This document is a Pricing Sheet for Oakland County, Michigan's Solicitation Event #000971, specifically for a sewage disposal system maintenance and rehabilitation contract with the Water Resource Commissioner (WRC). The contract is anticipated to cover major maintenance and rehabilitation programs including cleaning, closed circuit television inspection, and sewage system repairs, with project scopes and durations to be developed prior to assignment. The contract term spans three years (2025-2027), during which WRC will have sole discretion in project assignments and may request project estimates from one or more contractors based on their submitted rates.

The pricing sheet outlines comprehensive rate submission requirements for vendors, including detailed rates for hourly labor (with regular, overtime, weekend, and holiday classifications), equipment rental (daily, weekly, monthly rates), materials and supplies, subcontractor expenses, and traffic control. Vendors must submit rates in an Excel spreadsheet, with explicit instructions that all rates must include mobilization, drive time, personal protective equipment, and safety equipment costs. No additional payments will be made for standard safety equipment, and invoices will be based on quantities agreed upon between the contractor and WRC. The document also requests vendors to indicate potential prompt payment discount terms, emphasizing a structured and transparent pricing approach for the contract opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OAKLAND COUNTY EXECUTIVE DAVID COULTER

SOLICITATION EVENT #000971 – PROPOSAL FORM

VENDOR NAME: INSERT RESPONSE HERE IN RED

VENDOR CONTACT: INSERT RESPONSE HERE IN RED

CONTACT PHONE: INSERT RESPONSE HERE IN RED

CONTACT EMAIL: INSERT RESPONSE HERE IN RED

DIRECTIONS: PLEASE SUBMIT YOUR RESPONSE TO EACH CATEGORY BELOW IN RED. SAVE THIS FILE IN THE FORMAT OF “000XXX ATT A - YOUR ENTITY NAME” AND UPLOAD TO THE BIDNET/MITN SYSTEM. VENDORS MUST SUBMIT ONLY ONE COMPLETE FILE FOR THIS PROPOSAL FORM (MULTIPLE FILES OF THE PROPOSAL WILL NOT BE ACCEPTED; IT MUST BE JUST ONE FILE). UPLOADED FILE MUST BE EITHER IN WORD FORMAT OR ADOBE PDF FORMAT.

RESPONSE:

Compensation rates – The rate list shall be submitted in a clear and organized format, in an Excel Spreadsheet for the years 2025, 2026, and 2027.

Note: All rates shall include mobilization, including drive time from the Contractor’s ship to the job site, unless otherwise stipulated in the bidder’s proposal.

Invoices will be based on agreed upon quantities between Contractor and WRC. All billable items including labor, equipment, materials, supplies, and subcontractor expense shall be authorized by WRC prior to invoicing. Rates shall include all necessary expenses to perform the work, including personal protective equipment and all safety equipment. No payment will be made for personal protective equipment items such as work gloves, boots, safety glasses, fall protection, gas detectors, clothing and any other personal protective equipment.

No additional payment will be made for any items needed to adhere to all local, State, and Federal Safety Standards.

1. Hourly Labor Rates: Supply a job classification rate sheet for all positions including shop, field and office that may be utilized for this contract. Regular, overtime, weekend, and holiday rates for each classification shall be provided, as applicable. If WRC determines the need to work 4 days, ten hours per day work weeks, overtime will not be considered for 10-hour workdays. The WRC staff work schedule is generally Monday to Thursday from 6 AM to 4 PM for March to September and Monday to Friday from 7 AM to 3 PM for October to February.

INSERT RESPONSE HERE IN RED

2. Equipment Rates: The rates shall include a tabulation of daily, weekly, and monthly rates for all Contractor supplied equipment. For bypass pumping, standby and online rates shall be provided. Fuel costs for pumping equipment shall be considered as part of the unit rate, unless otherwise indicated in the proposal. For bypassing piping, the total fee for any particular project should not exceed the original cost of said piping. As such, WRC will have the option of negotiating a buyback price or credit for long duration rentals of bypassing piping. The markup rate for equipment rented by the Contractor, along with a list of any anticipated rental equipment shall also be provided in the proposal.

INSERT RESPONSE HERE IN RED

3. Materials & Supplies: Fixed costs for materials and supplies shall be listed and tabulated in the proposal. Anticipated variable rate or project specific materials and supplies, including freight, shall also be listed in the proposal with the bidder’s mark-up rate.

INSERT RESPONSE HERE IN RED

4. Subcontractor Expense and Rental Equipment: The mark-up rate for subcontractor expense, along with a list of any anticipated subcontractor activities.

INSERT RESPONSE HERE IN RED

5. Traffic Control: Provide daily, weekly, and monthly rates for traffic control.

INSERT RESPONSE HERE IN RED

6. Indicate whether they are willing to provide a discount for prompt payment of X% discount Net XX days.

INSERT RESPONSE HERE IN RED

image1.png

File details come from the government source that posted it. Updated .