Attachment 4 N5005421R0011 DRAFT USS GRAVELY ISRA Cat II Standard Items List.pdf
PDF 19 KB Posted
- Attached to
- USS GRAVELY (DDG-107) FY22 ISRA
- Solicitation number
- N5005421R0011
About this file
This document outlines a sources sought announcement from the Department of the Navy for the USS GRAVELY (DDG-107) FY22 Incremental Selected Restricted Availability (ISRA). The Navy seeks information from potential contractors to perform pier-side maintenance, repair, and alterations work anticipated to begin on or around July 5, 2022. The anticipated contract type is firm-fixed price. Interested parties are requested to provide information on their company size and facilities, relevant past performance examples within the last three years, experience completing similar work on naval vessels, planned response to a future solicitation, and approach to executing the availability. Responses are due by August 20, 2021. The document includes an outline of anticipated work categories and ship specifications as attachments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat II Standard Items List - 2022 - CH-1 8/5/2021-14:21
Standard
Item Year Standard Item #
2022 009-05
2022 009-09
2022 009-11
2022 009-12
2022 009-15
2022 009-17
2022 009-25
2022 009-26
2022 009-32
2022 009-36
2022 009-57
2022 009-58
2022 009-63
2022 009-65
2022 009-71
2022 009-76
2022 009-78
2022 009-83
2022 009-87
2022 009-88
2022 009-89
2022 009-103
2022 009-104
2022 009-107
2022 009-113
N5005421R0011 DRAFT Cat II Standard Items List - 2022 - CH-1
Title
Temporary Access; accomplish
Process Control Procedure (PCP); provide and accomplish
Insulation and Lagging; accomplish
Weld, Fabricate, and Inspect; accomplish
Rotating Machinery; balance
Rotating Electrical Equipment; repair
Structural Boundary Test; accomplish
Deck Covering; accomplish
Cleaning and Painting Requirements; accomplish
Controller; repair
Reduction Gear Security; accomplish
Pump and Driver Shaft Alignment; accomplish
Lubricating Oil and Hydraulic Fluid; analyze
Polychlorinated Biphenyls (PCBs); control
Piping System; test
Waveguide and Rigid Coaxial Lay-Up; accomplish
Passive Countermeasures System (PCMS) Material; repair
Wire Rope Assembly; Fabricate
Chemical disinfection Procedures; accomplish
Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-
Contaminated Tanks, Spaces, and Piping; certify
Contractor Furnished Anode Purchase and Inspection; accomplish
Weight and Moment Change Data; provide
Vibration Testing and Analysis; accomplish
Piping System Cleanliness Restoration and Flushing (Non-Nuclear); accomplish
Rotating Electrical Equipment with a Sealed Insulation Systems (SIS); rewind
8/5/2021 10:39
Change Change Date
Original 10/01/2018
Original 10/01/2019
Original 10/01/2017
Original 10/01/2019
Original 10/01/2019
Original 10/01/2019
Original 03/06/2020
Original 03/06/2020
CH-1 02/21/2021
Original 08/31/2018
Original 11/18/2016
Original 03/06/2020
Original 04/30/2018
Original 03/26/2018
Original 03/06/2020
Original 10/01/2018
Original 10/01/2018
Original 03/26/2018
Original 10/01/2017
Original 11/18/2016
Original 03/06/2018
Original 04/30/2018
Original 03/06/2020
Original 10/01/2019
Original 10/01/2019
File details come from the government source that posted it. Updated .