ATTACHMENT 7 SOLICITATION N3220521R4205.pdf
PDF 1 MB Posted
- Attached to
- TECHINCAL LIBRARY SERVICES Federal contract opportunity
- Solicitation number
- N3220521R4205
About this file
This solicitation requests proposals for technical library services to be provided to the Military Sealift Command. The services include day-to-day operation and maintenance of the technical library and virtual technical library system, engineering drawing development and updates, records inventory and cataloging aboard vessels, and database administration and testing support. The requirement is set aside for 8(a) small businesses and will be awarded on a lowest price technically acceptable basis to a proposal meeting the technical and past performance standards. The base period of performance is one year with four one-year option periods. Pricing must be submitted using the fixed-price spreadsheets and labor categories identified. Proposals are due by July 26, 2021 and award will be made without discussions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitaiton Amendment 0002 N3220521R4205.zip | ZIP file | |
| Solicitation Amendment 0001 N3220521R4205.pdf | ||
| RFP N3220521R4205 QUESTIONS AND ANSWERS 1.pdf | ||
| Attachment 2 - MSC Computer Aided Designed.pdf | ||
| Attachment 4 Past Performance Data Sheet.doc | DOC document | |
| ATTACHMENT 6 CDRLS New WinZip File.zip | ZIP file | |
| Attachment 3 - MSC GTR.doc | DOC document | |
| ATTACHMENT 1-PRICING SHEET-TECH LIBRARY.xls | XLS spreadsheet | |
| Attachment 5 Past Performance Questionnaire.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N3220521R4205 22-Jun-2021
b. TELEPHONE NUMBER
757-443-5914
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 26 Jul 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N322059. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
TIMOTHY LEWIS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MILITARY SEALIFT COMMAND NORFOLK
471 EAST C STREET, BLDG SP-64 NAVAL STATION N
NORFOLK VA 23511
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
X 8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$16,500,000
NAICS:
519120
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF83
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N3220521R4205
Section SF 1449 - CONTINUATION SHEET
PWS
PERFORMANCE WORK STATEMENT (PWS)
ACRONYMS
The following acronyms apply to the terms used in this statement of work:
ABS........................... American Bureau of Shipping
ASME....................... American Society of Mechanical Engineers
COMSC...................... Commander, Military Sealift Command
COR............................ Contracting Officer Representative
COTS.......................... Commercial off The Shelf
EPI…………………. Engineering Process Instruction
ESTA………………. Emprise Secure Transfer Agent
ERM………………… Electronic Records Management
EWI………………… Engineering Work Instruction
GFI ………………… Government Furnished Information
GFM………………... Government Furnished Material
MSC............................ Military Sealift Command
NAVSEA.................... Naval Sea Systems Command
ODC............................ Other Direct Costs
OEM............................ Original Equipment Manufacturer
PC............................... Personal Computer
PM............................... Preventive Maintenance
SAMM........................ Shipboard Automated Maintenance Management
SCORM……………... Sharable Content Object Reference Model
SMART...................... Ship Material Assessment and Readiness Testing
SMS ………………... Safety Management System
SNAME....................... Society of Naval Architects and Marine Engineers
SQL………………… Structured Query Language
TMDER…………….. Technical Manual Deficiency Evaluation Report
TPOC.......................... Technical Point of Contact
TRANSALT............... Transportation Alteration of Equipment
USCG.......................... United States Coast Guard
VRR............................ Voyage Repair Request
VTL............................. Virtual Tech Library
WAWF……………... Wide Area Work Flow
3M............................... Maintenance and Material Management
1. BACKGROUND. The Military Sealift Command (MSC) owns and operates approximately 120 vessels including steam turbine, gas turbine, and diesel engine propelled vessels. These vessels fulfill various missions such as underway replenishment, oceanographic research, cable repair and dry & refrigerate cargo transportation. MSC’s Engineering Division is responsible for the maintenance, repair, alteration, and material readiness of the MSC fleet. Throughout the period of performance of this contract, new vessels will be introduced into the MSC fleet and vessels will be retired from service life.
The Technical Documentation Branch N04713 is responsible for managing many sources of data within the
Engineering Division. The Technical Documentation Branch is required to provide new and revised technical manuals, drawings, and technical data for fleet support. The MSC Tech Library is the central location for all of
MSC’s technical documentation.
2. SCOPE. The Engineering Department of Military Sealift Command (MSC) requires the Technical
Documentation Branch to provide Military Sealift Command (MSC) administrative, data management and technical support of the engineering library. This includes the MSC Virtual Technical Library system (VTL), an electronic repository and management system for technical manuals, drawings, engineering designs, engineering and technical references. The Contractor shall provide the MSC Engineering Department (N7) administrative support, data management support, and technical support for the engineering library Ashore and Afloat. The
Contractor will be responsible for performing the following tasks on or off-site.
3. Tasking:
3.1. Contractor shall follow the government holiday schedule and be responsible for normal day-to-day operation of the technical library which include:
3.1.1. Managing records to include receiving, cataloging, filing, rearrangement and redistribution within the available library space.
3.1.2. Operating equipment to conduct and complete the required work.
3.1.3. Securing all operating equipment at the end of the workday.
3.1.4. Receiving telephone calls and communicating messages via email, answering questions, and initiating telephone calls, as required to accomplish regular operations.
3.1.5. Maintaining the United States Coast Guard (USCG), American Bureau of Shipping (ABS), and other regulatory body approval files for ship designs. This task requires retrieval of drawings, approval letters, certifications, and other files from the ABS website, NAVSEA website, SAMM, and other sites as applicable. The government will provide access to the ABS and NAVSEA websites. The retrieved files may be required to be uploaded and cataloged into the SAMM VTL.
3.1.6. Document handling and cataloging.
3.1.7. Scanning and converting original drawings, technical manuals, files, records, and other documentation as requested. Original media may be in paper, vellum, microfiche, and microfilm or in aperture card form.
3.1.7.1. Scanning, printing and document reproduction based on customer request.
3.1.7.2. Duplicating and transferring technical data onto electronic media based on customer request.
3.1.8. Develop and maintain process and procedure manuals for all library operations (CDRL 1423-1
Procedures and Processes for Library Operations) including:
3.1.8.1. Detailed steps on how to perform all operations at the technical library and may be required to include flow charts, equipment nameplates, programs, passwords, points of contact (POC) address, etc.
3.1.8.2. The procedure and process manuals may be required to be updated and approved by the COR.
3.1.8.3. Develop and maintain, at a minimum on an annual basis, an Engineering Process Instruction for all library operations.
3.1.9. Maintain the MSC SAMM VTL at MSCHQ (Norfolk, VA).
3.1.10. Laminate small and large format drawings or other documents. Prepare and ship documents as required.
3.1.11. Provide support for managing changes to Technical Manuals (TMs) to include:
3.1.11.1. Retrieve TM changes. Reviewing changes and revisions to TMs.
3.1.11.2. Properly formatting, submitting and tracking changes to Technical Data Management
Information System (TDMIS) or subsequent system and Naval Systems Data Support Activity
(NSDSA).
3.1.11.3. Submit SAMM feedback for all ships affected by the Technical Manual changes and revision.
3.1.11.4. Maintain, post and update a library of engineering standards and reference documents both hard copy and electronic copy on the VTL.
3.1.11.5. Provide changes to the Technical Manuals (TMs) on behalf of the TMMA to include, at minimum, processing of TMDERs, assembling changes and revisions to manuals, requesting new TMINS and submitting final documents to NSDSA.
3.2. Maintain the library of manufacturer’s literature including engineering service bulletins and advisories which includes:
3.2.1. Retrieving, sorting, and filing engineering service bulletins.
3.2.2. Distributing engineering service bulletins to appropriate vessels.
3.2.3. Cataloging and updating service bulletins on the SAMM VTL.
3.2.4. Updating technical manuals by including service bulletins.
3.2.5. Maintain an electronic and/or hardcopy collection of controlled technical documents and distribute as directed by the MSC COR. The Contractor may be required to update the metadata in the SAMM
VTL for the controlled documents.
3.3. Provide support for the assembly and distribution of technical data in support of ship availabilities to include:
3.3.1. Verify the referenced technical records (drawings and manuals) are the correct version for the ship availability.
3.3.2. Search technical library information to retrieve reference data, drawings, manuals, and designs for the development of work packages.
3.3.3. Duplicate the availability work package as requested.
3.3.4. The Contractor may be required to catalog and import scanned hard copies and converted electronic files received in bulk into the local instance of the SAMM VTL. The Contractor may be required to conduct bulk distribution of technical data based on customer request and as directed by the COR.
3.3.5. The Contractor shall develop data CDs or DVDs and duplicate as required.
3.4. The Contractor will be required to provide personnel capable of creating and updating engineering drawings based on information from MSC Engineers and in accordance with the latest revision of
Attachment 2 - MSC Computer Aided Designed (CAD) drawing standard and Attachment 3 - MSC General
Technical Requirements (GTRs). The Contractor may be required to provide all CAD drawings in an
AutoCAD compatible format.
3.4.1. Make changes to Engineering Drawings after receiving change information from N7 engineers; make changes to drawing numbers, references, and applicability tables. The Contractor maybe asked to accompany an engineer on ship check for drawing development.
3.5. SAMM VTL Support
3.5.1. Exporting and distributing electronic technical data from the local instance of the SAMM VTL to the
MSC fleet.
3.5.2. The Contractor may be required to provide support for distribution of SAMM VTL and SMS files to the MSC fleet via ESTA on a weekly basis.
3.5.3. The Contractor shall maintain the SAMMVTL within the LES Engineering Ashore Application
ERM.
3.5.4. The contractor shall, when identified, make recommendations for efficiency improvement for the
SAMM VTL application and business processes.
3.5.5. The Contractor shall provide database administration and testing support when requested by the
COR.
3.5.6. The Contractor shall provide database conversion and testing support when requested by the COR.
3.5.7. The Contractor shall recommend technology improvements that may increase quality of existing
VTL content and reduce manual labor required to perform data entry of document meta-data into
VTL database.
3.5.8. The Contractor shall recommend technology improvements that may increase probability of users finding required documentation.
3.5.9. The Contractor shall recommend technology improvements that may enhance the capabilities of the
VTL.
3.6. The Contractor may be required to travel to MSC vessels to inventory, scan and catalog technical documents, either pier side or underway, into SAMM VTL. CDRL 1423- 4 Trip Report
3.6.1. The Contractor may be required to review records contained in the ashore SAMM VTL for applicable vessel records and annotate those shipboard records not in the ashore library.
3.6.2. The Contractor may be required to scan those records not existing in the ashore SAMM VTL.
3.6.3. The Contractor may be required to perform general organization of the shipboard library to include labeling and document repair.
3.6.4. The Contractor shall transport necessary scanning equipment to the vessel location.
3.6.5. Submit to the vessel an updated records inventory upon completion of records entry into SAMM
VTL. CDRL 1423-5 Ship Technical Library Inventory
3.7. First Line Supervisor/Librarian may be required to provide a monthly technical library metrics report.
CDRL 1423-2 Library Metrics.
3.8. The Government will provide initial training in the use and operation of SAMM VTL Library network and website, to the extent necessary to perform the required functions. After the initial training, it is the responsibility of the Contractor to train new employees prior to starting work.
4. Quality Assurance Plan: The Contractor may be required to submit a preliminary Quality Assurance Plan
(QAP) for all specific tasks that describes the processes which will be in place to ensure the final product is free of errors. The QAP shall describe how the Contractor will ensure that the work performed will meet all requirements. The QAP must address how the Contractor intends to implement quality control, quality assurance, and continuous process improvement. The QAP shall include as a minimum: Quality Metrics, Quality Checklist(s) and, Process Improvement Plan; Quality Baseline. The Contractor may be required to retain documentation generated as a result of the QAP to facilitate audits by the COR.
4.1.1. Process Management Plan: The process document may be required to include identification of the process lead, all additional roles, the detailed process activities to include quality assurance and sustainment. (i.e. helpdesk support process).
4.1.2. Weekly Meetings. The Contractor may be required to schedule Weekly Meetings with the COR.
The COR can elect to conduct meetings in person or electronically and the frequency. The meeting may be required to include subcontractors as needed, discuss work conducted since the last meeting and expected work to be conducted in the next reporting period, and any areas of concern. The
Contractor may be required to provide meeting minutes as defined in CDRL 1423-7 Meeting
Minutes.
4.1.3. Trip Reports. The Contractor will be required to provide Trip Reports for all travel (ship check, installation, and training, etc.). The Trip Reports shall be in the format as defined in CDRL 1423-4
Trip Report.
4.1.4. Monthly Report. The Contractor may be required to provide a Monthly Report that outlines the progress for each of the Specific Tasks. CDRL 1423-3 Monthly Report
4.1.5. Electronic Invoicing. Invoices shall be submitted via the WAWF system to process all vendor payment requests and receiving reports.
4.1.6. Monthly Management Meeting. The Contractor may be required to schedule Monthly Meetings with the COR in person to discuss the Monthly Report. At minimum, First Line Supervisor will be required to attend these meetings. The Contractor may be required to provide meeting minutes as defined in CDRL 1423-7 Meeting Minutes.
4.1.7. Action Item Tracking. The Contractor may be required to maintain a consolidated list of actions items, with the exception of help calls or SAMM feedback, and enter all action items into the SAMM
Task Manager and record the task identification number in the action items tracking list. When an action item is the responsibility of the government, the Contractor may be required to submit a task request via the SAMM Task Manager module. CDRL 1423-6 Action Item Report
5. MEETINGS, FACILITIES, AND PERSONNEL.
5.1. Facilities. All work services shall be performed at the MSC Technical Library or on travel visiting an MSC vessel. Situational telework offsite shall be permitted as necessary to provide flexibility and continuation of operations. The Contractor shall be able to provide services in these areas or be prepared to perform travel.
5.1.1. The Government will provide sufficient office space for Contractor personnel working on-site to perform the required duties. The office space shall have as necessary; include telephones, computer hardware, software and full time access to the computer systems of MSC. The
Government will provide unlimited official use of copying equipment for unclassified reproduction.
5.2. Business Meetings. The Contractor and Government will have monthly meetings at a time agreed to by MSC and the contractor. The meetings allow time to review contract performance and to discuss Contractor findings. Meeting minutes will be documented by the Contractor.
5.3. Personnel. The minimum personnel qualifications and key personnel designations are set forth in
Subfactor 3 in Federal Acquisition Regulation (FAR) 52.212-2 Addendum of the solicitation. The
Contractor shall advise the Contracting Officer, in writing, which specific persons have the decision-making authority described herein. Within 5 days of award, the contractor shall provide personnel to begin the onboarding process (i.e. CAC issuance, SAAR-N, facilities access, etc.) to work on this contract as specified in the table below.
Minimum
Number of
Resumes
Labor Category
2 Engineering Technician Level IV-V with Drafting Experience
1 First Line Supervisor/Librarian
1 Senior Library Technician
2 Library Technician
3 General Clerical Level III
1 System Analyst
10 TOTAL
5.3.1. First Line Supervisor/Librarian
5.3.1.1. The First Line Supervisor shall be responsible for managing the daily activities of the Library
Technicians and General Clerks performing the functions described in the SOW.
5.3.1.3 The First Line Supervisor shall also be responsible for coordinating the daily activities of the Contractor’s personnel with those of the Library Director, contract COR, and request originators.
5.3.1.4 The First Line Supervisor shall coordinate library projects and plans with the Library
Director/COR. The First Line Supervisor will also receive and coordinate work prioritization with the Library Director/COR.
5.3.1.5 The First Line Supervisor shall be responsible to coordinate and oversee tasks conducted by civilian mariners, military personnel, and other Contractors.
5.3.2. Senior Library Technician
5.3.3. Two Library Technicians
5.3.4. Two Engineering Technicians with Drafting Experience
5.3.5. Three General Clerks
5.3.6. System Analyst shall provide equipment, hardware, software and database support as well as technological improvements.
5.3.7. Substitution of Key Personnel: No substitutions to key personnel can be made without prior written approval of the Contracting Officer. Any proposed substitute must have a CONFIDENTIAL security clearance and meet the qualifications specified in Subfactor 3 in FAR 52.212-2 Addendum of the solicitation The contractor shall provide resumes in accordance with CDRL 1423-8 Resume.
5.4. Safety. Personal Protective Equipment shall be required for personnel performing shipboard operations on vessels in accordance with the Personal Protective Equipment SMS procedure 2.1-006.
6. TRAVEL/MATERIALS
6.1 Travel and materials will be firm fixed price.
7. PERIOD OF PERFORMANCE
YEAR PERIOD OF PERIOD
Base Year 1 October 2021 - 30 September 2022
Option 1 1 October 2022 - 30 September 2023
Option 2 1 October 2023 - 30 September 2024
Option 3 1 October 2024 - 30 September 2025
Option 4 1 October 2025 - 30 September 2026
8. OVERTIME
MSC anticipates that the scope of work defined in the PWS can be satisfactorily performed based on a standard
40-hour workweek. In the event that the Government and Contractor deems overtime to be necessary (Urgent
Requests) to meet the needs of the Government, the Government and the Contractor will collaborate to determine if the Contractor should perform overtime at the pre-negotiated overtime labor rate for this contract.
Collaboration between the Government and Contractor is highly recommended especially since this is a firm-fixed price contract, and contractor is fully responsible for controlling costs and performing effectively.
However, the Government reserves the right to procure any additional support via a competitive solicitation in the event such a course of action is determined to be in the best interests of the Government.
9. OTHER INFORMATION
The Contracting Officer has designated the person named below as the authorized COR for this Contract:
NAME: Jermaine Green
CODE: N7
PHONE: 757-443-2696
EMAIL: jermaine.a.green1@navy.mil
The COR will represent the Contracting Officer in the administration of technical details within the scope of this contract and will perform inspection and acceptance of all deliverables. The COR is not otherwise authorized to make any representations or commitments of any kind on behalf of the Contracting Officer or the
Government. The COR does not have the authority to alter the Contractor's obligations or change the specifications in the contract. If, as a result of technical discussions, it is desirable to alter contract obligations or work statements, a modification must be issued in writing and signed by the Contracting Officer. The COR is responsible for reviewing the invoices submitted by the Contractor and informing the Contracting Officer of areas where exceptions are to be taken. The COR authority is not delegable. The COR may be personally liable for unauthorized acts.
AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
Except as specified in the paragraph below, no order, statement, or conduct of Government personnel who visit the Contractor’s facilities or in any other manner communicates with Contractor personnel during the performance of this contract shall constitute a change under the Changes clause of this contract.
The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, said authority remains solely the mailto:jermaine.a.green1@navy.mil
Contracting Officer’s. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase incurred as a result thereof. The address and telephone number of the Contracting Officers are:
Timothy Lewis
MSC N102C
Military Sealift Command
Bldg SP64
Navy Station Norfolk, VA 23511
757-443-5914 timothy.lewis6@navy.mil
PERMITS AND RESPONSIBILITIES
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable Federal, State, and Municipal laws, codes, and regulations, in connection with any movement over the public highways of overweight/over dimensional materials.
CONTRACT TYPE
This will be Firm-Fixed Price contract with a one (1) year base period and four (4) one-year options.
REQUIRED STANDARD OF WORKMANSHIP/PERFORMANCE STANDARDS
Services will be acquired under this contract. This contract is structured as performance based in accordance with FAR
Subpart 37.6. This contract, as supplemented by the performance work statement (PWS) provides specific requirements to accomplish the work. The contractor shall be evaluated on its ability to provide quality deliverables in an efficient manner.
Task or
Deliverable
Performance Standard* Performance
Indicator
Surveillance Method Incentive (Negative)
SAMM VTL
Support
(PWS 3.5)
The contractor shall respond to electronic requests for technical data within 3 working days.
80% or greater
Sampling of 10% of online requests
When the contractor fails to meet the performance goal, the government may permanently withhold 5% of the hold back amount associated with the performance period up to a maximum of 100% of the hold back.
Substitution of
Key Personnel
(PWS 3.1 - 3.8)
Any proposed substitution of Key Personnel must have a CONFIDENTIAL security clearance and meet the qualifications specified in
Personnel Qualifications
95% or greater
Resume, review of
CDRL 1423-8
When the contractor fails to meet the performance goal, the government may permanently withhold 5% of the hold back amount associated with the performance period up to a maximum of 100% of the hold back.
METHODLOGIES TO MONITOR PERFORMANCE
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are direct observation, validated user/customer feedback, and analysis of contractor’s progress reports.
Surveillance Method Description
Direct Observation Observation of direct services and/or products is used to survey the requirements. Performed periodically or through 100% surveillance. The observations are documented in a Surveillance Log.
Management Information
Systems (MIS)
Outputs through the use of management information reports are evaluated.
Used for general surveillance and augmented with periodic inspections.
Periodic Inspection Comprehensive evaluation of selected outputs. Applicable to interim outputs whose quality is also measured in final outputs. Inspections may be scheduled or unscheduled, as required.
User Survey/Customer
Feedback
Combines elements of validated user complaints and random sampling. A random survey is conducted to solicit user satisfaction.
Validated User/Customer
Complaints
Relies on the user of the service to identify deficiencies. Complaints are investigated and validated. Highly applicable to services provided in quantity and where quality is highly subjective.
100% Inspection Evaluates all outputs of the award requirement. Most applicable to small quantity, but highly important products and/services.
Periodic Sampling Variation of random sampling, however, sample is only taken when a deficiency is suspected. Good follow-up to MIS analysis. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.
Random Sampling Designed to evaluate the outputs of the award requirement by randomly selecting and inspecting a statistically significant sample. Highly recommended for large quantity repetitive activities with objective and measurable quality attributes.
Progress or Status Meetings Ascertain contractor’s performance from information presented at progress reviews or project status meetings.
Analysis of Contractor's
Progress Reports
Evaluate cost, schedule, etc. from data reported by contractor’s status and financial reports.
Performance Reporting Evaluate metrics for a specific time period. Develop metrics or use metrics found in MIS.
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the PCO and/or COR/TOM, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR. The COR will accept those customer complaints and investigate.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
SHIP & BASE ACCESS
BASE ACCESS for Contractors without a CAC – MSC Security Awareness Memorandum 05-18 provides detailed interim guidance on gaining access onto CNRMA base installations. SECNAV 5512/1 DON ID Card Base Access Pass shall be used by the sponsor when requesting base access for visitors/vendors. Base access requirements may change and the interim guidance may change without notice, therefore MSC Security Awareness Memorandum 05-18 or superseded version shall be followed.
It shall take 7-10 business days (or more) to completely process base access paperwork and the sponsor must meet the individual(s) at Pass & ID to retrieve passes.
Regarding MSC Security Awareness Memorandum 05-18, paragraph 7 Same Day Access, the sponsor must accompany the contractor to the Pass Office with the SECNAV 5512/1 DON ID Card Base Access Pass. Contractors will not be vetted without their sponsor.
Government personnel and contractors with CAC require only a JPAS visit request as they all presently hold CACs.
Military Sealift Command ship access: Government agencies and Industry that have access to JPAS shall have their security
Manager/Officer/FSO submit a JPAS visit request on their behalf to Military Sealift Command (SMO CODE: 404426). Ensure the Point of Contact (POC) on the JPAS visit request is listed as the name of the ship being visited.
If there is no JPAS access: A command/company letterhead document shall be submitted to: MSC Security Department
MSC_NRFK_N0211@navy.mil
FSO/SECURITY MANAGER SIGNATURE IS REQUIRED
If unable to send via encrypted email or faxed to the number below it shall be sent as a password protected, locked PDF with password sent via separate correspondence
The information that shall be on a letterhead document for EACH contractor:
Name:
SSN:
Level of Clearance (N/A if none): (Please Fill)
Purpose of Visit:
Duration of Visit (dates):
Security POC: TERESA OYEWOLE 757-443-2874 (All MSCHQ ships):
Point of Contact (If Ship, please list name of Ship):
Company POC: (If ship please list "N/A"):
CONTRACTOR IDENTIFICATION
Contractor employees must be clearly identifiable while on Government property by wearing appropriate badges.
Contractor personnel and their subcontractors must identify themselves as Contractors during meetings, telephone conversations, in electronic messages, or correspondence related to this Contract.
Contractor-occupied facilities (on Department of the Navy or other Government installations) such as offices, separate rooms, or cubicles must be clearly identified with Contractor supplied signs, name plates, or other identification, showing that these are work areas for Contractor or subcontractor personnel.
LICENSES, PERMITS, AND PRECAUTIONS
The Contractor shall, at the Contractor’s expense, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable laws, codes, and regulations, in connection with the performance of work. Further, the Contractor is responsible to ensure that proper safety and health precautions are taken to protect the work, the workers, the public, and the property of others.
CONTRACTOR PERSONNEL
The Contractor is hereby advised that some Contract requirements may take place at facilities where a visitor security clearance may be required. Therefore, the Government reserves the right to request any appropriate information concerning Contractor personnel as necessary to provide security check and/or clearances to enter such facilities. The Contractor must comply with
COMSCINST 5521.1 Series or latest revision.
INVOICING REQUIREMENTS
The Contractor shall utilize Wide Area Workflow (WAWF) when submitting invoices. Contractor will follow the procedures at
DFARS 252.232-7006.
CONTRACTOR PERFORMANCE APPRAISAL REPORTING SYSTEM (CPARS)
Past performance information will be collected and maintained under this contract using the Department of Defense CPARS.
CPARS is a web-enabled application that collects and manages the Contractor’s performance information on a given contract during a specific period of time. Additional information is available at http://www.cpars.navy.mil/.
The Contractor will receive notification via email when a CPARS has been completed and is available for review and comment on any element of the proposed rating before the rating becomes final. Within 30 days after contract award, the Contractor shall provide the name, title, e-mail address and telephone number of the company’s individual or individuals who will have the responsibility of reviewing and approving any CPARS developed under the contract to the Contracting Officer. If during the life of this contract, the company individual(s) are replaced, the substituted individual’s information will be provided to the
Contracting Officer within 30 days of the replacement.
CPARS reports will be completed on an annual period which will take into account the cumulative performance over the course of the rating period.
Evaluation factors for each assessment will be in accordance with FAR 42.1503(b)(2).
SERVICE CONTRACT REPORTING
Services Contract Reporting (SCR) requirements apply to this contract. The contractor shall report required SCR data fields using the SCR section of the System for Award Management (SAM) at following web address: https://sam.gov/SAM/.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://sam.gov/SAM/.
WAGE DETERMINATION
Service Contract Act WD #: 2015-4342 Rev. 15, 04 August 2020 will apply.
CLAUSES INCORPORATED BY FULL TEXT
52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29
CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
THIS STATEMENT IS FOR INFORMATION ONLY: IT IS NOT A WAGE DETERMINATION
http://www.cpars.navy.mil/
Employee Class Monetary Wage-Fringe Benefits
Employee Class Monetary Wage-Fringe Benefits Location
(13047) Site
Super/Librarian
$23.37 $8.47 Norfolk, VA
(13054) Senior Library
Technician
$21.10 $7.65 Norfolk, VA
(13058) Librarian
Technician
$17.04 $6.18 Norfolk, VA
(30085) Engineering Tech
V
$25.81 $9.36 Norfolk, VA
(30086) Engineering Tech
VI (Lead)
$31.23 $11.32 Norfolk, VA
(01113) General Clerk III $15.23 $5.52 Norfolk, VA
(14103) Computer Systems
Analyst III
$37.43 $13.57 Norfolk, VA
(End of clause)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Activity
Unit
Base Period
FFP
Technical Library Services
FOB: Destination
R605
NET AMT
0002 1 Activity
OPTION Option Period 1
Technical Library Services
0003 1 Activity
OPTION Option Period 2
Technical Library Services
0004 1 Activity
OPTION Option Period 3
Technical Library Services
0005 1 Activity
OPTION Option Period 4
Technical Library Services
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-OCT-2021 TO
30-SEP-2022
N/A N/A
0002 POP 01-OCT-2022 TO
30-SEP-2023
0003 POP 01-OCT-2023 TO
30-SEP-2024
0004 POP 01-OCT-2024 TO
30-SEP-2025
0005 POP 01-OCT-2025 TO
30-SEP-2026
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
52.212-1 (ADDENDUM) ADDITIONAL INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS
Any inconsistency between FAR Provision 52.212-1 and the Addendum to FAR 52.212-1 shall be solved by giving precedence to the Addendum to FAR 52.212-1.
SUBMISSION PACKAGE
PLEASE ONLY SUBMIT (1) ONE PROPOSAL. MULTIPLE OFFERS WILL NOT BE ACCEPTED. Proposal may be sent via email or via DOD Safe at https://safe.apps.mil. It is highly recommended that your email submissions are sent via DOD Safe. Due to COVID-19 mailed submissions or hand delivered proposals will not be accepted.
1. E-mail proposals shall be in either Adobe or Microsoft Word format, with the exception of the signed 1449 and any amendments, which must be included in a proposal as scanned .pdf files, and the price proposal, which must be submitted in Excel format. Offerors are advised that the Government may be unable to receive other types of electronic files (e.g., .zip files) or files in excess of 20 megabytes. To be timely, an E-mail proposal must be received in its entirety in the designated E-mail inbox by the due date and time for proposal submission. An E-mail proposal that resides on a Government server, but has not appeared in the designated E-mail inbox by the due date and time for proposal submission will be considered late unless the exception at FAR 52.212-1(f)(2)(i)(A) applies. The exception at FAR 52.212-1(f)(2)(i)(B) shall not apply to E-mail proposals.
OR
Additionally, electronic files can be sent via the DOD SAFE (Secure Access File Exchange. DOD SAFE (Secure
Access File Exchange) is a service to make it easy for you to exchange unclassified files up to 8.0 GB that can't be sent through email. There are no user accounts for DOD SAFE - authentication is handled via email and CAC.
Everyone has access or can obtain access to DOD SAFE, and the application is available for use by anyone. The
DOD SAFE application can be accessed via https://safe.apps.mil/.
Please note: Non-DoD Personal Identity Verification (PIV) certificates or External Certificate Authority (ECA) are not currently supported. Users should select their SIGNATURE certificate issued through the DoD email Certificate
Authority (CA) or select the AUTHENTICATION PIV certificate issued by the DOD Identifier (ID) Certificate
Authority (CA) in order to connect.
***In order for a guest user to create a drop-off, they must receive a drop-off request from an authenticated user. A drop-off request is valid for 14 days. For users who wish to use DOD SAFE to submit their proposal, please submit your request directly to jenna.schaff@navy.mil and timothy.lewis6@navy.mil. A request to create a drop-off must be received no later than 14 business days BEFORE the specified closing date and time. Additionally, for an offeror’s proposal to be considered on-time, it must be received by the Contracting Officer or one of the designated points of contact stated above on or before the closing date and time specified in the solicitation.***
Users outside of DOD may notice lengthy download and upload times depending on their bandwidth availability, but DISA will work to continually improve the experience for all users.
https://safe.apps.mil/ mailto:timothy.lewis6@navy.mil
Files are automatically deleted from DoD SAFE 7 days after you upload them. Please notify the points of contact listed above if a proposal has been submitted more than 7 days in advance of the closing date and time of the solicitation.
2. Questions regarding this solicitation may be sent via email to the following recipients only:
jenna.schaff@navy.mil and timothy.lewis6@navy.mil. Questions may not be accepted after 07 July 2021 2:00PM
Norfolk, VA time.
The proposal must demonstrate an understanding of and ability to meet all of the requirements set forth in the
Performance Work Statement (PWS) referenced herein. Throughout the proposal, the Offeror shall provide sufficient detail to substantiate the validity of all statements. The Offeror shall demonstrate that the proposal is compliant with the requirements, terms and conditions of the Request For Proposal (RFP).
Comprehensive responses to the requirements of the RFP are required to enable the Government to evaluate the
Offeror’s understanding of and capability to accomplish the requirements of the PWS. The proposal must clearly demonstrate the Offeror’s ability to meet the requirements of the RFP and successfully accomplish and manage all requirements of the RFP. General statements that the Offeror can or will comply with the requirements, that standard procedures will be used, that well known techniques will be used, or paraphrasing the RFP’s requirements in whole or in part, will NOT constitute compliance. Failure to conform to any of the requirements of the RFP may form the basis for rejection of the proposal.
Brochuremanship is not desired; clarity, completeness, and conciseness are essential and the overall quality of the proposal will be evaluated in the context of being representative of the Offeror’s services. An Offeror’s proposal is presumed to represent the best efforts to respond to the RFP. Only the proposal submitted in response to the RFP will be evaluated. The Offeror should make certain that its proposal is complete with regard to the information provided. Data previously submitted, or presumed to be known, e.g., previous projects performed for the
Government, will not be considered in the evaluation unless that information is physically contained in the proposal.
Proposal shall be presented in three (3) separately bound volumes:
Volume I (Technical)
Volume II (Past Performance)
Volume III (Price)
The electronic copies shall be in either Microsoft Word or Portable Document Format (PDF) and shall be provided via email or via DOD Safe. (Please note that other forms of electronic media, such as USB flash drives, will not be accepted.). The pages are to be typewritten; no less than 1 1/2-line spacing, and no smaller than 12-point type.
Volume I shall not exceed 220 pages. All Offeror documentation such as charts, figures, tables, are included in the
220-page limit. Tables of contents, dividers, pages intentionally marked as blank for ease of reading. All material in excess of the page limits will neither be read nor evaluated.
Each volume of the proposal shall be clearly marked as to the volume number, the RFP number, and the Offeror’s name. Pages shall be numbered consecutively within each volume showing volume and page. For example, page
19 of Volume I would be numbered I-19 and page 10 of Volume II would be numbered II-10.
The Offeror is advised that the Government may selectively verify any information provided in the proposal. The
Offeror is cautioned that it is responsible to ensure that material it desires to have evaluated for a particular section is contained in that specific section. The proposal shall not contain classified material. If the Offeror considers any portion of its proposal “business sensitive”, the Offeror should clearly label that portion as such in accordance with
FAR 52.215-1.
VOLUME I: TECHNICAL
The technical factor will be evaluated on an acceptable or unacceptable basis. All capabilities documents will be evaluated to determine whether they conform with all minimum technical requirements of the solicitation. To receive an acceptable rating, offers must be found acceptable in all technical subfactors and conform fully to the minimum technical requirements of the solicitation. The subfactors are as follows:
Subfactor 1: Demonstration of Past Experience
Subfactor 2: Understanding of PWS / Technical Approach
Subfactor 3: Personnel Qualifications
Offerors shall structure the technical information of their proposals in the same format set forth below. Further, to facilitate the evaluation process, Offerors shall submit their proposals in an organized manner that indicates the sections as set forth below.
Offerors are advised that the technical evaluation will be based on the information provided in the technical volume.
The Government will not make assumptions regarding the information contained therein; only information contained in the proposals will be evaluated. Therefore, offerors must conclusively demonstrate in their proposals how the Government’s stated requirements are met.
1. Offeror shall provide a narrative describing their experience in performing the work specified in the PWS.
Demonstrate past experience with performance of normal day-to-day operation of the technical library (3.1)
The narrative shall address the following:
The Offeror may be required to maintain the United States Coast Guard (USCG), American
Bureau of Shipping (ABS), and other regulatory body approval files for ship designs. This task requires retrieval of drawings, approval letters, certifications, and other files from the
ABS website, NAVSEA website, or SAMM Task Manager. The government will provide access to the ABS and NAVSEA websites. The retrieved files may be required to be uploaded and cataloged into the SAMM Virtual Technical Library (VTL). (3.1.5)
The Offeror shall scan and convert original drawings, technical manuals, files, records, and other documentation as requested. Original media may be in paper, vellum, microfiche, microfilm or in aperture card form. Scanning, printing and document reproduction based on customer request. Duplicating and transferring technical data onto electronic media based on customer request. (3.1.7 – 3.1.7.2) The Offeror shall demonstrate the ability to create and update engineering drawings based on information from MSC Engineers and in accordance with MSC Computer Aided
Designed (CAD) drawing standard and MSC General Technical Requirements (GTRs).
The Offeror may be required to provide all CAD drawings in an AutoCAD compatible format. (3.4)
The Offeror shall make changes to Engineering Drawings after receiving change information from the engineers. The Offeror shall make changes to drawings numbers, references, and applicability tables. The Offeror may be asked to accompany an engineer on ship check for drawings development. (3.4 – 3.4.1)
2. The Offeror shall demonstrate the ability to support SAMM VTL (3.5)
The Offeror shall maintain the SAMM VTL within the LES Engineering Ashore
Application ERM.
The Offeror shall, when identified, make recommendations for efficiency improvement for the SAMM VTL application and business processes.
The Offeror shall provide database administration and testing support when requested by the COR.
The Offeror shall provide database conversion and testing support when requested by the
COR.
The Offeror shall recommend technology improvements that may increase quality of existing VTL content.
The Offeror shall recommend technology improvements that may increase probability of users finding required documentation.
The Offeror shall recommend technology improvements that may enhance the capabilities of the VTL. (3.5.3 – 3.5.3.9)
3. The Offeror may be required to travel to MSC vessels to inventory, scan and catalog technical documents, either pier side or underway, into SAMM VTL. CDRL 1423- 4 Trip Report (3.6)
The Offeror may be required to review records contained in the ashore SAMM VTL for applicable vessel records and annotate those shipboard records not in the ashore library.
The Offeror may be required to scan those records not existing in the ashore SAMM VTL.
1. The Offeror may be required to perform general organization of the shipboard library to include labeling and document repair.
2. The Offeror shall transport necessary scanning equipment to the vessel location.
3. Submit to the vessel an updated records inventory upon completion of records entry into
SAMM VTL. (3.6.1 -3.6.5)
Offeror shall provide a written narrative that demonstrates their overall understanding of the type of service that they would deliver and perform if awarded a Contract. Offeror shall demonstrate an understanding of the services require in the PWS. The narrative shall address the elements set forth below:
1. Offeror shall provide a narrative describing their experience in performing the work specified in the PWS with performance of normal day-to-day operation of the technical library (3.1) The narrative shall address the following:
task requires retrieval of drawings, approval letters, certifications, and other files from the
ABS website, NAVSEA website, or SAMM Task Manager.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .