Attachment 4 - QASP - Clinical Support Services.doc
DOC document 247 KB Posted
- Attached to
- Clinical Support Services for Human Studies Projects Federal contract opportunity
- Solicitation number
- 12905B24Q0008
About this file
This Quality Assurance Surveillance Plan outlines clinical support services requirements for a federal contract to support human studies projects at the Western Human Nutrition Research Center in Davis, California. The contractor must provide participant oversight and support services to ensure health and safety, comply with all research protocols and institutional review board requirements, and maintain proper documentation. Performance will be evaluated on timeliness, quality of work, professionalism, and documentation. Methods include periodic inspection, 100% inspection, and progress report analysis to assess performance standards for oversight, compliance, documentation and professionalism. Non-performance may result in corrective actions by the contracting officer. The plan details performance monitoring and customer feedback collection to ensure contract requirements are met for the clinical support services solicitation from the Department of Agriculture Agricultural Research Service Pacific West Area.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amd 0001 QAs -Clinical Support Services for Human Studies Projects.pdf | ||
| Attachment 2 - PPQ - Clinical Support Services.docx | DOCX document | |
| Attachment 1 - Performance work Statement - Clinical Support Services.doc | DOC document | |
| RFQ - SAM Description Notice - Clinical Support Services for Human Studies.docx | DOCX document | |
| RFQ - Terms and Conditions - Clinical Support Services for Human Studies.docx | DOCX document | |
| Attachment 3 -Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 4
QUALITY ASSURANCE SURVEILLANCE PLAN
Clinical Support Services for
Human Studies Projects - WHNRC Davis, CA
TABLE OF CONTENTS
Section 1:
Introduction 1.1 Purpose
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions
1.2.2 Surveillance Performance Progression
1.3 QASP Relation to the Quality Control Plan
Section 2:
Performance Description …………………………………………………… 2.1 Performance Standards and Acceptable Quality Level
2.1.1 Allowable Deviation
2.1.2 Substantially Complete 2.2 Nonperformance
2.2.1 Documentation
2.2.2 Remedial Actions
Section 3:
Contractor and Government Responsibility .………………………
3.1 Contractor Responsibility
3.2 Government Responsibility
3.2.1 Contracting Officer
3.2.2 Contracting Officer Representative
3.2.3 Customers
Section 4:
Surveillance Methods to Perform Quality Assurance .…………
4.1 Surveillance Methods
4.2 Analysis Results
4.3 Performance Requirement Summary
Section 5:
Appendixes ………………………………………………………………………...8
A Discrepancy Report
B Customer Feedback Record
C Sampling Guide/Inspection Checklist
D Quality Assurance Monitoring
E Customer Complaint Investigation
F Surveillance Activity Checklist
SECTION 1: INTRODUCTION
This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Performance Work Statement - Clinical Support Services. This plan sets forth the procedures and guidelines that the USDA, Western Human Nutrition Center (WHNRC) Davis, CA will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the PWS. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the PWS, Performance Requirement Summary (PRS) and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the contractor to enable the contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).
1.2.2 Surveillance of Performance Progression As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal consistent deficiencies, increased surveillance may be implemented.
1.3 QASP Relation to the Quality Control Plan (QCP) The QCP is a required element of contract and the Contractor shall adhere to its established quality control processes and procedures in managing and performing work as described in the contract. While the QCP represents the way in which the Contractor will ensure its quality and timeliness of services, as defined in the PWS, the QASP represents the way in which the Government personnel specified in Section 3: Contractor and Government Responsibilities, Paragraph 3.2, Government Responsibilities will evaluate the contractor’s performance. The contractor’s QC program and the residual organization’s QASP should be complementary programs that ensure successful contractor performance.
SECTION 2: PERFORMANCE DESCRIPTION
Performance of the contractor will be monitored through the surveillance methods described in Section 4: Surveillance Methods to Perform Quality Assurance to assess the Contractor’s performance against PWS requirements.
2.1 Performance Standards and Acceptable Quality Levels (AQLs) For selected activities in the PWS, the PRS provides a performance standard and an AQL. A performance standard is the expected level of contractor performance. An AQL defines the level of performance that is satisfactory. Depending on the service evaluated and the evaluation method selected, performance standards and AQLs may be stated as a number of occurrences or as a percentage. Performance standards and AQLs for random sampling and 100 percent inspection are generally stated as percentages. For periodic inspections, performance standards may be stated as either percentages or as absolute numbers.
The contract requires the Contractor to perform all work as specified. Any inaccuracies or omissions in services or products are referred to as “defects” on the part of the Contractor. The Contractor shall be responsible for all identified defects and may be required to perform the work at no cost to the government. The AQLs take into account that in some instances an allowable level of deficiencies (deviations) is possible while overall performance continues to meet the government’s desired level of service.
2.1.1 Allowable Deviation The AQLs define the level or number of performance deficiencies the Contractor is permitted to reach under this contract. AQLs take into account the difference between an occasional defect and a gross number of defects. AQLs can be expressed as a percentage of or as an absolute number (e.g., three per month). There may be instances where 100 percent compliance is required, and no deviation is acceptable (e.g., where safety is involved).
2.1.2 Substantially Complete In some cases, service outputs are evaluated using subjective values (e.g., excellent, satisfactory, unsatisfactory). The criteria for acceptable performance and for defects must be defined for these service outputs. The concept of “substantially complete” should be the basis for inspections based on subjective scales. Work is considered “substantially complete” where there has been no significant departure from the terms of the contract and no omission of essential work. In addition, the Contractor has performed the work required to the best of its ability and the only variance consists of minor omissions or deficiencies.
2.2 Non-performance Non-performance occurs when the contractor’s performance does not meet the AQL for a given requirement. Requirements may contain multiple performance elements, and therefore, deficiencies may occur in one or more aspects of performance (e.g., timeliness, accuracy, completeness, etc.) or subject areas of effort.
When surveillance indicates that the contractor's service output is not in compliance with the contract requirements, the Contracting Officer’s Representative (COR) must determine whether the Contractor or the Government caused the deficiency. If the cause of the defect rests with the Government, corrective action must be taken through Government channels. If the cause of the defect is due to action or inaction by the contractor, the contractor is responsible for correction of the problem at no additional expense to the Government.
2.2.1 Documentation Documentation of work non-performed or unacceptable work is essential for tracking Contractor performance. The COR will document deficient work by compiling facts describing the inspection methods and results and to substantiate nonconformance with the contract. A sample documentation reporting form is provided in Appendix A. The documentation, with any recommendations, will be forwarded to the CO. In the case of the Contractor, the COR will decide whether to elevate the problem to the CO for corrective action.
2.2.2 Remedial Actions The Federal Acquisition Regulation allows for penalties in the event that the Contractor fails to perform the required services. Penalties are defined as those actions taken under the direction of the CO against the contractor within the general provisions of the contract for nonconformance to the PWS and PRS.
SECTION 3: CONTRACTOR AND GOVERNMENT RESPONSIBILITIES
3.1 Contractor Responsibility The Contractor is responsible for delivering products or services in accordance with the contract. Implementing its QCP, which describes the Contractor’s methods for ensuring all products and services under the contract meet established performance standards and AQLs. Maintaining, and providing for audit, quality control records and reports and all records associated with the investigation and complaint resolutions. Appointing a single quality control point-of-contact to act as a central recipient of communication from the COR or CO.
3.2 Government Responsibility 3.2.1 Contracting Officer (CO) The CO is responsible for administering and monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by COR and the contractor’s performance. The CO may delegate various day-to-day contract administration duties to an Administering ACO (ACO) and/or the COR for performance management and administrative actions such as invoice approval and issuance of Contract Discrepancy Reports may be, and normally are, delegated by the CO to the COR. The CO shall approve any revisions to the QASP processes or standards.
3.2.2 Contracting Officer Representative (COR) The COR, is designated in writing, by the CO. The COR will ensure that the QA function is properly executed, plays a key role in contract administration, and performs the contract surveillance and monitoring. Some key contract administration duties include, but are not limited to, performs surveillance as required by this QASP; make recommendations to the CO for issuance of Contract Discrepancy Reports or letters of commendation and acceptance or rejection of completed work and for administrative actions based on unsatisfactory or non-performed work, and revisions or changes to the QASP; and assists the CO in identifying necessary contract modifications and preparing reports of Contractor performance and cost.
The COR may use the form(s) included in the Appendices to perform the inspection or other forms as approved by the CO. The Contractor overall guidance is also provided by FAR clause AGAR 452.246-70 Inspection and Acceptance. (FEB 1988) which can be found in the Terms and Conditions of the solicitation.
3.2.3 Customers Customers or organizations/offices that the Contractor provided support may be requested to assist the COR in conducting QA to provide information relating to the Contractor’s performance through Customer Feedback. Information gained from the Customer Feedback may be used in conjunction with other methods of observation to rate the performance of the Contractor.
SECTION 4: SURVEILLANCE METHODS TO PERFORM QUALITY ASSURANCE
4.1 Surveillance Methods The surveillance methods used in the QA process are the Government’s tools to monitor the Contractor’s products and services. The best means of determining whether the Contractor has met all contract requirements is to inspect the Contractor’s service products and analyze the results. Further, documented inspection results are an effective tool in contract administration that can confirm the successful achievement of all performance requirements or highlight areas where defects exist, and improvements are necessary.
4.1.1 100 Percent Inspection The 100 percent inspection method requires complete inspection each week of service and will be used for critical contract requirements. The Contractor's designated representative shall meet with the ACO weekly during the first three (3) months of the contract. Thereafter, meetings shall be held as often as deemed necessary by the ACO, but at least once per month. At these meetings, a mutual effort will be made to resolve any and all problems identified. The Quality Assurance Plan for the Center contains further procedures for quality assurance determination and administration. A copy of this plan shall be provided at contract award.
4.1.1.1 Performance Standards and AQLs
The performance standards and AQLs may be stated as either percentages or absolute numbers. The AQLs will be evaluated as a % of adherence. These are listed in the table in example 1 below
4.1.1.2 Evaluation Procedures
Observed defects for a service monitored by 100 percent inspection is compared to the performance standard and AQL. In an effort to minimize the performance management burden, simplified surveillance methods shall be exercised by the government to evaluate contractor performance when appropriate. Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP that shall be captured from the NAO Peer Review Form.
| Observation Methodology |
| Evaluator |
| Observation can be performed periodically or through daily checks at beginning and end of shifts. 100% surveillance. |
| COR or appointed representative |
Analysis of Contractor's Progress
Reports: Compile data from the Peer Review CSU Provider Exit
Profile.
COR or WHRNC’s Center Director Staff
4.2 Analysis and Results When the inspections and research participant feedback customer feedback validations have been completed, the COR will perform an analysis of the Contractor’s performance. The purpose of the analysis is to ensure Government is receiving high-quality products and services from the Contractor. The COR will review the results, rate the Contractor’s compliance with the performance standards and AQLs, and characterize the Contractor’s overall performance. Analysis of all types of contract monitoring will result in one of the following outcomes:
4.2.1 Outstanding Performance Outstanding performance is the result of the Contractor substantially exceeding the performance standards with significant achievements and no significant deficiencies. The Government may reduce its level of surveillance when the COR determines that the Contractor provides sustained performance that significantly exceeds the requirements with no significant deficiencies.
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following rating elements are derived from the NAO Peer Review Form.
| Indicator Ratings |
| Points Assigned |
| Level 4: Exceptional (E) |
| 4.00 |
| Level 3: Fully Successful (FS) |
| 3.00 |
| Level 2: Minimally Successful (MS) |
| 2.00 |
| Level 1: Unacceptable (U) |
| 1.00 |
4.2.2 Documenting Unacceptable Performance
When unacceptable performance occurs, Key Government Personnel and the COR shall inform the CO. The CO will notify the Contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
If formal written communication is required, the CO shall prepare a cure notice, and present it to the Contractor. The contractor shall acknowledge receipt of the cure notice in writing. The cure notice will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The cure notice will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor’s corrective action plan to determine acceptability.
4.3 PERFORMANCE REQUIREMENT SUMMARY
Contractor shall provide research support for Nutrition for Precision Health Project
| INDICATOR |
| PWS Reference |
| STANDARD |
| ACCEPTABLE |
QUALITY LEVEL
METHOD OF
SURVEILLANCE
| Participant oversight |
| 4.2- support services |
| the assurance of the research subjects' health and safety |
| A rating or “Fully Successfully or “Exceptional” |
| Periodic inspection, 100% |
inspection and an analysis of contractor’s progress reports
| Compliance with Research related activities |
| 4.3 |
| No deviations from institutional review board (IRB) or Manual of Procedures or disciplinary actions or violations of published Policies; Procedures; |
| No deviations from research protocols. No reprimands or disciplinary actions. |
| Periodic inspection, 100% |
inspection and an analysis of contractor’s progress reports
| Documentation |
| 4.2 |
| Contractors completed require documentation in clear and legible form in a timely manner. |
| Score of acceptable or higher required on scale |
Periodic inspection, 100% inspection and an analysis of contractor’s progress reports
| Professionalism |
| 2.32 |
| Contractors presented in professional appearance demonstrated exceptional ethical conduct with effective communication. |
Score of acceptable or higher required on scale
Direct observation, 100% inspection and an analysis of contractor’s progress reports.
SECTION 5: APPENDIXES
APPENDIX - A
| DISCREPENCY REPORT |
| 1. DISCREPENCY REPORT NO. |
| 2. TO: (Contractor / Project Manager Name) |
| 3. FROM: (Name of COR) |
CONTRACT NUMBER: DATE:
| PREPARED |
| ORAL NOTIFICATION |
| RETURNED BY CONTRACTOR |
| ACTION COMPLETE |
4. DISCREPENCY OR PROBLEM (Describe in Detail. Include PWS references. Attach Continuation Sheet if Necessary)
5. SIGNATURE OF COR
| 6. TO: (Name of COR) |
| 7. FROM: (Contractor / Project Manager) |
8. CONTRACTOR RESPONSE AS TO CAUSE, EFFECT, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE (Attach Continuation Sheet if necessary. Cite applicable Contractor QC program procedures or new QC procedures)
| 9. SIGNATURE OF CONTRACTOR REPRESENTIVE |
| 10. DATE |
11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, or rejection. Attach Coordination Sheet if necessary)
12. GOVERNMENT ACTIONS (Cure notice, show cause, other)
CLOSE OUT
| KTR NOTIFIED |
| NAME AND TITLE |
| SIGNATURE |
| DATE |
COR
APPENDIX - B
CUSTOMER FEEDBACK RECORD
DATE AND TIME OF COMPLAINT CONTRACT NUMBER/ OR PROJECT:
SOURCE OF COMPLAINT ORGANIZATION
INDIVIDUAL
NATURE OF COMPLAINT
PWS REFERENCE
VALIDATION
| DATE AND TIME CONTRACTOR INFORMED OF COMPLAINT |
| NAME OF CONTRACTOR REPRESENTATIVE INFORMED OF COMPLAINT |
ACTION TAKEN BY CONTRACTOR (Responsible officer)
RECEIVED AND VALIDATED BY
Determination:
Complaint Valid Complaint Invalid
APPENDIX - C
SAMPLING GUIDE/INSPECTION CHECKLIST
CONTRACT NUMBER: ___________________________________
SERVICE FUNCTION:
PWS SECTION:
| 1 |
| Method of Surveillance: |
| 2 |
| Lot Size: |
| 3 |
| Sample Size: |
| 4 |
| Performance Requirement: Performance is Excellent (E) when ___________or fewer defects are discovered per month. Performance is Satisfactory (S) when ________ |
or fewer defects are discovered per month. Performance is Unsatisfactory (U) when _______ or more defects are discovered per month.
| 5 |
| Sampling Procedure: Instructions on how to select the sample must be clear and complete |
| 6 |
| Inspection Procedure: The procedure must be detailed enough to allow a yes/no objective decision as to the acceptability of performance by anyone making the inspection. Explain when evaluation is to occur and what is acceptable/unacceptable |
Performance: Excellent (E), Satisfactory (S), Unsatisfactory (U), Not Applicable (N/A)
| PRS Requirements |
| Timeliness |
| Quality of Work |
| Notes |
Overall Rating of Inspection (E, S, U or N/A)
COR/Inspector Comments:
Contractor Signature:
Date:
COR Signature:
____________________Date: _________________
APPENDIX - D
QUALITY ASSURANCE MONITORING
CONTRACT NUMBER: ______________________________________
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check the applicable item):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check the applicable item):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check the applicable item):
( Meets Standards
( Does Not Meet Standards
Narrative of Performance During Survey Period:
Prepared By: _______________________________
Date: ______________
APPENDIX - E
CUSTOMER COMPLAINT INVESTIGATION
CONTRACT NUMBER: _________________________
SERVICE or STANDARD:
SURVEY PERIOD:
DATE COMPLAINT RECEIVED: ____________
SOURCE OF COMPLAINT: _________________________________________ (Name)
_______________________________________________________________ (Organization)
___________________ (Phone No.) _______________________________ (Email Address)
NATURE OF COMPLAINT: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
RESULTS OF COMPLAINT INVESTIGATION: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
DATE SERVICE PROVIDER INFORMED OF COMPLAINT: _____________
CORRECTIVE ACTION TAKEN BY SERVICE PROVIDER: _________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Received and Validated By: __________________________________________
Prepared By: _____________________________ Date: _________________
APPENDIX - F
SURVEILLANCE ACTIVITY CHECKLIST
Performance
Requirement Performance
Standard Method of
Measurement
Performance
Metrics Method of
Surveillance Date
Accomplished Compliance
(Exceed, Met, Partial Met)
2 | Page 5 | Page
File details come from the government source that posted it. Updated .