Attachment_A_-_Cost_Sheet.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Stack Emission Testing Services
- Contract number
- 505CAP-M25-AD251095-01
- Issued by
- Wisconsin
About this file
This document is a cost sheet attachment for RFB # AD251095, a stack emission testing services contract managed by the Wisconsin Department of Administration - Division of Facilities Development. The primary contractor is Alliance Technical Group, and the contract covers various state facilities including University of Wisconsin campuses (Madison Charter Street Plant, Madison Walnut Street Plant, River Falls, Platteville, Superior, Whitewater, and La Crosse), state mental health institutes (Mendota and Winnebago), and Department of Corrections facilities in Waupun.
The contract provides stack emission testing services with a total annual cost of $45,150, based on required testing at three primary locations. The UW Madison Charter Street Plant requires Method 9 Visible Emissions testing on 4 boilers and NOx/CO RATA testing at $18,750 per visit, scheduled tentatively between January-March 2026, 2027, and 2028. The UW Madison Walnut Street Plant requires similar testing on 1 boiler at $9,900 per visit during the same timeframe. The DOA Capitol Heat and Power Plant requires NOx/CO testing on 3 boilers at $16,500 per visit, scheduled for December 2026 and October-December 2028. The cost sheet also includes detailed fee schedules for various EPA testing methods ranging from $1,000 to $14,000 per service, mobilization costs to different facilities ranging from $2,400 to $5,600 per visit, and daily labor rates of $1,600 for project managers and $1,200 for field technicians.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Department of Administration - Division of Facilities Development | |||||||
| Stack Emission Testing Services | |||||||
| RFB # AD251095 | |||||||
| Attachment A - Cost Sheet | |||||||
| Bidder Name: | |||||||
| Alliance Technical Group | |||||||
| Instructions: | |||||||
| 1. Complete Bidder Name (blue cell). | |||||||
| 2. Bidder must provide a response for all cells highlighted in yellow. | |||||||
| 3. Failure to provide a response for all yellow cells may result in the rejection of the Bid. | |||||||
| 4. Costs in Section 1 Total Annual Cost will be used to determine method of award. Responses in Section 2 and 3 are for informational purposes only. Responses in Section 2 and 3 are required but will not be used to determine award. | |||||||
| 5. Cost shall be a single amount, not a range. | |||||||
| 6. Total Annual Cost shall be auto calculated. | |||||||
| 7. Cost must be all inclusive of all terms and conditions of the RFB. | |||||||
| 8. Alternative cost formats will not be accepted and may result in the rejection of the Bid. | |||||||
| 9. Bids with blank entries or "N/A" (or similar) may be rejected. If a service/product is supplied at no cost, Bidder must enter "0.00". | |||||||
| 10. For Section 1 and Section 3, cost must include all costs incurred by the Contractor during the performance of the work in the RFB including but not limited to direct, indirect, overhead, and mobilization costs such as travel and living expenses. Additionally, expenses related to providing on-site services (e.g. computer, printer, miscellaneous equipment) must be included in the proposed cost and cannot be an additional charge. | |||||||
| 11. For Section 2, all mobilization costs incurred by the Contractor during a visit shall be a separate cost and not included with the other testing methods. | |||||||
| SECTION 1 | |||||||
| Agency/ Institution | Location | Contact | Stack Type and Height (feet) | Year Built | Potential Test Date(s) | Required Test(s) | Cost Per Visit for Required Test(s) |
| UW Madison | Charter Street Plant- 117 North Charter St. Madison, WI 53715 | Charter/Walnut Plt. Mgr: Travis Thoeny Email: travis.thoeny@wisc.edu |
Asst. Plt. Mgr. Charter/Walnut: Andrew Gossfeld Email: andrew.gossfeld@wisc.edu Phone: (608) 262-8835/262-5039 Fax: (608) 265-5465 Stainless Steel, 140 2012-2016 Tentatively between the months of January- March in 2026, 2027, and 2028 Method 9 Visible Emissions on 4 boilers performed on fuel oil
| NOx, CO RATA on 4 Boilers with PEMs | $ 18,750.00 | /per visit | |
| UW Madison | Walnut Street Plant- 505 North Walnut St. Madison, WI 53705 | Charter/Walnut Plt. Mgr: Travis Thoeny Email: travis.thoeny@wisc.edu |
Asst. Plt. Mgr. Charter/Walnut: Andrew Gossfeld Email: andrew.gossfeld@wisc.edu Phone: (608) 262-8835/262-5039 Fax: (608) 265-5465 Masonry, 250 1974 Tentatively between the months of January- March in 2026, 2027, and 2028 Method 9 Visible Emissions on 1 Boiler performed on fuel oil
| NOx, CO RATA (Method 3A, 7E & 10) on one boiler with PEMS | $ 9,900.00 | /per visit | |
| DOA Capitol Heat and Power Plant | 624 East Main Street, Madison 53703 | Superintendent: Derrick Hicks |
Email: derrick.hicks@wisconsin.gov Plant Phone: (608) 266-3550 Fax: (608) 266-3981 Assistant Superintendent: Jacob Vance
| Email: Jacob.Vance@wisconsin.gov | Stainless Steel, 125 | 2010-2014 | Tentatively December 2026 and between the months of October-December in 2028 | NOx, CO (Method 3A, 7E & 10B) on 3 boilers | $ 16,500.00 | /per visit | |
| Total Annual Cost | $45,150.00 |
| For Informational Purposes Only | ||
| SECTION 2 | ||
| Stack Testing Services Fee Schedule: | Cost Per Visit | |
| Cost of mobilization to a site including but not limited to travel and living expenses: | ||
| a. UW-River Falls | Central Heating Plant |
410 South 3rd St.
| River Falls, WI 54022 | $ 2,400.00 | /per visit | ||
| b. Mendota Mental Health Institute | Central Heating Plant |
Troy Drive
| Madison, WI 53704 | $ 5,200.00 | /per visit | ||
| c. UW-Platteville | Central Heating Plant |
Long Horn Drive
| Platteville, WI 53818 | $ 5,200.00 | /per visit | ||
| d. UW-Superior | Central Heating Plant |
2210 Poplar Avenue
| Superior, WI 54880 | $ 3,100.00 | /per visit | ||
| f. UW-Whitewater | Central Heating Plant |
734 W. Lauderdale Drive
| Whitewater, WI 53190 | $ 5,600.00 | /per visit | ||
| g. UW-LaCrosse | Central Heating Plant |
1725 State Street
| La Crosse, WI 54601 | $ 3,500.00 | /per visit | ||
| h. DOC-Waupun | Central Generating Plant |
400 S. Drummond Street
| Waupun, WI 53963 | $ 5,200.00 | /per visit | ||
| i. DHS-Winnebago Mental Health Institute | Central Heating Plant |
South Drive
| Winnebago, WI 54901 | $ 5,200.00 | /per visit | |||
| Wisconsin DNR Method 5- Particulate including back half (including written test plan) | $ 5,400.00 | /per visit | |||
| Method 6C – Sulfur Dioxide, Instrumental (including written test plan) | $ 4,750.00 | /per visit | |||
| Method 7E – Nitrogen Oxide, Instrumental (including written test plan) | $ 4,750.00 | /per visit | |||
| Method 9 – Visual Opacity | $ 1,000.00 | /per boiler | |||
| Method 10B – Carbon Monoxide (including written test plan) | $ 5,600.00 | /per visit | |||
| Method 18 – VOC (including written test plan) | $ 9,300.00 | /per visit | |||
| Method 23 - Dioxin and Furan (including written test plan) | $ 14,000.00 | /per visit | |||
| Method 26 – Hydrogen Halide and Halogen (including written test plan) | $ 4,950.00 | /per visit | |||
| Method 29 - Metals Emissions from Stationary Sources (including written test plan) (Method 29 analysis to include: Arsenic, Beryllium, Cadmium, | |||||
| Chromium, Lead, Manganese, Mercury, Nickel, and Selenium) | $ 8,100.00 | /per visit | |||
| Method 108 - Particulate & Gaseous Arsenic emissions (including written test plan) | $ 6,750.00 | /per visit | |||
| Relative Accuracy Test Audit (RATA) for the nitrogen oxide (NOx), and carbon monoxide (CO) continuous emission monitor, performed to the specifications of PS 2. (Methods 3A, 7E, and 10) (Including written test plan) | |||||
| RATA location are UW Madison Charter and Walnut Street Plant. | $ 5,300.00 | /per boiler | |||
| Relative Accuracy Audit (RAA) per PS-16 for the nitrogen oxide (NOx), and carbon monoxide (CO) predictive emission monitor system (PEMS), performed to the specifications of PS 16. (Including written test plan) | |||||
| RAA locations are UW Madison Charter and Walnut Street Plant | $ 4,500.00 | /per boiler |
| SECTION 3 | |||
| Labor Costs: | Cost Per Day | ||
| Project Manager, (per day) | $ 1,600.00 | /each | |
| Field Technician, (per day) | $ 1,200.00 | /each |