ATTACHMENT 4 AF Form 66 MBMV212833 LED Lighting West.pdf

PDF 64 KB Posted

Attached to
MBMV212833 Replace LED Basewide West Side
Solicitation number
W50S84-22-B-0004
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

MBMV212833

APPROVED DISAPPROVED

1 Submittal Schedule - AF Form 66 1 x

2 Transfer and Acceptance of DOD Real Property - DD Form 1354 1 x

3 Contractor Hazardous Material Identification 1 x

4 Solid Waste Recycling and Disposal Reporting Form 1 x

5 Affirmative Procurement Reporting Form 1 x

6 Construction Schedule 1 x

7 Construction Photos 1

8 Safety Documentation as stated 1 x

9 Permits, Licenses and Certificates 1 x

10 Quality Control Plan 1 x

11 LED Light 1 1 1 1 12 Occupancy Senor 1 1 1 13 Dimming switch/controls 1

REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

M

AT

ER

IA

L

O R

D

AT

A

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D

AT

IO

N

S

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O

U T

SOLICITATION/CONTRACT NO.PROJECT TITLE

LED LIGHTING – West SIDE OF BASE

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

File details come from the government source that posted it. Updated .