Attachment C - Contract Deliverable Requirements List (CDRL).pdf

PDF 1 MB Posted

Attached to
Space Weather Next L1 Series Coronagraph Federal contract opportunity
Solicitation number
80GSFC24R0009
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This federal solicitation seeks proposals for three flight Coronagraph instruments for the NASA and NOAA Space Weather Next L1 Series mission. Offerors must submit proposals by April 22, 2024. NASA intends to award a cost-plus-fixed-fee completion contract with technical milestones incentives in October 2024, with deliveries of the first unit by March 2027, the second by June 2029, and the third as a spare for the first two missions. The contract will be performed offsite at the contractor's facilities and utilize existing government furnished property. The North American Industry Classification System code is 336414 with a small business size standard of 1,300 employees.

View the file

Other files for this federal contract opportunity

Other files attached to Space Weather Next L1 Series Coronagraph, newest first.
File Type Posted
Amendment No. 4_Page 2_Final.pdf PDF
Coronagraph SF30-Amendment No. 04.pdf PDF
Additional Offeror Questions and Government Responses for Coronagraph RFP.pdf PDF
L1 series instrument RFP Past Performance Questionnaire_Coronagraph 4-5 F.pdf PDF
Final RFP Clean 4-5-24 F.pdf PDF
Offeror Questions and Government Responses for Coronagraph RFP - F.pdf PDF
Coronagraph SF30-Amendment No. 3.pdf PDF
Coronagraph RFP cover letter REVISED 2-F.pdf PDF
Coronagraph SF30-Amendment No. 02.pdf PDF
Final RFP Clean 3-26 R1A.pdf PDF
Coronograph RFP Cost Exhibits R1A.pdf PDF
Cost Exhibits_Coronagraph_Updated 05 March 2024.xlsx XLSX spreadsheet
Coronagraph SF30-Amendment No. 01-spb rev.pdf PDF
Coronagraph RFP cover letter_CO Signed.pdf PDF
Updated Final RFP .pdf PDF
Attachment P - Organizational Conflict of Interest (OCI) Avoidance Plan Data Requirements Description (DRD).pdf PDF
Final Request For Proposal (FRFP) Cover Letter.pdf PDF
Attachment M - IT Security Applicable Documents List.pdf PDF
Attachment J - IT Security Management Plan.pdf PDF
Attachment O - DD Form 254.pdf PDF
Attachment T - L1 Series Radiation Requirements Document.pdf PDF
SF33_RFP_Coronagraph.pdf PDF
Attachment R - Diversity Equity Inclusion and Accessibility DEIA Plan.pdf PDF
Attachment N - Health Safety Plan.pdf PDF
Attachment H - Financial Management Reporting Requirements.pdf PDF
Attachment K - Quality Assurance Plan.pdf PDF
Final RFP GSFC24R0009F.pdf PDF
Attachment P - Organizational Conflict of Interest (OCI) Avoidance Plan Data Requirements Description (DRD).pdf PDF
Attachment G - Government Furnished Property.pdf PDF
Attachment E - Direct Labor Rates Indirect Rates and Fee Matrices.pdf PDF
Attachment S - L1 Series Radiation Hardness Assurance Requirements Document.pdf PDF
Enclosure AA - Quality Assurance Surveillance Plan.pdf PDF
Enclosure EE - IT Security Management Plan Template.pdf PDF
Attachment B - Requirements Specification (SPEC).pdf PDF
Attachment Q - Diversity Equity Inclusion and Accessibility (DEIA) Plan Data Requirements Description DRD.pdf PDF
Final RFP GSFC24R0009.pdf PDF
L1 series instrument RFP Past Performance Questionnaire_Coronagraph.pdf PDF
Attachment L - Contractor Proposed Enhancements.pdf PDF
Coronograph RFP Cost Exhibits.pdf PDF
Attachment I - Organizational Conflicts of Interest (OCI) Avoidance Plan.pdf PDF
Attachment F - Small Business Contracting Plan.pdf PDF
Attachment D - Mission Assurance Requirements (MAR).pdf PDF
Attachment A - Statement of Work.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Effective Date: February 23, 2024 Expiration Date: February 23, 2029

Check the L1 Series CM tool Server at https://ipdtdms gsfc nasa gov/ to verify that this is the correct version prior to use.

L1SERIES-COR-REQ-0027, Revision - Space Weather Next L1 Series Project, Code 493

Space Weather Next (SW Next) Program

Lagrange (L1) Series Project Coronagraph (COR)

Contract Deliverables Requirements List

(CDRL)

U.S. Department of Commerce (DOC) National Oceanic and Atmospheric Administration (NOAA) NOAA Satellite and Information Service (NESDIS) National Aeronautics and Space Administration (NASA)

GSFC SW Next L1 Series CMO

February 23, 2024

Released

L1 Series Project Coronagraph CDRL L1SERIES-COR-REQ-0027, Revision -ii Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

Lagrange 1 (L1) Series Project Coronagraph

Contract Deliverables Requirements List (CDRL)

Signature/Approval Page

Originally Electronically signed on 02-22-24 by:

Mark Edison SW Next L1 Series Coronagraph Instrument Lead NASA Goddard Space Flight Center

Originally Electronically signed on 02-23-24 by:

Hudson DeLee SW Next L1 Series Instrument Systems Manager

Originally Electronically signed on 02-23-24 by:

J. Timothy Van Sant Project Manager, SW Next L1 Series iii Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

Preface

This document is under L1 Series Program configuration control. Once this document is approved, L1 Series approved changes are handled in accordance with Class I and Class II change control requirements as described in the L1 Series Configuration Management Procedure, and changes to this document shall be made by complete revision.

In this plan, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall”. The terms “may” or “can” denote discretionary privilege or permission; “should” denotes a good practice and is recommended but not required; “will” denotes expected outcome;

and “are/is” denotes descriptive material.

Any questions should be addressed to:

L1 Series Configuration Management Office

NASA/GSFC

Code 493 Greenbelt, MD 20771 iv Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

Change History Log

Revision Effective Date Description of Changes (Reference the CCR & CCB/ERB Approval Date)

Revision - February 23, This document was reviewed and approved for baseline in CCRs L1SERIES-CCR-0059 and L1SERIES-CCR-0066 and was dispositioned on February 23, 2024.

v Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

Table of Contents

1 INTRODUCTION

1.1 DEFINITION OF DUE DATES/MATURITY, DEFINITION OF CATEGORIES, AND

DELIVERY INSTRUCTIONS

Due Date Maturity NASA Acceptance Code

1.2 CORONAGRAPH CONTRACT DELIVERABLES REQUIREMENTS LIST (CDRL) . 2

1.3 DATA ITEM DESCRIPTION (DID) OVERVIEW

1.4 DELIVERY INSTRUCTIONS

1.5 CDRL ITEMS OVEVIEW

Integrated Baseline Review (IBR) Package Contract Work Breakdown Structure and Dictionary

2 PROGRAM DATA ITEM DESCRIPTIONS

PM-1 PROGRAM MANAGEMENT PLAN

PM-2 WEEKLY STATUS REPORTS AND TELECON MINUTES

PM-3 CONFIGURATION MANAGEMENT PLAN

PM-4 CONFIGURATION CHANGE REQUESTS (CCR) CLASS I

PM-5 PROGRAM MANAGEMENT STATUS REVIEW DATA PACKAGE

PM-6 NASA PROPERTY IN THE CUSTODY OF THE CONTRACTORS

PM-7 CONTRACTOR TASK PLAN

PM-8 DOCUMENT TREE

3 RESOURCE MANAGEMENT

RM-1 EARNED VALUE MANAGEMENT (EVM) PLAN

RM-2 FINANCIAL REPORTS

RM-3 RISK MANAGEMENT PLAN

RM-4 INTEGRATED PROGRAM MANAGEMENT DATA AND ANALYSIS REPORT

(IPMDAR)

RM-5 INTEGRATED BASELINE REVIEW (IBR) PACKAGE

RM-6 CONTRACT WORK BREAKDOWN STRUCTURE AND DICTIONARY

4 REVIEW DATA ITEM DESCRIPTIONS

RVW-1 SYSTEM DEFINITION REVIEW (SDR) DATA PACKAGE

RVW-2 PRELIMINARY DESIGN REVIEW (PDR) DATA PACKAGE

RVW-3 CRITICAL DESIGN REVIEW (CDR) DATA PACKAGE

RVW-4 PRE-ENVIRONMENTAL REVIEW (PER) DATA PACKAGE

RVW-5 PRE-STORAGE/PRE-SHIP REVIEW (PSR) DATA PACKAGE

RVW-6 SUBSYSTEM REVIEW MINUTES AND ACTION ITEMS

RVW-7 RESPONSES TO REQUEST FOR ACTIONS

RVW-8 SUBCONTRACT AND SUBSYSTEM REVIEW DATA PACKAGES

5 SYSTEMS ENGINEERING DATA ITEM DESCRIPTIONS

SE-1 SYSTEMS ENGINEERING MANAGEMENT PLAN

SE-2 ENGINEERING ANALYSES REPORTS

SE-3 COR SYSTEM SPECIFICATION

SE-4 DETAILED DESIGN SPECIFICATIONS

vi Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

SE-5 THERMAL MATH MODEL AND REPORTS

SE-6 STRUCTURAL MATH MODEL AND REPORTS

SE-7 SOLID MATH MODEL

SE-8 INSTRUMENT BLOCK DIAGRAMS, AND APPROVED OR CONTROLLED

DRAWINGS

SE-9 SYSTEM PERFORMANCE VERIFICATION PLAN

SE-10 SYSTEM PERFORMANCE VERIFICATION REPORT

SE-11 PERFORMANCE VERIFICATION PROCEDURES

SE-12 ENVIRONMENTAL VERIFICATION SPECIFICATION

SE-13 ENVIRONMENTAL VERIFICATION REPORTS

SE-14 DIGITAL IMAGE AND VIDEO RECORDS

SE-15 INDIVIDUAL TEST PLANS

SE-16 MAGNETIC CONTROL PLAN

SE-17 COMPONENT AND SUBASSEMBLY TEST REPORTS FOR ALL

SUBCONTRACTED ITEMS

SE-18 EMC/EMI COMPATIBILITY PLAN

SE-19 MAINTENANCE, TEST, AND OPERATIONS MANUAL FOR THE COR

EMULATOR

SE-20 REQUEST FOR USE OF MULTI-MISSION OR PREVIOUSLY DESIGNED,

FABRICATED, OR FLOWN HARDWARE

6 MISSION ASSURANCE AND SAFETY DATA ITEM DESCRIPTIONS

MA 1-1 MISSION ASSURANCE REQUIREMENTS COMPLIANCE MATRIX

MA 1-2 SUPPLIER LIST

MA 2-1 INPUT TO ORBITAL DEBRIS ASSESSMENT REPORT and End of Mission Plan

(EOMP)

MA 3-1 SYSTEM SAFETY PLAN (SSP)

MA 3-2 SAFETY REQUIREMENTS COMPLIANCE CHECKLIST

MA 3-3 OPERATIONS HAZARD ANALYSIS AND HAZARD VERIFICATION

TRACKING LOG

MA 3-4 INSTRUMENT SAFETY ASSESSMENT REPORT

MA 3-5 HAZARDOUS PROCEDURES FOR PAYLOAD I&T AND PRELAUNCH

PROCESSING

MA 3-6 PRE-MISHAP PLAN

MA 4-2 FAILURE MODE, EFFECTS, AND CRITICALITY ANALYSIS, AND

CRITICALITY ITEMS LIST

MA 4-3 FAULT TREE ANALYSIS

MA 4-4 RELIABILITY PREDICTIONS

MA 4-5 LIMITED LIFE ITEMS LIST

MA 4-6 PARTS STRESS ANALYSIS

MA 4-7 WORST-CASE ANALYSES

MA 5-1 SOFTWARE ASSURANCE PLAN

MA 6-1 ELECTROSTATIC DISCHARGE (ESD) CONTROL PLAN

MA 6-2 PRINTED CIRCUIT BOARD (PCB) PROCUREMENT PLAN

MA 6-5 LEAD-FREE CONTROL PLAN (LFCP)

MA 7-1 EEE PARTS CONTROL PLAN

MA 7-2 MASTER EEE PARTS LIST

vii Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

MA 7-3 RADIATION EFFECTS MITIGATION

MA 7-4 RADIATION SHIELDING AND DOSE ANALYSIS REPORT

MA 7-5 SINGLE EVENT EFFECT FAULT MANAGEMENT PLAN

MA 8-1 MATERIALS & PROCESSES SELECTION, CONTROL, AND

IMPLEMENTATION PLAN

MA 8-2 MATERIALS USAGE AGREEMENT EVALUATION FORM

MA 8-3 MATERIALS IDENTIFICATION AND USAGE LIST

MA 8-4 LIFE TEST PLAN AND FINAL REPORT FOR LUBRICATED MECHANISMS . 91

MA 8-5 ADDITIVE MANUFACTURING CONTROL PLAN (AMCP)

MA 8-6 AM PRODUCTION PLAN (PPP)

MA 9-1 CONTAMINATION CONTROL PLAN

MA 9-2 FOREIGN OBJECT DEBRIS PROGRAM

MA 11-1 GIDEP ALERTS/NASA ADVISORY DISPOSITIONS

MA 11-2 INITIATING GIDEP ALERTS

MA 12-1 END ITEM ACCEPTANCE DATA PACKAGE (EIDP)

7 OPERATIONS DATA ITEM DESCRIPTIONS

OPS-1 FLIGHT TELEMETRY AND COMMAND DATABASE

OPS-2 FLIGHT TELEMETRY AND COMMAND HANDBOOK

OPS-3 OPERATIONS HANDBOOK

OPS-4 GROUND PROCESSING ALGORITHMS TEST AND VALIDATION PLAN

OPS-5 GROUND PROCESSING ALGORITHM DOCUMENT

OPS-6 GROUND SOFTWARE ACCEPTANCE PLAN INPUT

OPS-7 TREND ANALYSIS PLAN AND DATA REPORTS

OPS-8 ON-SITE DATA ANALYSIS REPORTS

OPS-9 MASS PROPERTIES AND POWER REPORT

OPS-10 COR PACKETIZED DATA

OPS-11 INSTRUMENT OPERATIONS CONFIGURABLE ITEMS

8 SOFTWARE DATA ITEM DESCRIPTIONS

SW-1 SOFTWARE MANAGEMENT PLAN

SW-2 SOFTWARE DELIVERY PACKAGES

9 INTEGRATION AND TEST DATA ITEM DESCRIPTIONS

I&T-1 TRANSPORTATION, HANDLING PLAN AND PROCEDURES

I&T-2 POST LAUNCH TEST REPORTS

I&T-3 OBSERVATORY LEVEL TEST PROCEDURES

I&T-4 OBSERVATORY LEVEL TEST REPORT

I&T-5 CALIBRATION PROGRAM PLAN

I&T-6 CALIBRATION DATA BOOKS

10 FPGA DATA ITEM DELIVERABLE

FW-1 FPGA DEVELOPMENT PLAN

FW-2 FPGA DESIGN DATA PACKAGE

11 COR HARDWARE/SOFTWARE DELIVERABLE ITEMS

APPENDIX A ABBREVIATIONS AND ACRONYMS

APPENDIX B RECOMMENDED OPERATING PROCEDURES (ROPS) TEMPLATE 124

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

1 INTRODUCTION

This Space Weather Next (SW Next) Lagrange 1 (L1) Series (L1 Series) Instrument Contract Deliverables Requirements List (CDRL) document defines the requirements for deliverable items to be provided by the L1 Series Coronagraph Contractor. All data shall be prepared, maintained/updated, and delivered to the Government in accordance with the requirements specified in the governing contract, delivery order, Statement of Work (SOW), Mission Assurance Requirements (MAR), and this CDRL and its associated Data Item Descriptions (DIDs).

1.1 DEFINITION OF DUE DATES/MATURITY, DEFINITION OF CATEGORIES,

AND DELIVERY INSTRUCTIONS

The following definitions apply to the "Delivery" column in Table 2 L1 Series Coronagraph Contract Deliverables Requirements List (CDRL)

Due Date

a. Proposal: Items that are provided with the proposal.

b. At CDR, PER, etc.: Critical Design Review, Pre-Environmental Review, Pre-Ship

Review, etc.

c. As Generated: After each initial edition, revision, addition, etc. Monthly: Monthly by the 15th of each month or as required or as modified by CO

d. Weekly: Weekly status reports by Tuesday close of business or as modified by

Contracting Officer (CO)

e. L: Launch Date

f. DACA: Days after contract award

g. MACA: Months after contract award

h. NLT: No later than

i. Authorization to Proceed: ATP

Unless otherwise noted, the data in the due date column titled "days" are to be interpreted as calendar days.

Maturity

a. Preliminary: The initial submission of an item. To be completed with available information as of the time of preparation for the due date.

b. Update: The best up-to-date information available at the time.

c. Final: The complete thorough submission of an item for approval, review, or information. This does not preclude updating later.

NASA Acceptance Code

A Approval: Documents in this category require approval by the Goddard Space Flight Center (GSFC) Contracting Officer’s Representative prior to use by the contractor.

If the Government disapproves, the requirement for resubmission by the Contractor shall be as specified by the Government Contracting Officer. Normally, the requirement for

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

resubmission will be within 30 days of receiving the Government’s comments. If the Government does not provide comments in the prescribed time, the Contractor may proceed with the associated work after notifying the Government of the intention to proceed.

R Review: Documents in this category require delivery to the Government prior to use and within the time period specified in the "Due Date" column of this document.

They are subject to evaluation by the Government or its designated representatives to determine Contractor effectiveness in meeting contract objectives. Following submission, the Contractor may proceed with the associated work. Starting when the Government receives the document, the Government Contracting Officer may provide written (electronic) comments within 21 calendar days. When the Government identifies a deficiency, the Contractor shall re-submit within 30 calendar days of receiving Government comments (3 days for Spacecraft-level test and calibration/validation procedures) or provide a plan within 7 calendar days (1 day for test calibration/ validation procedures), as specified by the Government Contracting Officer, for approval by the Government to close the deficiency.

I Information: Data in this category require delivery to the Government within the time period specified in the “Due Date” column of the COR Contract Deliverables Requirements List for the purpose of determining current program status, progress, and future planning requirements. The Government Contracting Officer may provide written (electronic) comments within 21 calendar days to identify errors and omissions, and the Contractor shall make the corrections and re-submit as specified by the Government Contracting Officer. The Contractor shall address Government comments in the next version delivered, or in a revised version if it is the final delivery

1.2 CORONAGRAPH CONTRACT DELIVERABLES REQUIREMENTS LIST

(CDRL)

Items with an “As Generated” due date that are critical to schedule, performance, or interface shall be transmitted to GSFC by within 48 hours of generation.

Any updates to items of “Final” maturity shall require the same "approval/review" process as was required for the previous submissions.

All Data items shall be delivered in electronic format to a GSFC L1 Series specified web portal unless otherwise noted in the Coronagraph Contract Deliverables Requirements List.

Individual CDRL items may be combined with other CDRL items to increase documentation efficiency if the content and requirements of the CDRL items are satisfied.

Electronic deliverables shall be delivered in the following formats unless otherwise approved by the government:

a. Text Documents: PDF (searchable) or MS Word

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

b. Presentations: PDF (searchable) or PowerPoint

c. Spreadsheets: Microsoft Excel

d. Database: Delimited ASCII files accompanied with database schema document defining tables and entries.

e. Schedules: MS Project

f. Schematics and Drawings: PDF

g. Photographs: JPEG or current industry standard.

h. Video: Any readily available open standard (e.g., AVI, MPEG)

1.3 DATA ITEM DESCRIPTION (DID) OVERVIEW

Each CDRL item is defined by a corresponding DID. The DID includes the title, number, SOW reference, purpose, applicable documents, and required preparation information.

Much of the required information specified in the DIDs may already exist in the Contractor’s documentation. In those cases, existing documents and formats should be used if they meet the intent of the DID requirements. If so, a notation shall be supplied in the deliverable which indicates where in the Contractor’s document the information that satisfies the requirement can be found.

1.4 DELIVERY INSTRUCTIONS

a. The Contractor shall deliver each CDRL item via the media indicated below in accordance with the schedule and any special instructions indicated in Table 2 and/or the corresponding DID, and in accordance with the contract or mission-specific Delivery Order (DO) requirements and provisions.

b. All CDRL items shall be delivered electronically (one electronic copy for each CDRL item) to an electronic library designated by the Government. If all or a portion of a CDRL item is not well suited for electronic delivery, the item may be delivered via hard copy upon mutual agreement between the Contractor and the Government.

c. Upon submitting each CDRL item, the Contractor shall notify via email the Government Contracting Officer (CO), the CO Representative, and the Data Management Office.

1.5 CDRL ITEMS OVEVIEW

Table 1 provides a list of CDRL item categories as follows:

a. Item #: An alpha-numeric identifier for each CDRL item category and its respective DID.

The alpha descriptor is based on the subject matter of the deliverable:

Table 1 Alpha-numeric identifiers for each CDRL

PM Program Management RM Resource Management

RVW Reviews SE Systems Engineering

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

MA Mission Assurance and Safety OPS Operations SW Software I&T Integration and Test FW FPGA Development Plan

b. Requirements Reference: The reference indicates the section of the L1 Series Instrument

SOW, MAR, and/or Instrument Requirements Specification (SPEC) where the CDRL item is called out.

c. Title: (self-explanatory)

d. Delivery: The contract baseline schedule of delivery for the CDRL item. Many of the dates are referenced to reviews or other milestones. Unless stated otherwise, days are calendar days.

e. Flight Model: This column describes if a deliverable is required for the first flight model, all fight models or a subset of all flight models.

f. Purpose: The purpose of the CDRL item submission (i.e., The Government’s role following receipt of a CDRL item) is based on the definitions below. The designation for an item applies to all submissions (e.g., preliminary/initial, update, final) of that item unless noted otherwise. UAR indicates Update as Required with the approval letter indicated in the parenthetical. An A, R, or I indicate the delivery is required, with the Government’s role following a receipt as indicated.

Table 2 L1 Series Coronagraph Contract Deliverables Requirements List (CDRL)

CRDL No. SOW/MAR Title Delivery Flight Model Purpose

PM-1 SOW 4.1 Program Management Plan Preliminary: 30 DACA Final: PDR+14 days ALL R

PM-2 SOW 4.1 Weekly Status Reports and Telecon Minutes Weekly ALL I

PM-3 SOW 4.6 Configuration Management Plan

Preliminary: 15 DACA Final: PDR + 14 days FM1 A

PM-4 SOW 4.6 Configuration Change Requests (CCR) Class I As generated ALL A

PM-5 SOW 4.7.6

Program Management

Status Review Data Package

Bi-monthly ALL I

PM-6 SOW 4.2 NASA Property in the Custody of the Contractors

Per Contract Clause 1852.245-73, Oct. 15, of each contract year for prior year. Final at contract closeout.

ALL R

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

CRDL No. SOW/MAR Title Delivery Flight Model Purpose

PM-7 SOW 4 Contractor Task Plan

Per the contract ordering mechanism for Special

Studies (only required once a special study is requested/awarded)

ALL R

PM-8 SOW 4.6 Document Tree Preliminary: PDR Final: CDR ALL R

RM-1 SOW 4.3.1 Earned Value Management (EVM) Plan

Initial Submission:

In accordance with NFS

1852.234-2, or Alternate I, 60 DACA

Frequency:

Revised EVMS description or plan as directed

ALL A

RM-2 SOW 4.3.3 Financial Reports:

533 M Package 533 Q Reports

Initial Submission:

533M package shall be submitted 30 DACA.

533Q Reports: shall be submitted after the initial 533M and contain a full fiscal year estimate by quarter Frequency:

533M are due NLT 10 working days following the close of the contractor’s monthly accounting period, unless otherwise specified in the contract.

The 533Q reports shall be distributed NLT the 15th day of the month preceding the quarter being reported.

RM-3 SOW 4.3.4,

4.9

Risk Management (RM) Plan

Initial Submission:

60 DACA

Frequency:

Revised RM description or plan within 30 days after contractor internal approval or as directed by Contracting Officer.

Update:

The Risk Report shall be updated monthly or more

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

CRDL No. SOW/MAR Title Delivery Flight Model Purpose frequently, as required. A review copy shall be provided to the Government at least 24 h in advance of Monthly

Risk Management Board Meetings.

RM-4 SOW 4.3.5 Integrated Program

Management Data and Analysis Report (IMPDAR)

Initial Submission:

The IMPDAR authoritative data (CPD, Schedule, and Performance Narrative) shall be submitted NLT 16 business days after the end of the first full accounting period following the ATP.

Frequency:

Microsoft Project or

Native Schedule and SPD by the 5th business day after the contractor’s accounting month ends.

CPD and Executive Summary by the 10th business day after the contractor month end.

Then the Government has three days to review, analyze the data and informs the contractor the list of control accounts for detailed variance analysis.

Detailed Analysis Report by the 16th business day after the contractor accounting month end.

Monthly Performance

Narrative Report (Executive Summary and Detailed Analysis) shall be submitted NLT 16 business days after the close of the contractor’s monthly accounting period.

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

CRDL No. SOW/MAR Title Delivery Flight Model Purpose

RM-5 SOW 4.4 Integrated Baseline Review (IBR) Package

Initial Submission:

60 days prior to IBR

Frequency:

Per the direction of the cognizant government contracting officer, updated as required

FM1 A

RM-6 SOW 4.3.2 Contract Work Breakdown Structure and Dictionary

Initial Submission:

Draft CWBS and CWBS dictionary will be submitted with the proposal. The initial CWBS and CWBS dictionary will be submitted 30 DACA Updates:

As required Frequency:

Revised pages are to be submitted 10 calendar days after CWBS changes (following Government approval)

ALL A

RVW-1 SOW

4.7.4.1

System Definition Review (SDR) Data Package

Preliminary:

SDR/SRR –14 days

Update:

SDR/SRR – 7 days

Final:

NLT SDR/SRR review – 2 days

FM1 R

RVW-2 SOW

4.7.4.2

Preliminary Design Review (PDR) Data Package

Preliminary:

PDR– 14 days

Final:

NLT PDR review – 2 days

ALL R

RVW-3 SOW

4.7.4.3

Critical Design Review (CDR) Data Package

Preliminary:

CDR – 14 days

Final:

NLT CDR review – 2 days

ALL

R

RVW-4 SOW

4.7.4.4

Pre-Environmental Review (PER) Data Package

Preliminary:

PER Dry Run– 7 days

Final:

PER

RVW-5 SOW

4.7.4.5

Pre-Storage/Pre-Ship Review (PSR) Data

Package

Preliminary:

PSR Dry Run – 7 days

Final:

PSR

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

CRDL No. SOW/MAR Title Delivery Flight Model Purpose

RVW-6 SOW 4.7.3,

4.7.9

Subsystem Review Minutes and Action Items

Preliminary:

2 days after review

Final:

14 days after review

A

RVW-7 SOW 4.1 Responses to Request for Actions

Preliminary:

30 days after assigned

Updates: As agreed

ALL R

R

RVW-8 SOW 4.7.9 Subcontract and Subsystem Review Data Packages Final: Review ALL R

SE-1 SOW 5.1 Systems Engineering Management Plan

Preliminary: 30 DACA Final: PDR – 30 days FM1 R

SE-2 SOW 5.6 Engineering Analyses Reports As generated ALL R

SE-3 SOW 5 COR System Specification Preliminary: SDR – 14 days Final: SDR

FM1 A

A

SE-4 SOW 6.1 Detailed Design Specifications

Preliminary: Applicable subsystem PDR

Final: Applicable subsystem CDR

ALL R

R

SE-5 SOW 5.3,

6.3.2.5

Thermal Math Model and Reports

Preliminary: PDR Update: CDR, FM1 PER, FM1 PSR, and as generated

FM1 R

R

SE-6 SOW 5.3,

6.3.2.2

Structural Math Model and Reports

Preliminary: PDR Update: CDR, PER, PSR, and as generated

FM1 R

R

SE-7 SOW 5.3,

6.3.2.2 Solid Math Model

Preliminary: PDR Update: CDR, PER, PSR, and as generated

FM1 R

R

SE-8 SOW 4.6 &

6.1.1

Instrument Block Diagrams, And Approved Or

Controlled Drawings

Preliminary: PDR Final: PSR

Update: CDR

FM1

R R

SE-9 SOW 5.1 &

6.3.2

System Performance Verification Plan

Preliminary: SDR/SRR Final: PDR ALL

SE-10 SOW 5.1 &

6.3.2

System Performance Verification Report

Preliminary: PSR – 30 days ALL R

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

CRDL No. SOW/MAR Title Delivery Flight Model Purpose

Final: PSR

SE-11 SOW 5.1 &

6.3.2

Performance Verification Procedures 30 Days prior to use ALL A

SE-12 SOW 6.3.2 Environmental Verification Specification

Preliminary: PDR-14 days Final: CDR – 14 days Update: As Required

ALL

A A A

SE-13 SOW 6.3.2 Environmental Verification Reports

Initial assessment:

1 day after test

Preliminary: 5 days after test

Final: 30 days after Test

R

SE-14 SOW 4.6,

6.3, 8

Digital Image and Video Records

Preliminary: PER Final: PSR

Update: As requested by government

ALL

I I I

SE-15 SOW 6.3 Individual Test Plans Preliminary: CDR Final: 90 days before Test ALL A

SE-16 SOW 5.5 Magnetic Control Plan Preliminary: PDR Final: CDR FM1 R

R

SE-17 SOW 6.2

Component and

Subassembly Test Reports for all Subcontracted Items

As generated Maintained on site ALL I

SE-18 SOW

6.3.2.3

EMC/EMI Compatibility Plan

Preliminary: PDR Final: CDR FM1 R

R

SE-19 SOW 7.1.2

Maintenance, Test, and

Operations Manual for the Coronagraph Emulator

Final: With Delivery of

CORE FM1 R

SE-20 SOW 6.1 &

6.2

Request for Use of Multi- Mission or Previously

Designed, Fabricated, or Flown Hardware

Preliminary: 60 DACA Final: SDR/SRR + 60 days FM1 R

R

MA 1-1 SOW 8

MAR 1.1

Mission Assurance Requirements Compliance

Matrix

Preliminary: With proposal Final: 15 DACA FM1 I

A

MA 1-2 SOW 8

MAR 1.8 Supplier List

Initial: 60 DACA Updates: As updated by

Contractor

ALL I

MA 2-1 SOW 8

MAR 2.3

Input to Orbital Debris Assessment Report (ODAR) and End of

Mission Plan (EOMP)

Preliminary ODAR: 45 days prior to mission PDR ALL

I I

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

CRDL No. SOW/MAR Title Delivery Flight Model Purpose

Interim ODAR and Draft EOMP: 60 days prior to mission CDR Final: 90 days prior to

Instrument PSR

MA 3-1 SOW 8

MAR 3.3.1 System Safety Plan (SSPP)

Preliminary: /SRR Final: 45 days prior to

PDR

Updates: 30 days prior to implementation

ALL

R A A

MA 3-2 SOW 8

MAR 3.3.2

Safety Requirements Compliance Checklist

Preliminary: 45 days prior to PDR

Final: 45 days prior to

CDR

Updates: 45 days prior to Implementation

ALL

A A A

MA 3-3

SOW 8

MAR

3.3.4.2

Operations Hazard Analysis (OHA) and Hazard

Verification Tracking Tool

(HVTL)

Final OHA and HVTL: 45 days prior to first use FM1 A

MA 3-4

SOW 8

MAR 3.3.3,

3.3.4

Instrument Safety Assessment Report (ISAR)

Preliminary: 30 days prior to instrument PDR

Intermediate: 30 days prior to instrument CDR

Final: 30 days prior to instrument PSR

FM1 only (if identical design and build for all FMs)

MA 3-5 SOW 6.5,8

MAR 3.3.6

Hazardous Procedures for Payload I&T and Prelaunch

Processing

I&T Hazardous Procedures: 7 days prior to first use Launch Range Hazardous Procedures: 65 days prior to first use

ALL R

MA 3-6 SOW 8

MAR 3.3.8 Pre-Mishap Plan

Preliminary:

45 days prior to PDR

Final:

45 days prior to CDR

Updates:

45 days prior to PSR

MA 4-2 SOW 8

MAR 4.2.1

Failure Mode, Effects, and Criticality Analysis

(FMECA) and Criticality Items List (CIL)

Preliminary:

30 days prior to PDR

Update:

30 days prior to CDR and each subsequent milestone review leading to LRR

ALL

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

CRDL No. SOW/MAR Title Delivery Flight Model Purpose

MA 4-3 SOW 8

MAR 4.2.2 Fault Tree Analysis

Preliminary: 30 days prior to PDR

Final: 30 days prior to

CDR

Updates: 30 days after identification of updates or changes

ALL

R R R

MA 4-4 SOW 8

MAR 4.2.3 Reliability Predictions Preliminary: PDR

Final: CDR FM1 R R

MA 4-5 SOW 8

MAR 4.3 Limited Life Items List

Draft: 30 days prior to

PDR

Preliminary: 30 days prior to CDR

Updates: 30 days after identification of updates or changes

FM1

R R R

MA 4-6 SOW 7.1, 8

MAR 4.4 Parts Stress Analysis

Draft: 30 days prior to

PDR

Final: 30 days prior to

CDR

Revisions: 30 days after identification of updates or changes

FM1

A A A

MA 4-7 SOW 7.1, 8

MAR 4.5 Worst-case Analyses

30 days prior to CDR Revisions within 30 days after identification of updates or changes

FM1 R

MA 5-1 SOW 8

MAR 5.1 Software Assurance Plan

Preliminary: 30 days prior to SRR

Final: 15 days prior to

PDR

Updates: 30 days prior to implementation

FM1

I

MA 6-1 SOW 8

MAR 6.2

Electrostatic Discharge Control (ESD) Plan 30 days prior to PDR FM1 I

MA 6-2 SOW 8

MAR 6.3

Printed Circuit Board (PCB) Procurement Plan

Preliminary: 30 days prior to CDR

Changes: 14 days prior to manufacturing

FM1

MA 6-5 SOW 8

MAR 6.4 Lead-Free Control Plan 60 DACA FM1 I

MA 7-1 SOW 8

MAR 7 EEE Parts Control Plan 30 DACA FM1 I

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

CRDL No. SOW/MAR Title Delivery Flight Model Purpose

MA 7-2 SOW 8

MAR 7.4 Master EEE Parts List

EEE parts to the Parts Control Board prior to inclusion Updates prior to inclusion

ALL A

MA 7-3 SOW 8

MAR 7.5

Radiation Effects Mitigation 60 DACA FM1 A

MA 7-4 SOW 5.3, 8

MAR 7.5

Radiation Shielding and Dose Analysis Report

Preliminary: PDR Final: CDR FM1 R

MA 7-5 SOW 5.3, 8 Single Event Effect Fault Management Plan

Preliminary: PDR Final: CDR FM1 A

MA 8-1 SOW 8

MAR 8.1

Materials & Processes Selection, Control, and Implementation Plan

(MPCIP)

14 days prior to SRR 30 days prior to PDR 30 days prior to CDR

FM1

I A A

MA 8-2 SOW 8

MAR 8.2 Materials Usage Agreement

30 days prior to CDR New or revised after CDR:

30 days after their identification

ALL A

MA 8-3

SOW 8

MAR 8.3,

9.2

Materials Identification and Usage List (MIUL)

Preliminary:

30 days prior to PDR

Final:

30 days prior to CDR

Updates within 30 days after identification

As-built MIUL 30 days prior to PSR

ALL

R A A A

MA 8-4 SOW 8

MAR 8.4

Life Test Plan and Final Report for Lubricated

Mechanisms

30 days prior to PDR 30 days after acceptance test completion

ALL A

I

MA 8-5 SOW 8

MAR 8.5

Additive Manufacturing Control Plan (AMCP)

14 days prior to SRR 30 days prior to PDR 30 days prior to CDR

FM1

I A A

MA 8-6 SOW 8

MAR 8.6 AM Production Plan (PPP) 30 days prior to CDR

30 days prior to AMRR FM1 I A

MA 9-1 SOW 8

MAR 9.1 Contamination Control Plan

Preliminary: 30 days before PDR

Final: 30 days before CDR Final thermal vacuum bakeout results: within 30 days of completion

Contamination Certificate of compliance with EIADP

ALL

R

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

CRDL No. SOW/MAR Title Delivery Flight Model Purpose

MA 9-2 SOW 8

MAR 9.3

Foreign Object Debris Prevention and Control 30 days prior to PDR FM1 R

MA 11-1 SOW 8

MAR 11.1

GIDEP Alerts/NASA Advisory Dispositions

Disposition of existing Alerts within 30 days of identification Disposition of new Alerts within 30 days of Alert release

MA 11-2 SOW 8

MAR 11.3 Initiating GIDEP Alerts Within 30 days of identification ALL R

MA 12-1 SOW 8

MAR 12

End Item Acceptance Data Package

Preliminary: 30 days prior to PSR

Final: 30 days prior to End Item delivery

Updates: 30 days after identification

OPS-1 SOW 6.5.3 Flight Telemetry and Command Database

Baseline: PER Final: PSR FM1 R

R

OPS-2 SOW 6.5.3 Flight Telemetry and Command Handbook

Preliminary: PDR Final: PSR

Updates: As required

FM1 R

R

OPS-3 SOW 6.5.3 Operations Handbook Preliminary: PER Final: PSR FM1 A

A

OPS-4 SOW 6.1.3

Ground Processing

Algorithms Test and Validation Plan

Preliminary: PDR Update: CDR

Final: PSR - 3 months

FM1

A A A

OPS-5 SOW 6.1.3 Ground Processing Algorithm Document

Preliminary: PDR Update: CDR

Final: PSR -3 months

FM1

A A A

OPS-6 SOW 6.1.3 Ground Software Acceptance Plan Input

Preliminary: CDR Final: PSR - 6 months FM1 R

R

OPS-7 SOW 6.5.3 Trend Analysis Plan And Data Reports

Preliminary: PDR Final:

CDR as generated

ALL R

OPS-8 SOW 6.5.2 On-site Data Analysis Reports As generated ALL R

OPS-9 SOW

6.3.3.2

Mass Properties and Power Report

Monthly NLT 15th of each month FM1 I

OPS-10 SOW 7 COR Packetized Data As generated ALL I

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

CRDL No. SOW/MAR Title Delivery Flight Model Purpose

OPS-11 SOW 6.5.3 Instrument Operations Configurable Items

Preliminary: 30 days prior to launch

Updates: As needed

ALL R

R

SW-1 SOW 6.1.2 Software Management Plan

Preliminary:

30 DACA

Final:

SW Acceptance Review

Update:

PDR, CDR, TRR

FM1

A A A

SW-2 SOW 6.1.2,

6.5.3.1

Software Delivery Packages

Preliminary: PER Final: PSR

Updates: At major revision releases

ALL

R R R

I&T-1 SOW 6.4.1 Transportation, Handling Plan and Procedures

Preliminary: PDR Final: CDR ALL R

I&T-2 SOW 6.5.3,

6.5.5 Post Launch Test Reports

Preliminary: 2 weeks after test

Final: 2 months after test

ALL R

I&T-3 SOW 5.3 Observatory Level Test Procedures

Preliminary: PER Final: PSR ALL R

I&T-4 SOW 5.3 Observatory Level Test Report Observatory PSR ALL R

I&T-5 SOW 6.3.3 Calibration Program Plan Preliminary: SDR/SRR

Update: PDR Final: CDR

ALL

A A A

I&T-6 SOW 6.3.3 Calibration Data Books Final: PSR of each Model ALL R

FW-1 SOW 6.2.1 FPGA Development Plan Preliminary: SRR/SDR

Final: 30 days before PDR

FM-1 R

FW-2 SOW 6.2.1 FPGA Design Data Package

(FDDP)

Preliminary:

30 days before CDR

Updates: As generated Final: 30 days before PER

FM-1

R

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

2 PROGRAM DATA ITEM DESCRIPTIONS

PM-1 PROGRAM MANAGEMENT PLAN

Title:

Program Management Plan

DID for CDRL No.

PM-1

Reference:

COR SOW Section 4.1 Purpose:

Describes how the program is organized and managed. It provides the management structure, its system of operation, responsible lines of communications, and key personnel assignments Preparation Information:

1. The Program Management Plan shall address the overall organization, management approach, and structure of the COR Program plus its interrelationships with the parent company and the subcontractors, and relationship with the Government.

2. The Program Management Plan shall delineate how the requirements of the Statement of Work (SOW) will be achieved and include a description of planned activities for identifiable SOW requirements.

3. The Program Management Plan shall address interfaces with the Government and with any Government Furnished Equipment (GFE) suppliers.

4. The Program Management Plan shall indicate critical paths, long-lead items and significant milestones down to the lowest level of the WBS.

5. The Program Management Plan shall indicate the need for additional definition of spacecraft and mission information, and when this information is required to avoid schedule slippage.

6. The Program Management Plan shall include graphical displays such as flow diagrams, WBS, logic networks, etc., to reduce verbal descriptive material.

7. The Program Management Plan shall provide an organizational chart(s) and sufficient supplemental narrative to describe fully the organization proposed for carrying out the program showing inter- relationships of technical management, business management, and subcontract management, from lower level through intermediate management to top-level management with detailed explanation of:

a. The authority of the COR Program Manager relative to other ongoing programs and applicable support organizations within the company structure.

Discuss the program manager’s control over essential resources and functions necessary to accomplish the work.

b. How and by whom interdepartmental work will be monitored and the authority of the program manager over interdepartmental work.

c. Process to be followed by the program manager in obtaining decisions beyond his/her authority and in resolving priority conflicts for resources and functions

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

not under the program manager’s direct control such as personnel, finances, and facilities.

d. The lead program team members with names, functions, and qualifications

8. The Program Management Plan shall provide contractual procedures proposed for the program to effect administrative and engineering changes, describing any differences from existing procedures.

9. The Program Management Plan shall describe management techniques to be employed in minimizing program costs and schedule impacts, including controls to be exercised over subcontractors and suppliers.

10. The Program Management Plan shall describe how issues will be surfaced in a timely manner and at the proper levels.

11. The Program Management Plan shall describe how supply chain performance will be tracked.

12. The Program Management Plan shall discuss and illustrate the proposed COR Mission Assurance organizational structure, including staffing plans, reporting channels, authority and responsibilities, and management visibility.

13. The Program Management Plan shall discuss whether the technical, test, manufacturing and system safety/quality assurance/ reliability/ configuration management personnel required for this program (as indicated in your proposed labor hours) are presently on payroll and immediately available for this work.

14. The Program Management Plan shall state the number and kind of persons who would have to be hired and plans to obtain them.

15. The Program Management Plan shall describe how the schedules are developed, maintained and updated.

16. The Program Management Plan shall describe how subcontracts will be managed and reviewed and describe the performance milestones of each.

17. The Program Management Plan shall list and describe the planned subsystem reviews.

PM-2 WEEKLY STATUS REPORTS AND TELECON MINUTES

Title:

WEEKLY STATUS REPORTS AND TELECON MINUTES

DID for CDRL No.

PM-2

Reference:

COR SOW Section 4.1 Purpose:

Contract status evaluation.

Preparation Information:

1. The Weekly Status Report shall indicate the status of the contract as of close of business the preceding Friday, including a summary of progress made.

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

2. The Weekly Status Report shall address the work completed during the week against the work planned for the week, and address recovery plans if necessary.

3. The Weekly Status Report shall include technical progress, including significant accomplishments and milestones reached.

4. The Weekly Status Report shall include problems encountered and proposed corrective action.

5. The Weekly Status Report shall indicate any actual or anticipated slip in schedule.

6. The Weekly Status Report shall include identification of any Class I or Class II changes.

7. The Weekly Status Report shall detail the work planned for the next week and summarize the work planned for the next month.

8. The Weekly Status Report shall contain Action Item Status for any overdue action items and any action items due in the next two weeks.

9. The Weekly Status Report shall contain status of any open Non-Conformance

Reports.

10. The Weekly Status Report shall contain status on any open contract actions, including

Special Engineering Analyses.

11. The Weekly Status Report shall contain status on any red risk item.

Note: This weekly report is intended to be timely and informal and should detail the above topics as changes or problems occur.

PM-3 CONFIGURATION MANAGEMENT PLAN

Title:

CONFIGURATION MANAGEMENT PLAN

DID for CDRL No.

PM-3

Reference:

COR SOW Section 4.6 Purpose:

To define the contractor’s configuration management system and provide a means of control for all changes affecting form, fit, or function and any impact on performance, cost or schedule.

Preparation Information:

1. The Configuration Management Plan shall describe the scope, approach, methods, and procedures of the system used to control changes of requirements, design, and any other configuration managed item.

2. The Configuration Management Plan shall describe the organization of the configuration management program and how it relates to the rest of the COR program.

3. The Configuration Management Plan shall list all tools used for configuration management.

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

4. The Configuration Management Plan shall use the following product change classifications:

a. A change or request for Deviation/Waiver is classified as Class I when it affects one or more of the following factors:

i. Program baseline documentation

ii. Technical requirements contained in the product configuration identification, including the following:

1. Form, fit, or function

2. Performance

3. Power

4. Reliability outside stated requirements

5. Weight, balance, moment of inertia

6. Interface characteristics

7. Hardware and process qualifications

iii. Non-technical contractual provisions

1. Fee

2. Incentives

3. Cost

4. Schedule

5. Guarantees or deliveries

iv. Other factors

1. Government-furnished property (GFP)

2. Safety

3. Electromagnetic characteristics

4. Deliverable operational, test, or maintenance computer programs

5. Compatibility with support equipment

b. A change is classified as Class II when it does not fall within the definition of a Class I change.

PM-4 CONFIGURATION CHANGE REQUESTS (CCR) CLASS I

CONFIGURATION CHANGE REQUESTS (CCR) CLASS I

DID for CDRL No.

PM-4

Reference:

COR SOW Section 4.6

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

Purpose:

Class I changes are to be used as a vehicle for orderly processing of change requests to appropriate levels of approval authority for disposition.

Preparation Information:

Class I Configuration Change Requests shall document proposed changes impacting form, fit, function, cost, schedules or performance per the Configuration Management Plan or per the Software Configuration Management Plan section of the Software Management Plan.

PM-5 PROGRAM MANAGEMENT STATUS REVIEW DATA PACKAGE

PROGRAM MANAGEMENT STATUS REVIEW DATA PACKAGE

DID for CDRL No.

PM-5

Reference:

COR SOW Section 4.7.6 Purpose:

To summarize the progress since the previous Program Management Status Review.

Preparation Information:

The Program Management Status Review Data Package shall include the following items:

1. Accomplishments since last review, including 20 milestone events depicting critical items of program status for the succeeding two months with a report on the previous two months milestone events

2. Schedule

3. Technical issues and concerns, including summaries of technical progress and descriptions of the current technical issues and concerns

4. Business issues and concerns, including personnel changes

5. Open contract items

6. Open action items

7. Planned effort for next review period

8. Reliability and quality assurance information

9. Mass properties and power summary

10. Software metrics for each Class A, B or C Computer Software Configuration Item

(CSCI) including:

a. Number of software requirements and their change status

b. Number of software change requests and problem reports and their status

c. Resource utilization estimates and measurements of memory, CPU and I/O

Bandwidth

11. Financial summary including a summary of actuals versus planned manpower

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

12. Subcontractor status including:

a. Efforts under contract

b. Efforts waiting contract award

c. Changes to first tier and sub-tier contractors

d. Change orders, problems, issues

e. Pending subcontractor consent packages

f. Supply chain performance will be tracked using the table below, updated bi-monthly. This includes items 12. a. through 12. e. for subcontracts.

Part Description Supplier Leadtime

Original Date

(on contract)

Delivery Date

Need date

Slack (days)

Affected Constraint

Te ch ni ca l

Sc he du le

C on tra ct

13. A list of actions requested of GSFC management

14. Update of corporate changes, for example: early warning of

a. Restructuring activities (including internal reorganizations)

b. Indirect/direct rate changes

15. Risk assessment including approach for mitigation

16. Any additional data requested by GSFC

PM-6 NASA PROPERTY IN THE CUSTODY OF THE CONTRACTORS

NASA PROPERTY IN THE CUSTODY OF THE CONTRACTORS

DID for CDRL No.

PM-6

Reference:

COR SOW Section 4.2 Purpose:

For budget, cost, and property control Preparation Information:

The NASA Property in the Custody of the Contractors report shall consist of NASA Form 1018 in accordance with NFS 1845.505-14, the instructions on the form, subpart 1845.71, and any supplemental instructions for the current reporting period issued by NASA.

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

PM-7 CONTRACTOR TASK PLAN

Title:

CONTRACTOR TASK PLAN

DID for CDRL No.

PM-7

Reference:

COR SOW Section 4 Purpose:

The task plan is the contractor's resources plan for accomplishing the work described in the task order.

Preparation Information:

The Contractor Task Plan shall be prepared in accordance with the contract ordering mechanism for Special Studies.

PM-8 DOCUMENT TREE

DOCUMENT TREE

DID for CDRL No.

PM-8

Reference:

COR SOW Section 4.6 Purpose:

For ready reference list of all COR and GSE documents.

Preparation Information:

1. The document tree shall list all documents for the COR and separately for the GSE.

2. The document trees shall be organized and identified to serve as a ready reference list.

3. The document tree shall identify documents by name and number.

4. The document tree shall include a brief description defining the scope of each document

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

3 RESOURCE MANAGEMENT

RM-1 EARNED VALUE MANAGEMENT (EVM) PLAN

EARNED VALUE MANAGEMENT (EVM) PLAN

DID for CDRL No.

RM-1

Reference:

COR SOW Section 4.3.1

Purpose:

To provide a comprehensive description of the contractor’s plan for utilizing an earned value management system (EVMS) that complies with the Electronic Industries Alliance (EIA)-748 guidelines.

Preparation Information:

1. The EVMS description or plan shall present the contractor's approach to comply with the EIA-748 guidelines.

2. The EVMS description or plan shall address the processes for conducting variance analysis; developing ongoing comprehensive estimates at completion; flowing down requirements to all applicable subcontracts; and managing technical scope, schedule, cost, and risk.

3. The EVMS description or plan shall address the requirements of NASA’s Federal Acquisition Regulation Supplement (NFS) 1852.234-2 or Alternate I.

4. Guidelines are available in the Earned Value Management Systems EIA-748-D Intent Guide Appendix Compliance Map Template

5. Contractor-selected Format are acceptable

Applicable Documents:

• Industry Guidelines for Earned Value Management Systems, EIA-748-D

• Earned Value Management System, NFS 1852.234-2 (or Alternate I)

• Earned Value Management System, EIA-748-D Intent Guide Appendix Compliance

Map Template

RM-2 FINANCIAL REPORTS

FINANCIAL REPORTS

DID for CDRL No.

RM-2

Reference:

COR SOW Section 4.3.3

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

Purpose:

To provide data necessary for:

a. Projecting cost and hours to ensure that cost and labor resources realistically support the project and its schedules.

b. Evaluating Contractor’s actual cost and fee data in relation to negotiated contract value, estimated costs, and budget forecast data.

c. Planning, monitoring, and controlling project resources.

d. Accruing cost in NASAs accounting system.

Preparation Information:

Financial management reports shall be submitted by the contractor on NASA’s 533 series reports, in accordance with NASA Procedural Requirements (NPR) 9501.2, NASA Contractor Financial Management Reporting (current version), and additional instructions issued by the contracting officer. The following information is required for all 533 series reports:

1. Level of Detail: The contractor’s 533 reports shall contain a summary of total contract costs and per the level specified in the WBS and WBS Dictionary DID (RM-

6) and contract modifications. The reports shall contain a breakdown of hours and costs by the elements of cost categories listed in bullet item (d) below.

2. Variance Narrative Reporting: In accordance with Section 3.6 of NPR 9501.2, the contractor shall include a narrative explanation for variances per items identified exceeding plus or minus 10 percent between the total direct labor hours (prime and subcontractors) and total estimated cost amount shown in the prior month and the actual total direct labor hours and actual total cost amount shown in the current month at the total contract level (for example, the “Estimated Cost Hours to Complete” amount shown for June in column 8a in the May NF 533M report and the “Cost Incurred Actual” June total cost amount shown in column 7a in the June NF 533M report). Each variance narrative shall explain the: (1) reason for the variance, (2) impact(s) on the core baseline and/or each individual task order, and (3) specific corrective action(s) being taken or to be taken.

3. Distribution: The contractor shall distribute 533 reports to each addressee indicated in the contract clause entitled, "Financial Management Reporting." The contractor shall submit an initial report in the NF 533M format within 30 working days after contract award. After the initial report, the NF 533M reports shall be distributed not later than the 10th working day following the close of the contractors' monthly accounting period. The 533Q reports shall be distributed not later than the 15th day of the month preceding the quarter being reported.

4. Reporting Requirements: Each individual report shall, at a minimum, provide cost data (using accruals to match the schedule and earned value management monthly data and end date) by the following elements of cost (EOC) categories and summaries:

a. Prime direct labor hours:

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

i. Prime direct labor hours – onsite

ii. Prime direct labor hours – offsite

iii. Total prime direct labor hours

b. Subcontractor direct labor hours:

i. Subcontractor A direct labor hours – onsite (include once for every subcontractor)

ii. Subcontractor A direct labor hours – offsite (include once for every subcontractor)

iii. Total subcontractors direct labor hours

c. Total prime and subcontractors direct labor hours:

i. Total prime and subcontractors hours – onsite

ii. Total prime and subcontractors hours – offsite

iii. Total prime and subcontractors direct labor hours

d. Prime direct labor costs:

i. Prime direct labor costs – onsite

ii. Prime direct labor costs – offsite

iii. Total prime direct labor costs

e. Prime overhead expenses:

i. Onsite overhead

ii. Offsite overhead

iii. Total prime overhead

f. Other direct costs (ODC):

i. Subcontracts (list separately, Subcontractor A, B, C, etc.)

ii. Material

iii. Travel

iv. Other (specify)

v. Total ODCs

g. Subtotal (direct labor, overhead, and ODCs)

h. General and Administrative expense

i. Total estimated cost

j. Fixed fee

k. Total cost-plus-fee

Check the L1 Series CM tool Server at https://ipdtdms.gsfc nasa.gov/ to verify that this is the correct version prior to use.

5. Financial Period End Date: Financial period end date will reconcile with the schedule status date and the earned value management calendar period end date.

• NPR 9501.2, NASA Contractor Financial Management Reporting

• NASA’s Federal Acquisition Regulation Supplement 1842.72, NASA Contractor Financial Management Reporting

• G.1, Financial Management Reporting (GSFC 52.52.242-90)

•…