ATTACHMENT 4 AF Form 66 MBMV222323.pdf

PDF 64 KB Posted

Attached to
MBMV222323 Repair Floors Basewide West
Solicitation number
W50S84-22-B-0010
Issued by

About this file

This document contains a federal contract solicitation and related project submittal schedule. The solicitation is for repair work on floors basewide at facilities located in Battle Creek, Michigan. The required repairs include installation of carpet, porcelain tile, grout, transition strips, rubber tile, vinyl cove base, and tile cove base. The solicitation number is W50S84-22-B-0010 and has a period of performance of 180 calendar days. The estimated value is between $500,000 to $1,000,000. The NAICS code is 238330 for flooring contractors and it is set aside for small businesses with a size standard of $16.5 million. The pre-bid conference will be held on August 16, 2022 and award will be made based on price to the responsible bidder. The project submittal schedule specifies when the contractor must submit items like a quality control plan, permits, warranties, and product data during the period of performance.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

MBMV222323

APPROVED DISAPPROVED

1 Submittal Schedule - AF Form 66 1 x

2 Transfer and Acceptance of DOD Real Property - DD Form 1354 1 x

3 Contractor Hazardous Material Identification 1 x

4 Solid Waste Recycling and Disposal Reporting Form 1 x

5 Affirmative Procurement Reporting Form 1 x

6 Construction Schedule 1 x

7 Construction Photos 1

8 Safety Documentation as stated 1 x

9 Permits, Licenses and Certificates 1 x

10 Quality Control Plan 1 x

11 Carpet 1 1 1 1 12 Porcelain Tile 1 1 1 13 Thinset 1 14 Carpet Adhesive 1 15 Grout 1 1 16 Transition 1 1 17 Rubber Tile 1 1 1 18 Vinyl Cove Base 1 1 19 Tile Cove Base 1 1 20 Recesessed Aluminum Entry Mats 1 1 1 21 Rubber Tile Adhesive 1

REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

M

AT

ER

IA

L

O R

D

AT

A

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D

AT

IO

N

S

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O

U T

SOLICITATION/CONTRACT NO.PROJECT TITLE

Repair Floors Base Wide - West

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

File details come from the government source that posted it. Updated .