This document is an Attachment A - Contract Pricing spreadsheet for a Statewide Contract (1-22-56-20-02C) issued by the California Department of General Services' Procurement Division. The contract covers Asphalt Concrete Plant Mix deliveries and involves Eagle Rock, Inc. as the primary contractor, with pricing and delivery specifications for District 2, Areas 3 and 9, specifically within Trinity and Shasta Counties.

The contract establishes detailed pricing for 3/4" Aggregate with PG 64-16 Binder, including base asphalt pricing at $65.00 per ton and variable fuel/delivery charges ranging from $12.00 to $31.82 per ton depending on delivery distance and location. Additional alternate costs are specified for different aggregate types, binder grades, and delivery methods, with supplemental charges for deliveries outside regular working hours, plant openings, and unplanned delays. The contract provides flexible pricing for various delivery scenarios, with unit of measure set at tons (TN) and specific line items for different route segments and geographic locations within the designated districts.

View the file

Other files

File Type Posted
UI_Supp_7.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

District 2, Area 3

Department of General Services - Procurement Division
Statewide Contract 1-22-56-20-02C, Asphalt Concrete Plant Mix, Delivered
Attachment A - Contract Pricing, District 2, Area 3
Contractor: Eagle Rock, Inc.
Contact Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesItem DescriptionStock Keeping Unit SKU #Manufacturer Part NumberManufacturer (OEM)UNSPSCPlant Physical Address and Telephone NumberMiles from Delivery SiteUnit of MeasureQuantity of Unit of MeasureAsphalt Contract PriceFuel/Delivery Contract PriceContract PriceColumn1Column2
2020301231Shasta Trininty
Trininty36 3
360.00/11.93 'L0.00/4.0
28.65/41.143/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order203203Eagle Rock, Inc.30121601Eagle Rock, Inc. 40029 LaGrange Rd. Weaverville, CA 96093 (530) 623-444463TN1$ 65.00$ 25.45$ 90.45
2020302232Trininty30.00/30.853/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order203203Eagle Rock, Inc.30121601Eagle Rock, Inc. 40029 LaGrange Rd. Weaverville, CA 96093 (530) 623-444439TN1$ 65.00$ 25.45$ 90.45
2020303233Trininty330.86/57.253/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order203203Eagle Rock, Inc.30121601Eagle Rock, Inc. 40029 LaGrange Rd. Weaverville, CA 96093 (530) 623-444434TN1$ 65.00$ 19.09$ 84.09
2020304234TrinintyEagle Rock57.25/86.853/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order203203Eagle Rock, Inc.30121601Eagle Rock, Inc. 40029 LaGrange Rd. Weaverville, CA 96093 (530) 623-444465TN1$ 65.00$ 25.45$ 90.45
2020305235Trininty360.00/28.653/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order203203Eagle Rock, Inc.30121601Eagle Rock, Inc. 40029 LaGrange Rd. Weaverville, CA 96093 (530) 623-444474TN1$ 65.00$ 31.82$ 96.82
2020306236Trininty29925.77/48.473/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order203203Eagle Rock, Inc.30121601Eagle Rock, Inc. 40029 LaGrange Rd. Weaverville, CA 96093 (530) 623-444420TN1$ 65.00$ 14.00$ 79.00
2020307237Trininty29948.47/58.153/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order203203Eagle Rock, Inc.30121601Eagle Rock, Inc. 40029 LaGrange Rd. Weaverville, CA 96093 (530) 623-444413TN1$ 65.00$ 12.00$ 77.00
2020308238Trinity29958.15/72.243/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order203203Eagle Rock, Inc.30121601Eagle Rock, Inc. 40029 LaGrange Rd. Weaverville, CA 96093 (530) 623-444427TN1$ 65.00$ 15.00$ 80.00
Alternate Cost Contact Line Item # (CLIN)Commodity DescriptionTypeStock Keeping Unit (SKU #)Contract Price (Per Ton)blank
A1Alternate Aggregate Cost (any size)N/A202$10.00
A2Alternate PG Binder (any grade, specify-->N/A202$15.00
A3Alternate MC/SC Binder (any grade)N/A202$10.00
A4Alternate Delivery Super DumpN/A202N/A
A5Alternate Delivery Semi-End DumpN/A202$5.00
A6Alternate Delivery End Dump ( 4-10 yard)N/A202$5.00
A7Open GradeN/A202N/A
Alternate Cost Contact Line Item # (CLIN)Commodity DescriptionStock Keeping Unit (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)blank
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".202$20.00N/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.202$20.00N/AN/A
A10Additional charge for delivery and plant opening.202N/A$400.00N/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $1.78 PER MINUTE.202N/AN/AN/A
A12Plant Mix pick up by State Forces (Orders less than the minimum)202$0.00N/AN/A
End of Sheet

District 2, Area 9

Department of General Services - Procurement Division
Statewide Contract 1-22-56-20-02C, Asphalt Concrete Plant Mix, Delivered
Attachment A - Contract Pricing, District 2, Area 9
Contractor: Eagle Rock, Inc.
Contact Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesItem DescriptionStock Keeping Unit SKU #Manufacturer Part NumberManufacturer (OEM)UNSPSCPlant Physical Address and Telephone NumberMiles from Delivery SiteUnit of MeasureQuantity of Unit of MeasureAsphalt Contract PriceFuel/Delivery Contract PriceContract PriceColumn1Column2
2020901291Trinity29900.0/25.773/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order20330121601Eagle Rock, Inc. 40029 LaGrange Rd. Weaverville, CA 96093 (530) 623-444445TN1$ 65.00$ 21.00$ 86.00
Alternate Cost Contact Line Item # (CLIN)Commodity DescriptionTypeStock Keeping Unit (SKU #)Contract Price (Per Ton)blank
A1Alternate Aggregate Cost (any size)N/A202$10.00
A2Alternate PG Binder (any grade, specify-->202$15.00
A3Alternate MC/SC Binder (any grade)N/A202$10.00
A4Alternate Delivery Super DumpN/A202N/A
A5Alternate Delivery Semi-End DumpN/A202$5.00
A6Alternate Delivery End Dump ( 4-10 yard)N/A202$5.00
A7Open GradeN/A202N/A
Alternate Cost Contact Line Item # (CLIN)Commodity DescriptionStock Keeping Unit (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)blank
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".202$20.00N/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.202$20.00N/AN/A
A10Additional charge for delivery and plant opening.202N/A$400.00N/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $1.78 PER MINUTE.202N/AN/AN/A
A12Plant Mix pick up by State Forces (Orders less than the minimum)202$0.00N/AN/A
End of Sheet