Attachment B - Specifications Vault Toilet Pumping Contract Specifications

SECTION C • DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C-1 GENERAL SPECIFICATIONS

C.1-1 Scope of Contract Contractor shall furnish, on a call when needed basis, toilet pumping services which includes all equipment, supervision, transportation, labor, operating supplies, and incidentals necessary to pump, wash down, recharge, cleanup, disinfect, and dispose of all waste products removed from the toilets, in accordance with the following contract specifications and in accordance with State and Federal regulations.

C.1-2 Description. Dates and Location The number of days and exact dates on which services will be required cannot be pre- determined.

The location of the work sites, access to the sites, and other information pertinent to each area is contained in the various Attachments: Maps, Location & Frequencies, Vault Locations List.

C.1-3 Scheduling Work The Government Contracting Officers Representative (COR) will notify the Contractor of the required servicing. This initial notification may be by phone, FAX, or other means. The Contractor must complete the required servicing within 72 hours (not including Saturday or Sunday) after the initial notification. Generally, servicing shall be between the hours of 8 A.M. and 5 P.M.

Occasional emergency pumping may be required and may be outside the 8 A.M. and 5 P.M. constraint. Response time for any emergency will be by mutual agreement between both parties.

C.1-4 Definitions

1. Sewage liquid, semi-liquid, and solid waste matter.

2. Debris all other refuse found in vault toilets, to include but not limited to items such as the following:

Cans, bottles, rocks, sticks, and logs, clothing, plastic bags and containers, metal products, pinecones, waste food products, cardboard and paper products, whole rolls of toilet paper, toilet paper dispensers, tools, diapers and sanitary napkins, miscellaneous trash, etc.

C.1-5 Prework Conference Prior to the start of work, a meeting will be scheduled by the Contracting Officer to be attended by the Contractor, The Contracting Officer, the Contracting Officer's Representative (COR), and other Forest Service personnel who may be involved in the administration of this contract. The meeting will be held at a time and place mutually agreeable to the Contractor and Contracting Officer. The purpose of this meeting is to thoroughly discuss the schedule of work, work performance requirements, approved waste disposal sites, contract terms, and to familiarize both parties with the responsibilities of each under the terms of this contract.

C.1-6 Contractor's Representative Prior to the start of work, the Contractor shall designate in writing a person to act for him/her during his/her absence from any work site and shall specify the scope of their authority.

C.1-7 Minimum Pumping Request Guarantee As a minimum, each service call will guarantee one of the following: Three units to be serviced.

C,2 TECHNICAL SPECIFICATIONS

C.2-1 Equipment The Contractor shall furnish all toilet pumping equipment, tank truck (a truck that can reverse the suction process and create a pressure force is preferred so that the inevitable clogged lines can be more easily cleaned, but is not required), water truck, tools, approved disinfectant, and other equipment and supplies necessary to perform work in accordance with these specifications. A 4 inch (minimum size) suction hose and attachment couplings shall be utilized to accomplish all pumping requirements.

The length of hose must be long enough to accomplish the required pumping. (Contractor may preview sites by contacting the COR to determine accessibility)

Some type of pressure washer system is required to wash the side and end walls of the vault after pumping and may be necessary to dilute solidified waste in the bottom of a flat bottomed vault and to wash the last portion of waste down a sloped bottomed vault.

Some suggested tools are: Two 6 foot long clam rakes with 6 inch long tines (the tines shall be completely dulled or rounded on the ends to prevent the tines from injuring the pumper or his/her helpers and from puncturing any rubber or synthetic liners that may be present in the vault), a long handled grabber, plastic bags to haul away all the miscellaneous debris (see C.1- 4), brushes designed for cleaning up the spilled waste, and containers to mix the cleaning and disinfecting solutions in.

All disinfecting solutions shall be approved by the COR.

All equipment shall be in full accordance with any local and State County Regulations. C.2-2 Pumping Procedures When an Outside Manhole is Available As long as the outside pump out access is in excess of 20 inches in diameter (or 20 inches square) the Contractor shall not be allowed to remove the vault contents through the toilet riser. If the dimension is less than 20 Inches, then there may be items in the vault that were thrown into the vault through the toilet riser which is 16 inches by 20 inches and those items may not be removable through the outside manhole of a lesser dimension.

After removing the manhole cover, use the clam rakes or long handled grabber to remove as much of the debris as possible before trying to pump out the waste. This procedure will help stir up the contents of the vault and break up the dense concentration of waste typically located just under the toilet riser (the impact zone). By removing most or all of the debris before pumping, the Contractor will find that the 4 inch hose will not clog so often, and the liquid portion of the contents will not be removed before the thicker solids are removed.

ALL DEBRIS REMOVED FROM THE VAULT SHALL BE PLACED INTO A LEAK PROOF CONTAINER SO THAT NO CONTAMINATION TO THE SURROUNDING GROUND WILL RESULT.

If the bottom of the vault is flat, then the waste shall be removed down to within 4-5 inches of the bottom. At this point the 4 inch hose will begin to suck air (vortexing) and further removal will be slow.

At this time remove any further debris that was not removed during the initial raking and removal.

Using a pressure washer system, wash down the interior walls of the vault before the clinging debris has a chance to dry. If at this time, there is a heavy concentration of solids on the bottom of the vault, use the pressure washer system to break up and dilute the solids and then pump this diluted waste down again until the suction hose begins to suck too much air to make further pumping practical.

The flat bottomed vault shall now be pre-charged with enough water to bring the depth of water up to 12-18 inches. Deodorize the remaining vault contents.

If the bottom of the vault is sloped (all vaults should be sloped a minimum of 1 in per ft), then pump the waste down (at the deep end) to where the hose begins to suck air. Remove any remaining debris and then go inside the building with the pressure washer system and wash the remaining waste down the sloped bottom. Wash down the vault walls from inside the building or from the outside manhole, whichever is easier. Now pump out the remaining waste and the water that was just added by the pressure washer until the suction hose begins to suck too much air to make further pumping practical.

Pre-charge the vault with clean fresh water so that there is 12-18 inches of water covering the bottom under the toilet riser. Deodorize the remaining vault contents.

Thoroughly clean and disinfect all contaminated areas resulting from the pumping process. Either sweep or wash all waste that is deposited on the concrete surrounding the manhole cover, back into the vault if possible. The waste that runs off the edge of the concrete, onto the dirt or into the gravel edge, will be an attractant for fly’s, a potential health risk and an odor problem. This problem should be avoided.

Clean thoroughly around the manhole cover gasket area and replace the cover. The manhole cover MUST fit with an airtight seal so that the venting process of the vault toilet is not interfered with. If there is not an airtight seal, the Contractor shall notify the COR.

C.2-3 Pumping Through the Toilet Riser When There Is No Outside Manhole Remove the debris and pump in accordance with C.2-2. Extra care shall be taken to prevent waste spillage onto the toilet riser, interior floor and wall surface while removing debris and while pumping. The toilet paper dispenser and toilet riser shall be protected from damage and the toilet paper shall be covered with a waterproof material prior to removing debris or pumping, in order to prevent the paper from getting contaminated.

During the final cleanup, the interior floor surface and any wall surface that was contaminated by waste shall be thoroughly disinfected. Again, every effort shall be made to sweep or wash the spilled waste back into the vault. The Contractor shall not allow the spilled waste to be washed or swept out through the front door because the waste will collect at the edge of the concrete and the dirt (or gravel) and will become an attractant for fly’s, a possible health risk for barefoot persons and an odor problem.

Thoroughly wash and disinfect both the inside and outside of the toilet riser and the seat and cover. The toilet riser and seat shall be dry before the Contractor leaves the work site. Remove the waterproof covering that was protecting the toilet paper and make sure the paper did not get contaminated. If the paper did get contaminated, the Contractor shall notify the COR. The door handles or knobs shall also be disinfected and dry before the Contractor leaves the job site.

Each unit shall be available for immediate use after the pumping and final cleanup. The Contractor shall not leave any toilet location until final cleanup is accomplished.

C.2-4 Offsite Disposal of Sewage and Debris The Contractor shall be properly licensed and shall be responsible for making disposal arrangements, including disposal of all effluent, debris, and trash, and payments of all fees. Disposal shall conform to all Federal, State, and local laws and ordinances. COR shall approve all disposal sites before pumping begins.

The Contractor shall be responsible to prevent spillage and to haul all waste material (sewage and debris) in watertight containers. Handling of all waste material shall be in accordance with all applicable health regulations.

C.2-5 Conduct of Personnel The Contractor and his/her employees shall make every reasonable effort to prevent interference with the normal use and occupancy of recreational areas while engaged in the performance of the contract.

Due to the nature of the duties under the contract, the Contractor and his/her employees shall keep themselves and equipment presentable at all times. The Contracting Officer may, in writing, require the Contractor to remove from the work site any employee the Contracting Officer deems incompetent, careless, discourteous to the public, or is otherwise objectionable, or for theft, possession and/or removal of materials, supplies, equipment, or any Government- owned property.

C.2-6 Resource Damage Any damage or defacement that occurs to government property or land resources during the Contractor's operations shall be repaired at the Contractor's expense to its original condition. Onsite inspection will be made by the COR prior to the acceptance of work.

Vault Details

Camp Name
Open Season
Estimated Times Pumped Per Year
Vaults
VAULTS Descriptions
South Branch Family Campground
15-May
Every two years
3
Three 500-gallon vaults
Stout Trailhead
1-Jan
Every two years
1
One 500 gallon vault
Hoist Lake West Area
1-Jan
Every two years
1
One 500 gallon vault
Reid Lake Foot Travel Area M72 Trailhead
1-Jan
Every two years
1
One 500 gallon vault
Horseshoe Lake Campground and Boat Launch
15-May
Every two years
2
Two 500 gallon vaults
Au Sable Vista
1-Jan
Every two years
1
One 500 gallon vault
Thompson's Landing River Access
1-Jan
Every two years
1
One 500 gallon vault
Pine River Campground
15-May
Every two years
2
Two 500 gallon vaults
Jewell Lake Boat Ramp
1-Jan
Every two years
1
One 500 gallon vault
Hoist Lake East Area
1-Jan
Every two years
1
One 500 gallon vault
Sand Lake Beach Day Use Area
15-May
Every two years
4
Four 500 gallon vaults
Liberty OHV Trailhead
1-Jan
Every two years
1
One 500 gallon vault
Eagle Run
1-Jan
Every two years
2
Two 500-gallon vaults
Sand Lake ORV Trailhead
1-Jan
Every two years
1
One 500 gallon vault
Corsair Trailhead
1-Jan
Every two years
1
Two 500 gallon vaults
Wrights Lake Trailhead
1-Jan
Every two years
1
One 500 gallon vault
River Road Trailhead
1-Jan
Every two years
1
One 500 gallon vault
Grass Lake OHV Trailhead
1-Jan
Every two years
1
One 500 gallon vault
Rollways Day Use Area
1-Jan
Every two years
1
One 500 gallon vault
South Branch Group Campground and Trailhead
1-Jan
Every two years
6
Six 500-gallon vaults
Jewell Lake Campground
15-May
Once a year
3
Three 500 gallon vaults
Pine Acres Boat Launch
1-Jan
Once a year
1
One 500 gallon vault
Sawmill Point Boat Launch
1-Jan
Once a year
4
Four 500 gallon vaults
Monument Campground
15-May
Once a year
5
Camp host holding tank, 4-500-gallon vaults
Round Lake Campground and Day Use Area
1-May
Once a year
7
Seven 500 gallon vaults

Round Lake Boat Launch-3 latrines,

Largo Springs
1-Jan
Once a year
2
Two 500-gallon vaults
Westgate Scenic Overlook
1-Jan
Once a year
2
Two 500 gallon vaults
Rollways Campground
15-May
Once a year
5
Four 500-gallon vaults and host tank
Lumberman's Monument Visitor Center
1-May
once per year
3
lift station-2000 gallon, 2000 and 1,500-gallon vaults

***End of Document***