ATTACHMENT 4 AF Form 66 MBMV222323.pdf
PDF 64 KB Posted
- Attached to
- MBMV222323 Repair Floors Basewide West
- Solicitation number
- W50S84-22-B-0010
- Issued by
-
Department of the Army National Guard
About this file
This document contains a federal contract solicitation and related project submittal schedule. The solicitation is for repair work on floors basewide at facilities located in Battle Creek, Michigan. The required repairs include installation of carpet, porcelain tile, grout, transition strips, rubber tile, vinyl cove base, and tile cove base. The solicitation number is W50S84-22-B-0010 and has a period of performance of 180 calendar days. The estimated value is between $500,000 to $1,000,000. The NAICS code is 238330 for flooring contractors and it is set aside for small businesses with a size standard of $16.5 million. The pre-bid conference will be held on August 16, 2022 and award will be made based on price to the responsible bidder. The project submittal schedule specifies when the contractor must submit items like a quality control plan, permits, warranties, and product data during the period of performance.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
MBMV222323
APPROVED DISAPPROVED
1 Submittal Schedule - AF Form 66 1 x
2 Transfer and Acceptance of DOD Real Property - DD Form 1354 1 x
3 Contractor Hazardous Material Identification 1 x
4 Solid Waste Recycling and Disposal Reporting Form 1 x
5 Affirmative Procurement Reporting Form 1 x
6 Construction Schedule 1 x
7 Construction Photos 1
8 Safety Documentation as stated 1 x
9 Permits, Licenses and Certificates 1 x
10 Quality Control Plan 1 x
11 Carpet 1 1 1 1 12 Porcelain Tile 1 1 1 13 Thinset 1 14 Carpet Adhesive 1 15 Grout 1 1 16 Transition 1 1 17 Rubber Tile 1 1 1 18 Vinyl Cove Base 1 1 19 Tile Cove Base 1 1 20 Recesessed Aluminum Entry Mats 1 1 1 21 Rubber Tile Adhesive 1
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L
O R
D
AT
A
SH
O
P D
R
AW
IN
G
S
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D
AT
IO
N
S
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair Floors Base Wide - West
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
File details come from the government source that posted it. Updated .