The document is an Attachment B - Specifications for Chiller Maintenance at LDH (Louisiana Department of Health), with RFx No. 3000024934. The specification details a comprehensive preventative maintenance program for various mechanical systems and equipment, including 4 air-cooled chillers, 31 pumps, 26 air handling units (AHUs), 2 makeup air units, 10 ventilation fans, 1 unit heater, 12 boilers, and 24 variable frequency drives located in the mechanical yard and building. The maintenance schedule includes semi-annual and quarterly inspections covering equipment from manufacturers like JCI/Trane, Taco, York, Captive Aire, Loren Cook, Raywall, Ray Pak, LAARS, Schneider, and Cont Tech Corp.
The maintenance specifications outline detailed inspection protocols for each equipment type, including checks on electrical components, mechanical systems, lubrication, refrigerant levels, control systems, and overall operational performance. The Schneider Electric SmartStruxure Building Automation System will receive specific attention, with diagnostics of 11 automation servers, 252 VAV controllers, 20 AHU controllers, 4 MAU controllers, 3 central plant controllers, 1 T.A.C. I/Net Seven system, and 3 SmartStruxure Workstations. Each maintenance task requires comprehensive documentation, including written reports of completed work, operating logs, and identification of any uncorrected deficiencies detected during the inspections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3000024934.pdf | ||
| Attachment A - Special Terms and Conditions - Pages 1-8.docx | DOCX document | |
| Attachment C - Online Bidding Instructions - Pages 1-10.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFx No.: 3000024934 Attachment B - Specifications Title: *Mand. Site Visit* Chiller Maintenance – LDH
Qty. Equipment
Location
Manufacturer
Times Per Year
4 Air Cooled Chiller Mech. Yard JCI/Trane 4 31 Pumps Mech. Yard Taco 4 26 AHU Building JCI/York 4 2 Makeup Air Unit Building Captive Aire 4 10 Ventilation Fans Building Loren Cook 1 l Unit Heater Building Raywall 1 12 Boilers Mech. Yard Ray Pak, LAARS 4
Variable frequency drive
ISO Unit
Building/Yard Building
Schneider Cont Tech Corp
Building Automation Preventative Maintenance
The Schneider Electric SmartStruxure Building Automation System will have a semi-annual maintenance checkup and calibration of systems. This will include diagnostics of all field controllers as well as all automation servers. This service will include verification of all programming sequences and ensure proper operation of the building control system.
This service specifically includes a full checkout of each VAV box and controller to ensure proper operation and control.
Includes the following:
(11) Automation Servers
(252) VAV controllers
(20) AHU controllers
(4) MAU control1ers
(3) Central Plant controllers
(1) T.A.C. I/Net Seven
(3) SmartStruxure Workstations
RFx No.: 3000024934 Attachment B - Specifications Title: *Mand. Site Visit* Chiller
Peak Performance Maintenance Schedule Chiller Maintenance Inspection
• Check for proper refrigerant charge.
• Repair minor refrigerant leaks.
• Check control calibration and operation.
• Inspect main electrical components.
• Inspect compressor operation oil level.
• Check for evidence of moisture in refrigerant circuit.
• Check and record refrigerant sub cooling.
• Check and record superheat.
• Check and record all water temperatures and pressures.
• Check and record compressor voltage and amperages.
• Check for proper closed system water make up.
• Check expansion tank for proper air cushion.
• Operationally test energy management system at least twice per year.
• Inspect central system pumps, motors and bearings and lubricate per manufacturer's recommendations.
• Check electrical wiring for evidence of overheating and tighten connections as required.
• Check crankcase heater operation.
• Visually inspect and clean air cooled condenser coils.
• Check proper operation all condenser fan motors.
• Clean the starter and cabinet.
• Inspect wiring and connections for tightness and signs of overheating and discoloration.
• Check condition of the contacts for wear and pitting.
• Check contactors for free and smooth operation.
• Check the mechanical linkages for wear, security, and clearances.
• Check tightness of the motor terminal connections.
• Meg the motor and record reading.
• Verify the operation of the electrical interlocks
• Furnish inspection report and inform of any abnormal conditions or necessary repairs.
RFx No.: 3000024934 Attachment B - Specifications Title: *Mand. Site Visit* Chiller
General System Check
• Inspect the unit for cleanliness.
• Inspect the fan wheel and shaft for wear and clearance.
• Check the sheaves and pulleys for wear and alignment.
• Install new belts. Belts will be provided by BBMC.
• Verify tight bolts, set screws, and locking collars.
• Check dampers for wear, security and linkage adjustment.
• Clean condensate pan.
• Clean and verify proper operation of the condensate drain.
• Clean Evaporator and heating coils.
• Verify smooth fan operation.
• Log operating conditions after system has stabilized.
Lubrication
• Lubricate the fan shaft bearings.
• Lubricate the motor bearings.
Motor and Starter
• Clean the starter and cabinet.
• Inspect the wiring and connections for tightness and signs of overheating and discoloration.
• Check the condition of the contacts for wear and pitting.
• Check the contactors for free and smooth operation.
• Meg the motor and record readings.
• Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.
Peak Performance Maintenance Schedule Pump Preventative Maintenance
General Assembly
• Check motor shaft and pump shaft for alignment.
• Inspect the coupling for wear.
• Verify that the shaft guard is in place and tight.
• Verify water flow through the pump.
• Check for leaks on the mechanical pump seals, if applicable.
• Verify proper drip rate on the pump seal packing, if applicable.
• Verify smooth operation of the pump.
RFx No.: 3000024934 Attachment B - Specifications Title: *Mand. Site Visit* Chiller
Lubrication
• Lubricate the pump bearings.
Motor and Starter
• Clean the starter and cabinet.
• Inspect wiring and connections for tightness and signs of overheating and discoloration.
• Meg the motor.
• Verify tight connections on the motor terminals.
• Check the condition of the contacts for wear and pitting, if applicable.
• Check the contactors for free and smooth operation.
• Verify proper volts and amps.
Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.
Peak Performance Maintenance Schedule Split System Preventive Maintenance Evaporator Check
• Inspect the unit for cleanliness.
• Inspect the fan wheel and shaft for wear and clearance.
• Check the sheaves and pulleys for wear and alignment.
• Install new belt if needed. Belts will be provided by BBMC.
• Verify tight bolts, set screws, and locking collars. Clean condensate pan.
• Clean and verify proper operation of the condensate drain.
• Clean Evaporator and heating coils.
Condenser Check
• Inspect the unit for cleanliness.
• Inspect the fan blade and shaft for wear and clearance.
• Verify tight bolts, set screws, and locking collars.
• Clean air-cooled condenser, using building supplied water source.
RFx No.: 3000024934 Attachment B - Specifications Title: *Mand. Site Visit* Chiller
System Lubrication
• Lubricate the fan shaft bearings.
System Electrical Check
• Inspect the wiring and connections for tightness and signs of overheating and discoloration.
• Check the condition of the contacts for wear and pitting.
• Check the contactors for free and smooth operation.
Peak Performance Maintenance Schedule Ventilation Fan Inspection
• Visually inspect general conditions of fan, motor blade and housing.
• Inspect fan belt and sheaves for wear.
• Replace fan belt as required and adjust tension.
• Check fan motor and fan bearings for wear.
• Lubricate fan and fan motor bearings.
• Inspect electrical wiring and tighten terminals.
• Check electrical current draw.
• Check fire stat and terminals for tightness.
Peak Performance Maintenance Schedule Unit Heater (Electric/Hot Water) Inspection
• Check all high limit controls.
• Check all safety controls.
• Check all operating controls.
• Visually inspect pilot safety control.
• Check burner operation.
• Check and record entering and leaving water temperature.
• Check and record all associated pressures.
• Test for proper draft.
• Check operation of circulation pumps in mechanical room.
RFx No.: 3000024934 Attachment B - Specifications Title: *Mand. Site Visit* Chiller
• Visually inspect all valves and piping in mechanical room for corrosion and/or deterioration.
• Check low water cut off.
• Check expansion tank for proper air cushion.
• Check for proper water make up.
Provide a written report of completed work, operating Jog, and indicate any uncorrected
Peak Performance Maintenance Schedule Unit Heater (Electric/Hot Water) Inspection
• Check all high limit controls.
• Check all safety controls.
• Check all operating controls.
• Visually inspect pilot safety control.
• Check burner operation.
• Check and record entering and leaving water temperature.
• Check and record all associated pressures.
• Test for proper draft.
• Check operation of circulation pumps in mechanical room.
• Visually inspect all valves and piping in mechanical room for corrosion and/or deterioration.
• Check low water cut off.
• Check expansion tank for proper air cushion.
Provide a written report of completed work, operating Jog, and indicate any uncorrected
Peak Performance Maintenance Schedule
BOILER INSPECTION
• Check boiler water level.
• Check all high limit controls.
• Check all safety controls.
• Check all operating controls.
• Check relief valve operation.
• Inspect pilot light flame appearance and position.
• Visually inspect pilot light safety control.
• Check gas valve operation.
• Check burner operation.
RFx No.: 3000024934 Attachment B - Specifications Title: *Mand. Site Visit* Chiller
• Check and record entering and leaving water temperature.
• Check and record all associated pressures.
• Test for proper draft.
• Check operation of circulation pumps in mechanical room.
• Visual1y inspect all valves and piping in mechanical room for corrosion and deterioration.
• Check low water cut-off.
• Check expansion tank for proper air cushion.
• Inspect all fresh air vents to assure proper combustion air to boiler.
• Lubricate pumps and motors in mechanical room per manufacturer's recommendations.