Attachment 5 - SOW 731 WTD A116.pdf
PDF 144 KB Posted
- Attached to
- THERMAL SPRAY Federal contract opportunity
- Solicitation number
- N4523A22Q1309
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - FAR 52.212-1.pdf | ||
| Attachment 6 - DWG 4775446 J.pdf | ||
| Attachment 2 - FAR 52.212-2.pdf | ||
| Attachment 3 - FAR 52.212-5.pdf | ||
| Attachment 8 - 410 EM 193M-20.pdf | ||
| Attachment 7 - NAVSEA Technical Publication T9074-AA-GIB-010.pdf | ||
| Attachment 4 - SOW 730 WTD A116.pdf | ||
| Attachment 8 - EM 410 114M-20.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW) – SERVICE CONTRACT
WORKSHEET
REV 2/12/13
CHECK ALL BELOW THAT APPLY:
HIGH RISK (Justify in # 12 below)
SUBSAFE
WORK IS WITHIN: ENGINEERING SPACE PROPULSION PLANT SYSTEM
(Review NAVSEAINST 9210.4B for applicability)
JML #: XXX, REQN X684381280W585
DD2276 #: (Request for Contractual Procurement (RCP) required for services over $2500 or services with terms and conditions.)
Ship/Activity: 731 USS Alabama/TRF Bangor MMAC Title: Thermal Spray Repair Service Place of Performance: Contractor Facility Period of Performance: Contractor will have 10 days to complete the work after receipt of the items Estimated cost:
Source of estimate: Vendor Quote
REFERENCES :
a) DWG 4775446 J
b) NAVSEA Technical Publication T9074-AA-GIB-010/1687
c) EM 410/114M-20
1. BACKGROUND:
NAVIMFAC PACNORWEST in support of SSBN 731 USS Alabama requires contractor services for the restoration/repair of plasma spray on ten watertight door locking ring lugs, 7 on one ring 3 on a second ring.
Describe current (baseline) condition: Locking ring, item 1 of reference (a) has worn areas of thermal spray showing white base metal visible
2. SCOPE: Contractor shall:
2.1 Apply thermal spray, by process METCO 445 as directed by reference (a), to 10 Watertight Door (WTD) Locking Ring Lugs total, on 2 WTD Locking Rings. Application process shall be accomplished in accordance with reference (b) & reference (c).
2.2 The contractor shall submit proof of NAVSEA certification of the thermal spray process in accordance with reference (b) with quote.
3. DELIVERABLE ITEMS:
3.1 Certifications of contractor’s facilities, operators and QA program.
3.2 2(EA) Thermal Spray Job Record in accordance with reference(b) Figure 1, 2, 3 or 4. Selection of the appropriate record is dependent on spray process utilized by contractor for repair of Watertight Door Locking Ring Lugs, reference(a).
3.3 Figure 3 of reference(b).
3.4 Enclosure 3, 6 & 7 of reference(c).
4. CONTRACTOR FURNISHED MATERIAL:
4.1 Contractor is responsible for all materials required to accomplish thermal spray services.
5. GOVERNMENT-FURNISHED PROPERTY:
5.1 Original acquisition value of material: $4,864.25 each
5.2 Location of GFP: (2 EA) Watertight Door Locking Ring (Ref a) will be delivered to contractor by expedited shipping method.
5.3 Manufacturer, model # and type include serial number(s):
1(EA) Watertight Door Locking Ring (item 14 ref a)
5.4 Government provided or contractor pickup: Government provided
6. QUALITY ASSURANCE REQUIREMENTS:
PSNS&IMF –or- Contractor is responsible for quality assurance.
Define quality standards used for acceptance.
Primary Performance Objectives
Performance Standard/AQL Performance Assessment Method
Provide NAVSEA Certification to accomplish this work
Verified by Government Surveillance Officer
Provide completion record 100% compliance Verified by Government
Provide services to meet delivery schedule
100% compliance Verified by Government
Contractor maintain close liaison and good communication with
Government
Any problems or questions encountered by either party are addressed within 24 hours (1 business day)
Provide COR with written report of discrepancies
Final condition report of assessment
100% compliance Provide COR final assessment condition report
7. SECURITY REQUIREMENTS: NA
8. TRAVEL REQUIREMENTS: NA
Is COD (carrier onboard delivery, i.e., when the contractor will be transported to a vessel underway) required? NA
9. GOVERNMENT REPRESENTATIVE:
10. OTHER CONSIDERATIONS:
10.1 Estimated Work Hours: NA
10.2 All technical clarifications will be coordinated through the Government Representative.
10.3 Environmental and Safety Concerns: NA
10.4 Laydown and Utilities Requirements: NA
File details come from the government source that posted it. Updated .