This is a Specifications attachment for a state contract opportunity issued by the State of Louisiana's Office of Juvenile Justice (OJJ) for detention door replacement services at the Jetson Center for Youth - Sunshine Dormitory in Baker, Louisiana. The project scope requires the contractor to replace 10 detention doors, including inspection and adjustment of existing door frames, alignment, operation, structural condition, and detention locking mechanisms. The work includes installing 12-gauge galvanized carbon wall wraps at 10 existing cut openings, welding detention frames into new framed openings, security caulking, mortar filling, and installing half-lite doors with food pass and detention hardware. Each opening requires specific components: one Viking V80 or equal manual detention deadbolt, one manual snap lock for food passing doors, one raised pull, one recessed pull, one LCN 2214 concealed or equal closer, four 4-1/2-inch stainless steel detention hinges, and one piece of Lexan. Site visit contacts are Allen B. Myrick at (225) 954-2895 and Michael Albarez at (225) 436-1095.

The specifications require all replacement components to be new, commercial-grade, and appropriate for detention environments. The contractor must coordinate all work with facility personnel, comply with security procedures, ensure no security devices are left unsecured at day's end, and report any conditions compromising facility safety or security. Upon completion, the contractor must test all 10 detention doors to verify proper operation, alignment, locking mechanism engagement, hardware operation, and secure closure, with all deficiencies corrected prior to final acceptance. Work scheduling must be coordinated with facility management to minimize operational disruption while maintaining facility security throughout the project.

View the file

Other files

File Type Posted
3000026781.pdf PDF
Attachment B - Job Site Verification Form - Page 1.docx DOCX document
Attachment A - Special Terms and Conditions Pages 1-15.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C – Specifications RFx 3000026781

**If bidding other than specified, please provide manufacturer’s specs for “or equal” items. **

Scope of Work:

The Contractor shall supply all labor, equipment, supplies, and materials to replace 10 detention doors for the Office of Juvenile Justice (OJJ).

Location:

Jetson Center for Youth – Sunshine Dormitory 15200 Scenic Hwy Baker, LA 70714

Site Visit Contact:

Allen B. Myrick, allen.myrick2@la.gov, (225) 954-2895 Michael Albarez, Michael.albarez@la.gov, (225) 436-1095

Specifications:

The Contractor shall be responsible for the following:

· Inspect the existing door frame.

· Inspect door alignment, operation, and structural condition.

· Inspect and test detention locking mechanisms and related security hardware.

· Adjust doors to ensure proper alignment, operation, and secure closure.

· Inspect and service electronic or mechanical locking components, where applicable.

· Verify proper operation of control mechanisms, interlocks, and associated security components, where applicable.

· Replace damaged or deteriorated hardware with components suitable for detention-facility applications.

· Remove and properly dispose of any replaced materials and debris generated by the work.

· Provide and install 12GA galv carbon wall wraps at the 10 existing cut openings.

· Weld in detention frames to new framed openings, security caulk and fill with mortar Install half lite door, food pass and detention hardware to include per opening

· One Viking V80 or Equal - l Lock Manual Detention Deadbolt Specify Lock Bidding: _________________

· One Manual snap lock for food passing doors

· One Raised pull

· One Recessed pull

· One LCN 2214 concealed or Equal closer

Specify Closer Bidding: _________________

· Four 4-1/2" SS detention hinges

· One piece of ½" Lexan

General Terms:

· Because the work involves detention-area security equipment, the Contractor shall coordinate all work with designated facility personnel.

· The Contractor personnel shall comply with all facility security procedures and access requirements.

· No security device, locking mechanism, or detention door shall be left in an unsecured or non-operational condition at the conclusion of each workday unless specifically authorized by facility management.

· Any condition that could compromise the safety or security of the facility shall be reported immediately to designated facility personnel.

· The Contractor personnel shall not make unauthorized modifications to the facility's security systems.

· All replacement components shall be compatible with the existing detention door and security systems.

· All materials and replacement components shall be new, commercial-grade, and appropriate for use in a detention environment unless otherwise approved by the facility.

· The Contractor shall verify compatibility of replacement components with the existing door assemblies prior to installation.

· Upon completion of the work, the contractor shall test each of the 10 detention doors to verify:

· Proper opening and closing.

· Proper alignment and operation.

· Proper engagement of locking mechanisms. Proper operation of associated hardware.

· Proper operation of electronic/mechanical security components, where applicable. Secure closure and locking.

· Overall safe and reliable operation.

· All deficiencies identified during final inspection shall be corrected by the Contractor prior to final acceptance.

· The Contractor shall coordinate the work schedule with facility management to minimize disruption to facility operations. All work shall be completed in a professional and workmanlike manner, with the facility remaining secure and operational throughout the project.