARE SANITARY

PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

583-23-102

03-01-2024 FULLY SPRINKLERED Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Submission Project TitleDrawing Title

INDIANAPOLIS VA MEDICAL CENTER

1481 W. 10TH STREET, INDIANAPOLIS, IN 46202

Project LocationApproved: Project Director

INDIANAPOLIS

VA

MEDICAL

CENTER

ARCHITECT/ENGINEER OF RECORDCONSULTANT

AutoCAD SHX Text

NTS

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

GI-07

AutoCAD SHX Text

6TH FLOOR - AMERICA WING

AutoCAD SHX Text 3/32" = 1' - 0"

AutoCAD SHX Text

KEY PLAN - SIXTH FLOOR

AutoCAD SHX Text

AMERICA WING

AutoCAD SHX Text

GENERAL PHASING NOTES

AutoCAD SHX Text

KEYED NOTES

AutoCAD SHX Text 1-23 KEYED NOTES INDICATE STACKS THAT SERVE FIXTURES ON 7TH AND 8TH KEYED NOTES INDICATE STACKS THAT SERVE FIXTURES ON 7TH AND 8TH FLOORS. REFER TO SHEETS GI-08 AND GI-09 FOR ROOMS/FIXTURES ASSOCIATED WITH THE INDICATED STACK.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text NOTE: THE PURPOSE OF THIS SHEET IS TO CORRELATE 5TH FLOOR PIPING WITH 6TH FLOOR FIXTURES. PIPE SHOWN ON THIS SHEET IS IDENTICAL TO PIPE SHOWN ON SHEET GI-06 AND SHOULD NOT BE CONSTRUED AS ADDITIONAL SCOPE. THIS PLAN SHOWS 5TH FLOOR (INTERSTITIAL) PIPE WITH 6TH FLOOR PLAN AND FIXTURES OVERLAIN. THIS SHEET IS FOR REFERENCE ONLY.

AutoCAD SHX Text PHASING PLANS ARE CONCEPTUAL IN NATURE AND DO NOT RELIEVE THE CONTRACTOR OF PREPARING SITE SPECIFIC PHASING PLANS FOR IMPLEMENTATION OF THE FULL SCOPE OF WORK IDENTIFIED BY THE CONTRACT DOCUMENTS. (REFER TO SPECIFICATION SECTION 01 00 00, GENERAL REQUIREMENTS FOR CONTRACTOR PHASING RESPONSIBILITY.) A. REFER TO SHEET GI-03 FOR GENERAL PHASING NOTES APPLICABLE TO REFER TO SHEET GI-03 FOR GENERAL PHASING NOTES APPLICABLE TO THIS SHEET.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LINETYPE LEGEND

7TH FLOOR

GI-08

BVG MMF

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

321 4 5 6 7 8 9 10

Revisions: Date:

BID DOCUMENTS

FOR CONSTRUCTION

REPLACE PATIENT CARE SANITARY

PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

583-23-102

03-01-2024 FULLY SPRINKLERED Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Submission Project TitleDrawing Title

INDIANAPOLIS VA MEDICAL CENTER

1481 W. 10TH STREET, INDIANAPOLIS, IN 46202

Project LocationApproved: Project Director

INDIANAPOLIS

VA

MEDICAL

CENTER

ARCHITECT/ENGINEER OF RECORDCONSULTANT

AutoCAD SHX Text

NTS

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

GI-08

AutoCAD SHX Text

7TH FLOOR - AMERICA WING

AutoCAD SHX Text 3/32" = 1' - 0"

AutoCAD SHX Text

KEY PLAN - SEVENTH FLOOR

AutoCAD SHX Text

AMERICA WING

AutoCAD SHX Text

GENERAL PHASING NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KEYED NOTES

AutoCAD SHX Text 1-23 HATCHED AREAS/ROOMS CONTAIN FIXTURES THAT CONNECT TO 5TH FLOOR HATCHED AREAS/ROOMS CONTAIN FIXTURES THAT CONNECT TO 5TH FLOOR (INTERSTITIAL) PIPING. EACH HATCHED AREA CONTAINS A KEYED NOTE; REFER TO THE CORRESPONDING KEYED NOTE ON SHEET GI-06 FOR PIPE SERVING THE FIXTURES IN THE HATCHED AREA. EACH KEYED NOTE MAY APPEAR IN MORE THAN ONE HATCH. PROVIDE APPROPRIATE SIGNAGE IN EACH OF THE AFFECTED ROOMS WHEN REPLACING THE ASSOCIATED PIPE IN 5TH FLOOR INTERSTITIAL.

PHASING PLANS ARE CONCEPTUAL IN NATURE AND DO NOT RELIEVE THE CONTRACTOR OF PREPARING SITE SPECIFIC PHASING PLANS FOR IMPLEMENTATION OF THE FULL SCOPE OF WORK IDENTIFIED BY THE CONTRACT DOCUMENTS. (REFER TO SPECIFICATION SECTION 01 00 00, GENERAL REQUIREMENTS FOR CONTRACTOR PHASING RESPONSIBILITY.) A. REFER TO SHEET GI-03 FOR GENERAL PHASING NOTES APPLICABLE TO REFER TO SHEET GI-03 FOR GENERAL PHASING NOTES APPLICABLE TO THIS SHEET.

8TH FLOOR

GI-09

BVG MMF

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

321 4 5 6 7 8 9 10

Revisions: Date:

BID DOCUMENTS

FOR CONSTRUCTION

REPLACE PATIENT CARE SANITARY

PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

583-23-102

03-01-2024 FULLY SPRINKLERED Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Submission Project TitleDrawing Title

INDIANAPOLIS VA MEDICAL CENTER

1481 W. 10TH STREET, INDIANAPOLIS, IN 46202

Project LocationApproved: Project Director

INDIANAPOLIS

VA

MEDICAL

CENTER

ARCHITECT/ENGINEER OF RECORDCONSULTANT

AutoCAD SHX Text

NTS

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

GI-09

AutoCAD SHX Text

8TH FLOOR - AMERICA WING

AutoCAD SHX Text 3/32" = 1' - 0"

AutoCAD SHX Text

KEY PLAN - EIGHTH FLOOR

AutoCAD SHX Text

AMERICA WING

AutoCAD SHX Text

GENERAL PHASING NOTES

AutoCAD SHX Text

KEYED NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1-8 HATCHED AREAS/ROOMS CONTAIN FIXTURES THAT CONNECT TO 5TH FLOOR HATCHED AREAS/ROOMS CONTAIN FIXTURES THAT CONNECT TO 5TH FLOOR (INTERSTITIAL) PIPING. EACH HATCHED AREA CONTAINS A KEYED NOTE; REFER TO THE CORRESPONDING KEYED NOTE ON SHEET GI-06 FOR PIPE SERVING THE FIXTURES IN THE HATCHED AREA. EACH KEYED NOTE MAY APPEAR IN MORE THAN ONE HATCH. PROVIDE APPROPRIATE SIGNAGE IN EACH OF THE AFFECTED ROOMS WHEN REPLACING THE ASSOCIATED PIPE IN 5TH FLOOR INTERSTITIAL.

AutoCAD SHX Text

PHASING PLANS ARE CONCEPTUAL IN NATURE AND DO NOT RELIEVE THE CONTRACTOR OF PREPARING SITE SPECIFIC PHASING PLANS FOR IMPLEMENTATION OF THE FULL SCOPE OF WORK IDENTIFIED BY THE CONTRACT DOCUMENTS. (REFER TO SPECIFICATION SECTION 01 00 00, GENERAL REQUIREMENTS FOR CONTRACTOR PHASING RESPONSIBILITY.) A. REFER TO SHEET GI-03 FOR GENERAL PHASING NOTES APPLICABLE TO REFER TO SHEET GI-03 FOR GENERAL PHASING NOTES APPLICABLE TO THIS SHEET.

RISER DIAGRAM - STACK 1B & 2E

GI-10

BVG MMF

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

321 4 5 6 7 8 9 10

Revisions: Date:

BID DOCUMENTS

FOR CONSTRUCTION

REPLACE PATIENT CARE SANITARY

PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

583-23-102

03-01-2024 FULLY SPRINKLERED Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Submission Project TitleDrawing Title

INDIANAPOLIS VA MEDICAL CENTER

1481 W. 10TH STREET, INDIANAPOLIS, IN 46202

Project LocationApproved: Project Director

INDIANAPOLIS

VA

MEDICAL

CENTER

ARCHITECT/ENGINEER OF RECORDCONSULTANT

AutoCAD SHX Text

AutoCAD SHX Text

GI-10

AutoCAD SHX Text

SANITARY RISER DIAGRAM - STACK 1B

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

3RD FLOOR

AutoCAD SHX Text

4TH FLOOR

AutoCAD SHX Text

5TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

2ND FLOOR

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text P403

AutoCAD SHX Text T-22E

AutoCAD SHX Text

3" FD-B

AutoCAD SHX Text

3" FD-B

AutoCAD SHX Text

3" FD-B

AutoCAD SHX Text

3" FD-B

AutoCAD SHX Text

3" FD-B

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text P502

AutoCAD SHX Text P401

AutoCAD SHX Text P401

AutoCAD SHX Text P103

AutoCAD SHX Text P103

AutoCAD SHX Text P401

AutoCAD SHX Text P103

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

4TH FLOOR

AutoCAD SHX Text

3" FD-R

AutoCAD SHX Text

3" FD-R

AutoCAD SHX Text

3" FD-R

AutoCAD SHX Text P502

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text

AutoCAD SHX Text T-2

AutoCAD SHX Text P808

AutoCAD SHX Text P403

AutoCAD SHX Text P519

AutoCAD SHX Text P812

AutoCAD SHX Text P403

AutoCAD SHX Text P519

AutoCAD SHX Text Y-2

AutoCAD SHX Text P812

AutoCAD SHX Text P403

AutoCAD SHX Text P519

AutoCAD SHX Text P505

AutoCAD SHX Text P505

AutoCAD SHX Text 2"

AutoCAD SHX Text

3" FD-R

AutoCAD SHX Text

3" FD-R

AutoCAD SHX Text

3" FD-R

AutoCAD SHX Text P505

AutoCAD SHX Text

3" FD-R

AutoCAD SHX Text

3" FD-R

AutoCAD SHX Text

CO

AutoCAD SHX Text 2"

AutoCAD SHX Text 4"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 4"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 3"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 3"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

GI-10

AutoCAD SHX Text

SANITARY RISER DIAGRAM - STACK 2E

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

3RD FLOOR

AutoCAD SHX Text

4TH FLOOR

AutoCAD SHX Text

5TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

2ND FLOOR

AutoCAD SHX Text

LINETYPE LEGEND

EXISTING SANITARY STACK EXISTING SANITARY VENT

RISER DIAGRAM - STACK 3E

GI-11

BVG MMF

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

321 4 5 6 7 8 9 10

Revisions: Date:

BID DOCUMENTS

FOR CONSTRUCTION

REPLACE PATIENT CARE SANITARY

PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

583-23-102

03-01-2024 FULLY SPRINKLERED Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Submission Project TitleDrawing Title

INDIANAPOLIS VA MEDICAL CENTER

1481 W. 10TH STREET, INDIANAPOLIS, IN 46202

Project LocationApproved: Project Director

INDIANAPOLIS

VA

MEDICAL

CENTER

ARCHITECT/ENGINEER OF RECORDCONSULTANT

AutoCAD SHX Text

AutoCAD SHX Text

GI-11

AutoCAD SHX Text

SANITARY RISER DIAGRAM - STACK 3E

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text P519

AutoCAD SHX Text P403

AutoCAD SHX Text

2" FD-M

AutoCAD SHX Text

2" FD-M

AutoCAD SHX Text P103

AutoCAD SHX Text

3" FD-T

AutoCAD SHX Text P411

AutoCAD SHX Text

3" FD-R

AutoCAD SHX Text

2" FD-M

AutoCAD SHX Text P519

AutoCAD SHX Text P403

AutoCAD SHX Text P505

AutoCAD SHX Text P502

AutoCAD SHX Text P505

AutoCAD SHX Text P403

AutoCAD SHX Text

3" FD-L

AutoCAD SHX Text N-2

AutoCAD SHX Text J-2

AutoCAD SHX Text P505

AutoCAD SHX Text Y-2

AutoCAD SHX Text P403

AutoCAD SHX Text P505

AutoCAD SHX Text P103

AutoCAD SHX Text P103

AutoCAD SHX Text P201

AutoCAD SHX Text P402

AutoCAD SHX Text P402

AutoCAD SHX Text P402

AutoCAD SHX Text P402

AutoCAD SHX Text P402

AutoCAD SHX Text P402

AutoCAD SHX Text P103

AutoCAD SHX Text P103

AutoCAD SHX Text P103

AutoCAD SHX Text

2" FD-C

AutoCAD SHX Text P701

AutoCAD SHX Text

2" FD-C

AutoCAD SHX Text P702

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text P502

AutoCAD SHX Text P103

AutoCAD SHX Text P414

AutoCAD SHX Text P609

AutoCAD SHX Text P403

AutoCAD SHX Text F4

AutoCAD SHX Text P103

AutoCAD SHX Text P414

AutoCAD SHX Text P403

AutoCAD SHX Text P702

AutoCAD SHX Text P103

AutoCAD SHX Text P401

AutoCAD SHX Text P702

AutoCAD SHX Text P403

AutoCAD SHX Text P103

AutoCAD SHX Text P401

AutoCAD SHX Text P702

AutoCAD SHX Text P401

AutoCAD SHX Text P401

AutoCAD SHX Text P103A

AutoCAD SHX Text P201

AutoCAD SHX Text P103A

AutoCAD SHX Text P103A

AutoCAD SHX Text P702

AutoCAD SHX Text P103

AutoCAD SHX Text P401

AutoCAD SHX Text X

AutoCAD SHX Text P403

AutoCAD SHX Text P505

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text P701

AutoCAD SHX Text P104

AutoCAD SHX Text P414

AutoCAD SHX Text P403

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

3RD FLOOR

AutoCAD SHX Text

4TH FLOOR

AutoCAD SHX Text

5TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

2ND FLOOR

AutoCAD SHX Text

6TH FLOOR

AutoCAD SHX Text

LINETYPE LEGEND

RISER DIAGRAM - STACK 4F

GI-12

BVG MMF

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

321 4 5 6 7 8 9 10

Revisions: Date:

BID DOCUMENTS

FOR CONSTRUCTION

REPLACE PATIENT CARE SANITARY

PIPE IN INTERSTITIAL SPACE

3RD AND 5TH FLOOR

583-23-102

03-01-2024 FULLY SPRINKLERED Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Submission Project TitleDrawing Title

INDIANAPOLIS VA MEDICAL CENTER

1481 W. 10TH STREET, INDIANAPOLIS, IN 46202

Project LocationApproved: Project Director

INDIANAPOLIS

VA

MEDICAL

CENTER

ARCHITECT/ENGINEER OF RECORDCONSULTANT

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text P103

AutoCAD SHX Text P505

AutoCAD SHX Text P401

AutoCAD SHX Text T22E

AutoCAD SHX Text T-1G

AutoCAD SHX Text T18C

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text P811

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text P505

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text T18C

AutoCAD SHX Text P403

AutoCAD SHX Text

2" FD-M

AutoCAD SHX Text P502

AutoCAD SHX Text T-1G

AutoCAD SHX Text T22E

AutoCAD SHX Text P103

AutoCAD SHX Text P103

AutoCAD SHX Text P414

AutoCAD SHX Text P414

AutoCAD SHX Text P403

AutoCAD SHX Text

2" FD-C

AutoCAD SHX Text P104

AutoCAD SHX Text P414

AutoCAD SHX Text P403

AutoCAD SHX Text P414

AutoCAD SHX Text P403

AutoCAD SHX Text

2" FD-C

AutoCAD SHX Text P403

AutoCAD SHX Text P104

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text P103

AutoCAD SHX Text P414

AutoCAD SHX Text P403

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text P403

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text P811

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text P502

AutoCAD SHX Text P403

AutoCAD SHX Text P811

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text P403

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text Y-2

AutoCAD SHX Text T-1G

AutoCAD SHX Text

2" FD-M

AutoCAD SHX Text

2" FD-M

AutoCAD SHX Text P403

AutoCAD SHX Text P402

AutoCAD SHX Text P103

AutoCAD SHX Text P403

AutoCAD SHX Text T18C

AutoCAD SHX Text P403

AutoCAD SHX Text P403

AutoCAD SHX Text P414

AutoCAD SHX Text P403

AutoCAD SHX Text P103

AutoCAD SHX Text P505

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text

MOD LAV

AutoCAD SHX Text

M…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .