Sheet1

Schedule of Items FY 2021 Chequamegon-Nicolet Culvert Order
East Zone
GREEN = BASE BID ITEMS
YELLOW = OPTIONAL BID ITEMS
Forest Service4978 Hwy 8 West Laona, WI 54541
Type, Size, and LengthCost per LFLFIndividual Culvert CostQty.Cost(w/o bands or lugs)Cost per Band# of BandsTotal Cost of BandsCost/ Lifting Lug# of Lifting LugsTotal Cost of L. LugsTotal Cost incl. accessories
Furnish and deliver pipe as indicated below:
ALL PIPE ARE REQUIRED TO MEET MINIMUM WISDOT LOAD RATING
Item #1
21"X15"X24' CMPA galvanized$0.0024$0.006$0.00$0.00
Item #2
21"x15"x28' CMPA galvanized$0.0028$0.006$0.00$0.00
Item #3
21"x15"x32' CMPA galvanized$0.0032$0.006$0.00$0.00
Item #4
36"X40' galvanized CMP (round)$0.0040$0.001$0.00$0.00
Item #5
48"X40' galvanized CMP (round) with beveled ends$0.0040$0.001$0.00$0.00$0.00
Item #6
81"x59"x67' poly coated galvanized pipe arch, with 2:1 step bevel (Furbush)$0.0067$0.001$0.00$0.002$0.00$0.00
Item #7
95"x67"x54' poly coated galvanized pipe arch, with 2:1 step bevel (Baldwin)$0.0054$0.001$0.00$0.002$0.00$0.00
Item #8
21"x15"x30' CMPA galvanized, (Argonne)$0.0030$0.004$0.00$0.00
Item #9
36"X40' CMP galvanized, (round) (Argonne)$0.0040$0.001$0.00$0.00
Item #10
21"x15"x30' CMPA galvanized, (Alvin)$0.0030$0.004$0.00$0.00
Item #11
21"x15"x32' CMPA galvanized, (Alvin)$0.0032$0.001$0.00$0.00
Item #12
28"x20"x30' CMPA galvanized, (Alvin)$0.0030$0.001$0.00$0.00
Item #13
21"x15"x30' CMPA galvanized, (Alvin/HEO)$0.0030$0.001$0.00$0.00
Item #14
21"x15"x32' CMPA galvanized, (Alvin/HEO)$0.0032$0.001$0.00$0.00
Item #15
28"x20"x30' CMPA galvanized, (Alvin/HEO)$0.0030$0.001$0.00$0.00
Item #16
21"x15"x26' CMPA galvanized, (Alvin/HEO)$0.0026$0.006$0.00$0.003$0.00$0.00
Item #17
73”W x55”H x 62’L, poly coated galvanized pipe arch, with 2:1 step bevel (UNT Mosquito)$0.0062$0.001$0.00$0.002$0.00$0.00$0.00
E ZONE TOTAL CULVERTS43TOTAL COST E. ZONE$0.00

FOR EAST ZONE ITEMS FOB DELIVERY TO:

USDA Forest Service 4978 Hwy 8 West Laona, WI 54541 DELIVERY: Delivery for Items shall be FOB destination within 45 days of Contract Award. Vendor is required to call the identified contact person a minimum of 48 hours prior to delivery.

Delivery will be accepted Monday – Thursday 8:00 AM – 3:00 PM

Assistance outside these hours may be possible if 3 days advance notification is provided. Destination is as indicated below and on the attached map:

1.5 miles south on west side of Hwy 32 from this location:

USDA Forest Service 4978 Hwy 8 West

Laona, WI 54541TECHNICAL CONTACT:Casey Swanson Phone: (715) 674-4481 ext: 6231Email:casey.swanson@usda.gov
West Zone
GREEN = BASE BID ITEMS
YELLOW = OPTIONAL BID ITEMS
Forest Service1170 4th Ave. S. Park Falls, WI 54552
Type, Size, and LengthCost per LFLFIndividual Culvert CostQty.Cost (w/o bands or lugs)Cost/ Band# of BandsCost of BandsCost/ Lifting Lug# of Lifting LugsCost of Lifting LugsTotal Cost Incl. accessories
Furnish and deliver pipe and bands as indicated below:
ALL PIPE ARE REQUIRED TO MEET MINIMUM WISDOT LOAD RATING
Item #18
15"X20' HDPE$0.0020$0.0012$0.00$0.006$0.00$0.00
Item #19
18"X20' HDPE$0.000$0.000$0.00$0.005$0.00$0.00
Item #20
24"X20' HDPE$0.0020$0.008$0.00$0.004$0.00$0.00
Item #21
36"X24' HDPE$0.0024$0.008$0.00$0.004$0.00$0.00$0.00
Furnish and deliver pipe as indicated below:
ALUMINUM PIPE, MINIMUM HIGHWAY GAGE:
Item #22
28" X 20" X 18' Aluminum$0.0018$0.006$0.00$0.003$0.00$0.00
Item #23
28" X 20" X 24' Aluminum$0.0024$0.006$0.00$0.003$0.00$0.00
Item #24
35" X 24" X 20' Aluminum$0.0020$0.006$0.00$0.003$0.00$0.00
Item #25
35" X 24" X 24' Aluminum$0.0024$0.006$0.00$0.003$0.00$0.00
Item #26
49" X 33" X 22' Aluminum with 2:1 step bevel on one end$0.0022$0.002$0.00$0.001$0.00$0.00$0.00
Furnish and deliver pipe as indicated below:
Item #27
#18 Structure Aluminum 40.5', ALBC # 18 (12' - 7" X 5' - 2") FULL INVERT.
POLY TOE-WALLS (Eleven Mile Creek)$0.0040.5$0.001$0.00$0.00The aluminum box culvert is to come PRE-ASSEMBLED and DELIVERED TO THE JOBSITE:
From Fifield, WI at the intersection of State Highways 13 and 70, travel East
on STH 70 10.9 miles to FR 533, then turn North and go 0.5 miles to intersection
with Trail 118C-101. Turn left, West, and go 0.4 miles to the project .
Item #28LAT 45.896525, LON -90.209464
71” X47” X 44' CMPA - POLY COATED 2:1 partial step bevel each end, lifting lugs (FR326 Chippewa)$0.0044$0.001$0.00$0.002$0.00$0.00
Item #29
103"X71"X 55' galvanized CMPA - POLY COATED, 2:1 partial step bevel each end, lifting lugs (Venison)$0.0055.0$0.001$0.00$0.001$0.00$0.002$0.00$0.00
Item #30
71” X47” X 36' CMPA - POLY COATED, 2:1 partial step bevel each end, lifting lugs (UNT Brush Creek)$0.0036.0$0.001$0.00$0.002$0.00$0.00$0.00
W ZONE TOTAL CULVERTS58W ZONE TOTAL COST$0.00$0.00
GRAND TOTAL CULVERTS101GRAND TOTAL COST$0.00

FOR WEST ZONE ITEMS FOB DELIVERY TO:

USDA Forest Service 1170 4th Ave South, Park Falls, WI 54552

DELIVERY: Delivery for Items shall be FOB destination within 45 days of Contract Award. Vendor is required to call the identified contact person a minimum of 48 hours prior to delivery.

Delivery will be accepted Monday – Thursday 8:00 AM – 3:00 PM "NOTE" The CMPA must be banded in packs weighing less than 5000 pounds. The packs must be separated from the one beneath it by at least 3 inches to allow my forklift tines to enter the load without snagging a pack of culverts

Assistance outside these hours may be possible if 3 days advance notification is provided.

Destination is as indicated below and on the attached map:

USDA Forest Service 1170 4th Ave. South Park Falls, WI. 54552 TECHNICAL CONTACT: Mark Koshak Phone: (715) 762-5129 CELL: 715-661-0253 Email: mark.a.koshak@usda.gov