Attachment_3_Air_Specification.pdf

PDF 173 KB Posted

Attached to
Bolt, Explosive, AMENDMENT 0002 Federal contract opportunity
Solicitation number
FA821321R3012
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document provides specifications for an explosive bolt item under a federal solicitation. The specifications cover requirements for shipment notifications, transportation coordination, hazardous materials markings, quality inspections, testing procedures, material age limits, and safety compliance. Key details include explosive classification data and net weights for two national stock numbers. Lot acceptance testing must be conducted according to an approved test plan and failures require a root cause analysis. The age of all energetic materials cannot exceed 24 months and ingredients must be traceable to original manufacturers. The item is designated as a critical safety item requiring government approval for nonconforming material disposition. The related solicitation seeks 581 each of a canopy actuated release bolt explosive item for the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base.

View the file

Other files for this federal contract opportunity

Other files attached to Bolt, Explosive, AMENDMENT 0002, newest first.
File Type Posted
FA821321R3012_______0002.pdf PDF
FA821321R3012_______0001.pdf PDF
Attachment_10_Transportation_Instructions.pdf PDF
Attachment_1_Exhibit_A_CDRLs.pdf PDF
FA821321R3012.pdf PDF
Attachment_7_SPI_0855974.pdf PDF
Attachment_2_ADC_SOW_Jan2018.pdf PDF
Attachment_8_Packaging_SOW.pdf PDF
Attachment_4_CADPAD_Item_Marking_Instruction.pdf PDF
Attachment_6_REPSHIP_11Mar14.pdf PDF
Attachment_5_QALI.pdf PDF
Attachment_9_AFMCForm158.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/02/2019

AIRMUNITION SPECIFICATION

(version 15 Jun, 2016)

FD2020-21-50120 USAF, FD2020-21-50121 FMS

NSNs: 1377-01-085-5974ES, alt. 1377-01-461-9131ES

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with Attached REPSHIP.

2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of Availability (NOA) including FMS case and requisition numbers by mail to:

AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.

3. Department of Defense Identification Code (DODIC): SP87

4. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)

5. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.5, 01 May 2019, reference attachment.

6. Shelf Life Code marking NOT required per MIL-STD-129.

7. Hazard Classification Information:

NSN 1377-01-085-5974ES

Hazard Class/Division: 1.4 Storage Compatibility Group: S DOT Marking/Proper Shipping Name: EX1988080340/RELEASE DEVICES, EXPLOSIVE DOT Class/Hazard Class: 1.4S DOT Label/Shipping Label: EXPLOSIVE 1.4S UN Serial No.: UN0173 UN Proper Shipping Name/UN No: RELEASE DEVICES, EXPLOSIVE/UN0173 Net Explosive Weight per item (NEW): 0.001800 NEW Unit of Measurement: lbs.

mailto:ooalc.gacp.transportation@us.af.mil

NSN 1377-01-461-9131ES

Hazard Class/Division: 1.4 Storage Compatibility Group: S DOT Marking/Proper Shipping Name: EX1988080340A/ RELEASE DEVICES, EXPLOSIVE DOT Class/Hazard Class: 1.4S DOT Label/Shipping Label: EXPLOSIVE 1.4S UN Serial No.: UN0173 UN Proper Shipping Name/UN No: RELEASE DEVICES, EXPLOSIVE/UN0173 Net Explosive Weight per item (NEW): 0.001700 NEW Unit of Measurement: lbs.

NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. . If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.

8. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For

Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.

Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:

COGNIZANT GOVERNMENT ENGINEER

ECPs -- CDRL (DI-SESS-80639D) NORs – CDRL (DI-SESS-80642D) RFVs – CDRL (DI-SESS-80640D)

Distribution Statement: B, Reason: Administrative or Operational (ref. DoD 5230.24)

9. The contractor shall provide the Lot Acceptance Test Plan (LATP/ATP) for this item(s) in accordance with the contractual data requirements. No changes to previously approved government Acceptance Test Plans shall be made without prior government approval. The Lot Acceptance Test Plan provided must be approved by HAFB engineering at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553A)

10. Lot Acceptance Test Requirements are: Contractor

11. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system:

WAWF

CDRL: (DI-NDTI-80809B)

12. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.

Air Force Engineering Organization: AFLCMC/EBHJ Organization E-mail: Quinn.Tidwell@us.af.mil

13. In the event of test failure(s), a Failure Analysis and Corrective Action Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255A)

14. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.

15. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).

16. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The waiver shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan.

Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.

17. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.

MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA:

18. Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment Clause ES7034) http://www.pmddtc.state.gov/regulations_laws/itar.html

19. Contracts involving ammunition and explosives (AE) will contain:

- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives

- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:

- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments

File details come from the government source that posted it. Updated .