Attachment_A_-_Contract_Pricing_-_Hat_Creek.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
Statewide Contract CA|1-22-56-20-02B|0000023802
Contract number
1-22-56-20-02B
Issued by
California

About this file

This document is a Statewide Contract Pricing Attachment for Asphalt Concrete Plant Mix, specifically for District 2, Areas 2 and 5, issued by the California Department of General Services - Procurement Division under contract number 1-22-56-20-02B. The contract is awarded to Hat Creek Constructions & Materials, Inc., a contractor providing asphalt concrete services across multiple counties including Modoc, Lassen, and Siskiyou in California.

The contract covers 3/4" Aggregate with PG 64-16 Binder, to be delivered via transfer end dump or bottom dump methods to various locations. Pricing is structured with a base asphalt contract price of $94.80 per ton and additional fuel/delivery charges that vary by distance and location, ranging from $22.84 to $47.72 per ton. The total contract price per ton ranges from $93.34 to $142.52. The attachment also includes alternate cost options for different aggregate sizes, binder grades, and delivery methods, with additional charges for overtime deliveries, plant openings, and unplanned delays. The contract includes provisions for deliveries outside regular working hours and standby time charges of $1.78 per minute for unplanned delays.

View the file

Other files

File Type Posted
UI_Supp_8.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

District 2, Area 2

Department of General Services - Procurement Division
Statewide Contract 1-22-56-20-02B, Asphalt Concrete Plant Mix, Delivered
Attachment A - Contract Pricing, District 2, Area 2, *Supplement 1*
Contractor: Hat Creek Constructions & Materials, Inc.
Contact Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesItem DescriptionStock Keeping Unit SKU #Manufacturer Part NumberManufacturer (OEM)UNSPSCPlant Physical Address and Telephone NumberMiles from Delivery SiteUnit of MeasureQuantity of Unit of MeasureAsphalt Contract PriceFuel/Delivery Contract PriceContract PriceColumn1Column2
2020201221Modoc1390.23/23.93/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Shaw Pit 1294 CR 85A Lookout, CA 96054 (530) 335-550132TN1*$94.80* [$70.50]*$28.95* [$22.84]*$123.75* [$93.34]
2020202222Modoc13924.0/50.683/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Shaw Pit 1294 CR 85A Lookout, CA 96054 (530) 335-550148TN1*$94.80* [$70.50]*$34.55* [$27.26]*$129.35* [$97.76]
2020203223Modoc2990.00/21.743/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Shaw Pit 1294 CR 85A Lookout, CA 96054 (530) 335-550138TN1*$94.80* [$70.50]*$31.43* [$24.80]*$126.24* [$95.30]
2020204224Modoc29921.74/40.623/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Shaw Pit 1294 CR 85A Lookout, CA 96054 (530) 335-550137TN1*$94.80* [$70.50]*$31.24* [$24.65]*$126.05* [$95.15]
2020205225Modoc3950/22.673/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Ward Lake Pit 476-250 Ward Lake Road Litchfield, CA 96117 (530) 335-550170TN1*$94.80* [$70.50]*$42.63* [$33.63]*$137.43* [$104.13]
2020206226Lassen395115.0/139.983/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Ward Lake Pit 476-250 Ward Lake Road Litchfield, CA 96117 (530) 335-550165TN1*$94.80* [$70.50]*$40.27* [$31.77]*$135.07* [$102.27]
2020207227Siskiyou1390.0/5.03/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Ward Lake Pit 476-250 Ward Lake Road Litchfield, CA 96117 (530) 335-550153TN1*$94.80* [$70.50]*$36.12* [$28.50]*$130.93* [$99.00]
2020208228Modoc29942.62/66.633/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Ward Lake Pit 476-250 Ward Lake Road Litchfield, CA 96117 (530) 335-550172TN1*$94.80* [$70.50]*$44.15* [$34.83]*$138.95* [$105.33]
2020209229Modoc39522.67/42.623/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Shaw Pit 1294 CR 85A Lookout, CA 96054 (530) 335-550168TN1*$94.80* [$70.50]*$41.78* [$32.96]*$136.58* [$103.46]
20202102210Modoc39542.62/61.563/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Shaw Pit 1294 CR 85A Lookout, CA 96054 (530) 335-550191TN1*$94.80* [$70.50]*$47.72* [$37.65]*$142.52* [$108.15]
20202112211Siskiyou1610.0/19.303/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Shaw Pit 1294 CR 85A Lookout, CA 96054 (530) 335-550165TN1*$94.80* [$70.50]*$42.07* [$33.19]*$136.87* [$103.69]
20202122212Modoc3950.0/22.673/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Shaw Pit 1294 CR 85A Lookout, CA 96054 (530) 335-550166TN1*$94.80* [$70.50]*$42.63* [$33.63]*$137.43* [$104.13]
Alternate Cost Contact Line Item # (CLIN)Commodity DescriptionTypeStock Keeping Unit (SKU #)Contract Price (Per Ton)blank
A1Alternate Aggregate Cost (any size)N/A1/2" HMA$15.00
A2Alternate PG Binder (any grade, specify-->PG 64-28PG64-28$10.00
A3Alternate MC/SC Binder (any grade)N/AALT MC/SC$100.00
A4Alternate Delivery Super DumpN/AALT SD$15.00
A5Alternate Delivery Semi-End DumpN/AALT SED$10.00
A6Alternate Delivery End Dump ( 4-10 yard)N/A10WHLR$25.00
A7Open GradeN/A1/2" HMA OPEN$50.00
Alternate Cost Contact Line Item # (CLIN)Commodity DescriptionStock Keeping Unit (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)blank
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".OT DELIVERY$10.00N/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.OT PRODUCTION$20.00N/AN/A
A10Additional charge for delivery and plant opening.OT STARTUPN/A$2,500.00N/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $1.78 PER MINUTE.STANDBYN/AN/AN/A
A12Plant Mix pick up by State Forces (Orders less than the minimum)N/A$75.00N/AN/A
End of Sheet

District 2, Area 5

Department of General Services - Procurement Division
Statewide Contract 1-22-56-20-02B, Asphalt Concrete Plant Mix, Delivered
Attachment A - Contract Pricing, District 2, Area 5, *Supplement 1*
Contractor: Hat Creek Constructions & Materials, Inc.
Contact Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesItem DescriptionStock Keeping Unit SKU #Manufacturer Part NumberManufacturer (OEM)UNSPSCPlant Physical Address and Telephone NumberMiles from Delivery SiteUnit of MeasureQuantity of Unit of MeasureAsphalt Contract PriceFuel/Delivery Contract PriceContract PriceColumn1Column2
2020501251Lassen
Lassen36
13919.20/29.39
00.0/13.643/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Ward Lake Pit 476-250 Ward Lake Road Litchfield, CA 96117 (530) 335-550124TN1*$94.80* [$70.50]*$26.22* [$20.69]*$121.03* [$91.19]
2020502252Lassen3600..0/19.203/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Ward Lake Pit 476-250 Ward Lake Road Litchfield, CA 96117 (530) 335-550137TN1*$94.80* [$70.50]*$31.61* [$24.94]*$126.41* [$95.44]
2020503253Lassen4400.0/14.703/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order4443Hat CreekHat Creek Construction & Materials, Inc.30121601Hat Creek Ward Lake Pit 476-250 Ward Lake Road Litchfield, CA 96117 (530) 335-550153TN1*$94.80* [$70.50]*$37.63* [$29.69]*$132.43* [$100.19]
2020504254Lassen Lassen139 13913.64/39.23 39.23/66.643/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Ward Lake Pit 476-250 Ward Lake Road Litchfield, CA 96117 (530) 335-550170TN1*$94.80* [$70.50]*$44.06* [$34.76]*$138.86* [$105.26]
2020505255Lassen29900.0/25.633/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Shaw Pit 1294 CR 85A Lookout, CA 96054 (530) 335-550128TN1*$94.80* [$70.50]*$30.20* [$23.83]*$125.01* [$94.33]
2020506256Lassen39524.10/54.093/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Ward Lake Pit 476-250 Ward Lake Road Litchfield, CA 96117 (530) 335-550140TN1*$94.80* [$70.50]*$31.50* [$24.85]*$126.30* [$95.35]
2020507257Lassen39554.09/75.5723/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Ward Lake Pit 476-250 Ward Lake Road Litchfield, CA 96117 (530) 335-550116TN1*$94.80* [$70.50]*$23.70* [$18.70]*$118.50* [$89.20]
2020508258Lassen39575.6/100.03/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Ward Lake Pit 476-250 Ward Lake Road Litchfield, CA 96117 (530) 335-550130TN1*$94.80* [$70.50]*$28.01* [$22.10]*$122.81* [$92.60]
2020509259Lassen395100.1/138.983/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order44433/4" HMA PG64-16Hat Creek Construction & Materials, Inc.30121601Hat Creek Ward Lake Pit 476-250 Ward Lake Road Litchfield, CA 96117 (530) 335-550165TN1*$94.80* [$70.50]*$40.27* [$31.77]*$135.07* [$102.27]
Alternate Cost Contact Line Item # (CLIN)Commodity DescriptionTypeStock Keeping Unit (SKU #)Contract Price (Per Ton)blank
A1Alternate Aggregate Cost (any size)N/A1/2" HMA$15.00
A2Alternate PG Binder (any grade, specify-->PG 64-28PG64-28$10.00
A3Alternate MC/SC Binder (any grade)N/AALT MC/SC$100.00
A4Alternate Delivery Super DumpN/AALT SD$15.00
A5Alternate Delivery Semi-End DumpN/AALT SED$10.00
A6Alternate Delivery End Dump ( 4-10 yard)N/A10WHLR$25.00
A7Open GradeN/A1/2" HMA OPEN$50.00
Alternate Cost Contact Line Item # (CLIN)Commodity DescriptionStock Keeping Unit (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)blank
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".OT DELIVERY$10.00N/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.OT PRODUCTION$20.00N/AN/A
A10Additional charge for delivery and plant opening.OT STARTUPN/A$2,500.00N/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $1.78 PER MINUTE.STANDBYN/AN/AN/A
A12Plant Mix pick up by State Forces (Orders less than the minimum)N/A$75.00N/AN/A
End of Sheet