Attachment 4 - AF 66.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Repair CE Open Storage Canopy Federal contract opportunity
- Solicitation number
- FA301021R0002
About this file
This document contains a submittal register and related federal contract opportunity solicitation. The submittal register outlines 16 items or descriptions of submittals required for the Repair CE Open Storage project, including hazard materials questionnaires and reports, shop drawings, warranties, and product data. Due dates for submissions to the civil engineering department range from 5 days prior to the start date to the end of the contract. The related federal contract opportunity solicitation is for the Repair CE Open Storage Canopy project with an estimated value between $500,000 and $1 million, set aside for Service-Disabled Veteran-Owned Small Businesses. A mandatory site visit is scheduled for February 4, 2021 at 0900 at the Air Force base, requiring valid identification and proof of insurance to enter. Proposals are due as outlined in Section L and will be evaluated as specified in Section M.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 10 - Questions and Answers.pdf | ||
| Solicitation Amendment FA301021R00020001 SF 30.pdf | ||
| Site Visit Sign In 4 Feb 21.pdf | ||
| Solicitation - FA301021R0002.pdf | ||
| Attachment 2 - Repair CE open Storage Specs.pdf | ||
| Attachment 6 - Past Performance Questionnaire.pdf | ||
| Attachment 1 - Repair CE open Storage SOW.pdf | ||
| Attachment 3 - Repair CE open Storage DWG.pdf | ||
| Attachment 7 - Past Performance Reference List.pdf | ||
| Attachment 8 - SF 1444.pdf | ||
| Attachment 9 - Notice of Compliance.pdf | ||
| Attachment 5 - Wage Det MS20200050.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF 66 Sheet 1-16
| SUBMITTAL REGISTER | PROJECT NUMBER | PROJECT TITLE | ||||||||||||||||
| MAHG171030 | Repair CE open Storage | |||||||||||||||||
| TO BE COMPLETED BY PROJECT MANAGER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| ITEM NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |||||||||
| CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | DATA | DOCUMENT \ REPORT |
APPROVED DIS-APPROVED
| 1 | HazMat Questionnaire | 3 | 3 | 5 Days Prior to Start Date | |
| 2 | HazMat MSDS | 3 | 5 Days Prior to Start Date | Must be filled out if contractor answers YES to the Hazmat Questionnaire | |
| 3 | Hazmat Reporting Entry Form | 3 | 3 | 5 Days Prior to Start Date | Submit Final Quantities |
| 4 | Hazmat Reporting Entry Form | 3 | 3 | End of Contract | |
| 5 | Recycling and Landfill Report | 3 | 3 | End of Contract | |
| 6 | Warranty (Manufacturer's) | 3 | End of Contract | ||
| 7 | 1-Year Warranty (Contractor) | 3 | End of Contract | ||
| 8 | Paint and Primer | 3 | 5 Days Prior to Start Date | See specification | |
| 9 | Roofing System | 3 | 5 Days Prior to Start Date | See specification | |
| 10 | Steel Shop Drawings | 3 | 5 Days Prior to Start Date | See specification | |
| 11 | Lighting and Electrical | 3 | 5 Days Prior to Start Date | See specification | |
| 12 | Sealant | 3 | 5 Days Prior to Start Date | See specification | |
| 13 | |||||
| 14 | |||||
| 15 | |||||
| 16 | |||||
| 17 | |||||
| 18 | |||||
| 19 | |||||
| 20 | |||||
| 21 | |||||
| 22 |
File details come from the government source that posted it. Updated .