Attachment 6 - Questions and Answers.pdf
PDF 206 KB Posted
- Attached to
- DAFB_Wrestling_Mats
- Solicitation number
- FA449726Q0029
About this file
This is a Questions and Answers document from a sources sought announcement addressing seven clarifications regarding a mat procurement.
The procurement requires delivery of mats that are 1 7/8 inches thick with an equivalent connector system (non-tape based) to the Flexi-Connect system. Logo specifications are mandatory, with the logo centered and sized as originally specified. The government will accept delivery only; installation is not required. This is a 100% Small Business set-aside procurement. The delivery timeline is 30 days after award notice, with contractors required to contact the contracting office immediately if issues are encountered. While specific material performance standards exist beyond the thickness requirement, the document does not enumerate them in detail. Past performance references are not required as part of the evaluation process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Quote Schedule.xlsx | XLSX spreadsheet | |
| Attachment 1- Salient Characteristics.pdf | ||
| Attachment 3 - Provisions and Clauses.pdf | ||
| Attachment 4 - RFO 52.212-1 ADDENDUM.pdf | ||
| Attachment 5 - RFO 52.212-2 ADDENDUM.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
Listed below are the answers to questions that were asked while the sources sought was open.
1. Is the Flexi-Connect system required, or will equivalent systems be considered? – An equivalent connector system will be sufficient. We are trying to avoid using tape for connecting the mats.
2. Are there any specific material or performance standards (e.g., ASTM, NFHS) that must be met? – We need it to be 1 7/8in thick. However, there are specific performance standards as far as the material.
3. Can the logo specifications (size and placement) be adjusted, or are they mandatory as stated? – No, the logo must be centered and the same size.
4. Is installation required, or is delivery only acceptable? – Delivery only is acceptable.
5. Are there any small business or set-aside considerations applicable to this procurement?
–Yes. It will be a 100% Small Business set-aside.
6. What is the expected delivery timeline after award? – 30 Days after award notice. If issues are encountered, contact the contracting office immediately.
7. Will past performance references be required as part of the evaluation? – No, they will not be required.