ATTACHMENT B - PWS - SNOWPLOWING - GUNFLINT RD.pdf

PDF 211 KB Posted

Attached to
Superior National Forest - Snowplowing - Gunflint RD Admin
Solicitation number
12444624Q0012
Issued by

About this file

This performance work statement outlines snowplowing and sanding requirements for the Gunflint Administrative Site located in Grand Marais, Minnesota. The contractor shall plow parking lots, roadways, and drives after any snowfall over one inch and push snow fully outside areas. Plowing must be substantially completed by 6:00am Monday through Friday. Additional plowing may be requested for wind events or multiple small snowfalls. Sanding is required immediately after plowing when ice is present on pavement. The contractor must submit invoices monthly through IPP and keep areas clear to performance standards subject to periodic government inspection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Performance Work Statement

Contents Project Title General Information

1.0 Background and Purpose

2.0 Definitions

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Deliverable / Schedule

5.0 Government Furnished

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 - Electronic and Information Technology Standards

11.0 Performance Requirement Measures

Project Title Gunflint Administrative Site Snowplowing

General Information

1.0 Background and Purpose

The Administrative site for the Gunflint Ranger District located at 2020 W. Hwy 61, Grand Marais, MN 55604, requires snow removal of all parking lots, roadways, and drives to garages and employee housing units. Also, sanding of paved parking lots and drives when ice is present.

2.0 Definitions

CO = Contracting Officer COR = Contracting Officer’s Representative IPP = Invoice Processing Platform (www.ipp.gov)

Contractor Requirements

3.0 Technical Requirements / Tasks

Parking Lot and Roadway plowing

1. Plowing shall be required after any snowfall over one inch at the Gunflint Ranger Station.

2. Government may request additional plowings as needed due to wind events or multiple small snow falls.

3. Description of areas to be plowed:

a. Plow all paved roads including the upper and lower parking lots and in front of all crew quarters, garage doors and dumpster area. All empty parking spots shall be kept clear of snow. District will rotate vehicles between spots throughout the winter to keep all spots clear.

4. Plowing shall be substantially complete by 6:00am to not be impacted by employees showing up for work.

5. Snow shall be pushed fully outside the shoulder line of lots and drive.

6. Plowing is generally not required while snow is falling during workdays unless requested by the Government and should be completed at the end of the snow event. If the snow event would have deposited over 8” of snow and the contractor decides to plow more than once to make plowing easier payment will only be made for 1 event over 8” unless the Government has requested the additional shoveling.

7. Weekend plowing will not be required (unless requested by the Government). Plowing must be completed by 6:00 am on Monday.

Parking Lot Sanding

1. Sanding shall be done immediately after each snow removal when ice is present on pavement. Additional sanding shall be done at the direction of the Contacting Officer or Contracting Officer’s Representative

(COR).

4.0 Deliverable / Schedule

Item No. Deliverable Objective Due

Submit invoices in IPP once monthly.

Plow snow after any snowfall exceeding 1 inch depth.

Snow removal shall be substantially completed before 6:00am Monday -Friday.

Weekend plowing will not be required but must be completed by 6:00am Monday.

Plowing less than 1 inch snow depth or on weekends when requested by the COR or CO.

Sanding of parking areas shall be done immediately after each snow removal when ice is present on pavement.

Additional sanding shall be done at the direction of the Contacting Officer or Contracting Officer’s Representative (COR).

Payments shall be made on a calendar month (30 day) basis in arears.

Keep parking lots, drives, roadways, and warehouse entrances clear of snow. Snow shall be pushed fully outside the shoulder line of lots and drives.

Roadways and parking areas shall be cleared of snow before employees arrive for work.

Keep parking lots, drives, roadways, and warehouse entrances clear of snow. Snow shall be pushed fully outside the shoulder line of lots and drives.

Parking areas are clear of ice when employees arrive for work.

Submit within 5 business days of the last working day of every month May through September

Each work session

When snowfall exceeds 1 inch depth Monday – Friday.

When snowfall is less than 1 inch or on weekends is requested by COR or CO.

When requested by the COR or

CO.

Monday – Friday by 6:00 am when ice is present on pavement.

5.0 Government Furnished

COR will routinely inspect the work area.

6.0 Travel

No Requirement

7.0 Contractor’s Key Personnel

Contractor and staff shall comply with all safety rules and regulations of the Occupational Safety and Health Administration (OSHA) for this type of work.

Resumes are not required.

8.0 Security Requirements

No Requirement

9.0 Data Rights

No Requirement

10.0 Section 508 - Electronic and Information Technology Standards No Requirement

11.0 Performance Requirement Measures

Performance Objective

Required Task or Deliverable

Performance Standard Method of Surveillance

Positive/Negative Incentive % for NOT meeting the Task

Ensure snow free roadways, drives, parking lots, and garage entrances.

Shoulder line of parking lots, drives and roadways are clear of snow.

Visibility is not hindered by mounded snow at entrance to road/highway intersections.

Parking areas are clear of ice.

Plow when snowfall is greater than 1 inch depth.

Snow removal shall be substantially completed before 6:00am Monday - Friday.

Plow to keep shoulder line of parking lots, roadways and drives clear of snow and garage entrances clear.

Sanding shall be done on parking areas immediately after snow removal.

When snowfall exceeds one inch depth, snow is plowed from roadways, drives, parking lots, and garage entrances before employees arrive at 6:00am Monday-Friday.

Snow is pushed fully outside the shoulder line of parking lots, drives and roadways and is cleared from garage entrances.

Sanding shall be done immediately after each snow removal when ice is present on pavement. Additional sanding shall be done at the direction of the Contracting Officer or Contracting Officer’s Representative.

COR will periodically inspect the work area indicated, random observations, customer complaints.

Contractor shall meet the following minimum inspection standard for Government acceptance:

No more than 2 deficiencies per month are acceptable.

Performance of work above the minimum acceptable standard will result in the Contractor being eligible for the additional option periods if the Government exercises the options.

Performance of work at this level will also result in a favorable performance rating for future work with the Government.

The contractor shall correct all deficiencies brought to its attention at no additional cost to the Government.

Project Title
General Information
1.0 Background and Purpose
2.0 Definitions
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Deliverable / Schedule
5.0 Government Furnished
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 - Electronic and Information Technology Standards
11.0 Performance Requirement Measures

File details come from the government source that posted it. Updated .