Attachment D - Itemized Schedule of Values Cost Breakdown Fence.xls
XLS spreadsheet 66 KB Posted
- Attached to
- Y1PZ--590-19-107 Replace Perimeter Fence
- Solicitation number
- 36C24623B0007
About this file
This document contains an itemized schedule of values cost breakdown template for replacing a perimeter fence at a Veterans Affairs facility. The template includes line items for labor and material costs across 16 construction divisions and allows contractors to provide overhead, profit and bond percentages. It also contains two alternative cost breakdown templates for additional fencing proposals.
The related federal contract opportunity is seeking bids to provide all labor, materials, equipment and expertise to perform general construction for replacing an existing perimeter fence at a Veterans Affairs facility located at 100 Emancipation Drive in Hampton, Virginia. The project includes removing the existing fencing, rails, posts, gates and footings and necessary site work. The completion period is 560 calendar days. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S07. Bid Abstract 36C24623B0007 - CO Signed.pdf | ||
| 36C24623B0007 0008.docx | DOCX document | |
| S05 Hampton Fence RFI Responses 3-1-2023.pdf | ||
| 36C24623B0007 0007.docx | DOCX document | |
| Fence Amendment Nine.pdf | ||
| 590-19-107 - Replace Perimeter Fence - Plan Revisions 1 - Combined Drawings.pdf | ||
| S04 Site Visit Participants Perimeter Fence.pdf | ||
| 36C24623B0007 0006.docx | DOCX document | |
| Perimeter Fence Sheet 5 CD101.pdf | ||
| 36C24623B0007 0005.docx | DOCX document | |
| 36C24623B0007 0004.docx | DOCX document | |
| Sheet 5 CD101.pdf | ||
| 36C24623B0007 0003.docx | DOCX document | |
| Attachment E Drawings-Replace Perimeter Fence.pdf | ||
| 36C24623B0007 0002.docx | DOCX document | |
| Attachment B Final Specifications Manual - Hampton VAMC - Construct Perimeter Fence.pdf | ||
| 36C24623B0007_1.docx | DOCX document | |
| S02 IFB PERIMETER FENCE Final.pdf | ||
| Attachment A - Submittal Log.pdf | ||
| Attachment C Wage Det VA20220022 Dated 12092022.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
| Base Offer Cost Breakdown | |||||
| Project Number: | 590-19-107 | Date: | |||
| Project Title | Replace Perimeter Fence | ||||
| Project Location | 100 Emancipation Drive, Hampton, VA 23667 | ||||
| Offeror Name | |||||
| Offeror Street | |||||
| Offeror City | State | Zip | |||
| Item | Description | Labor Cost | Material Cost | Total Cost | |
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 | |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 | |
| Division 3 | Concrete | - 0 | - 0 | - 0 | |
| Division 4 | Masonry | - 0 | - 0 | - 0 | |
| Division 5 | Metals | - 0 | - 0 | - 0 | |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 | |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 | |
| Division 9 | Finishes | - 0 | - 0 | - 0 | |
| Division 10 | Specialties | - 0 | - 0 | - 0 | |
| Division 11 | Equipment | - 0 | - 0 | - 0 | |
| Division 12 | Furnishings | - 0 | - 0 | - 0 | |
| Division 13 | Special Construction | - 0 | - 0 | - 0 | |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 | |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 | |
| Division 22 | Plumbing | - 0 | - 0 | - 0 | |
| Division 23 | HVAC | - 0 | - 0 | - 0 | |
| Division 26 | Electrical | - 0 | - 0 | - 0 | |
| Division 27 | Communications | - 0 | - 0 | - 0 | |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 | |
| Division 31 | Earthwork | - 0 | - 0 | - 0 | |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 | |
| Division 33 | Utilities | - 0 | - 0 | - 0 | |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 | |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 | ||
| Overhead % | 0.00% | - 0 | |||
| Profit % | 0.00% | - 0 | |||
| Bond % | 0.00% | - 0 | |||
| Overhead/Profit Subtotals : | $ - 0 | ||||
| Total Base Offer Cost | $ - 0 | $ - 0 | $ - 0 |
Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
VA assigned project # Date Offer Prepared/Submitted VA assigned Project Title Enter all Labor Costs by Division Enter all Material Costs by Division Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).
This Column is the sum of the Division's Labor and Material Costs Sum of Overhead, Profit and Bond %.
Alternative 1
| Alternative 1 Offer Cost Breakdown | |||||
| Project Number: | 590-19-107 | Date: | |||
| Project Title | Replace Perimeter Fence | ||||
| Project Location | 100 Emancipation Drive, Hampton, VA 23667 | ||||
| Offeror Name | |||||
| Offeror Street | |||||
| Offeror City | State | Zip | |||
| Item | Description | Labor Cost | Material Cost | Total Cost | |
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 | |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 | |
| Division 3 | Concrete | - 0 | - 0 | - 0 | |
| Division 4 | Masonry | - 0 | - 0 | - 0 | |
| Division 5 | Metals | - 0 | - 0 | - 0 | |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 | |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 | |
| Division 9 | Finishes | - 0 | - 0 | - 0 | |
| Division 10 | Specialties | - 0 | - 0 | - 0 | |
| Division 11 | Equipment | - 0 | - 0 | - 0 | |
| Division 12 | Furnishings | - 0 | - 0 | - 0 | |
| Division 13 | Special Construction | - 0 | - 0 | - 0 | |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 | |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 | |
| Division 22 | Plumbing | - 0 | - 0 | - 0 | |
| Division 23 | HVAC | - 0 | - 0 | - 0 | |
| Division 26 | Electrical | - 0 | - 0 | - 0 | |
| Division 27 | Communications | - 0 | - 0 | - 0 | |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 | |
| Division 31 | Earthwork | - 0 | - 0 | - 0 | |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 | |
| Division 33 | Utilities | - 0 | - 0 | - 0 | |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 | |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 | ||
| Overhead % | 0.00% | - 0 | |||
| Profit % | 0.00% | - 0 | |||
| Bond % | 0.00% | - 0 | |||
| Overhead/Profit Subtotals : | $ - 0 | ||||
| Total Alt. 1 Offer Cost | $ - 0 | $ - 0 | $ - 0 |
VA assigned project # Date Offer Prepared/Submitted VA assigned Project Title Enter all Labor Costs by Division Enter all Material Costs by Division This Column is the sum of the Division's Labor and Material Costs Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).
Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Sum of Overhead, Profit and Bond %.
Alternative 2
| Alternative 2 Offer Cost Breakdown | |||||
| Project Number: | 590-19-107 | Date: | |||
| Project Title | Replace Perimeter Fence | ||||
| Project Location | 100 Emancipation Drive, Hampton, VA 23667 | ||||
| Offeror Name | |||||
| Offeror Street | |||||
| Offeror City | State | Zip | |||
| Item | Description | Labor Cost | Material Cost | Total Cost | |
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 | |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 | |
| Division 3 | Concrete | - 0 | - 0 | - 0 | |
| Division 4 | Masonry | - 0 | - 0 | - 0 | |
| Division 5 | Metals | - 0 | - 0 | - 0 | |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 | |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 | |
| Division 9 | Finishes | - 0 | - 0 | - 0 | |
| Division 10 | Specialties | - 0 | - 0 | - 0 | |
| Division 11 | Equipment | - 0 | - 0 | - 0 | |
| Division 12 | Furnishings | - 0 | - 0 | - 0 | |
| Division 13 | Special Construction | - 0 | - 0 | - 0 | |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 | |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 | |
| Division 22 | Plumbing | - 0 | - 0 | - 0 | |
| Division 23 | HVAC | - 0 | - 0 | - 0 | |
| Division 26 | Electrical | - 0 | - 0 | - 0 | |
| Division 27 | Communications | - 0 | - 0 | - 0 | |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 | |
| Division 31 | Earthwork | - 0 | - 0 | - 0 | |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 | |
| Division 33 | Utilities | - 0 | - 0 | - 0 | |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 | |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 | ||
| Overhead % | 0.00% | - 0 | |||
| Profit % | 0.00% | - 0 | |||
| Bond % | 0.00% | - 0 | |||
| Overhead/Profit Subtotals : | $ - 0 | ||||
| Total Alt. 2 Offer Cost | $ - 0 | $ - 0 | $ - 0 |
VA assigned project # Date Offer Prepared/Submitted VA assigned Project Title Enter all Labor Costs by Division Enter all Material Costs by Division This Column is the sum of the Division's Labor and Material Costs Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).
Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Sum of Overhead, Profit and Bond %.