Attachment_5_QALI.pdf
PDF 909 KB Posted
- Attached to
- Bolt, Explosive, AMENDMENT 0002 Federal contract opportunity
- Solicitation number
- FA821321R3012
About this file
This document contains a quality assurance letter of instruction for an explosive part used on the F-16 aircraft program. It lists the part numbers and DODIC codes covered, and outlines nine mandatory inspection points for the contractor, including witnessing the leak test, selecting samples for lot acceptance testing, reviewing x-ray films and ammunition data cards, preparing items for shipment, and ensuring additional requirements imposed by the Defense Contract Management Agency are approved. The related federal contract opportunity notice is for an explosive canopy actuated release bolt with national stock number 1377010855974ES, solicited by the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base. The opportunity type is a solicitation and 581 total units are required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821321R3012_______0002.pdf | ||
| FA821321R3012_______0001.pdf | ||
| Attachment_10_Transportation_Instructions.pdf | ||
| Attachment_3_Air_Specification.pdf | ||
| Attachment_1_Exhibit_A_CDRLs.pdf | ||
| FA821321R3012.pdf | ||
| Attachment_7_SPI_0855974.pdf | ||
| Attachment_2_ADC_SOW_Jan2018.pdf | ||
| Attachment_8_Packaging_SOW.pdf | ||
| Attachment_9_AFMCForm158.pdf | ||
| Attachment_4_CADPAD_Item_Marking_Instruction.pdf | ||
| Attachment_6_REPSHIP_11Mar14.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name
CAGE code
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor, at a minimum, shall allow DCMA to inspect the following points:
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend per comment section.
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.
Notify - N: By phone or email prior to action.
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer Signature
Rev Date: 5 May 2019
Sheet1
| Text46: 11 Jun 2020 | |
| 2020-06-11T11:23:34-0600 | |
| TIDWELL.QUINN.RAY.1241451913 |
| undefined_9: N |
| Text32: 9. Additional Requirements |
| undefined_8: M |
| Text31: 8. Shippers (DD250, Reports) |
| undefined_7: M |
| Text30: 7. AMMO Data Card Review |
| undefined_6: V |
| Text29: 6. Preparation for Shipment |
| undefined_5: W |
| Text28: 5. LAT |
| undefined_4: V |
| Text27: 4. LAT Sample Selection |
| undefined_3: V |
| Text26: 3. X-Ray/N-Ray |
| undefined_2: V |
| Text25: 2. Leak Test |
| undefined: V |
| Text36: 1. Explosive Weight |
2. Verify gross leak and fine leak check are performed.
3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer
| Text24: 1.Inspection |
| Part Number: 2652100-2, 2-502300-1 |
| DODIC: SP87 |
| Text20: |
| Text19: |
| Part Number Line 2: |
| Contract No: 21-50120, 21-50121 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: F-16 |
File details come from the government source that posted it. Updated .