Attachment D - Itemized Schedule of Values Cost Breakdown Fence.xls

XLS spreadsheet 66 KB Posted

Attached to
Y1PZ--590-19-107 Replace Perimeter Fence
Solicitation number
36C24623B0007
Issued by

About this file

This document contains an itemized schedule of values cost breakdown template for replacing a perimeter fence at a Veterans Affairs facility. The template includes line items for labor and material costs across 16 construction divisions and allows contractors to provide overhead, profit and bond percentages. It also contains two alternative cost breakdown templates for additional fencing proposals.

The related federal contract opportunity is seeking bids to provide all labor, materials, equipment and expertise to perform general construction for replacing an existing perimeter fence at a Veterans Affairs facility located at 100 Emancipation Drive in Hampton, Virginia. The project includes removing the existing fencing, rails, posts, gates and footings and necessary site work. The completion period is 560 calendar days. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown
Project Number:590-19-107Date:
Project TitleReplace Perimeter Fence
Project Location100 Emancipation Drive, Hampton, VA 23667
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0
Overhead %0.00%- 0
Profit %0.00%- 0
Bond %0.00%- 0
Overhead/Profit Subtotals :$ - 0
Total Base Offer Cost$ - 0$ - 0$ - 0

Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

VA assigned project # Date Offer Prepared/Submitted VA assigned Project Title Enter all Labor Costs by Division Enter all Material Costs by Division Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).

This Column is the sum of the Division's Labor and Material Costs Sum of Overhead, Profit and Bond %.

Alternative 1

Alternative 1 Offer Cost Breakdown
Project Number:590-19-107Date:
Project TitleReplace Perimeter Fence
Project Location100 Emancipation Drive, Hampton, VA 23667
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0
Overhead %0.00%- 0
Profit %0.00%- 0
Bond %0.00%- 0
Overhead/Profit Subtotals :$ - 0
Total Alt. 1 Offer Cost$ - 0$ - 0$ - 0

VA assigned project # Date Offer Prepared/Submitted VA assigned Project Title Enter all Labor Costs by Division Enter all Material Costs by Division This Column is the sum of the Division's Labor and Material Costs Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).

Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Sum of Overhead, Profit and Bond %.

Alternative 2

Alternative 2 Offer Cost Breakdown
Project Number:590-19-107Date:
Project TitleReplace Perimeter Fence
Project Location100 Emancipation Drive, Hampton, VA 23667
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0
Overhead %0.00%- 0
Profit %0.00%- 0
Bond %0.00%- 0
Overhead/Profit Subtotals :$ - 0
Total Alt. 2 Offer Cost$ - 0$ - 0$ - 0

VA assigned project # Date Offer Prepared/Submitted VA assigned Project Title Enter all Labor Costs by Division Enter all Material Costs by Division This Column is the sum of the Division's Labor and Material Costs Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).

Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Sum of Overhead, Profit and Bond %.

File details come from the government source that posted it. Updated .