Attachment - I - Combined Drawings.pdf
PDF 3 MB Posted
- Attached to
- Z1DA--Remodel Building 114 610-22-518
- Solicitation number
- 36C25022B0034
About this file
This set of construction drawings and related federal contract opportunity provide details for the remodeling of Building 114 at the Veterans Health Administration facility in Marion, Indiana. The drawings include demolition plans, architectural plans, door and window schedules, and specifications for electrical, mechanical, and plumbing work. The project involves asbestos abatement, installation of new walls, flooring, ceilings, doors, windows, and mechanical and plumbing systems. The related solicitation is for the remodeling work and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The solicitation number is 36C25022B0034 and is titled "Z1DA--Remodel Building 114 610-22-518."
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25022B0034 0001.docx | DOCX document | |
| 21-100M - 5 of 6 Revised.pdf | ||
| Wage Determination.pdf | ||
| RFI 3.pdf | ||
| RFI 1.pdf | ||
| RFI 2.pdf | ||
| Attachment - IV - Wage Determination.pdf | ||
| Attachment - II - Combined Specs.pdf | ||
| Attachment - III - Contractor EMR Certification Form.docx | DOCX document | |
| 36C25022B0034.docx | DOCX document | |
| Attachment - V - RFI Form Solicitaton.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Approved: Medical Center Director Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot
B
A
C
D
E th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
D
U N
I T E D S TAT ES OF A M ERIC
A
SR
IA
FF
A
SNARETEVFOTNEMTRAPE
Approved: Medical Center Assistant Director
Approved: Engineering Department
Drawing Title
F
Marion, IN
C. Hasty
NORTHERN INDIANA HEALTH CARE SYSTEMS,
VETERANS ADMINISTRATION
1700 E. 38TH. STREET MARION, INDIANA 46953
PROJECT # 610-22-518
REMODEL BUILDING 114
Michael E. Hershman
Zachary I. McDaniel
21-100M 1 605-18-2021 Z.McDaniel
Cover Sheet Anthony Colon
Remodel Building 114 610-22-518
M
IS
SI
SS
IN
EW
A
RI
VE
R
MISSISSINEWA RIVER
NATIO
NAL CEM
ETARY
NATIONAL CEMETARY
N
ATIO
N
AL C
EM
ETAR
Y
65 114
N
ATIO
N
AL C
EM
ETAR
Y
COMPOUND
MATERIAL
COMPOUND
51 52
(2) 30,000
GAL. U.S.T.
T516
9 8
1301 / 733002 / 72
3001 / 69
ES / 3004
MB / 3
G01
3003 / 83
T504
E 38TH ST.
E 38TH ST. E 38TH ST. E 38TH ST.
S LIN
C
O
LN
BLVD
41 97
177 49
HA7
HA8
R.T.
HA9
HA1
DIESEL
HA6
HA3
HA4
WATER ST.
WATER ST.
M
CM
AH
O
N
AV
E.
CO
TT
AG
E
RD
CO
TT
AG
E
RD
BLACK RD.
WATER ST.
RAILROAD AVE.
BL
AC
K
RD
BL
AC
K
RD
EA
RTH
FI
LL
EA
RTH
FI
LL
HA2 HA5
HA10
HA11
GRAY
R
D.
G R
AY
R
D
. STEELE CIRCLE
MCMAHON AVE.
MAIN ENTRANCE
MCMAHON AVE.
IN
DIA
NA
AV
E.
INDIANA AVE.
INDIANA AVE.
STEELE CIRCLE
BLACK RD.
BLACK RD. BLACK RD.
BLACK RD.
BL
AC
K R
D
BL
AC
K
RD
BLACK RD.
BLACK RD.
G R
AY
R
D
ORCHARD AVE.
ORCHARD AVE.
ORCHARD AVE.
RIVER RD.
O
RCHARD AVE.
NELSON ST.
NELSON ST.
S LIN
C
O
LN
BLVD
S LIN
C
O
LN
BLVD
CHAPMAN AVE.
CHAPMAN AVE.
CHAPMAN AVE.
M
ISSISSIN
EW
A R
D
KUDER PL. KUDER PL.
NATIONAL CEMETERY
MAIN ENTRANCE
HYDE RD.
H
YD
E R D
H
YD
E R D
M
AR
IO
N
R D
M
AR
IO
N
R D
HYD
E
RD.
IR
W
IN
D
R
IR
W
IN
D
R
CHAPMAN AVE.
CHAPMAN AVE.
CHAPM
AN AVE.
STEELE C
IR
C
LE
NELSON ST.
SHORT ST.
M
EC
H
AN
IC
S AVE.
WATER ST.
SH
O
RT
S
T.
FLO
W
ER ST.
FLO
W
ER
ST.
RIVER RD.
RAILROAD AVE.
M
EC
H
AN
IC
S AVE.
VINE RD.
VINE RD.
DOCTOR'S RD.
D O
C
TO
R 'S R
D
D
IX R
D
D
IX R
D
PROJECT LOCATION
AutoCAD SHX Text N
GENERAL NOTES:
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot
B
A
C
D
E th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
D
U N
I T E D S TAT ES OF A M ERIC
A
SR
IA
FF
A
SNARETEVFOTNEMTRAPE
Approved: Engineering Department
Drawing Title
F
Marion, IN
Michael E. Hershman
Zachary I. McDaniel
2 6
General Notes / Asbestos abatementApproved: Medical Center Assistant Director
C. Hasty
21-100M 05-18-2021 Z.McDaniel
Anthony Colon
Remodel Building 114 610-22-518
103A
102101
101B
101A
103A
102101
101B
101A
Window Caulk (Contains Asbestos)
Floor Tile And Mastic (Contains Asbestos)
ASBESTOS ABATEMENT:
AutoCAD SHX Text N
AutoCAD SHX Text N
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot
B
A
C
D
E th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
D
U N
I T E D S TAT ES OF A M ERIC
A
SR
IA
FF
A
SNARETEVFOTNEMTRAPE
Approved: Engineering Department
Drawing Title
F
Marion, IN
Michael E. Hershman
Zachary I. McDaniel
3 6
Demolition Approved: Medical Center Assistant Director
C. Hasty
21-100M 05-18-2021 Z.McDaniel
Anthony Colon
Remodel Building 114 610-22-518
103A
102101
101B
101A
5 5
5 4
4 41
DEMOLITION CALLOUTS
1. REMOVE WINDOW AND FRAME IN ITS ENTIRETY (TYP).
2. REMOVE DOOR SYSTEM AND HARDWARE IN ITS ENTIRETY (TYP).
3. REMOVE COMMERCIAL CONSOLE WATER SOURCE HEAT PUMP IN ITS ENTIRETY (TYP).
4. REMOVE ALL ELECTRICAL PANELS, WIRE, CONDUIT, OUTLETS, AND SWITCHES IN THEIR ENTIRETY (TYP)
5. REMOVE PLUMBING FIXTURES, SUPPLY LINES, AND VALVES, IN THEIR ENTIRETY (TYP)
6. REMOVE WALL IN ITS ENTIRETY (TYP)
7. REMOVE SOFFIT AND FASCIA IN ITS ENTIRETY (TYP)
8. REMOVE ROOFING TO INCLUDE SHINGLES, UNDERLAY, DECKING, VENTS, RIDGE CAP IN ITS ENTIRETY (TYP)
9. REMOVE GUTTERS AND DOWN SPOUTS IN THEIR ENTIRETY (TYP)
10.REMOVE VINYL COMPOSITION TILE (VCT) INCLUDING ASBESTOS CONTAINING MATERIAL (ACM) MASTIC.
11.REMOVE CEILING AND LIGHTING IN ITS ENTIRETY.
12.REMOVE AND CAP ALL DRAINS. REMOVE ALL DRAIN PIPES AND SUPPLY LINES IN THEIR ENTIRETY. FILL DRAINS
BELOW GRADE WITH GROUT.
13.REMOVE DRYWALL IN ITS ENTIRETY
14.REMOVE, PROTECT, SAVE, AND STORE ALL FIRE ALARM DEVICES FOR FUTURE USE.
Walls to be demolished
Legend
AutoCAD SHX Text N
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot
B
A
C
D
E th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
D
U N
I T E D S TAT ES OF A M ERIC
A
SR
IA
FF
A
SNARETEVFOTNEMTRAPE
Approved: Engineering Department
Drawing Title
F
Marion, IN
Michael E. Hershman
Zachary I. McDaniel
4 6
Architectural / Reflected Ceiling Approved: Medical Center Assistant Director
C. Hasty
21-100M 05-18-2021 Z.McDaniel
Anthony Colon
Remodel Building 114 610-22-518
LOAD BEARING
ARCHITECTURAL CALLOUTS
102101
101A
101B
5 2
LOAD BEARING
REFLECTED CEILING PLAN NOTES
1. PREP AND PAINT ALL LINTELS ABOVE WINDOWS (TWO COATS). INSTALL NEW WINDOW AND FRAME IN EXISTING OPENING. FIELD VERIFY
OPENING SIZE PRIOR TO ORDERING WINDOWS. REFER TO WINDOW SCHEDULE SPECIFICATIONS.
2. INSTALL NEW DOOR AND FRAME IN EXISTING OPENING. FIELD VERIFY OPENING SIZE PRIOR TO ORDERING DOOR. REFER TO DOOR
SCHEDULE AND SPECIFICATIONS.
3. INSTALL LVT FLOORING AND VINYL COVE BASE, COLOR TO BE SUBMITTED TO COR FOR SELECTION. SEE SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
4. CONTRACTOR TO PROVIDE AND INSTALL NEW CONSTRUCTION WALLS. NEW CONSTRUCTION WALLS ARE TO BE ASSEMBLED WITH 20 GAUGE GALVANIZED STEEL STUDS COVERED IN 5/8" GYPSUM BOARD. PRIME AND PAINT INTERIOR WALLS. (TWO COATS).WET
5. CONTRACTOR TO PROVIDE AND INSTALL FURRING STRIPS TO EXISTING MASONRY WALLS AND INSTALL 5/8" GYPSUM BOARD.
6. INSTALL UPPER AND LOWER CASE WORK. VERIFY OPENING SIZE PRIOR TO ORDERING. REFER TO CASEWORK SCHEDULE AND
SPECIFICATIONS.
7. ADD BULKHEAD, DROP DOWN SIX INCHES FROM CEILING.
Legend
Bulkhead New construction walls
13. CONTRACTOR TO PROVIDE AND INSTALL LAY IN 2' X 2' ACOUSTICAL CEILING TILE WITH DXL 15/16" SUSPENSION SYSTEM GRID. SEE SPECIFICATIONS FOR MORE INFORMATION. ALL TILES SHALL BE 2' X 2' X 5/8" CLASS A. TYP.
14. CONTRACTOR TO PROVIDE AND INSTALL NEW 2' X4' LED LIGHTING FIXTURE, SEE SPECIFICATIONS. (TYP)
15. CONTRACTOR TO PROVIDE AND INSTALL NEW AIR TERMINAL DIFFUSER, SEE SPECIFICATIONS. (TYP)
16. CONTRACTOR TO PROVIDE AND INSTALL AN UNDER CABINET LED STRIP LIGHT OVER SINK.
103A
2' X 4' LED Lighting Air Terminal Diffuser
Restroom Exhaust Vent
AutoCAD SHX Text N
AutoCAD SHX Text N
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot
B
A
C
D
E th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
D
U N
I T E D S TAT ES OF A M ERIC
A
SR
IA
FF
A
SNARETEVFOTNEMTRAPE
Approved: Engineering Department
Drawing Title
F
Marion, IN
Michael E. Hershman
Zachary I. McDaniel
5 6
Doors and Windows Approved: Medical Center Assistant Director
C. Hasty
21-100M 05-18-2021 Z.McDaniel
Anthony Colon
Remodel Building 114 610-22-518
LOAD BEARING
DOOR TYPE:FRAME TYPE:
2"
2"
2"
A
WINDOW TYPE:
DC
40"
2"
2"
36"
EA B
7 7
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot
B
A
C
D
E th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
D
U N
I T E D S TAT ES OF A M ERIC
A
SR
IA
FF
A
SNARETEVFOTNEMTRAPE
Approved: Engineering Department
Drawing Title
F
Marion, IN
Michael E. Hershman
Zachary I. McDaniel
6 6
Electrical, Mechanical, and PlumbingApproved: Medical Center Assistant Director
C. Hasty
21-100M 05-18-2021 Z.McDaniel
Anthony Colon
Remodel Building 114 610-22-518
LOAD BEARING
LOAD BEARING
LOAD BEARING
Ø5'6"
ELECTICAL PLAN NOTES
PLUMBING PLAN NOTES
Legend
MECHANICAL PLAN NOTES
9. CONTRACTOR TO PROVIDE AND INSTALL NEW CLIMATE MASTER 2 TON (OR EQUAL TO) GEOTHERMAL HEATING AND COOLING UNIT, WITH ALTERNATE BACK UP 7KV ELECTRIC HEATING.
10. CONTRACTOR TO PROVIDE AND INSTALL AIR HANDLER PLENUM, TRUNK, AND ALL DUCT WORK. SEE SPECIFICATIONS. (TYP)
11. CONTRACTOR TO PROVIDE AND INSTALL CEILING DIFFUSERS, SEE SPECIFICATIONS. (TYP) 12.CONTRACTOR TO INSTALL 12" X 12" EXHAUST VENT IN RESTROOM, VENTED THROUGH ROOF, AND ACTIVATED BY MOTION SENSOR
SWITCH.
13.CONTRACTOR TO PROVIDE AND INSTALL A 10" X10" FRESH AIR INLET THROUGH THE WALL.
1. CONTRACTOR TO PROVIDE AND INSTALL TWO GANG ELECTRIC RECEPTACLES, WIRING, SWITCHES, AND CONDUENT. (TYP)
2. CONTRACTOR TO PROVIDE AND INSTALL DATA RECEPTACLES AND CAT 6 WIRING. SEE SPECIFICATIONS. (TYP)
3. CONTRACTOR TO PROVIDE AND INSTALL ELECTRICAL SERVICE ENTRANCE, 200 AMP PANEL, AND BEAKERS.
4. CONTRACTOR TO PROVIDE AND INSTALL FIRE ALARM SYSTEM.
5. CONTRACTOR TO PROVIDE AND INSTALL CAMERAS.
6. CONTRACTOR TO PROVIDE AND INSTALL EXTERIOR LIGHTING.
7. CONTRACTOR TO INSTALL MOTION ACTIVATED LIGHT SWITCH WITH MANUAL OVERRIDE. RESTROOM EXHAUST VENT IS TO BE
CONNECTED TO MOTION ACTIVATED LIGHT SWITCH WITH MANUAL OVERRIDE.
8. CONTRACTOR TO PROVIDE AND INSTALL LIGHT SWITCH.
Ø5'6"
14.CONTRACTOR TO RELOCATE DRAINS TO NEW RESTROOM AREA AND TIE INTO EXISTING SEWER DRAIN.
15.CONTRACTOR TO PROVIDE AND INSTALL TOILET WITH AUTOMATIC FLUSH VALVE.
16.CONTRACTOR TO PROVIDE AND INSTALL URINAL WITH AUTOMATIC FLUSH VALVE.
17.CONTRACTOR TO PROVIDE AND INSTALL RESTROOM SINK , ALL FIXTURES, AND DRAINS.
18.CONTRACTOR TO PROVIDE AND INSTALL KITCHEN SINK , ALL FIXTURES, AND DRAINS.
19.CONTRACTOR TO PROVIDE AND INSTALL WATER FOUNTAIN WITH WATER BOTTLE FILL STATION.
20.CONTRACTOR TO PROVIDE AND INSTALL 6 GAL ELECTRIC WATER HEATER.
21.CONTRACTOR TO CAP EXISTING DRAIN BELOW GRADE AND PRESERVE EXISTING CLEAN OUT.
22.EXISTING CLEAN OUT TO REMAIN FUNCTIONAL.
23.CONTRACTOR TO INSTALL NEW HOT AND COLD WATER SUPPLY LINES IN NEW WET WALL LOCATION.
24.CONTRACTOR TO PROVIDE AND INSTALL OUTSIDE FROST FREE HOSE BIB.
VTR
Water heater
Sewer Cleanout
ADA Compliant Radius
Ø5'6" s
A s s
Switch
Data drop two gang outlet s s
A s A s
As Automatic Motion Switch
AutoCAD SHX Text N
AutoCAD SHX Text N
| 610-22-518 - 21-100M - 1 of 6 |
| Sheets and Views |
| Model |
| 610-22-518 - 21-100M - 2 of 6 |
| Sheets and Views |
| Model |
| 610-22-518 - 21-100M - 3 of 6 |
| Sheets and Views |
| Model |
| 610-22-518 - 21-100M - 4 of 6 |
| Sheets and Views |
| Model |
| 610-22-518 - 21-100M - 5 of 6 |
| Sheets and Views |
| Model |
| 610-22-518 - 21-100M - 6 of 6 |
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .