Attachment 5 - Maintenance Task List.pdf
PDF 157 KB Posted
- Attached to
- ESS Repair & Maintenance Services Federal contract opportunity
- Solicitation number
- SP330022Q5049
- Issued by
- Defense Logistics Agency Distribution
About this file
This document provides maintenance task lists for security systems at a Defense Logistics Agency distribution facility. It outlines twelve maintenance task lists covering security workstations, alarm point testing, CCTV cameras, access control doors, duress systems, digital video recorders, terminal panels and equipment panels, motion detectors, and server maintenance. The tasks include inspecting equipment for wear, damage and proper function; testing alarms, access control and tamper switches; and cleaning equipment per manufacturer specifications. Technicians are instructed to provide written reports of testing results and corrective actions.
The related federal contract opportunity is solicitation number SP330022Q5049 for electronic security system repair and maintenance services at the Defense Logistics Agency Distribution facility. The contractor will be responsible for performing the maintenance tasks outlined in the attachment on a quarterly basis to ensure all security equipment is in operational status.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment A00003 Page from SF30.pdf | ||
| Amendment A00004 Page from SF30.pdf | ||
| Attachment 1- Schedule of Supplies.xlsx | XLSX spreadsheet | |
| Questions and Answers DDOO ESS.pdf | ||
| Amendment A00002 Page from SF30.pdf | ||
| Amendment A00001 Page from SF30.pdf | ||
| Attachment 11 - DD2875 SAAR.pdf | ||
| Attachment 7 - Contractor Personnel Security.pdf | ||
| Attachment 1- Schedule of Supplies.xlsx | XLSX spreadsheet | |
| Attachment 8 - DL0584 Visitor Register Form.pdf | ||
| Attachment 4 - Wage Determination.pdf | ||
| Attachment 3 - Equipment List.pdf | ||
| Attachment 2 -PWS-ESS Rpr Mntc Svcs.pdf | ||
| Attachment 6 - DoD Approved 8570 Baseline.pdf | ||
| Attachment 10 - DLAI 5230.01 Foreign Visit.pdf | ||
| Tab C-10 Combined Synopsis -.doc | DOC document | |
| Attachment 9 -DL1818 Visit Notification Form.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT – MAINTENANCE TASK LISTS
DLA DISTRIBUTION OKLAHOMA CITY, OK
MAINTENANCE TASK LIST #001
SECURITY SYSTEM BADGING WORKSTATION
Frequency: Quarterly
Verification: Verify All Model Numbers Match Equipment List
Workstation: 1. Check Cabling for Connection and Wear
2. Check monitor, keyboard, and CPU for proper Operation, Excessive Wear, and Damage
3. Check Monitor for Any Degradation of Performance
4. Check Printer for Paper Supply, Printer Ribbon Darkness, and Proper
Operation
5. Check badging equipment for any Error/Warning notifications and clear any discrepancies.
Badge Encoder: 1. Check Condition of Unit for Obvious Damage and Excessive Wear
2. Check Cabling and Power Cord Damage
3. Check Entire Unit for Damage
Badging Camera: 1. Check Condition of Cabling to the Camera and Camera Flash Unit
2. Check Video Operation for Picture Quality
3. Check for Excessive Wear or Damage to the Camera, Lens, and Flash Unit
4. Check Operation of Camera Flash Unit
ID Badge Printer: 1. Check Cabling and Power Wiring for Connection and Wear
2. Check Exterior of Unit for Excessive Wear and Damage
3. Check Interior for any Obvious Problems (spool alignment, etc.)
4. Check Operation of Unit (noise, color output, error/warning etc.)
5. Check color ribbon
6. Provide blank badges and performed operational test of printing a badge.
Cleaning (per Mfr. specs.):
1. Clean Monitor, Keyboard, Printer, and CPU Housing
2. Clean Camera, Lens, Camera Flash Unit w/Soft Cloth
3. Clean Exterior of Unit with Damp Cloth
4. Clean Filter and Fan
5. Inspect and Clean Badge Printer Cleaning Roller
6. Clean Exterior of Badging Encoder w/Damp Cloth
Completion: Ensure all equipment returned to operational status
MAINTENANCE TASK LIST #002
BMS ALARM POINT TEST (NON-BASE POLICE REPORTING)
Frequency: Quarterly
Inspection: 1. Verify Switch Model No. Matches Equip. List
2. Check for General Wear and Tear
3. Check That Mounting is Secure
4. Check Condition of Door
5. Check electrical striker on door (if applicant)
BMS Switch Test
1. Activate BMS
2. Alarm Received? (Check=Yes)
3. After Activation, Close door Verify Alarm Reset
4. Proper Date and Time? (Check=Yes)
5. Proper Location? (Check=Yes)
Completion: Ensure all equipment returned to operational status. Provide a written report of all reporting alarms to the Lenel On-Guard system and any corrective action taken during testing.
MAINTENANCE TASK LIST #003
BMS ALARM POINT TEST (BASE POLICE REPORTING)
Frequency: Quarterly
Buildings 110, 171, 175 and Mayport
Inspection: 1. Verify Switch Model No. Matches Equip. List
2. Check for General Wear and Tear
3. Check That Mounting is Secure
4. Check Condition of Door
5. Check electrical striker on door (if applicant)
BMS Switch Test
1. Place building in security standby by calling Central Dispatcher.
2. Activate BMS
3. Alarm Received on the Lenel On Guard station and at host Central dispatcher.
(Check=Yes)
4. After Activation, Close door Verify Alarm Reset
5. Proper Date and Time? (Check=Yes)
6. Proper Location? (Check=Yes)
Completion: Ensure all equipment returned to operational status. Provide a written report of all alarms that was received at host Central Dispatcher center and Lenel On-Guard system.
MAINTENANCE TASK LIST #004
CCTV INTERIOR AND EXTERIOR FIXED AND PTZ CAMERAS
Frequency: Quarterly
Verification: 1. Verify Camera Model No. Matches Equip. List
2. Verify Lens Model No. Matches Equip. List
Inspection: 1. Check All Screws / Mounting Hardware
2. Verify Auto Iris Operation
3. Check / Confirm All Camera Switch Settings
4. Confirm Camera Housing Mounted Securely
5. Inspect Cabling
Optimal Camera Image (Viewable at Monitor):
1. Proper Location
2. Quality Image (color, clarity, sharpness)
3. No White Out Areas
4. No Obstructions
5. Check Optimal Focus
6. (OPTIONAL) Re-do Entire Test (If adjustments made)
Camera Operation and Controls for PTZ (via the controlling unit):
1. Pan Left and Right
2. Tilt Up and Down
3. Rotate 360 degrees
4. Zoom in and out (with same picture quality)
Camera Matrix Data (Viewable at Monitor):
1. Camera Appears in Proper Quadrant, Each Zone
2. Confirm Camera Intent (View, Depth, Etc.)
3. Heater / Blower Functional (If Applicable)
4. Camera Labeling Correct for Each Zone
5. Camera Image Does Not Roll When Switched
6. Lightning Protection Installed
7. Provide a written report of all cameras and any corrective action taken during testing.
Cleaning (Per Mfr.
Specs.): Clean Housing, Camera, and Lens
MAINTENANCE TASK LIST #005
CCTV / AIPHONE / KEY BOXES
Frequency: Quarterly
Verification: Verify Monitor Model No. Matches Equip. List
Inspection: 1. Check Operation and Picture Quality
2. Check Unit for Excessive Wear and Damage
3. Inspect Cabling and Connectors
4. Turn off Power and Check For Burn In / On Screen
5. Check/Confirm all Switch Settings
6. Check each key slot on the key box to ensure they fire/release
7. Check key box battery using a voltmeter to ensure it is between 12-14 volts
Cleaning (per Mfr.
specs.): Clean Face and Housing with Damp Cloth
MAINTENANCE TASK LIST #006
EMERGENCY EGRESS DOOR
Push firmly on the door(s). Do not push on crash bar or exit device:
1. Door remains secured by maglock /electric door striker
Push firmly on the door crash bar or exit device:
1. Audible alarm sounds
2. Door alarm is received at IDS
3. Audible alarm stop when close is secured
4. Door alarm restored is received at IDS
Open door(s) one at a time (if double door):
1. Audible alarm sounds
2. Door alarm is received at IDS
3. Audible alarm stop when close is secured
4. Door alarm restored is received at IDS
HARDWARE CHECK: Perform thorough check of all hardware on door:
1. All hardware is properly mounted and secured
2. Clean all hardware
CLOSEOUT: Call IDS and check status of door. Let IDS know testing for door is complete:
1. Door status at IDS is normal
2. Provide a written report of all doors and any corrective action taken during testing.
Completion: Ensure all equipment returned to operational status. Provide a written report of all alarms that was received at host Central Dispatcher center and Lenel On-Guard system.
MAINTENANCE TASK LIST #007
DOOR GROUP
A. Valid Card Transaction Entry: [ ] Entry [ ] Exit
Use Authorized Card/Card + PIN: 1. Access Granted
2. Door Unlocked
3. Hold Door Open Past Dwell Time
4. Close Door / Relock
Results Viewable at Workstation: 1. Transaction Logged
2. No Door Alarm Rcvd
3. Held Open Alarm
B. Invalid Card Transaction Entry: [ ] Entry [ ] Exit
Use Unauthorized Card/Card +
PIN:
1. Access Denied
2. No Enrollment
3. Inspect for damage and loose parts
Results Viewable at Workstation: 1. Alarm Received
2. Cardholder ID
3. Reader Location
4. Date and Time
C. Request-to-Exit (REX) Devices: [ ] Exit
Passive Infrared Devices: 1. Detection Range is less than 18 Inches From Door
2. Strike Re-engaged After Dwell Time Expires
3. Exit with No Alarm
4. Held Open Alarm
Pushbutton REX Devices: 1. Strike Re-engaged After Dwell Time Expires
2. Hold Door Open Past Programmed Time
3. Exit with No Alarm
4. Held Open Alarm
5. N/A
Emergency Release: 1. Lifting Cover Generates Alarm
2. Emergency Release Can Be Reset
3. Activate Emergency Release, Egress Permitted
4. N/A
D. Forced Door Entry: 1. Entry
2. Exit
3. Force Door
4. Close Door
Results Viewable at Workstation: 1. Forced Door Alarm
2. Restored Notification
E. Life Safety Interface : 1. Exit
2. Door Fails in Safe Mode (Allows Egress)
3. Door Fails in Secure Mode (Denies Egress)
4. N/A
F. Unauthorized Access Request by Time Restriction:
1. Entry
2. Valid Card @ Invalid Time (Access Denied)
Results Viewable at Workstation: 1. “Wrong Time” Alarm
2. Reader Location
3. Cardholder ID
4. Date and Time
G. Unauthorized Access Request by Location Restriction:
1. Entry
2. Valid Card @ Invalid Location (Access Denied)
Results Viewable at Workstation: 1. "Location" Alarm
2. Reader Location
3. Cardholder ID
4. Date and Time
h. Remote Release Function;
From Workstation:
1. Select Control Door Access
2. Door is Secure?
3. Access Granted?
4. No Alarm Condition?
5. N/A
i. Door Contact: 1. Check for Proper Operation
2. Check for Excess Grease and Dirt
3. Restored Notification that Door is Shut
4. Verify Switch is Properly Mounted
5. Alarm Notification is Received
6. Verify the electric door striker/maglock is working properly.
Completion: Ensure all equipment returned to operational status. Provide a written report of corrective actions.
MAINTENANCE TASK LIST #008
DURESS SYSTEM
Inspection: 1. Verify Switch Model No. Matches Equip. List
2. Check for General Wear and Tear
3. Check That Mounting is Secure
4. Check Condition of Batteries (replace if necessary)
Duress Switch Test (Results Viewable at Workstation):
1. Place building in security stand by though Central Dispatcher
2. Activate Duress Switches
3. Alarm Received? (Check=Yes)
4. After Activation, Verify Manual Reset Required
5. Proper Date and Time? (Check=Yes)
6. Proper Location? (Check=Yes)
Completion: Ensure all equipment returned to operational status. Provide a written report of all alarms that was received at host Central Dispatcher center and Lenel OnGuard system.
MAINTENANCE TASK LIST #009
DVR
Verification: 1. Verify Model No. Matches Equip. List
2. Verify the Settings for Frame Range and Resolution of Recorded Video
3. Verify DVR is Connected to UPS
4. Verify System Allows For Digitized Stop-Frame Video Displays
5. Verify DVR is recording and maintaining videos for 90 days
Inspection: 1. Check Image Clarity and Quality for Recorded Video
2. Check Record Time Settings (Real-time Recording during alarm condition)
Cleaning (Per Mftr.
Spec's.): Wipe or Vacuum Dust Off of Equipment
MAINTENANCE TASK LIST #010
REMOTE TERMIAL PANELS / POWER SUPPLY PANELS AND EQUIPMENT PANELS
Verification: 1. Verify Panel Model No. Matches Equip. List
2. Confirm Key for Unit is Available
Inspection: 1. Check Cabling for Connection and Wear
2. Check Exterior for Excessive Wear/Damage
3. Check for Proper Operation of Card Access
4. Verify proper operation of panel tamper switch
5. Check Batteries for Voltage w/in Mftr Specs
6. Confirm alarm when interrupting date communications
7. Check To Be Sure That Unit is Communicating properly
8. Check for Proper Operation of Line Supervision on Alarm Circuits
9. Check for Alarm When Date Communications are Interrupted
10. Check for Proper Operation on Battery Power
11. Tighten all Screws
Tamper / Sensor Switch Test
1. Activate Tamper /Sensor Switch
2. Alarm Received? (Check=Yes)
3. Verify Reset after door closed (Required)
4. Proper Date and Time? (Check=Yes)
5. Proper Location? (Check=Yes)
Fire Relay Test (Results Viewable at Workstation):
1. OPEN Fire Relay Connection (Required)
2. Alarm Received? Doors Unlocked (Check=Yes)
3. CLOSE Fire Connection Verify Reset/ Doors Relocked (Required)
4. Proper Date and Time? (Check=Yes)
5. Proper Location? (Check=Yes)
Cleaning (per Metro.
specs.): Clean Exterior of Unit
Completion: Ensure all equipment returned to operational status. Provide a written report to Security Officer on all test result and any corrective action.
MAINTENANCE TASK LIST #011
MOTION DETECTOR
Walk Activation: 1. Walk at a Rate > 1 Foot/Second, Motion Detected Within 3 Steps ---a. Alarm Received ---b. Date, Time & Location Displayed
2. Wait a Minimum of 3 Seconds, Repeat Walk Test ---a. Alarm Received ---b. Date, Time & Location Displayed
Area Coverage: 1. Motion Detected in Area, All Locations Within 5 Normal Steps ---a. Alarm Received ---b. Alarm Cleared
2. Adjust Sensitivity Lens As Required to Cover Area and Repeat Test ---a. Proper Date and Time Displayed ---b. Proper Location Displayed
Passive Infrared (PIR) Tamper Alarm:
1. Remove PIR Cover (Activating Tamper Switch)
2. Tamper Alarm Rcvd
3. Proper Date & Time Displayed
4. Proper Location Displayed
5. Replace PIR Cover and Reset alarm
Completion: Ensure all equipment returned to operational status. Provide a written report of all alarms that was received at host Central Dispatcher center and Lenel OnGuard system.
MAINTENANCE TASK LIST #012
WINDOWS - LENEL SERVER
Steps: 1. Review Event Logs
2. Backup Event Logs
3. Update Software & Install Patches (if applicable)
4. DNS Server Healthy (if applicable)
5. Drive Free Space
File details come from the government source that posted it. Updated .