Attachment A - Budget_Detail_and_Narrative.xlsx
XLSX spreadsheet 72 KB Posted
- Attached to
- WaterSMART: Desalination Construction Projects
- Opportunity number
- R26AS00034
About this file
This is a budget detail and narrative template file designed for applicants to the WaterSMART: Desalination Construction Projects grant opportunity administered by the Department of the Interior Bureau of Reclamation under CFDA 15.591. The file serves as an Excel-based worksheet for applicants to document and justify all project costs associated with planning, design, and/or construction of seawater or brackish water desalination facilities. Applicants must use this template to provide detailed budget line items, cost breakdowns, and corresponding narrative explanations that support the technical and financial feasibility of their proposed desalination project. The budget narrative should clearly explain how costs align with project objectives and demonstrate cost-effectiveness.
The template is mandatory for all applicants seeking federal cost-sharing assistance of up to 25 percent for eligible desalination projects located within the 17-state Western region (Arizona, California, Colorado, Idaho, Kansas, Montana, Nebraska, Nevada, New Mexico, North Dakota, Oklahoma, Oregon, South Dakota, Texas, Utah, Washington, and Wyoming). Eligible applicants include states, state departments, state subdivisions, and public agencies organized under state law. Completion of this budget detail and narrative document is a prerequisite for proposal submission and will be evaluated as part of the merit-based competitive review process. Applicants must ensure all budget information is consistent with the feasibility study submitted during preapplication coordination and complies with the specific evaluation criteria outlined in the Notice of Funding Opportunity.
Attachment A - Budget_Detail_and_Narrative.xlsx
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Reason for Budget Detail and Narrative |
| The budget for a financial assistance award is an estimate of costs. The budget narrative supports the budget by providing justification, or explanation, for cost items included in the budget. A thorough budget narrative will aid the administrative review of a recommended award. This Budget Detail and Narrative worksheet is a suggested format to document the estimated costs needed to accomplish project activities. |
| General Worksheet Instructions |
| • Input budget information in the light blue cells. White cells should not be modified. |
• Rows can be added as needed throughout tabs 6a. through 6j. If rows are added, formulas/calculations may need to be adjusted.
• The Budget Summary worksheet will auto-fill when you complete each tab. The amounts in the Budget Summary must match the SF-424A object class category amounts.
• The budget will include all project costs, regardless if federal or non-federal contributions.
| General Budget Information Instructions |
| • All costs in the budget must be directly related to project activities. |
• All costs must be allowable, allocable, and reasonable in accordance with 2 CFR 200 Subpart E, Cost Principles. (See Resources section below if you have questions.)
• Only non-construction related equipment purchases should be included within 6e. Equipment.
• All costs for sub-recipients and contractual/consultant costs that are not related to construction activities should be included within 6f. Contractual.
• All construction costs, including recipient-owned equipment use costs, equipment rental and purchase costs, supply costs, engineering services, and construction contract costs must be included under 6g. Construction.
• All third-party in-kind contributions of goods and services, including services performed by volunteers must be included with 6h. Other.
| If Non-Federal Cost Share Is Included |
| 1. The budget must include at least the minimum Federal to non-Federal required cost share. |
2. All cost-share payments or contributions must be necessary for the project activities.
3. Cost share is costs incurred and paid for during the project (i.e. personnel, supplies, etc.).
4. In-kind Cost Share is all third party contributions to the project that do not involve a payment or reimbursement (i.e. donated items or services).
| Resources for Costs |
| General questions on federal financial assistance Cost Principles at https://www.ecfr.gov/current/title-2/part-200/subpart-E |
| Questions on the factors that affect allowability of costs? https://www.ecfr.gov/current/title-2/section-200.403 |
| Questions on reasonable costs? See https://www.ecfr.gov/current/title-2/section-200.404 |
| Questions on allocable costs? See https://www.ecfr.gov/current/title-2/section-200.405 |
&"Segoe UI,Bold"&14Instructions https://www.ecfr.gov/current/title-2/part-200/subpart-Ehttps://www.ecfr.gov/current/title-2/section-200.403https://www.ecfr.gov/current/title-2/section-200.404https://www.ecfr.gov/current/title-2/section-200.405 Budget Summary
Summary Figures in this summary table are automatically calculated from entries made in subsequent object class categories spreadsheets.
| 6. Object Class Category | Total Cost | Federal Estimated Amount | Non-Federal Estimated Amount |
| a. Personnel | $0 | ||
| b. Fringe Benefits | $0 | ||
| c. Travel | $0 | ||
| d. Equipment | $0 | ||
| e. Supplies | $0 | ||
| f. Contractual | $0 | ||
| g. Construction | $0 | ||
| h. Other Direct Costs | $0 | ||
| i. Total Direct Costs | $0 | ||
| i. Indirect Charges | $0 | ||
| Total Costs | $0 | $0 | $0 |
| Cost Share Percentage | ERROR:#DIV/0! | ERROR:#DIV/0! |
6a. Personnel
6a. Personnel The Personnel category includes salaries and wages of your employees working directly on the project.
Salaries and wages of administrative and/or clerical personnel are usually classified under indirect costs (category 6j). However, if these salaries can be adequately documented as direct costs, you must include such justification in the narrative for Grants Officer review.
Tips for Narrative:
• For key personnel such as the project manager or principal investigator, identify the name individual and position/title.
• Other personnel should be identified by position only.
• For all positions, identify the project tasks that will be performed.
• Compensation rates can be expressed as hourly rates and number of hours, or annual salary and percentage effort and must be consistent with your organization’s accounting and timekeeping policies.
• Don't forget to include estimated hours for compliance with reporting requirements, including the final project report and evaluation!
• For multi-year projects, identify the level of effort anticipated for each budget year and any estimated increases in compensation rates.
• In the narrative provide certification that the labor rates included in the budget proposal represent the actual labor rates and that they are consistently applied to Federal and non-Federal activities.
Note: The annual/hourly labor rate must not include fringe benefits - those costs are included in category 6b. Fringe Benefits.
| Questions? | |||||||
| See the Uniform Guidance for Federal Financial Assistance (2 CFR Part 200) | 2 CFR Part 200.430 Compensation - personal services. | 2 CFR Part 200.430(g) Standards for Documentation of Personnel Expenses | |||||
| Personnel | |||||||
| Position Title | Time (Hrs or %) | Rate (Hr or Salary) | Total Cost | Rate Basis | Comments (as needed) | ||
| EXAMPLE!!! Sr. Engineer Y1 | 400 | $46 | $18,400 | Current Salary | hourly rate based on average rate for all personnel occupying this position | ||
| EXAMPLE!!! Sr. Engineer Y2 | 400 | $48 | $19,000 | Current Salary + 3% increase | Increase based on the average annual increase for all personnel occupying this position | ||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| Total | $0 | ||||||
| Narrative Justification: |
&"Segoe UI,Bold"SF-424A Object Class Category Personnel https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-E/subject-group-ECFRed1f39f9b3d4e72/section-200.430 6b. Fringe Benefits
6b. Fringe Benefits Fringe benefits are allowances and services provided by employers to their employees, in addition to regular salaries and wages. Fringe benefits may include the costs of leave (vacation, family-related, sick or military), employee insurance, retirement, and unemployment benefit plans. Fringe costs should also include employer contributions required by law such as payroll taxes such as FICA, unemployment, and workers compensation. Fringe does not include federal income taxes, employee portion FICA, or other such costs.
Note: The portion of automobile costs furnished to employees for personal use are unallowable as a fringe benefit.
Tips for Narrative:
• Fringe benefits can be expressed as an hourly rate or percentage of effort, but must correspond to how the costs are documented in your organization's accounting system.
• In the narrative, identify the fringe benefit rates/amounts for each position.
• For any fringe rate of 35% or higher, provide a breakdown of each of the employer costs/benefits (FICA, Retirement, etc.).
• If the rate is established within a negotiated indirect cost rate agreement (NICRA), provide a copy of the agreement with the application.
Note: Do not combine the fringe benefit costs with direct salaries and wages in the Personnel category.
| Questions? | ||||||
| See the Uniform Guidance for Federal Financial Assistance (2 CFR Part 200) | 2 CFR Part 200.431 Compensation-fringe benefits | |||||
| Fringe Benefits | ||||||
| Position Title | Compensation | Quantity | Total Cost | Comments (as needed) | ||
| EXAMPLE !!! Director | $8.55 | 475 | $4,061 | less than 35% of compensation rate | ||
| EXAMPLE !!! Sr. Engineer | 50% | $18,400 | $9,200 | FICA 8%, Unemployment 6%, WCI 1%, medical and dental 18%, retirement 3%, holidays and leave 14% | ||
| $0 | ||||||
| $0 | ||||||
| $0 | ||||||
| $0 | ||||||
| $0 | ||||||
| Total | $0 | |||||
| Additional Narrative/Comments: |
&"Segoe UI,Bold"SF-424A Object Class Category Fringe Benefits https://www.ecfr.gov/current/title-2/section-200.431 6c. Travel
6c. Travel Travel costs are expenses incurred by Personnel in travel status for the performance of project activities. Costs can be charged on an actual cost basis, on a per diem or mileage basis, or on a combination of the two. The method used must be applied to the entire trip, and not to selected days only. All charges must be consistent with those allowed under similar circumstances for non-Federally funded activities and established travel policies.
Tips for Narrative:
• Provide a narrative describing any travel employees are anticipated to perform for the project.
• Include the purpose of the travel and how it relates to project tasks.
• Include the origin and destination of the trip, number of Personnel traveling, length of stay and all travel costs including airfare, per diem, lodging, transportation, and miscellaneous travel expenses.
• Identify the basis for rates used, (e.g. GSA Per Diem Rates, published prices) and the total of each planned trip.
| Questions? | |||||||||||
| See the Uniform Guidance for Federal Financial Assistance (2 CFR Part 200) | 2 CFR Part 200.475 Travel costs | ||||||||||
| Travel | |||||||||||
| Purpose | From/To | # of Days | # of Travelers | Lodging per Traveler | Flight per Traveler | Vehicle per Traveler | Per Diem per Traveler | Cost per Trip | Basis for Estimate | ||
| EXAMPLE!!! Final Project Presentation | Washington D.C. to Denver | 2 | 1 | $195 | $345 | $146 | $114 | $800 | GSA rates, published price | ||
| EXAMPLE!!! Stakeholder meetings | TBD | NA | 1 | NA | NA | NA | NA | $244 | mileage cost for 6 meetings, average 70 mi Round trip x .58/mile | ||
| $0 | |||||||||||
| $0 | |||||||||||
| $0 | |||||||||||
| $0 | |||||||||||
| $0 | |||||||||||
| Total | $0 | ||||||||||
| Additional Narrative/Comments: |
&"Segoe UI,Bold"SF-424A Cost Category Travel https://www.ecfr.gov/current/title-2/section-200.475 6d. Equipment
6d. Equipment Equipment is defined in 2 CFR Part 200.1 as "tangible personal property (including information technology systems) having a useful life of more than one year and a per-unit acquisition cost which equals or exceeds the lesser of the capitalization level established by the recipient for financial statement purposes, or $10,000."
Tips for Narrative:
• If equipment will be purchased, itemize all equipment valued at or greater than $10,000 (or your organization's capitalization threshold).
• For each item, identify why it is needed for the project.
• For each item, identify how the equipment was priced (published price, quote, etc.).
• Include in the narrative a comparison of rental and/or lease costs over the purchase of the equipment item.
Note: Do not include equipment that will be purchased and/or installed as part of a construction- related activity. Construction costs must be included in Object Class Category 6g.
| Questions? | ||||||||
| See the Uniform Guidance for Federal Financial Assistance (2 CFR Part 200) | 2 CFR Part 200.313 Equipment | 2 CFR Part 200.439 Equipment and other capital expenditures | ||||||
| Equipment | ||||||||
| Equipment Item | Quantity | Unit Cost | Total Cost | Basis of Cost | Purpose | Rental Comparison | ||
| EXAMPLE!!! Ultra-cold freezer | 1 | $10,000 | $10,000 | Published price | store cell cultures and reagents | Rental cost $475-530/mo or $18,000 | ||
| $0 | ||||||||
| $0 | ||||||||
| $0 | ||||||||
| $0 | ||||||||
| $0 | ||||||||
| Total | $0 | |||||||
| Additional Narrative/Comments: |
&"Segoe UI,Bold"SF-424A Cost Cateogry Equipment https://www.ecfr.gov/current/title-2/section-200.313https://www.ecfr.gov/current/title-2/section-200.439 6e. Supplies
6e. Supplies A Supply is defined in 2 CFR Part 200.1 as "all tangible personal property other than those described in the equipment definition. A computing device is a supply if the acquisition cost is below the lesser of the capitalization level established by the recipient for financial statement purposes or $10,000, regardless of the length of its useful life.
Tips for Narrative:
• List all supplies and their purpose in the project.
• List the supplies basis of cost (e.g. vendor quotes, catalogue prices, prior invoices, etc.).
• For each item, provide the estimated unit cost, quantity, and total cost.
• General categories can be used for estimates, but if a category is too general or the estimate is too high, further itemization may be requested.
| Questions? | |||||||
| See the Uniform Guidance for Federal Financial Assistance (2 CFR Part 200) | 2 CFR Part 200.1 Computing devices | 2 CFR Part 200.453 Materials and supplies costs, including costs of computing devices | |||||
| Supplies | |||||||
| Supply Item | Quantity | Unit Cost | Total Cost | Basis of Cost | Purpose | ||
| EXAMPLE!!! Pressure Gage | 2 | $102 | $204 | vendor quote | to complete column tests in Task 1 | ||
| EXAMPLE!!! Compression tubing (lf) | 10 | $20 | $200 | vendor quote | to complete column tests in Task 1 | ||
| EXAMPLE!!! Peristalic pump | 1 | $3,180 | $3,180 | vendor quote | Load and regenerate columns (Tasks 1, 3, 5) | ||
| EXAMPLE!!! Instrument consumables (ls) | 1 | $1,500 | $1,500 | costs from previous project | analytical analyses in Tasks 1 through 6 | ||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| Total | $0 | ||||||
| Additional Narrative/Comments: |
&"Segoe UI,Bold"SF-424A Cost Category Supplies https://www.ecfr.gov/current/title-2/part-200/subpart-Ahttps://www.ecfr.gov/current/title-2/section-200.453 6f. Contractual
6f. Contractual Include all contracts and subawards (other than those for construction activities).
Contracts: Per 2 CFR Part 200.1, for Federal financial assistance purposes, a contract means "a legal instrument by which a recipient or subrecipient conducts procurement transactions under a federal award." Charactertics that support a procurement relationship are when a contractor; provides goods or services to many different purchasers, operates in a competitive environment, provides goods or services that are ancillary to the implementation of the Federal program, or is not subject to compliance requirements of the Federal program. The term as used in this part does not include a legal instrument, even if the non-Federal entity considers it a contract, when the substance of the transaction meets the definition of a subaward.
Subawards: Per 2 CFR Part 200.1, a subaward means "an award provided by a pass-through entity to a subrecipient for the subrecipient to contribute to the goals and objectives of the project by carrying out part of a Federal award received by the pass-through entity". A subaward may be provided through any form of legal agreement, including an agreement the pass-through entity (i.e. recipient) considers a contract.
Note: Do not include Construction contract costs in this subsection. Construction costs should be included in Object Class Category 6g, Construction.
| Questions? | |||
| See the Uniform Guidance for Federal Financial Assistance (2 CFR Part 200) | 2 CFR Part 200.1 Definitions | 2 CFR Part 200.331 Subrecipient and contractor determinations | |
| Contracts | |||
| Tips for Narrative: |
• For each contract, regardless of dollar value, describe the services to be obtained and the need for the project.
• Identify the total estimated cost and the basis(es) used to develop the estimate.
• For each contract with an estimated amount of $250,000 or greater, or those that represents 35% or more of the total project cost, provide a separate detailed description of the estimated costs. A detailed estimate can be included with the application in lieu of a description.
• For contracts with an estimated cost equal to or greater than the micro-purchase threshold (currently $10,000) identify the anticipated procurement method to be used and the basis of selection.
Note: Only contracts for architectural/engineering services can be awarded using a qualifications-based procurement method. If a qualifications-based procurement method is used, profit must be negotiated as a separate element of the contract price.
| Questions? | |||||||
| See the Uniform Guidance for Federal Financial Assistance (2 CFR Part 200) | 2 CFR Part 200.318 General procurement standards | 2 CFR Part 200.319 Competition | 2 CFR Part 200.320 Procurement methods | ||||
| Contractor Name | Purpose and Contracting Method | Total Cost | Description of costs | Basis of cost | |||
| EXAMPLE!! Facilitator, TBD | facilitate stakeholder meetings, technical assessments and preplanning activities. | $11,250 | personnel costs | average fees of consultants in the area is $150 x estimated 75 hours of work. Estimate prepared by Project Director | |||
| EXAMPLE!!! Water Quality Consulting | water quality support for pre-planning activities | $2,000 | personnel costs | quote from local provider of services | |||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| Contract Subtotal | $0 | ||||||
| Additional Narrative/Comments: | |||||||
| Subawards | |||||||
| Tips for Subaward Narrative: |
• If known, identify each subrecipient by name.
• Describe the activities to be performed under each subaward and need for the project.
• Provide a separate detailed budget for each subaward, regardless of dollar value.
• A detailed estimate may be included with an application in lieu of a description of budgeted costs. Identify who prepared the estimate (subrecipient, applicant personnel, etc.) and indicate the basis used to estimate each cost.
• Include any indirect/overhead costs anticipated to be paid and the rate used. If the subrecipient has a Federal negotiated indirect cost rate agreement (NICRA), include a copy of the NICRA with the application.
| Subrecipient Name | Description of Activites | Total Cost | Description of budgeted costs | Basis of Cost | |
| EXAMPLE!!! ABC Nonprofit | Conduct outreach, facilitate stakeholder meetings and perform preplanning activities | $8,400 | See attached estimate. | actual compensation and fringe rates(21%), GSA mileage rate, indirect cost rate agreement. | |
| $0 | |||||
| $0 | |||||
| $0 | |||||
| $0 | |||||
| Subaward Subtotal | $0 | ||||
| Additional Narrative/Comments: | |||||
| TOTAL CONTRACTUAL CATEGORY | $0 |
&"Segoe UI,Bold"SF-424A Class Category Contractual https://www.ecfr.gov/current/title-2/part-200/subpart-Ahttps://www.ecfr.gov/current/title-2/section-200.331https://www.ecfr.gov/current/title-2/section-200.320https://www.ecfr.gov/current/title-2/section-200.319https://www.ecfr.gov/current/title-2/section-200.318 6g. Construction
6g. Construction Construction costs are costs incurred in the construction, renovation, and/or equipping of a facility or structure. Costs include, engineering, design, permitting, demolition, acquisition of materials, and installation of improvements.
Identify all construction related costs including recipient-owned equipment use, rental equipment, construction supplies, equipment that will be purchased and installed, construction contracts, permitting, and environmental compliance.
Note: Personnel and fringe benefits costs related to construction should be included in Object Class Category 6a Personnel and 6b Fringe, if applicable.
| Recipient-Owned Equipment Use Costs |
| Tips for Recipient-Owned Equipment Narrative |
• If you propose to use equipment that you own under the project, provide the use rates and hours for each piece of equipment owned and budgeted.
• Ownership rates should be developed by the recipient for each piece of equipment (do not include operator costs).
• If ownership rates are not available, the U.S. Army Corp of Engineer’s recommended equipment rates for the region are acceptable.
| Questions? | |||||||
| See the U.S. Army Corps Equipment Rates. | EP1110-1-8 Construction Equipment Ownership and Operating Expense Schedule | ||||||
| Equipment Item | Hours | Rate | Total Cost | Basis of Cost | Purpose | ||
| JCB Excavator | 168 | $47 | $7,896 | COE Schedule | site prep, trenching | ||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| Subtotal | $0 | ||||||
| Additional Narrative or Comments: | |||||||
| Construction Materials | |||||||
| Tips for Construction Materials Narrative: |
• Identify any construction materials and non-movable equipment that will be purchased from a vendor.
• Include estimated purchase price, quantity, total cost, and the basis used to estimate the cost (published prices, quotes, previous project, etc.)
| Item | Quantity | Unit Cost | Total Cost | Basis of Cost | Comments (as needed) |
| EXAMPLE!!! 16" PVC pipe (lf) | 3000 | $20 | $3,600 | quote | |
| $0 | |||||
| $0 | |||||
| $0 | |||||
| $0 | |||||
| $0 | |||||
| $0 | |||||
| $0 | |||||
| $0 | |||||
| $0 | |||||
| $0 | |||||
| $0 | |||||
| $0 | |||||
| Subtotal | $0 | ||||
| Additional Narrative/Comments: | |||||
| Contractual | |||||
| Tips for Contractual Narrative: |
• For each contract, regardless of dollar value, describe the services to be obtained and the applicability or necessity of each to the project.
• Identify the total estimated cost and the basis(es) used to develop the estimate.
• For all construction contracts and each contract exceeding $250,000 or representing 35% or more of the total project cost, provide a separate detailed description of the estimated costs. A detailed estimate can be included with the application in lieu of a description.
• For contracts with an estimated cost equal to or greater than the micro-purchase threshold (currently $10,000) identify the anticipated procurement method to be used and the basis of selection.
Note: Only contracts for architectural/engineering services can be awarded using a qualifications-based procurement method. If a qualifications-based procurement method is used, profit must be negotiated as a separate element of the contract price. Recommend reviewing 2 CFR Part 200.459 Professional service costs.
| Questions? | |||||||
| See the Uniform Guidance for Federal Financial Assistance (2 CFR Part 200) | 2 CFR Part 200.318 General procurement standards | 2 CFR Part 200.319 Competition | 2 CFR Part 200.320 Procurement methods | ||||
| Contractor Name | Description of Services | Total Cost | Description of cost estimate | Basis of Cost | |||
| EXAMPLE!!! TBD | engineering and design, construction management | $300,000 | see attached estimate prepared by the City Engineer. | The estimate is based on a previous similar project. The procurement method will be competitive proposals and selections will be made based on best value (qualifications and price). | |||
| EXAMPLE!!! TBD | Construction contract to furnish and install all pipe, equipment, and appurtenances. | $2,600,000 | see attached estimate prepared by the District's contract engineer. | the estimate is based on the contract unit prices from two similar piping projects completed by the District in 2019 and 2020. The contract will be awarded using competitive bid procedures and the award will be made to the lowest qualified bidder. | |||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| Subtotal | $0 | ||||||
| Additional Narrative or Comments: | |||||||
| Other Construction-related costs | |||||||
| Identify any other construction-related costs (e.g. equipment rental, permitting, etc.) and indicate the applicability or necessity of each to the project. Include quantity, unit cost, total cost, and the basis for the estimate. |
Note: Do not include costs that are anticipated to be paid by a contractor under the terms of the contract.
| Item Description | Quantity | Unit Cost | Total Cost | Basis of Cost | Purpose |
| EXAMPLE!!! Permits | 1 | $3,600 | $3,600 | previous project | Legally required |
| $0 | |||||
| $0 | |||||
| $0 | |||||
| $0 | |||||
| Subtotal | $0 | ||||
| Additional Narrative/Comments: | |||||
| TOTAL CONSTRUCTION COSTS | $0 |
&"Segoe UI,Bold"SF-424A Object Class Category Construction https://www.usace.army.mil/Cost-Engineering/EP1110-1-8/https://www.ecfr.gov/current/title-2/section-200.319https://www.ecfr.gov/current/title-2/section-200.318 6h. Other Direct Costs
6h. Other This category contains items not included in the previous categories such as rental costs, third party in-kind contributions (i.e. donations), etc.
Tips for Narrative:
• List items by type or nature of expense, breaking down costs by cost per unit, quantity, and total cost and identify the basis of cost (quote, invoice, etc.).
• Describe the necessity of the costs for successful completion of the project.
| Questions? | |||||||||
| See the Uniform Guidance for Federal Financial Assistance (2 CFR Part 200) | 2 CFR Part 200 Subpart E Selected Items of Costs | 2 CFR Part 200.306 Cost sharing | |||||||
| Other | |||||||||
| Item Description | Quantity | Unit Cost | Total Cost | Basis of Cost | Purpose | ||||
| EXAMPLE!!! Facility Rental | 4 | $300 | $1,200 | published price | To hold the planned two 2-day workshop meetings of the watershed group at a local community college | ||||
| $0 | |||||||||
| $0 | |||||||||
| $0 | |||||||||
| $0 | |||||||||
| $0 | |||||||||
| $0 | |||||||||
| $0 | |||||||||
| Total | $0 | ||||||||
| Additional Narrative/Comments: | |||||||||
| Third-Party Contributions | |||||||||
| Identify any third-party services and donations (personnel costs, supplies, etc.) and include the name of the contributor. Indicate the applicability or necessity of each to the project and describe the basis(es) for the valuation. All third-party contributions must meet the requirements under 2 CFR Part 200.306 Cost sharing. | |||||||||
| Third Party Contributor | Purpose | Value | Description of costs | Basis of Valuation | |||||
| EXAMPLE!!! XYZ Company | Loan of xxxx equipment to perform analysis in Task 1 | $15,500 | XXX equipment, shipping to project site | current rental rates for similar equipment, quote for shipping | |||||
| EXAMPLE!!! ABC Conservation District | Two conservation planners to participate in planning meetings and assist with the review of the final plan | $1,650 | compensation, fringe, mileage, indirect | Actual compensation ($30/hr x 35 hrs) and fringe rates (20%), GSA mileage rate (.585/mi x 70mi x 6 meetings), de minimis (10%). | |||||
| $0 | |||||||||
| $0 | |||||||||
| $0 | |||||||||
| $0 | |||||||||
| $0 | |||||||||
| Subtotal | $0 | ||||||||
| Additional Narrative/Comments: |
TOTAL OTHER $0
&"Segoe UI,Bold"SF-424A Object Class Category Other https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-Ehttps://www.ecfr.gov/current/title-2/section-200.306 6j. Indirect Costs
6 j. Indirect Costs
Option 1: Include the approved Federal indirect cost rate from a current agreement, including the indirect rate base, and total amount for indirect costs. A copy of a current negotiated indirect cost rate must be included with your application as supporting documentation. If your organization's negotiated indirect cost rate is expired, you can choose the de minimis rate (see Option 2) or renew/renegotiate (see Option 3).
Option 2: Your organization can choose to utilize the de minimis rate of modified total direct costs (15% currently) for indirect costs. The de minimus can be used for all federal awards without a need for cognizant agency approval. From 2 CFR Part 200.1, modified total direct costs means "all direct salaries and wages, applicable fringe benefits, materials and supplies, services, travel, and up to the first $50,000 of each subaward (regardless of the period of performance of the subawards under the award). MTDC excludes equipment, capital expenditures, charges for patient care, rental costs, tuition remission, scholarships and fellowships, participant support costs, and the portion of each subaward in excess of $50,000. Other items may only be excluded when necessary to avoid a serious inequity in the distribution of indirect costs and with the approval of the cognizant agency for indirect costs."
Option 3: If your organization does not have a current federally approved indirect cost rate agreement, and has decided to renegotiate for a rate greater than the de minimis rate (currently 15%), include the computational basis for the indirect expense pool and corresponding allocation base for each rate. It is important to note that any subsequent negotiated rate cannot be applied to the award prior to the effective date of the federally approved indirect cost rate agreement.
Note: If Option 3 is selected, you will be required to submit an indirect cost rate proposal to your cognizant Federal agency and receive indirect rate approval. Information on “Preparing and Submitting Indirect Cost Proposals” is available from Interior, the National Business Center, and Indirect Costs and Acquisition Audit Services at https://ibc.doi.gov/ICS/indirect-cost.
Note: Construction costs are capital expenditures and must be excluded from the indirect cost base.
| Questions? | ||||||||
| See the Uniform Guidance at 2 CFR Part 200, or Interior Business Center | 2 CFR Part 200.1 Definitions | 2 CFR Part 200.414 Indirect Costs | https://ibc.doi.gov/ICS/indirect-cost | |||||
| j. Indirect Costs | ||||||||
| Rate Type | Current Federal NICRA | Base Description | Base Total | Rate | Total Cost | |||
| EXAMPLE!!! Final | Yes | See indirect cost rate agreement | $113,020 | 42.80% | $0 | |||
| EXAMPLE!!! De minimis | No | Personnel, Fringe, Travel, and Supplies | $141,020 | 10.00% | $0 | |||
| $0 | ||||||||
| $0 | ||||||||
| $0 | ||||||||
| $0 | ||||||||
| Total | $0 | |||||||
| Estimated amount of indirect costs to be paid with Federal funds | ||||||||
| Estimated amount of indirect costs to be paid with non-Federal funds |
&"Segoe UI,Bold"SF-424A Object Class Category Indirect Costs https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-A/subject-group-ECFR2a6a0087862fd2c/section-200.1https://ibc.doi.gov/ICS/indirect-costhttps://www.ecfr.gov/current/title-2/section-200.414
File details come from the government source that posted it. Updated .