Attachment 5 - Material Submittals.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Bldg 156 Epoxy Floor Solicitation Federal contract opportunity
- Solicitation number
- W50S8Q-23-R-0005
- Issued by
- Department of the Army National Guard
About this file
This document is a schedule of material submittals for a federal contract to install epoxy floors in Building 156. The contract number is W50S8Q-23-R-0005 and was issued by the Department of the Army National Guard.
The schedule lists 18 line items requiring submittals such as a project schedule, existing condition photos, samples of paint, epoxy, and rubber wall base to be used. For each item, the number of required copies, type of submittal, and due dates are specified. The contractor must submit items such as shop drawings, samples, and manufacturer's data/warranties by 10 days after notice to proceed. The civil engineering office then has suspension and follow up dates to review submissions before providing final approval to the contractor.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question Answers W50S8Q-23-R-0005 156 Epoxy.pdf | ||
| W50S8Q-23-R-0005 156 Epoxy.pdf | ||
| Attachment 1 - SOW.pdf | ||
| Attachment 2 - Bldg.156 Drawing #1.pdf | ||
| Attachment 7 - Base Entry Request.pdf | ||
| Attachment 3 - Color Sample Epoxy.pdf | ||
| Attachment 4 - Base Facility Standards.pdf | ||
| Attachment 6 - RFI Template.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF 3000
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| ( Form 66 Modified) | SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| (Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| WAAR232016 | Epoxy Floors Bldg. 156 | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | MSD SHEET | OPERATING INSTRUCTIONS | Other |
SUBMITTAL
REQUIRED DATES DUE
BY__10__
DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||
| APPROVAL | REMARKS | ||||||
| APPROVED | DISAPPROVED | ||||||
| 1 | Progress Schedule | ||||||
| (AF Form 3064) | 1 | ||||||
| 2 | Progress Reports |
(OANG Form 3065)
| 3 | Existing Condition Photos | |||||
| (Prior to Beginning Work) | 1 | |||||
| 5 | Paint | 1 | 1 | |||
| 6 | Epoxy | 1 | 1 | |||
| 7 | Rubber Wall Base | 1 | 1 | 1 | ||
| 9 | Thresholds | 1 | 1 | |||
| 11 | Adhesives | 1 | ||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 |