Attachment_A_-_Contract_Pricing_-_03B_Supp_7.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Statewide Contract CA|1-22-56-20-03C|0000013059
Contract number
1-22-56-20-03C
Issued by
California

About this file

This document is a Statewide Contract Pricing Attachment (Supplement 7) for Asphalt Concrete Plant Mix, issued by District 3, Area 1 Department of General Services - Procurement Division under Contract 1-22-56-20-03B. The primary contractor is High Sierra Industries (Blain Stumpf Trucking), serving Butte and Glenn Counties in California. The contract involves Teichert facilities in Hallwood and Woodland as the primary asphalt plant locations.

The contract covers multiple line items for 3/4" Aggregate with PG 64-16 Binder, allowing for transfer, end dump, and bottom dump deliveries across various route segments. Pricing is structured with a base asphalt contract price (ranging from $77.00 to $80.30 per ton) and an additional fuel/delivery contract price (ranging from $16.10 to $35.17 per ton), resulting in total per-ton prices between $93.10 and $112.17. The document also includes alternate cost options for different aggregate types, binder grades, and delivery methods, with supplemental charges for special delivery conditions, plant openings, and unplanned delays. The contract provides flexibility for varying project requirements with detailed pricing for different scenarios and delivery specifications.

View the file

Other files

File Type Posted
Attachment_A_-_Contract_Pricing_-_Dan_Palmer.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

District 3, Area 1

Department of General Services - Procurement Division
Statewide Contract 1-22-56-20-03B, Asphalt Concrete Plant Mix, Delivered
Attachment A - Contract Pricing, District 3, Area 1, *Supplement 7*
Contractor: *High Sierra Industries* [Blain Stumpf Trucking]
Contact Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesItem DescriptionStock Keeping Unit SKU #Manufacturer Part NumberManufacturer (OEM)UNSPSCPlant Physical Address and Telephone NumberMiles from Delivery SiteUnit of MeasureQuantity of Unit of MeasureAsphalt Contract PriceFuel/Delivery Contract PriceContract PriceColumn1Column2
2030101311Butte

Butte Glenn 32 32 0.0/15.0 15.0/37.0

0.0/10.73/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order1/2" 64-10 HMA40331107Teichert Hallwood30121601Teichert Hallwood 3331 Walnut Ave. Marysville, CA 95901 (530)749-110640TN1$77.00$25.98$102.98
2030102312Butte700.0/22.03/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order1/2" 64-10 HMA40331107Teichert Hallwood30121601Teichert Hallwood 3331 Walnut Ave. Marysville, CA 95901 (530)749-110646TN1$77.00$28.41$105.41
2030103313Butte1620.0/31.13/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order1/2" 64-10 HMA40331107Teichert Hallwood30121601Teichert Hallwood 3331 Walnut Ave. Marysville, CA 95901 (530)749-110625TN1$77.00$20.03$97.03
2030104314Glenn450.0/23.23/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order1/2" 64-10 HMA40331107Teichert Hallwood30121601Teichert Hallwood 3331 Walnut Ave. Marysville, CA 95901 (530)749-110663TN1$77.00$35.17$112.17
2030105315Glenn16232.6/65.03/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order1/2" 64-10 HMA40331107Teichert Woodland30121601Teichert Woodland 35030 County Road 20 Woodland, CA 95695 (530) 661-429047TN1$80.30$28.81$109.11
2030106316Glenn16265.0/84.63/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order1/2" 64-10 HMA40331107Teichert Hallwood30121601Teichert Hallwood 3331 Walnut Ave. Marysville, CA 95901 (530)749-110623TN1$77.00$19.34$96.34
2030107317Butte990.0/45.903/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order1/2" 64-10 HMA40331107Teichert Hallwood30121601Teichert Hallwood 3331 Walnut Ave. Marysville, CA 95901 (530)749-110658TN1$77.00$33.14$110.14
2030108318Butte1490.0/4.63/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order1/2" 64-10 HMA40331107Teichert Hallwood30121601Teichert Hallwood 3331 Walnut Ave. Marysville, CA 95901 (530)749-110615TN1$77.00$16.10$93.10
2030109319Butte1910.0/11.403/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order1/2" 64-10 HMA40331107Teichert Hallwood30121601Teichert Hallwood 3331 Walnut Ave. Marysville, CA 95901 (530)749-110615TN1$77.00$16.10$93.10
20301103110Glenn50.0/28.83/4” Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order1/2" 64-10 HMA40331107Teichert Woodland30121601Teichert Woodland 35030 County Road 20 Woodland, CA 95695 (530) 661-429029TN1*$80.30$21.65$101.95
Alternate Cost Contact Line Item # (CLIN)Commodity DescriptionTypeStock Keeping Unit (SKU #)Contract Price (Per Ton)blank
A1Alternate Aggregate Cost (any size)N/AA1Plus $11.00 ton
A2Alternate PG Binder (any grade, specify-->70-10A2Plus $1.65 ton
A3Alternate MC/SC Binder (any grade)N/AA3Plus $10.00 ton
A4Alternate Delivery Super DumpN/AA4Plus $12.00 ton
A5Alternate Delivery Semi-End DumpN/AA5Plus $12.00 ton
A6Alternate Delivery End Dump ( 4-10 yard)N/AA6Plus $17.00 ton
A7Open GradeN/AA7Plus $11.00 ton
Alternate Cost Contact Line Item # (CLIN)Commodity DescriptionStock Keeping Unit (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)blank
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".A8Plus $25.00 tonN/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.A9Plus $25.00 tonN/AN/A
A10Additional charge for delivery and plant opening.A10N/A$2,000-$3,000 InquireN/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $1.78 PER MINUTE.A11N/AN/AN/A
A12Plant Mix pick up by State Forces (Orders less than the minimum)A12Plus $14.00 tonN/AN/A
End of Sheet

File details come from the government source that posted it. Updated .