Attachment F - E Energy QAPS.pdf

PDF 17 MB Posted

Attached to
1. 6A Canada North Warning System Program Federal contract opportunity
Solicitation number
SPE605-21-R-0201
Issued by
Defense Logistics Agency Energy

View the file

Other files for this federal contract opportunity

Other files attached to 1. 6A Canada North Warning System Program, newest first.
File Type Posted
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 00001.pdf PDF
Attachment G QCP.pdf PDF
Attachment C - PCS OET Vendor Guide.pdf PDF
Attachment D - AMPS Role Guide.pdf PDF
Attachment B - Requesting The OET Vendor Role in AMPS Guide.pdf PDF
Final SPE60521R0201.pdf PDF
Attachment E - ENERGY QAP C16.09-1 JA1 (CANADA) (JUL 2015).pdf PDF
Attachment A - Base Reference Price and Escalator.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

PDF (DLA)DLA FORM 1889, OCT 2011

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET 1 OF 2PREVIOUS EDITION IS USABLE Add Continuation Page

Print Form Email Form Clear Export Data Import Data About Check for Newer Version Contact Us

REV DESCRIPTION DATE APPROVED

NEW DLA ENERGY QAP E40.01

REVISIONS

QAP E40.01 MATERIAL INSPECTION AND RECEIVING REPORT (MIRR)/WIDE AREA WORKFLOW

(WAWF) ENERGY RECEIVING REPORT (ERR) (BULK FUEL/DIRECT DELIVERY AVIATION FUEL).

Required in all bulk fuel solicitations/contracts and direct delivery aviation fuel solicitations/contracts. DLA FORM 1889 dated .

QAP E40.01 MATERIAL INSPECTION AND RECEIVING REPORT (MIRR)/WIDE AREA WORKFLOW

(WAWF) ENERGY RECEIVING REPORT (ERR) (BULK FUEL/DIRECT DELIVERY AVIATION FUEL)

(DLA ENERGY JUL 2014)

(a) The requirements listed in paragraphs (b) and (c) are in addition to the other Wide Area Workflow (WAWF) requirements included in this contract. Whenever access to the WAWF system is limited or not available (i.e., during an extended loss of internet connectivity), the Contractor shall notify the Contracting Officer and request permission to submit documents manually until the WAWF system is again available for use. Manual documentation shall be completed in accordance with DFARS Appendix F.

(b) Test reports shall be entered into the WAWF system by means of the Statement of Quality tab.

Instructions for entering test information into the Statement of Quality Tab can be found in the WAWF Vendor Energy Receiving Report (ERR)/Combo Desktop Reference which can be downloaded at https://wawftraining.eb.mil/xhtml/ unauth/web/wbt/wawfra/vendor/VendorIndex.xhtml.

(c) Use the guidelines below for the submission of fuel quality testing data and supporting documentation for each ERR/Combo.

(1) MARINE SHIPMENTS. Submit a completed ERR/Combo and test reports via the Statement of Quality tab for all products shipped. If more than one shipping tank was used for the lift, a complete laboratory analysis for each shipping tank must be entered in the Statement of Quality tab. Also, clearly indicate the quantity of product shipped from each tank in the block titled “Quantity shipped from this tank”. Upload scanned copies, via the Attachments tab, of quantity determination documents and other shipping documents requested by the Quality Assurance Representative (QAR).

(2) PIPELINE SHIPMENTS. Submit a completed ERR/Combo and input the test results via the Statement of Quality tab for the total quantity of product shipped from each shipping tank used to fill the order. If more than one shipping tank was used for the shipment, a complete laboratory analysis for each shipping tank must be entered in the Statement of Quality tab. Also, clearly indicate the quantity of product shipped from each tank in the block titled “Quantity shipped from this tank”. Upload scanned copies, via the Attachments tab, of quantity determination documents and other shipping documents requested by the QAR.

(3) TRUCK, RAIL CAR AND INTERMODAL CONTAINER SHIPMENTS. When loading from source tank has finished for each shipment, submit a completed ERR/Combo and input test results via the Statement of Quality tab, for product received from that source tank. If only one shipment is made from a shipping tank, enter that quantity in the “Quantity shipped from this tank” block located on the Statement of Quality tab. If more than one shipment is made from the same shipping tank, the “Quantity shipped from this tank” block can either be left blank or be annotated with the quantity shipped during each individual shipment. Upload scanned copies, via the Attachments tab, of quantity determination documents and other shipping documents requested by the QAR.

DISTRIBUTION

STATEMENT - A

APPROVED FOR

PUBLIC RELEASE

DISTRIBUTION IS

"UNLIMITED"

DATE

07/08/2014

APPROVED BY

07/08/2014

REVIEWED BY

07/07/2014

PREPARED BY

DRAWING NUMBERSCALE

CODE ID NO.

52838

SIZE

NSN

MULTIPLE

ITEM

DLA ENERGY QAP E40.01

DLA Land & Maritime DLA Troop Support DLA Aviation clear

DEFENSE LOGISTICS AGENCY ENERGY

8725 JOHN J. KINGMAN RD

FORT BELVOIR, VIRGINIA 22060-6222

DLA Energy

SHEET 2 OF 2PREVIOUS EDITION IS USABLE Add Continuation Page

NEW DLA ENERGY QAP E40.01

THIS PAGE INTENTIONALLY LEFT BLANK

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION

(SQAP)

DRAWING NUMBERSCALE CODE ID NO.

PDF (DLA)

DLA FORM 1889, OCT 2011

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev: NEW description: DLA ENERGY QAP E40.01 revdate:

revapproved:

revcomments:

apprdate: 07/08/2014 apprBy:

reviewdate: 2014-07-08 revBy:

prepdateA: 2014-07-07 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: DLA ENERGY QAP E40.01 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN RD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 1.00000000

SHEET 1 OF 11PREVIOUS EDITION IS USABLE Add Continuation Page

ENERGY QAP E1 September 2013

E1 CONTRACTOR INSPECTION RESPONSIBILITIES

(a) This contract provision applies to:

(1) All aviation fuel, lubricating oil, and additive shipments.

(2) All Bulk and Posts, Camps, and Stations non-aviation fuel shipments via pipeline or waterborne transport.

(b) QUALITY CONTROL PLAN.

(1) The Contractor is required to provide and maintain an inspection system, and a written description (Quality Control Plan

(QCP)) of that system, acceptable to the Government. The Contractor has the option to provide and maintain an inspection system that, as a minimum, incorporates the requirements of ISO9001, Quality Management Systems. If the Contractor chooses to comply with the ISO9001 quality system requirements and format, all the specific Quality Assurance Provisions of this contract must be included in the resulting ISO9001 document that will serve as the QCP. A copy of the QCP, in English, shall be presented to the Government Quality Assurance Representative (QAR) for their review and acceptance prior to commencement of production or services. An acceptable QCP is required prior to Government inspection and acceptance of supplies or services. The QCP shall be reviewed and updated when deemed necessary by the Contractor or the Government, to include changes necessary to prevent the recurrence of quality problems. The Contractor must sign and date the original QCP, as well as each subsequent revision. Revisions shall also be presented to the QAR for review and acceptance prior to implementation. When acceptable to the Government, the original QCP, and any revisions, shall be signed and dated by the QAR.

(2) The Contractor shall require subcontractors to provide and maintain inspection systems adhere to all the requirements in this contract provision.

(3) The QCP shall include the identification of key operational positions, a schematic diagram of plant facilities pertinent to the inspection system, indicating all inspection points, and a description of the following operations related to the supplies or services to be furnished under the contract:

(i) RECEIVING, BLENDING AND COMPOUNDING. Procedures used to ensure the quality of additives blended into product supplied under this contract. Procedures to identify and ensure the quality of component base stocks used to produce finished product.

Procedures to be used for adding, prior to batching, all required additives at all locations. When procedures for in-line blending of non-aviation products in accordance with the IN-LINE BLENDING OF NON-AVIATION PETROLEUM PRODUCTS contract provision are used, the QCP will provide for establishing blend ratios, and identify the responsible personnel within the Contractor's organization authorized to establish the blend ratios. When line injection of additives is required by the contract, the QCP will provide procedures for proportionately injecting additives throughout the entire loading process to ensure the additive is homogeneously blended into the product, as well as procedures for maintaining records evidencing the homogeneous blending of all line injected additives. In addition to the testing in (iii) below, a laboratory hand blend of jet fuel with all additives required by the contract shall be tested, prior to shipment, to verify compliance with the specification;

(ii) SAMPLING. Procedures for sampling additives, blend tanks, shipping tanks, lines, and conveyances/containers in accordance with API Manual of Petroleum Measurement Standards (MPMS), Chapter 8, Section 1, (ASTM D 4057) Manual Sampling of Petroleum and Petroleum Products, and/or Section 2, (ASTM D 4177) Automatic Sampling of Liquid Petroleum and Petroleum Products.

Procedures include sample location, frequency, quantity, and retention. For all tanker, barge, and pipeline shipments, a flow-proportional sample taken in accordance with MPMS Chapter 8, Section 2, is preferred at the custody transfer point. However, manual samples taken in accordance with MPMS Chapter 8, Section 1 are acceptable provided that they are taken hourly throughout the shipment and that the quantity of the composite sample meets the requirements in Table II of this contract provision. See Table I, Minimum Sampling and Testing Requirements, and Table II, Sample Retention;

(iii) TESTING. Types of test series and individual test methods/procedures to be performed on samples taken from each location identified in (ii) above. See Table I, Minimum Sampling and Testing Requirements, and Table III, Definitions of Test Series;

(iv) CALIBRATION. Program for testing and measuring equipment in accordance with ISO 10012, Measurement Manage

05/05/2014

DATEREVIEWED BY

04/14/2014

1:1

A

ENERGY QAP E1

SHEET 2 OF 11PREVIOUS EDITION IS USABLE Add Continuation Page

Systems - Requirements for Measurement Processes and Measuring Equipment, or equivalent local regulation, as appropriate;

and, a program for meters used to determine quantity complying with the API MPMS, Chapters 4, 5, and 6, or equivalent foreign standard. For items not covered by API, ASTM, or IP publications, the applicable manufacturer's recommended calibration method(s), outlined in the applicable industry publication, shall be used if acceptable to the Government;

(v) STORAGE AND HANDLING. Procedures for quality/quantity determination. Includes a description of storage and handling equipment, such as tanks, lines, valves, and manifolds; identification of dedicated/common product systems, including description of line segregation and controls to assure capability for proper gauging, sampling, draining of water, filtration, circulation, and drying; and identification of any other process/system used in maintaining product integrity during storage and handling;

(vi) LOADING AND SHIPPING - GENERAL. Procedures for product movement and related quality/quantity checks from shipping tank(s) to custody transfer point (CTP). Description of transfer system from shipping tank to CTP. A dedicated system, including lines, pumps, loading arms, and hoses, is preferred, but an isolated common system incorporating blind flanges, spectacle plates, or double valves between systems is acceptable. An isolated common system using single valves designed to ensure positive isolation, such as twin seal single valves, are also acceptable. Systems with single valve (other than twin seal) isolation require specific procedures be included in the QCP to ensure product integrity prior to the CTP. When single valves (other than twin seal) are present in the system, the Contractor shall provide their quality control procedures, from the first single valve to the CTP, at time of bid to the Contracting Officer for a determination of acceptability. Procedures for conditioning and testing of isolated systems that last carried a product other than that intended for movement under this contract. For in-line blending of non-aviation products, where approved in this contract, requirements must comply with the IN-LINE BLENDING OF NONAVIATION PETROLEUM PRODUCTS contract provision.

(vii) LOADING AND SHIPPING - TANK CARS, TANK TRUCKS, AND INTERMODAL CONTAINERS. For direct deliveries using Contractor-supplied tank cars and tank trucks in dedicated same grade aviation fuel service, refer to the section of API 1595 entitled “Loading of Road/Rail Cars” for loading and shipping procedures. All other tank car, tank truck, and intermodal container loadings shall be in accordance with the following procedures: Confirm all compartments have been prepared in accordance with Table IV, Conversion Chart for Tank Cars, Tank Trucks, and Intermodal Containers, below. Whenever possible, ensure the same preparation procedures used for compartments are applied to hoses, manifolds, etc. Ensure that conveyances carrying lubricating oil are dry and free from loose rust, scale, and dirt. Provide for investigation of discrepancies in either recorded quality or quantity. When required by the contract, seal conveyance and record seal numbers on the shipping document. Strainers and filters shall be located as near the loading or filling point as practicable and shall be used as outlined below for all deliveries except deliveries into tanker, barge, or pipeline.

(A) All aviation fuel shall be passed through strainers of 60 mesh or finer screen;

(B) All lubricating oil products, including preservatives, having a kinematic viscosity of 20.0 centistokes or less at 100 degrees Fahrenheit shall be passed through a 100 mesh or finer screen;

(C) All lubricating oil products, including preservatives, having a kinematic viscosity greater than 20.0 centistokes at

100 degrees Fahrenheit, but less than 22.0 centistokes at 210 degrees Fahrenheit, shall be passed through a 60 mesh or finer screen; and

(D) The Contractor shall furnish and periodically inspect strainers and filters pursuant to this paragraph to determine condition and perform maintenance as necessary, keeping a written record thereof.

(viii) LOADING AND SHIPPING - TANKERS AND BARGES.

(A) For f.o.b. destination Contractor-supplied tankers/barges. Procedures for the preparation of vessel cargo systems, in accordance with Energy Institute (EI) HM 50, Guidelines for the Cleaning of Tanks and Lines for Marine Tank Vessels Carrying Petroleum and Refined Products, that ensure the vessel is suitable to load the intended product(s).Particular attention should be given to vessels that previously carried a Fatty Acid Methyl Ester (FAME) cargo. As a minimum, f.o.b. destination Contractors must ensure that all cargo systems on the vessel intended for loading product under this contract, to include tanks, lines, manifolds, and pumps, are washed, gas freed, and inspected. In the event a solvent de-greaser is utilized in the tank preparation process, a minimum of two rinses must be performed by the vessel prior to loading Aviation Turbine Fuel. Vessels that will be carrying JP8 will be allowed to load without cleaning based upon the following criteria: the last cargo prior to loading JP-8 is Jet A/A1, and the second and third to last cargoes were clean middle distillate or lighter petroleum products (no black oils, lubricating oils, vegetable oils, palm oils, biodiesel with FAME content greater than or equal to 15 % or other similar products). The vessel will drop all lines and strip dry all cargo tanks of the previously carried Jet A/Jet A1 prior to loading JP-8. These procedures, and others deemed necessary by the Contractor, shall be included to ensure that the product meets the specification requirements at the CTP.

SHEET 3 OF 11PREVIOUS EDITION IS USABLE Add Continuation Page

(B) For f.o.b. origin Government-supplied tankers/barges. Procedures for maintaining a time log of all significant events/delays including vessel notice of readiness, vessel arrival, mooring, vessel deballasting, inerting and conditioning of cargo tanks, inspections, hose connections and disconnections, starts, stops, vessel release, or any other event that affects laytime of the vessel. Procedures for assuring condition of loading line (full of tested product, all air bled, and pressure packed) and gauging shore tanks, both before and after loading.

In the event an automated metering system is to be used as the means of shore quantity determination, manual gauges of all storage tanks designated for shipment shall be taken prior to commencement of loading. Procedures for preload discussion between Contractor, vessel, and QAR to include, but not be limited to, prior two cargoes, cleaning procedures, loading plan, loading rates, sampling requirements, and after loading sampling and gauging. [Prior to loading - gauge, sample, and test intransit cargoes designated for load on top. Gauge and sample (1 gallon) any other product on board, except for JPTS, and retain those samples.] All cargo quantities shall be calculated and volume corrected both before and after loading. Procedures for commencement of loading into one tank (up to 3 feet), then switching to at most two other vessel tanks while first-in sampling and testing is being accomplished (Table I). Procedures for the transportation of samples from the vessel to the testing facility.

Monitoring the loading (including line blending and additive injection) from source to vessel, investigating irregularities immediately and stopping loading, if necessary. Procedures for investigating discrepancies in quality (mandated if off-specification or out of testing tolerance) and quantity (mandated if shore to ship variance is in excess of the following: 0.2% (0.002) for cargos not requiring cleaning, gas freeing, or drop/strip; 0.3% (0.003) for cargos requiring drop/strip; or 0.5% (0.005) for cargos requiring cleaning and gas freeing, or figures are suspect) on loaded conveyance.

(C) For both f.o.b. origin and destination tankers/barges. Procedures for immediately notifying the QAR when irregularities occur or are suspected, and on all occasions when loading is interrupted. Authority to release a Government-furnished vessel rests with the Government QAR after compliance and completion by the Contractor of all required operations, including the preparation of the DD Form 250-1.

(ix) RECORDS AND REPORTS. Procedures for completing and distributing required documentation both prior to and after the release of the vessel. Documentation shall include, as a minimum, test reports for all products and additives, additive blending and/or injection records, vessel notice of readiness, customs documents, bills of lading, vessel ullage reports, and the DD Form 250/DD Form 250-1 and continuation sheet(s) (or the Paperless Ordering and Receipt Transaction System [PORTS] or equivalent). Other documentation may be required on an as needed basis, such as vessel port logs, calibration records, and results of quality or quantity discrepancy investigations. These records and reports will include by whom, where, and how they were prepared, as well as retention information. The DD Form 250-1 and DD Form 250-1 continuation sheet(s) will be signed by the Contractor and the vessel representative in the appropriate blocks before presenting them to the QAR for signature. The DD Form 250 and DD Form 250-1 shall identify the type, brand name, and amount of all additive(s).

(x) CORRECTIVE ACTION. Actions to be followed to effect correction of any deficiency affecting product quality or quantity, such as handling of off-specification product (waivers, conveyance rejections, etc.). The corrective action procedures shall include notification of the QAR.

(4) The QCP shall identify one individual to serve as a point of contact for quality/quantity matters relating to the inspection system description in the plan.

(5) The Contractor is responsible for all inspection systems, QCPs, and product quality and quantity.

(c) The Contractor shall perform all inspections and acceptance tests required by the specifications of the supplies to be furnished under this contract or, shall have such tests performed, in a laboratory acceptable to the Government. For f.o.b. destination Contractor-supplied tankers/barges, the Contractor shall provide the QAR, prior to the first shipment, with the name and location of the laboratory to be used for testing at each discharge point. The Contractor shall also notify the QAR of any subsequent laboratory changes prior to the affected shipments. If any laboratory is determined to be unacceptable to the Government, the Contractor must designate another laboratory that is acceptable, before acceptance testing can take place. Acceptance tests will normally be performed at the acceptance point. However, when such tests are performed at origin on supplies to be accepted at destination, documentation that will enable verification of the original test results shall be provided to the Government prior to acceptance at destination. Regardless of the method of delivery, products furnished under this contract must meet all specification requirements at the CTP.

SHEET 4 OF 11PREVIOUS EDITION IS USABLE Add Continuation Page

(d) Prior to loading, the Contractor shall inspect all shipping conveyances for suitability to load the supplies furnished under this contract, except for Government-furnished tankers and barges Authorization for the Contractor to participate in the inspection of Government-supplied tankers and barges rests with QAR. The QAR has the right to inspect any Government-supplied conveyance prior to loading and, in the event the Contractor and the QAR disagree on the suitability to load such a conveyance, the determination of the QAR shall govern. If the SHIPMENT AND ROUTING contract provision is included in the contract, Government-furnished transportation equipment that is unsatisfactory for loading shall be reported by the Contractor in accordance with the provisions contained in that contract provision. Procedures to determine suitability to load tank trucks and tank cars shall include, but not be limited to, visual inspection of interior compartments to assure cleanliness and dryness. Manifolds and hoses must be drained and be clean and dry for the intended product. If the Contractor intends to witness operations at any point up to, and including, government acceptance, the Contractor is responsible for contacting the facilities to be visited and obtaining the required access.

(e) When requested by the U.S. Government, the Contractor shall furnish no more than five (ten in the case of jet fuel) 1-gallon samples of liquid product from any individual batch or lot of the supplies to be furnished under this contract. Such samples shall be furnished without charge to the Government and shall be packed, marked, and shipped by the Contractor, at their expense.

(f) The Contractor shall keep all quality and quantity records related to the performance of this contract complete and available to the Government during the performance of this contract and for three years after final payment under this contract. These records shall include, but not be limited to, DD Form 250-series documents, documentation of internal inspections of all conveyances, laboratory certificates for all required testing (including those for the shipping tanks for f.o.b. destination tankers/barges), and documentation of quantity determinations.

(g) When a common system is to be used for shipment in accordance with paragraph (a)(3)(vi) above, the Contractor shall provide a list of all products carried by that system during the past year to the Contracting Officer, at the time of offer, for a determination of acceptability.

(h) The inspection system and related operations provided or performed pursuant to this provision shall be subject to surveillance by the QAR.

(i) The contractor may provide transportation to/from/between contractor facilities and operations to the QAR or DLA Energy representative performing official duties relating to the administration of the contract and the contract price shall include the cost of any such transportation.

TABLE I

MINIMUM SAMPLING AND TESTING REQUIREMENTS (1) (9)

LOCATION WHEN SAMPLED TYPE OF SAMPLE TYPE OF TEST

(SERIES OR INDIVIDUAL)

1. Refinery/Terminal Each Batch Prior to All Level or Multi-Level A (2) (Each Shipping Tank) Start of Shipment Composite

2. All Modes Prior to Loading/Shipping Spot

(Shipping Line)

a. Dedicated Line C

b. Common Line B

3. All Modes (except Tank Immediately After Start Spot C Car/Tank Truck)/ of Loading/Shipping Intermodal Container) (Custody Transfer Point)

4. a. Tanker/Barge or Pipeline (F.O.B. During Loading or Representative Line Sample Retain Only Origin) (Custody Transfer Point) Pipeline Shipping [See Paragraph (b)(3) (ii)]

b. Tanker/Barge (F.O.B Destination) During Discharge Representative Line Sample Retain Only - Discard After (Custody Transfer Point) [See Paragraph (b)(3) (ii)] Shore Tests are On-Specification

SHEET 5 OF 11PREVIOUS EDITION IS USABLE Add Continuation Page

TABLE I (CONTINUED

MINIMUM SAMPLING AND TESTING REQUIREMENTS (1) (9)

LOCATION WHEN SAMPLED TYPE OF SAMPLE TYPE OF TEST

(SERIES OR INDIVIDUAL)

5. Tanker/Barge/Pipeline Hourly During Spot Visual (3) plus additive analysis (Custody Transfer Point) Loading/Shipping for FSII & SDA, if line injected

6. Tanker/Barge After loading 3 feet or Spot C (4) - plus additive analysis for (First-In) the line displacement FSII & SDA, if line injected quantity, whichever is greater

7. Tanker/Barge (F.O.B. Origin only) After Loading

a. Each Compartment All-Level or Multi-Level Sample to be retained in case Composite composite fails. If composite fails perform Workmanship & Density on each compartment sample For JP5, flash point must also be performed.

b. Composite Multi-Tank Volumetric B (except gum for Aviation Composite (6) of Each Turbine Fuel) Product Loaded (except carbon residue for Diesel/Kerosene) (plus FAME (7))

8. Tanker/Barge (F.O.B. Destination only)

a. Origin (vessel) Composite After loading Multi-Tank Volumetric A (plus FAME (7)) Composite (6) of Each Product Loaded

b. Destination (vessel) Composite Prior to Discharge Multi-Tank Volumetric A Composite (6) of Each Product Loaded

c. Destination (vessel) Each Prior to discharge All-level or Multi-level For retain in case composite fails.

Compartment composite If composite fails perform (SEE NOTE 5 FOR ADDITIONAL REQUIREMENTS) Workmanship & Density on each compartment sample. For JP5 perform flash point also.

9. Tank Car/Tank Truck/Intermodal After change of source Spot C plus additive analysis for FSII & Container (Loading Rack) tank SDA, if line injected

10. Tank Cars/Tank Truck/ After Loading/Filling All-Level or Low Point Workmanship (C - when loading Intermodal Container Drain/Bottom Line (10) lubes and FSII)

11. Drum After Filling Multi-drum Composite (8) C

SHEET 6 OF 11PREVIOUS EDITION IS USABLE Add Continuation Page

NOTES FOR TABLE I:

(1) AT THE GOVERNMENT'S OPTION, FULL SPECIFICATION TESTING MAY BE REQUIRED AT THE CUSTODY

TRANSFER POINT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FURNISH THE GOVERNMENT WITH

SATISFACTORY EVIDENCE OF SPECIFICATION COMPLIANCE.

(2) PRIOR TO PERFORMING A-LEVEL TESTING, THE HOMOGENEITY OF EACH BATCH SHALL BE DETERMINED.

AT A MINIMUM, UPPER, MIDDLE, AND LOWER SAMPLES SHALL BE TESTED FOR DENSITY/API GRAVITY AND COMPARED TO THE SPECIFICATION REQUIREMENT FOR HOMOGENEITY. IF NO SPECIFICATION REQUIREMENT EXISTS, HOMOGENEITY SHALL BE DEFINED AS WHEN THE TEST RESULTS FOR THE UPPER, MIDDLE, AND LOWER SAMPLES ALL FALL WITHIN THE REPEATABILITY LIMIT(S) OF THE TEST METHOD USED TO DETERMINE DENSITY/API GRAVITY. IN ANY CASE, WHEN DEEMED NECESSARY BY THE GOVERNMENT, TESTS IN ADDITION TO DENSITY/API GRAVITYMAY BE

REQUIRED TO CONFIRM BATCH HOMOGENEITY.

(3) CONTINUOUS IN-LINE ANALYZERS (I.E., DENSITY AND/OR FLASH POINT) ARE ACCEPTABLE, IN LIEU OF HOURLY EVALUATIONS, IF QUALITY IS ASSURED. WHEN CONTINUOUS IN-LINE ANALYZERS ARE PRESENT IN THE SYSTEM, THE CONTRACTOR SHALL PROVIDE ITS QUALITY CONTROL PROCEDURES AT TIME OF

OFFER TO THE CONTRACTING OFFICER FOR DETERMINATION OF ACCEPTABILITY.

(4) TESTING FOR PARTICULATE CONTAMINATION SHALL BE REQUIRED BY THE GOVERNMENT IF VISUAL

EXAMINATION OF THE SAMPLE FAILS WORKMANSHIP FOR SEDIMENT/SUSPENDED MATTER.

(5) FOR FOB DESTINATION SHIPMENTS DESTINED FOR MULTIPLE LOCATIONS IN CLOSE PROXIMITY TO ONE ANOTHER (WITHIN 24 HOURS SAILING TIME BETWEEN LOCATIONS) THE A-TYPE TESTING REQUIRED PRIOR TO DISCHARGE SHALL ONLY BE REQUIRED AT THE INITIAL DISCHARGE POINT, WITH ONLY C-TYPE TESTING REQUIRED PRIOR TO DISCHARGE AT SUBSEQUENT DISCHARGE POINTS. HOWEVER, IF CARGO INTEGIRTY CHANGES BETWEEN DISCHARGE POINTS, SUCH AS THROUGH CARGO TRANSFERS, CONTAMINATION, ETC., THEN A-TYPE TESTING SHALL BE REQUIRED AT THE NEXT DISCHARGE POINT. A COPY OF THE FULL SPECIFICATION TEST REPORT FOR THE VESSEL, AFTER LOADING, SHALL BE PROVIDED TO THE RECEIVING ACTIVITY AT EACH DISCHARGE POINT, PRIOR TO

DISCHARGE.

(6) COMPRISED OF ALL-LEVEL OR MULTI-LEVEL COMPOSITES FROM EACH COMPARTMENT.

(7) CONTRACTORS DELIVERING INTO THE GPSS,CEPS, NIPS, AND DFSP ATHENS (MOH) SHALL PERFORM FAME

CONTENT TESTING IN ACCORDANCE WITH TEST METHOD IP 585 OR IP 590, AND REPORT THE RESULTS TO THE

DESTINATION CONSIGNEE PRIOR TO VESSEL ARRIVAL.

(8) A ONE LITER COMPOSITE SAMPLE OF EACH LOT OF PRODUCT SHALL BE TAKEN FROM A PREDETERMINED NUMBER OF RANDOMLY SELECTED DRUMS. THE TOTAL NUMBER OF DRUMS SAMPLED PER LOT SHALL, AT A MINIMUM, BE THAT CITED IN TABLE III OF API MPMS CHAPTER 8.1 (ASTM D 4057), BUT MAY BE INCREASED AT THE

GOVERNMENT'S OPTION.

(9) THE SIZE OF ALL THE SAMPLES REQUIRED IN THIS TABLE, EXCEPT FOR THOSE DESIGNATED “RETAIN ONLY”, SHALL BE DETERMINED BY THE CONTRACTOR AND SHALL BE OF SUFFICIENT QUANTITY TO PERFORM ALL THE TESTS REQUIRED BY THIS TABLE. THE SIZE REQUIREMENTS FOR RETAIN SAMPLES CAN BE FOUND IN TABLE II, SAMPLE

RETENTION

(10) THE LOW POINT DRAIN/ BOTTOM LINE OPTION ONLY APPLIES TO TANK CAR AND TANK TRUCK SHIPMENTS

OF FUEL - SHIPMENTS OF LUBRICATING OILS AND ADDITIVES MUST UTILIZE ALL-LEVEL SAMPLING PROCEDURES. IF INITIAL FUEL SAMPLES USING THE LOW POINT DRAIN/BOTTOM LINE OPTION ARE NOT CLEAR AND BRIGHT, ADDITIONAL SAMPLES SHALL BE TAKEN UNTIL A CLEAR AND BRIGHT SAMPLE IS OBTAINED.

SHEET 7 OF 11PREVIOUS EDITION IS USABLE Add Continuation Page

TABLE II

SAMPLE RETENTION (1)

LOCATION MINIMUM QUANTITY RETENTION PERIOD(1)

1. Bulk Tank Cars/Tank Trucks /Intermodal Container

Additives 2 Liters (2) Until Receipt and Quality Verification of Each Lot/Batch

Fuels and Lubricating Oils 1 Liter (2) 15 Days - 45 Days for Lubricating Oils

2. Drums Avgas 1 Liter - multi-drum composite (3) 45 Days

3. Shipping Tank(s) 20 Liters - for Aviation Turbine Fuels 45 Days 10 Liters - for all other Fuels, Lubricating Oils, and Additives

4. Tanker/Barge/Pipeline 20 Liters - for Aviation Turbine Fuels 45 Days

(Composite Line at Custody Transfer Point) 10 Liters - for all other Fuels

5. Tanker/Barge (Composite)

F.O.B. Origin 20 Liters - for Aviation Turbine Fuels 45 Days 10 Liters - for all other Fuels

F.O.B. Destination 20 Liters Until Shore Tests On-Specification

6. Tanker/Barge (Each Compartment)

F.O.B. Origin 0.5 Liter 45 days

F.O.B. Destination 1 Liter Until Shore Tests On-Specification

NOTES FOR TABLE II:

(1) UNLESS OTHERWISE NOTED, THE RETENTION PERIOD SHALL BE FOR THE STATED NUMBER OF DAYS AFTER

THE SAMPLE HAS BEEN TAKEN FROM THE LOCATION INDICATED.

(2) IF THE CONVEYANCE IS COMPARTMENTALIZED, A PROPORTIONAL SAMPLE SHALL BE TAKEN FROM EACH

COMPARTMENT SUCH THAT A TOTAL OF ONE LITER IS COLLECTED FROM THE CONVEYANCE.

(3) A ONE LITER COMPOSITE SAMPLE OF EACH LOT OF PRODUCT SHALL BE TAKEN FROM A PREDETERMINED NUMBER OF RANDOMLY SELECTED DRUMS IN ACCORDANCE WITH TABLE III OF API MPMS CHAPTER 8.1 (ASTM D 4057).

SHEET 8 OF 11PREVIOUS EDITION IS USABLE Add Continuation Page

TABLE III

DEFINITIONS OF TEST SERIES

I. TYPE A: Includes all specification quality conformance tests plus any additional contractual requirements.

II. TYPE B & C: As shown in the table below for each product. Properties and test methods will be in accordance with the product specification for each grade identified in the solicitation/contract

AVGAS TURBINE MOGAS DIESEL/ BURNER LUBE OIL FSII

FUEL KEROSENE

TEST PROPERTIES B C B C B C B C B C B C C

Workmanship * * * * * * * * * * * Particulate content * * * (1) * Filtration Time * Color * * * * * * * * * * Density or API Gravity * * * * * * * * * (2) * (2) * or Specific Gravity Distillation * * * * Corrosion, Copper Strip * * Existent Gum * * Carbon Residue * * Lean or Rich Ratings * Reid Vapor Pressure * * (3) * Water Reaction * * Lead Content * Freeze Point * Flash Point * * * * * * * * FSII Content * Microseparometer * Conductivity * Sediment & Water * * Viscosity * * * Water Content * * * * Water Tolerance * Foam Test * *

* THE PROCEDURE TO BE USED FOR CONDUCTING THESE TESTS WILL BE AS STATED IN THE APPROPRIATE

PRODUCT SPECIFICATION AND/OR CONTRACT.

NOTES FOR TABLE III:

(1) F76 ONLY.

(2) GRADES 1, 2, AND 4 (L) ONLY.

(3) JP4 ONLY.

SHEET 9 OF 11PREVIOUS EDITION IS USABLE Add Continuation Page

TABLE IV

CONVERSION CHART FOR TANK CARS, TANK TRUCKS, AND INTERMODAL CONTAINERS (1)

PRODUCT TO BE LOADED (6)

LAST JP-4 JP-5, JP-8 JPTS(7) RP1/RP2 JP-10/PF-1 F76 FSII LUBRICATING

PRODUCT JET B TS-1 OIL

CARRIED (2) AVGAS JET A/A1

JP-4, JET-B DRAIN STEAM STEAM STEAM STEAM STEAM STEAM STEAM

Mogas E85, Avgas EMPTY DRY DRY DRY DRY DRY DRY DRY

JP-5, JP-8, TS-1 DRAIN DRAIN STEAM STEAM STEAM DRAIN STEAM STEAM

JET A/A1, KS1/R/N EMPTY EMPTY (4) DRY DRY DRY EMPTY (4) DRY DRY

JPTS DRAIN DRAIN DRAIN DRAIN STEAM DRAIN STEAM STEAM

EMPTY EMPTY EMPTY EMPTY DRY EMPTY DRY DRY

RP1/RP2 STEAM STEAM STEAM DRAIN STEAM STEAM STEAM STEAM

DRY DRY DRY EMPTY DRY DRY DRY DRY

JP-10/PF-1 STEAM STEAM STEAM STEAM DRAIN STEAM STEAM STEAM

DRY DRY DRY DRY EMPTY DRY DRY DRY

F-76, MGO STEAM STEAM STEAM STEAM STEAM DRAIN STEAM STEAM

LS-1/2/S/W, DRY DRY DRY DRY DRY EMPTY (4) DRY DRY

LS-1/2/S/W,

HS-1/2, FS-1/2

FL-2/4

FSII DRAIN DRAIN STEAM STEAM STEAM DRAIN DRAIN STEAM

EMPTY EMPTY DRY DRY DRY EMPTY EMPTY DRY

LUBRICATING NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD STEAM NO LOAD DRAIN

OILS DRY EMPTY (3)

BIODIESEL STEAM STEAM STEAM STEAM STEAM STEAM STEAM STEAM

BLENDS < B15 DRY (4) DRY (4) DRY (4) DRY (4) DRY (4) DRY (4) DRY (4) DRY (4)

BIODIESEL STEAM STEAM NO LOAD NO LOAD NO LOAD STEAM STEAM STEAM

BLENDS > B15 DRY (4) (5) DRY (4) (5) DRY (4) DRY (4) DRY (4)

FS-4/5/6, FL-5 NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD

RF-4/5/6, R5L

IFO

NAPTHA DRAIN STEAM STEAM STEAM STEAM STEAM STEAM STEAM

EMPTY DRY DRY DRY DRY DRY DRY DRY

PETROLEUM STEAM STEAM STEAM STEAM STEAM STEAM STEAM STEAM

SOLVENT/PAINT DRY DRY DRY DRY DRY DRY DRY DRY

THINNER

SHEET 10 OF 11PREVIOUS EDITION IS USABLE Add Continuation Page

NOTES FOR TABLE IV:

(1) WHEN REQUIRED, “DRAIN EMPTY” INCLUDES THE PUMP(S), FILTER(S), METER(S), AND HOSE(S), AS APPLICABLE.

(2) IF A PRODUCT IS NOT LISTED IN THIS COLUMN, PERMISSION TO LOAD AND CONVEYANCE PREPARATIONS REQUIRE A

WAIVER FROM THE DLA ENERGY CONTRACTING OFFICER.

(3) APPLICABLE ONLY WHEN LOADING THE SAME SPECIFICATION LUBRICATING OILS; OTHERWISE, STEAM CLEAN AND

DRY.

(4) IF PREVIOUS CARGO CONTAINED A DYE MARKER AND PRODUCT TO BE LOADED DOES NOT, ALL VISIBLE TRACES OF

COLOR FROM THE DYE MUST BE REMOVED.

(5) PRIOR TO LOADING THE AVIATION FUELS LISTED, THE CONVEYANCE MUST CARRY A NON-FAME CARGO AND THEN BE

STEAM CLEANED AND DRIED.

(6) CONVEYANCES THAT ARE EPOXY COATED OR SARAN LINED SHOULD NOT BE STEAM CLEANED - WASHING WITH HOT

FRESH WATER, NOT EXCEEDING 58OC (136OF), AND DRYING THOROUGHLY IS RECOMMENDED.

(7) TO BE LOADED ONLY IN ALUMINUM OR STAINLESS STEEL CONVEYANCES, OR CONVEYANCES LINED WITH AN

APPROVED EPOXY COATING.

SHEET 11 OF 11PREVIOUS EDITION IS USABLE Add Continuation Page

THIS PAGE WAS INTENTIONALLY LEFT BLANK

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev:

description: ENERGY QAP E1 revdate: September 2013 revapproved:

revcomments:

apprdate: 05/05/2014 apprBy:

reviewdate:

revBy:

prepdateA: 2014-04-14 prepbyA:

drawingNum:

scale: 1:1 codeIDNo: 52838 size: A nsn: MULTIPLE itemdesc: ENERGY QAP E1 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN RD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 10.00000000

ENERGY QAP E1.21 February 2014

(a) This contract provision applies to JET A / JET A-1, with or without additives, shipped into fungible pipeline systems or transported by tank truck/trailer and rail car.

(b) Quality Control Plan - The contractor shall, as a minimum, have a company plan in effect that supports all aviation fuel produced for this contract. The following minimum elements are required:

(1) Full specification testing shall be performed on each batch tank offered under this contract and those results shall be documented on a Certificate of Quality (CoQ);

(2) Procedures for injecting all additives at all locations within the contractor's facility.

This includes where and when each individual additive will be injected, no premixing is allowed, and how to assure that all additives are homogeneously blended into the aviation fuel;

(3) Procedures for inspecting rail cars for suitability to load the aviation fuel furnished under this contract;

(4) When shipping via pipeline, ensure that the aviation fuel being introduced complies with the pipeline company's specification for fungible product;

(5) Documentation

(i) When shipping via pipeline, a copy of the CoQ shall be provided to the

Quality Assurance Representative and pipeline company prior to shipment;

(ii) All additives injected by the contractor shall be listed either on the CoQ or on the shipping document. Either the concentration of the additive in the jet fuel or the quantity of additive injected is required on the documentation;

05/05/2014

04/30/2014

ENERGY QAP E1.21

ENERGY QAP E1.21 February 2014

(iii) A copy of the CoQ and Bill of Lading shall be provided to the truck driver for all tank truck/trailer and railroad representative for all rail car shipments. This documentation will be provided to the Government Representative prior to discharge at the receiving location.

(c) The Contractor shall keep all quality and quantity records related to the performance of this contract complete and available to the Government during the performance of this contract and for three years after final payment under this contract.

(d) The contractor may provide transportation to/from/between contractor facilities and operations to the Quality Assurance Representative (QAR) or DLA Energy representative performing official duties relating to the administration of the contract and the contract price shall include the cost of any such transportation.

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev:

description: ENERGY QAP E1.21 revdate: February 2014 revapproved:

revcomments:

apprdate: 05/05/2014 apprBy:

reviewdate:

revBy:

prepdateA: 2014-04-30 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: ENERGY QAP E1.21 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN RD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 1.00000000

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev: 0 description: DLA ENERGY QAP E12 revdate: JUL 2015 revapproved: 30 JUL 2015 revcomments:

apprdate: 7/30/2015 apprBy:

reviewdate: 2015-07-30 revBy:

prepdateA: 2015-07-30 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: DLA ENERGY QAP E12 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN ROAD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 1.00000000

ENERGY QAP E18.01 August 2009

E18.01 SAMPLE SUBMISSION

The Contractor shall furnish hereunder, from time to time, samples of each product or grade of product to be furnished under this contract at the request of, and in the manner and to the place designated by, the Quality Representative; PROVIDED, however, that in no event shall the Contractor be required to furnish during the period of this contract more than five 1-gallon samples under each contract line item. Such samples shall be furnished without charge to the Government and shall be packed, marked, and shipped by the Contractor, shipping expense prepaid, in containers and shipping boxes furnished by the Contractor.

04/18/2014

ENERGY QAP E18.01

ENERGY QAP E18.01 August 2009

THIS PAGE WAS INTENTIONALLY LEFT BLANK.

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev:

description: ENERGY QAP E18.01 revdate: August 2009 revapproved:

revcomments:

apprdate: 04/18/2014 apprBy:

reviewdate:

revBy:

prepdateA: 2014-04-14 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: ENERGY QAP E18.01 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN RD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 1.00000000 viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev: 1 description: DLA ENERGY QAP E21.01 revdate: JUN 2015 revapproved: 26 JUN 2015 revcomments:

apprdate: 26 June 2015 apprBy:

reviewdate: 2015-06-26 revBy:

prepdateA: 2015-06-26 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: DLA ENERGY QAP E21.01 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN ROAD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 1.00000000 viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev: 1 description: DLA ENERGY QAP E22 revdate: APR 2016 revapproved: 4 APR 2016 revcomments:

apprdate:

apprBy:

reviewdate:

revBy:

prepdateA: 2016-04-04 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: DLA ENERGY QAP E22 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN ROAD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 3.00000000

ENERGY QAP E35 December 2011

E35 NONCONFORMING SUPPLIES AND SERVICES

(a) DEFINITION: As used in this contract provision:

Deviation is defined as a written authorization granted after contract award and prior to manufacture of an item, to depart from a particular performance or design requirement of a contract, specification, or referenced document, for a specific number of units or specific period of time, normally the duration of the contract.

Extraordinary situation means the matter cannot await resolution until the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded).

Waiver is defined as a written authorization granted after contract award to accept a configuration item or other designated item which, during production or after having been submitted for inspection, is found to depart from specified requirements, but nevertheless is considered suitable for use “as is” or after repair by an approved method. Approval is on a case-by-case basis and is normally for a set period of time.

(b) The Government may, at its discretion, accept nonconforming supplies or services. In such cases, the Contractor must obtain a deviation or waiver from the Contracting Officer prior to acceptance.

(c) The following procedures shall be used to request a deviation or waiver.

(1) Requests for deviations and waivers shall be submitted by the Contractor to the Contracting Officer with a copy to the appropriate Inspection Office referenced in the LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS or QUALITY REPRESENTATIVE contract provision of this contract. Each request shall provide the following information: Contractor name; name and contact information of the contractor's authorized negotiator; contract number; contract line item number and product nomenclature, clause or contract provision number, paragraph and subparagraph, as appropriate; the nature of the request; the reason for the request; the corrective action being taken by the Contractor to correct and prevent recurrence of the condition(s) causing the nonconformance; and an agreement to pay an equitable price reduction, estimated and proposed by DLA Energy, over and above the administrative fee, contingent on the impact of the specific circumstances on DLA Energy relative to approval of the deviation or waiver.

(2) In extraordinary situations, the Contractor may initially submit a verbal…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .