Attachment 3 Standard Specifications.pdf
PDF 2 MB Posted
- Attached to
- RENOVATION OF NIH LABORATORY - ENTEBBE, UGANDA Federal contract opportunity
- Solicitation number
- 19UG5021R0007
- Issued by
- Department of State
About this file
This solicitation is for renovation construction works at the National Institute of Health laboratory located at the Uganda Virus Research Institute campus in Entebbe, Uganda. The scope of work includes construction of a new laboratory building and is described in the attached bidding documents comprising technical specifications and drawings. The solicitation number is 19UG5021R0007 and was issued by the Department of State. Bids are due on an unspecified date. The award will be a firm-fixed-price contract. Construction is to be completed according to the specifications, drawings and statement of work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA NIH Project.docx | DOCX document | |
| QA from Site Visit.docx | DOCX document | |
| Attachement 1 BOQ (Breakdown of Price by Divisions of Specifications).pdf | ||
| Attachement 4 Code for Electrical Installations in Buildings.pdf | ||
| SF1442 - Cover Page.pdf | ||
| Attachment 2 Drawings.pdf | ||
| Solicitation Document.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSED LABORATORY OFFICE BLOCK
ON
PLOT 51-59 NAKIWOGO ROAD, ENTEBBE
FOR
M/S. UGANDA VIRUS RESEARCH INSTITUTE
VOLUME 2 OF 3
(TECHNICAL SPECIFICATIONS)
PROJECT MANAGERS
ARCH DESIGN LTD
P.O.BOX 22946
Kampala - Uganda.
Tel: +256-414-234487 /234488
Email: info@archdesign.co.ug
TH
JUNE, 2021
UVRI – LABORATORY OFFICE BLOCK – BIDDING DOCUMENTS (VOLUME 2 OF 3)
PROPOSED LABORATORY OFFICE BLOCK
ON
PLOT 51-59 NAKIWOGO ROAD, ENTEBBE
FOR
M/S. UGANDA VIRUS RESEARCH INSTITUTE
DOCUMENTS SUMMARY
VOLUME NO.
COMPRISING OF
1 of 3: Form of Tender, Instructions to Tenderers, General Conditions, Preliminaries, Bills of Quantities (Building, Civil Engineering Works, Electrical Installation Works &
Mechanical Installations Works & Main Summary) and Form of Bonds
2 of 3: Technical Specifications comprising:
(A) Standard Specifications for Building works
(B) Code for Electrical Installations in Buildings
3 of 3: Tender Drawings
FLYSHEET:
Volume 2A of 3 - Standard
Specifications for Building works
B
B
U
IL
D
IN
G W
O R
K S
THE REPUBLIC OF UGANDA
MINISTRY OF WORKS AND TRANSPORT
STANDARD SPECIFICATIONS
December 2012
FOREWORD
The mission of the Ministry of Works and Transport (MoWT) is to promote an adequate, safe and well maintained works and transport infrastructure and services so as to effectively contribute to the socio-economic development of the country.
In exercising this mission and in discharging its responsibilities, the Ministry is issuing a series of Design Manuals, Guidelines, Codes and Standards, of which the “Standard Specifications for Building Works” is one part thereof.
The Standard Specifications for Building Works will be a nationally recognized document which will serve as a standard reference for the preparation of specifications for works to be undertaken on building construction projects.
The major benefits to be gained in applying this document are the harmonization of professional practice in the building construction in Uganda and curtailment of informal developments so as to ensure well-planned, well-maintained, safe, cost effective and decent building developments and human settlements throughout the country.
The Standard Specifications will be periodically updated and new editions issued to cater for the dynamic technological developments in the construction industry.
Abraham Byandala
Minister of Works and Transport
December2012
Standard Specifications for Building Works
Ministry of Works and Transport i
General Table of Contents
Part 1: Architectural, Structural and
General Works
Part 2: Building Sanitation
Part 3: Electrical Services
Part 4: Air-conditioning
Ministry of Works and Transport ii
TABLE OF CONTENTS
1.0 GENERAL MATTERS
1.1 General Conditions of Contract
1.2 Instructions to Bidders
1.3 Scope of Contractor‟s Obligations
1.4 Interpretation of Terms
1.5 Workmanship
1.6 Codes of Practices
1.7 Materials
1.8 Ordering of Materials
1.9 Proprietary of Materials
1.10 Samples
1.11 Prove Vouchers
1.12 Tests
1.13 Payment forTests
1.14 Test Samples
1.15 Rejected Workmanship and Materials
1.16 Materials intended for the Works
1.17 Overtime or Nightwork
1.18 Nuisance to Adjoining Buildings andProperty
1.19 Existing and Adjacent Property
1.20 Damage to Public and Private Roads
1.21 Existing Services
1.22 Watching and Lighting
1.23 Licenses and Permits
1.24 Notices and Fees
1.25 Definition of “Fix only”
1.26 Attendance of Nominated Sub-Contractors
1.27 Temporary Roads
1.28 Temporary Fencing
1.29 Storage of Materials
1.30 Sheds for Operatives
1.31 Site Office
1.32 Site Meetings
1.33 Works Diary
1.34 Foreman-in-Charge
1.35 Temporary Latrines and Ablutions
1.36 Water for Works
1.37 Light and Power for the Works
1.38 Signboards
1.39 Protection of Works
1.40 Keeping and Delivering Site and Works Clean
1.41 Contingencies
2.0 WORKS OF DEMOLITION AND ALTERATIONS
2.1 Demolition
2.2 Obstruction of Public Road etc
2.3 Prevention of Dust and Fans
2.4 Removal of Rubbish
2.5 Disposal of Rubbish
2.6 Use of Suitable Material for Hardcore
2.7 Dustproof Screens
2.8 Shoring
2.9 Building Openings
2.10 Cutting Openings in Existing Walls
2.11 Existing Public Service Mains
2.12 Government to Retain Ownership of Old Materials
2.13 Materials to be Cleared Away
Ministry of Works and Transport iii
2.14 Definiton of “Make Out”and “Make Good”
3.0 EXCAVATION
3.1 Clearance of Site
3.2 Trees and Bushesto be Preserved
3.3 Felling Trees
3.4 Anthills
3.5 Removal of Vegetable Soil
3.6 Excavation to Reduce Level
3.7 Excavation for Embankments
3.8 Excavation for Foundations
3.9 Steps in Foundations
3.10 Excess Excavations
3.11 Bottoms of Excavations to be Approved
3.12 Soft Spots
3.13 Excess Excavations
3.14 Working Space
3.15 Excavation in Rock
3.16 Definition of Solid Rock
3.17 Determination of Rock Excavation
3.18 Payment for Rock Excavation
3.19 Blasting
3.20 Returning, Filling and Ramming
3.21 Filling to Make-up Levels
3.22 Borrow Pits
3.23 Replacement of Vegetable Soil
3.24 Disposal of Surplus Excavated Material
3.25 Definition of “Get out”
3.26 Planking and Strutting
3.27 Keeping Excavations Free of Water
3.28 Hardcore
3.29 Temporary Retaining Boards
3.30 Anti-termite treatment
4. 0 CONCRETE WORK
4.1 General Requirements
4.2 Cement
4.3 Aggregate for Concrete
4.4 Grading of Aggregates
4.5 Sand
4.6 Grading of Aggregates
4.7 Maximum Sizes of Coarse Aggregates
4.8 Storage of Aggregates
4.9 Concrete Mixes by Volume or Weight
4.10 Concrete Mixes
4.11 Design Mixes
4.12 Trial Mixes
4.13 Mixing of Concrete
4.14 Hand Mixing
4.15 Transporting and Placing Concrete
4.16 Ready Mix Concrete
4.17 Compaction of Concrete
4.18 Construction Joints
4.19 Movement /Expansion Joints
4.20 Protection of Concrete
4.21 Concrete Surface Finishes
4.22 Fair Face and Fine Face Finishes of Concrete
4.23 Form HoleChases
4.24 Steel Reinforcement
4.25 Bending Reinforcement
4.26 Spacing of RC bars
Ministry of Works and Transport iv
4.27 Fixing and Assembly of Reinforcement
4.28 Cover to Concrete
4.29 Inspection of Reinforcement
4.30 Formwork
4.31 Formwork Non-Exposed Concrete
4.32 Formwork for Exposed Concrete
4.33 Preparation of Formwork before Concreting
4.34 Approval of Formwork
4.35 Removal of Formwork
4.36. Composite Concrete/HollowClay Block Structures
4.37 “Freespan” and “Maxspan” Suspended Structures
4.38 “Freespan” Units or Beams
4.39 “Maxspan” Precast Rib and Filler Block Structures
4.40 Concrete Lintels
4.40 Precast Concrete
4.41 Concrete Apron
4.42 Attendance
5.0 WALLING
5.1 General Requirements
5.2 Brick Walling
6. ROOFING
6.1 General
6.2 Steel Sheet
6.3 Aluminum Sheets
6.4 Roof Tiling
6.5 Bituminous Felt Roofing
6.6 Roofing Shingles
6.7 Proprietary Roofing Systems
6.8 Roof Screeds
6.9 Make Good
7.0 CARPENTRY
7.1 Timber
7.2 Timber for Special Structures
7.3 Preventive Treatment for Timber
7.4 Seasoning
7.5 Samples and Testing
7.6 Sawn Timber
7.7 Wrot Timber
7.8 Workmanship
7.9 Jointing
7.10 Connectors
7.11 Nails and Bolts
7.12 Roofs
7.13 Ends of Timber
7.14 Fixing Slips and Plugs
7.15 Insect Damage
7.16 Cleaning
8.0 JOINERY AND IRONMONGERY
8.1 Timber
8.2 Species of Timber for Joinery Works
8.3 Preventive Treatment
8.4 Seasoning
8.5 Samples for Testing
8.6 All Joinery to be Wrot
8.7 Selected Timber for Polish
8.8 Plywood
8.9 Block Boards
8.10 Wood Chipboards
Ministry of Works and Transport v
8.11 Veneers
8.12 Adhesives
8.13 Nails and Screws
8.14 Workmanship
8.15 Joints
8.16. Moulding
8.17. Fixing or Building Frames
8.18 Fixing Beads etc
8.19 Scribing
8.20 Grounds
8.21 Flush Doors
8.22 Priming
8.23 Polish or Clear Finishes
8.24. Inspection
8.25. Storage and Delivery
8.26 Protection of Joinery
8.27 Ironmongery
8.28 Dowels
8.29. Mosquito Gauze
8.30. Making Good
9.0 METAL WORK
9.1 Materials generally
9.2 Structural Steel
9.3 Welding
9.4 Bolts
9.5 Metal Windows and Doors
9.6 Hanging
9.7 Fittings
9.8 Glazing Clips
9.9 Fixing Lugs and Screws
9.10. Composite Windows
9.11. Protective Finish
9.12 Fly Screens
10.0 PAVING
10.1 Cement
10.2 Sand
10.3. Granolithic Coarse Aggregate
10.4. Water
10.5. Granolithic paving
10.6. Granolithic Paving (Separate Construction)
10.7 Granolithic Paving (Monolithic)
10.8 Chemical Surface Treatment
10.9 Screeds
10.10. Terrazzo Paving
10.11 Concrete and Quarry Tile Paving
10.12 Cork Tile Paving
10.13 Flexible P.V.C Floor Tiling
10.14 Dividing Strips
10.15 Cover up and Protection of Paving
11.0 WALL AND CEILING FINISHES
11.1 Cement
11.2. Lime
11.3. Sand
11.4 Plastering Generally
11.5 Internal Plastering
11.6 External Rendering
11.7 Tyrolean Finish Rendering
11.8. Expanded Metal Lathing
11.9. Wall Tiling
Ministry of Works and Transport vi
11.10 Expanded Polystyrene Tiles
11.11 Insulation Board
11.12 Flat Sheets
11.13 Make Good
12.0 GLASS WORKS
12-1 Glass
12.2 Putty
12.3 Glazing
12.4 Bedding Strips
12.5 Cleaning on Completion
13.0 PAINTING
13.1 Workmanship
13.2 Sub-letting Work
13.3 Materials
13.4 Paint
13.5 Linseed Oil
13.6 Knotting
13.7 Wax Polish
13.8 Lacquer Treatment
13.9 Generally
13.10 Preparation
13.11 Preparation of Existing surfaces
13.12 Backs of Frames
13.13 Remove Ironmongery
13.14 Cover up and Protect
13.15 Cleaning up
14.0FIRE EXTINGUISHERS, CABINETS, pumpsand ACCESSORIES
14.1 Fire extinguisher cabinets
14.2 Fire extinguishers
14.3 Accessories
14.4 Pumps
14.5 Hosereel Installation
15. EXTERNAL WORKS
15.1 Standards
15.2 Generally
15.3 Site Clearance and Earthworks
15.4 Construction of Sub-Base and Bases
15.5 Drive Ways and Parking Areas
PART 2 99
BUILDING SANITATION
1.0 PLUMBING
1.1 Statutory Requirements
1.2 Galvanised Steel Pipes and Fittings
1.3 PPR pipes and fittings
1.4 Cast Iron Soil, Waste and Vent Pipes
1.4.1 uP.V.C. Soil Systems
1.5 Tubing Generally
1.6 Water Service and Distribution Pipework
1.7 Branches to Drinking Water Draw-off Taps
1.8. Delivery Pipes
1.9 Running, Jointing and Fixing Pipes
1.10 Stops, Taps and Ball Valves
1.11 Storage Cisterns
1.12. Testing of Water Mains and Services
1.13 Sanitary Fittings General
1.14 Water Closets
1.15 Urinals
Ministry of Works and Transport vii
1.16 Baths, Lavatory Basins and Sinks
2.0 DRAIN LAYING
2.1 Drainage & Sanitation Rules
2.2 Excavation
2.3 Laying Lines of Pipes
2.4 Materials
2.5 Size of Pipe and Fall
2.6 Minimum Cover to Pipes
2.7 Minimum Cover to Pipes other then cast Iron and Steel
2.8 Foundation for Drains
2.9. Drain Junctions
2.10. Provision of Inspection Chambers
2.11 Construction and sizes of Inspection Chambers
2.12. Inspection Chambers in Buildings
2.13 Inspection Chamber Covers
2.14 Channels and Benching in Inspection Chambers
2.15 Deep Inspection Chamber of Means of Access
2.16 Ventilation
2.17 Soil Pipe Materials
2.18 Anti-Siphonage to Soil Pipes
2.19 Channels or Open Drains
2.20. Waste-Pipes and Waste Water Fittings
2.21 Rain Water Pipes
2.22 Overflow Pipes
2.23 Requirement of Gully Traps
2.24. Provision of Grease Traps
2.25. Septic Tanks and Cesspool Biological Filters
3.0. SUBTERRANEAN STORM AND SURFACE WATER DRAINAGE
3.1 Site
3.2 Roof
3.3. Surface water
3.4. Drains, Sewers and channels for surface or storm water
3.5 Silt Traps and Grills or Gratings
ELECTRICAL SERVICES
1.0 GENERAL REQUIREMENTS
2.0 ELECTRICAL WORK
3.0 RELATED BUILDER’S WORK
4.0 CLIMATIC CONDITIONS/SPECIAL REQUIREMENTS FOR EQUIPMENT
5.0 ELECTRICAL SUPPLY
6.0 STANDARDS AND SPECIFICATIONS
7.0 POWER INTAKE-UNDERGROUND AND OVERHEAD
8.0 CONDUITS FOR INTERNAL WIRE DRAWING
9.0 CABLES (SINGLE AND MULTI-CORE) AND CONDUCTORS
9.0 MAIN AND SUB DISTRIBUTION BOARDS
10.0 WIRING ACCESSORIES, SMALL EQUIPMENT AND MATERIAL
11.0 INFORMATION AND COMMUNICATION TECHNOLOGY
12.0 LUMINAIRES AND LAMPS
13.0 SITE LIGHTING
14.0 LIGHTNING PROTECTION AND EARTHING
15.0 CLOSED CIRCUIT TELEVISION (CCTV) SURVEILLANCE
16.0 CENTRALISED TELEVISION SYSTEM
Ministry of Works and Transport viii
17.0 FIRE DETECTION AND ALARM SYSTEM
19.0 TRAINING OF CLIENT’S PERSONNEL
20.0 INSPECTION, TESTING AND COMMISSIONING
AIRCONDITIONING AND MECHANICAL VENTILATION
List of Reference Documents
Standard Specifications for Building Works Part 1
Ministry of Works and Transport 1
PART 1
ARCHITECTURAL, STRUCTURAL
AND
GENERAL WORKS
Standard Specifications for Building Works Part 1 - Section 1
Ministry of Works and Transport 2
1.0 GENERAL MATTERS
1.1 General Conditions of Contract
All clauses, definitions and procedures described in the General Conditions of Contract for the Procurement of Works, issued by the Public Procurement and Disposal of Public Assets Authority (PPDA)in June 2003 will apply to these specifications unless specifically ruled otherwise in Special Conditions of Contract.
1.2 Instructions to Bidders
All clauses, definitions and instructions issued in the Invitation to Bid and Instructions to Bidders will apply to these specifications unless otherwise ruled in the Bid Data Sheet/Bidding Data of the Bidding Documents
1.3 Scope of Contractor’s Obligations
The Contractor shall provide everything necessary for the proper execution and completion of the works, according to these specifications, the particular specification and/or the bills of quantities whether the same is particularly described or not.
The Contractor shall provide all labour, carriage, freightage, building materials, implements, tools, tackle and plant and whatever else may be required for the proper and efficient execution and completion of the works.
The Contractor shall obtain necessary consents, pay any charges for, provide, erect, maintain and remove all necessary self supporting and other scaffolding, staging, gangways etc together with the necessary planks, ladders, trestles, etc. for the use of all trades engaged upon the buildings.
The Contractor shall provide, erect, maintain and alter as necessary and remove on completion all internal scaffolding, planks, trestles, ladders etc to all floors for the use of all trades engaged upon the building.
The Contractor shall include in his rates, unit prices or tender for all charges for waste, establishment and overhead charges and profit.
1.4 Interpretation of Terms
Wherever the words – „selected‟ as „directed‟ „as required‟, or words of similar meaning are used in these documents, it is to be understood that the selection, direction or requirements of the Project Manager are intended.
Similarly the words „approved‟, „satisfactory‟ or other synonyms shall mean „approved by‟ or „satisfactory to‟ the Project Manager and the Project Manager‟s approval must first be obtained before the materials are ordered or the works to which the words refer are put in hand.
Where the words „necessary‟, „proper‟ or words of similar meaning are used in these documents with respect to the extent conduct or character or work described, it is to be understood that they shall mean that the said work shall be executed to the extent, must be conducted in a manner or be of a character which is „necessary‟ or „proper‟ in the opinion of the Project Manager.
Ministry of Works and Transport 3
1.5 Workmanship
All workmanship shall be carried out by skilled operatives well versed in their respective trades.
All persons carrying out Plumbing and Drainage works shall hold licenses for carrying out such work in accordance with Section 1.2.4 of the Uganda Code for Sanitary Installations in Buildings.
1.6 Codes of Practices
Where certain classes of work are described as in accordance with a Code of Practice or Standard, this shall be understood to mean the most recent and up to date editions of the Codes of Practicesor Standards referred to. Where a Uganda Standard is not in existence, the most recent version of the British Standard as published by the Council for Codes of Practice, British Standards Institutions or such other Code of Practice as shall be expressly stated herein by the Project Manager may be applied.
1.7 Materials
All materials shall be new unless otherwise directed or permitted by the Project Manager and in all cases where the quality of goods or materials is not described or otherwise specified is to be the best quality obtainable in the ordinary meaning of the word „best‟ and not merely a trade signification of that word.
A reference to Standard Specification shall be understood to mean the most recent and up to date edition of that specification as published by the Ministry responsible for Works
In absence of a specification of intended material does not exist in that Standard Specification, reference to a British Standard Specification may used and shall be understood to mean the most recent and up to date edition of that specification as published by the British Standard Institution. The initials „B.S.‟ used in this document are the abbreviated form of British Standard Specification.
The Project Manager reserves the right to substitute, amend, alter, enlarge upon, correct or revise any of the foregoing and where this is intended it will be expressly stated herein.
1.8 Ordering of Materials
The Contractor shall be solely responsible for ordering all materials required for use on the works.
The Contractor shall order all material, other than those covered by Prime Cost or Provisional Sums, as early as necessary after the Contract is signed to ensure that such material will be on site when required for incorporation in the works.
Materials which are the subject of Prime Cost or Provisional sums in these documents shall be ordered immediately after written instructions are received to do so from the Project Manager.
Ministry of Works and Transport 4
The Contractor is to take his own measurements for the ordering of materials.
No responsibility will be accepted by Government for surplus, shortage, loss or expense if the goods are wrongly ordered.
The Contractor shall be responsible for and shall replace or make good at his own expense any materials lost or damaged, no matter how arising.
1.9 Proprietary of Materials
All proprietary materials and goods, i.e. those specified to be obtained from a particular manufacturer shall be used and fixed strictly in accordance with their instructions.
Where proprietary materials are specified hereafter the Contractor may propose the use of materials of other manufacture and equal quality for approval by the Project Manager. If such approval is given, in writing, then these alternative materials may be incorporated in the works at no extra cost to the Government.
1.10 Samples
The Contractor shall furnish at the earliest possible opportunity before work commences and at this own cost, any samples of materials or workmanship that may be called for by the Project Manager for his approval or rejection and any further samples in the case of rejection until such samples are approved. Such samples when approved shall be of not less than the minimum standard for the work to which they apply.
Samples shall be as representative as possible and no attempt shall be made to be unduly selective, samples shall be taken separately from a number of places in a particular load, heap, stock pile, batch deposit pit or suppliers store as the case may be, as directed by the Project Manager.
1.11 Prove Vouchers
The contractor shall upon, request by the Project Manager, furnish vouchers to prove that materials are being supplied in accordance with the specifications.
1.12 Tests
The Project Manager shall, as stated in the GCC, clause 34, be at liberty to make all tests necessary in order to satisfy himself that the materials and workmanship of every kind are in accordance with the Specification.
Where tests are carried out on the Works or samples taken by the Project Manager, the Contractor shall give all necessary assistance when called upon to do so.
The testing of materials will, unless expressly stated to the contrary, be carried out either by the Chief Materials Engineer of the Ministry responsible for Works at the Central Materials Laboratory, Kampala, or equivalent laboratory as determined by the Project Manager. Tests may also be carried out by Project Manager or his representative on site when adequate facilities for such site tests exist.
Ministry of Works and Transport 5
1.13 Payment for Tests
In case the Contract Documents include a Provisional Sum to meet the cost of testing all materials other than concrete work cube tests as later described.
The Contractor shall keep an accurate record of the costs incurred in the successful testing of materials and such costs will be adjusted in the final account and set off against the Provisional sum.
The Contractor will not be paid for unsuccessful tests due to the submission of materials which for any reason whatsoever are not of the required standard.
1.14 Test Samples
Each sample submitted to the laboratory for testing shall be properly packed, adequately labeled and have affixed to it the following information for the purposes of identification:-
(a) Name of project and location
(b) Type of material
(c) Intended use
(d) Date sample taken
(e) By whom sampled
(f) In cases of aggregate or other naturally occurring material, the location of the pit or deposit.
(g) Name of contractor and contractor‟s sample reference number.
1.15 Rejected Workmanship and Materials
Any workmanship or materials not complying with the requirements of the specification or approved samples which have been damaged, contaminated or have deteriorated, must be immediately removed from the site and replaced at the Contractor‟s expense, as directed by the Project Manager.
1.16 Materials intended for the Works
No timber or other materials required in the permanent construction of the works will be allowed to be used as plant or scaffolding.
1.17 Overtime or Nightwork
If the Contractor determines for the purpose of expediting the Works or for any other reason to permit the working of overtime or nightwork necessary so that the works or any part thereof, shall be completed in every respect ready for occupation and use within the time stated, he must include for same in his tender as no extra payment will be allowed for this at the settlement of the accounts.
When the Project Manager directs the Contractor in writing, for any reasons whatsoever; to carry out work outside normal working hours, he will be reimbursed the net difference in cost between the operatives normal hourly or daily rate of pay and the enhanced overtime rate where this applies.
Ministry of Works and Transport 6
1.18 Nuisance to Adjoining Buildings and Property
The Contractor is to make every reasonable and practical effort, consistent with good and expeditious work, to avoid nuisance from noise, dust, transport or any other cause to the occupants of existing buildings and adjoining property and to the public generally.
1.19 Existing and Adjacent Property
The Contractor must take all steps necessary to safeguard the existing property and adjacent property, make good at his own expense any injury to persons or damage to property caused thereon, and hold the Government indemnified against any such claim arising.
The Contractor shall take all necessary precautions to avoid damage to the surrounding ground, grass, plants, shrubs and trees and reinstate at his own expense any damage caused thereto.
1.20 Damage to Public and Private Roads
The Contractor will be required to make good at his own expense, any damage he may cause to the present road surfaces and pavements during the period of the works.
1.21 Existing Services
Prior to commencement of any work the Contractor is to ascertain from the relevant Authorities the exact position, depth and level of all existing electric and telephone cables water pipes or other services in the area and he shall make whatever provisions may be required by the Authorities concerned for the support and protection of such services. Any damage or disturbance caused to any service shall be reported immediately to the Project Manager and the relevant authority and shall be made good to their satisfaction at the Contractor‟s expense.
1.22 Watching and Lighting
The Contractor shall provide at his own cost all requisite day and night watching and lighting including that for use by his Sub-Contractors, whether nominated or otherwise and everything else necessary for the protection and security of the Works, plant, materials on site, the Public, and all persons lawfully using the premises during the execution of the works.
The Contractor shall provide red warning lamps at night to all obstructions and excavations either on, in or adjacent to the public highway.
1.23 Licenses and Permits
The Contractor must ensure that he, as sole proprietor or as an authorized director of his company and his workpeople are in possession
He must also ensure that he or his suppliers are in possession of valid import licenses for materials which are required to be obtained from outside Uganda.
Ministry of Works and Transport 7
1.24 Notices and Fees
The Contractor shall allow for giving all notices to Public Authorities and Statutory undertakings and for payment all fees and charges legally demandable. (see separate clause regarding water charges).
1.25 Definition of “Fix only”
For all items described in these documents as „Fix only” the Contractor shall allow in addition to the foregoing for taking delivery where directed, checking with invoices or indents, reporting and claiming damages for shortages and damaged goods, defraying demurrage charges, transporting, unloading, storing and protecting until the time of fixing, unpacking, replacing anything lost or damaged, sorting, assembling, distributing, hoisting to required levels and fixing complete in accordance with the directions supplied or specified.
1.26 Attendance of Nominated Sub-Contractors
The Contractor shall afford both general and specific attendance upon all Nominated sub-contractors, specialists and other executing works for which prime cost or provisional sums or prices are included hereafter.
The Contractor shall give such facilities to all firms employed upon the Works as the Project Manager considers reasonable and afford them use of scaffolding and ladders, alter standing scaffolding as required, or erect and remove any special scaffolding which they may require for the purpose of carrying out their work, supply them with labour and tackle for unloading, getting in, storing, hoisting and distributing their materials, use of electric light, power, and water and allow them use of storage for their materials, and the use by the Nominated Sub-Contractors employees of all messrooms, sanitary accommodation and welfare facilities and clear away all rubbish.
The Contractor shall give Nominated Sub-Contractors and other parties working on the premises all information reasonably necessary to enable them to properly set out and execute their work in harmony with the surroundings and other trades, and is not to allow them to proceed otherwise.
The Contractor shall be responsible in every respect for Nominated Sub- Contractors and in particular to see that their work proceeds regularly with the general progress of the building works and in accordance with the Works Program or Implementation Schedule.
The value of the foregoing services to be rendered by the Contractor to the Sub-Contractors, as described in this Clause is to be allowed for in the Bills of Quantities or particular specification under the item “Attendance‟ which follows each Prime Cost or Provisional Sum.
The Contractor shall allow for hacking surfaces to receive special finishes as required by Nominated Sub-Contractors.
1.27 Temporary Roads
The Contractor shall provide and maintain as necessary, all temporary roads, ramps, hard-standing, tracks, crossings and the like for the efficient running of the Works for all vehicles entering and on the site, including those of Nominated Sub-Contractors and afterwards remove and reinstate the ground to its original condition if so directed by the Project Manager.
Ministry of Works and Transport 8
1.28 Temporary Fencing
The Contractor will not, unless otherwise expressly instructed in the Contract Documents, be expected to provide a temporary fence or hoarding around the site. He will however be required to afford adequate protection and security from theft or other loss by the provision of a safe area or compound for the storage of materials which cannot be properly stored in a lockable store as provided hereafter. The compound must be properly constructed and have adequate means of access and locking facilities and afterwards it must be dismantled and clear away from the site.
1.29 Storage of Materials
The Contractor shall provide erect and maintain and clear away on completion suitable watertight sheds and other protection for the storage of materials including those of all Sub-Contractors.
Floors of sheds used for the storage of cement and other perishable materials shall be raised at least 150 mm above ground level. Cement stacks or bags shall be placed on timber pallets approved by the Project Manager.
1.30 Sheds for Operatives
The Contractor shall similarly provide suitable watertight sheds for the use of the operatives and those of all Sub-Contractors.
1.31 Site Office
The Contractor shall provide erect and maintain and clear away on completion suitable watertight temporary office accommodation for the use of his site staff and a similar separate-office for the use of the Project Manager‟s Supervising Officer.
Each office shall be of suitable size for the purpose for which it is intended and shall have a lockable door, windows of a size proportionate to the floor area, adequate means of ventilation, and be fitted with a desk with a drawer for the storage of plans and chair for the use of the staff.
1.32 Site Meetings
Site Meetings will be held in the Site Office at intervals as directed and the contractor will be required to summon the attendance of Sub-Contractors and specialists, prepare and distribute minutes and generally organize the meetings.
1.33 Works Diary
The Project Manager will issue to the Contractor one copy of the Standard Works Diary which shall be kept on the site at all times.
Ministry of Works and Transport 9
1.34 Foreman-in-Charge
The Contractor shall keep a Foreman-in-Charge in constant attendance upon the works. He shall be capable of reading, writing and speaking English and he shall keep copies of all drawings; details, specifications, letters, instructions, etc. on the works.
He shall also be required to keep a day today record in the Works Diary of the weather on the site.
1.35 Temporary Latrines and Ablutions
The Contractor shall provide the necessary temporary latrines, water closets and ablutions for his staff and workmen to the requirements and satisfaction of the Health Authorities and maintain the same in a thoroughly clean and sanitary condition and pay all conservancy fees and connection charges during the period of the Works and remove when no longer required and make good all distributed surfaces.
1.36 Water for Works
The Contractor shall provide at his own risk and cost all water for use in connection with the Works (including the work of Sub-Contractors whether Nominated or otherwise). Where a mains supply is not available locally he will be required to bring in water by tanker or other approved method and pay all costs and fees in connection therewith. He shall also provide temporary storage tanks and tubing, etc. as he may consider necessary and clear way at completion.
All water shall be fresh, clear and pure, free from earthly vegetable or organic matter, acid or alkaline substance, in solution or suspension.
1.37 Light and Power for the Works
The Contractor shall provide all artificial lighting and power for use on the Works, including all Sub-Contractors and Specialists whether nominated or otherwise, requirements and including all temporary connections, wiring, fittings etc and clear away on completion. The Contractor shall pay all fees and obtain all permits in connection therewith.
Before submitting his tender the Contractor must ascertain for himself whether a supply will be available or not at commencement of or during the course of the Works as no claim will be entertained due to failure by UMEMEprovide such a supply.
1.38 Signboards
The Contractor shall provide, erect and clear away on completion a signboard for the display of the General Contractor‟s names which shall be of an approved size and design with the Employers‟ names painted thereon.
Particulars of all parties to the contract shall be given and words shall be printed in a minimum size of 50 mm letters. No other signboard or advertising signs shall be permitted without the permission of the Project Manager.
Ministry of Works and Transport 10
1.39 Protection of Works
The Contractor shall allow for covering up and protecting the Works during inclement weather and provision of all temporary covers, gutters, down pipes surface water drains, etc. as required.
1.40 Keeping and Delivering Site and Works Clean
He will also allow for carefully protecting all work including all Sub- Contractors Work liable to injury and prove all necessary temporary casing, linings, coverings to steps, floors, tiles, paving, walls, ceilings, fittings and fixtures of all kinds to the complete satisfaction of the Project Manager and finally clear all away on completion.
1.41 Contingencies
The Contractor shall allow for cleaning out drains, gullies, interceptors, manholes, etc. Cleaning glass inside and out, cleaning metalwork and woodwork, sweeping and scrubbing all floors pavings etc. or treating with special finishes as described, cleaning all cisterns, sanitary fittings, etc, testing all water supplies, cisterns and sanitary fittings and leaving drip dry, oiling all door and window hinges, bolts and looks and removing all paint and cement stains and clear and cart away all rubbish as it accumulates to a tip to be provided by the Contractor and leave the whole of the site and Works clean and tidy ready for occupation to the complete satisfaction of the Project
The Contractor shall include in his Tender the Contingency Sum as directed in the Particular Specification or Bills of Quantities which will be used as directed by the Project Manager and deducted in whole or in part if not required.
Standard Specifications for Building Works Part 1 - Section 2
Ministry of Works and Transport 11
2.0 WORKS OF DEMOLITION AND ALTERATIONS
2.1 Demolition
All taking down and demolition is to be carried out without damage to the remaining structures or the adjoining property. Where any such damage occurs the Contractor shall reinstate and make good at his own expense
2.2 Obstruction of Public Road etc
The Contractor shall not obstruct the Public Thoroughfares or Private Rights of Way without the approval of the Local authority and shall pay all their charges and conform to all instructions issued by them.
2.3 Prevention of Dust and Fans
The Contractor shall thoroughly water the work during all demolition to prevent any nuisance from dust, dirt, etc., and is to provide all necessary protecting fans, barricades, dust sheets, tarpaulins etc to protect the new and existing work, the public, the occupants and the workmen.
2.4 Removal of Rubbish
All items of taking down etc., shall be included for removing, basketting, getting out and clearing away from site all debris and rubbish whether specifically mentioned or not from the relevant floor levels.
2.5 Disposal of Rubbish
The Contractor shall make his own arrangements for a shoot or spoil heap for disposal of all materials arising from demolition works and he is to pay all charges in connection therewith
2.6 Use of Suitable Material for Hardcore
The Contractor may use the broken brick and other approved material arising from the pulling as hardcore filling under floors, paths etc., provided such materials are suitably broken down and cleaned to the approval of the Project
2.7 Dustproof Screens
The Contractor shall allow for providing and fixing temporary waterproof and dustproof screens, coverings, etc. to all sections of the existing building, which may be exposed by reason of the pulling down and shall efficiently keep the premises watertight and dust free whilst building work is in progress.
2.8 Shoring
The Contractor‟s price for shoring where described shall include for all shoring, needling, strutting etc., to all walls, floors, roofs, etc., as required, altering and adapting same as necessary and the Contractor shall be responsible for the sufficiency and maintenance of the same and removal when no longer required and making good all works disturbed at completion.
Standard Specifications for Building Works Part 1 - Section 2
Ministry of Works and Transport 12
2.9 Building Openings
The Contractor‟s price for building up openings in existing walls shall include for all temporary strutting to heads, preparing jambs, oils and wedging and pinning at heads.
2.10 Cutting Openings in Existing Walls
The Contractor‟s prices for cutting openings etc., in external walls at various floor levels and all other works necessitated shall be deemed to include for all necessary scaffolding, ladders, etc.
Similarly, this shall equally apply to the Contractor‟s prices for external painting.
2.11 Existing Public Service Mains
The contractor is to allow for protecting supporting or diverting as required any Public Service Mains encountered during the execution of the works or he must allow for and pay all fees chargeable if this work is executed by the Public Authorities concerned.
2.12 Government to Retain Ownership of Old Materials
Where materials as described “to set aside for re-use” they shall remain the property of the Government and shall be carefully preserved by the Contractor and loaded and carted to a store where directed by the Project Manager, and the Contractor shall allow in his prices for this activity.
2.13 Materials to be Cleared Away
All old materials described to be “cleared away” shall become the property of the Contractor and shall be removed from the site by him and he is to state in the place provided any credit he is prepared to allow. The Government reserves the right, however, to retain ownership in any of the materials arising from the pulling down and the Contractor will be reimbursed at the credit value he has allowed for those materials.
2.14 Definition of “Make Out “and “Make Good”
The terms “make out” and “make good” shall be read as including all necessary labour and new materials required to match in every respect the existing surrounding work, unless the same are described as „measured separately”.
Standard Specifications for Building Works Part 1 - Section 3
Ministry of Works and Transport 13
3.0 EXCAVATION
3.1 Clearance of Site
Clearance of the site of the Works shall be done to the extent as directed by the Project Manager but not otherwise. This shall include demolition and removal of all obstruction, removal of rubbish, cutting down vegetation, shrubs, bushes and trees and grubbing up stumps and roots and burning or clearing away from site, as appropriate. Holes made in grubbing up stumps and roots shall be filled in and rammed solid with approved material deposited in layers not exceeding 150mm thick.
3.2 Trees and Bushes to be Preserved
Trees and bushes which are to be preserved shall be marked with paint by the Project Manager‟s Supervising Officer on site and the Contractor shall carefully protect these as required until completion of the Works.
3.3 Felling Trees
All useable timber trees shall remain the property of the Government. Trees shall be cut down as near to the ground as possible, leaves and branches removed and burnt, and useful trunks cut into suitable lengths and removed and placed in stocks on the site where directed.
3.4 Anthills
All anthills, nests, queen ants and grubs shall be removed as necessary, and the ground sterilized either by lighting fires and burning for not less than 24 hours or use of an approved insecticide, and filling any holes excavated with approved material, rammed solid in layers not exceeding 150 mm thick.
3.5 Removal of Vegetable Soil
The Contractor shall excavate over surface of site of roads, paths, embankments, terraces, etc., and to a distance of not less than 3 m around any building, and remove vegetation and top soil to a depth of not less than 150 mm below the average existing ground level jot to such other average existing ground level or to such other depth as directed by the Project Manager, Vegetable soil shall be removed to a spoil heap within the boundary of the site or as otherwise directed and carefully preserved for reuse in top soiling to embankments and areas of cut or fill.
3.6 Excavation to Reduce Level
The Contractor shall excavate over surface of site to reduce level and “get out”. Formation level is deemed to be the underside or gravel/murram base courses of roads, hard standings and the like. Grassed areas or unpaved areas, are unless directed to the contrary to be reduced to 150 mm below finished ground levels to allow for the replacing of top soil for grassing.
Ministry of Works and Transport 14
3.7 Excavation for Embankments
The Contractor shall excavate to reduce levels to form embankments where required and “get out”. Unless otherwise shown on the drawings the face of the embankment shall be finished to an even slope not greater than 2:5.
3.8 Excavation for Foundations
The Contractor shall excavate for basements, foundation, ducts, pier holes, stanchion bases, etc., all to the widths and depths as shown on the drawings or as directed by the Project Manager.
3.9 Steps in Foundations
Steps in foundations shall be provided in accordance with the drawings or the Project Manager‟s instructions.
3.10 Excess Excavations
The Contractor shall level or trim to falls and cross falls as indicated on the drawings, ram and consolidate the surface of the ground and bottom of all excavations to receive concrete foundations, beds, etc.
3.11 Bottoms of Excavations to be Approved
The bottom of all excavations and ground surfaces under foundations, beds and the like shall be inspected and approved by the Project Manager before concrete of hardcore is laid.
3.12 Soft Spots
Where pockets of soft or other unsuitable material are found to extend below the approved foundation or formation level, the pockets shall be removed to such extent and levels as directed by the Project Manager and filled up to the underside of the adjacent foundations, with concrete mix „E‟ as later described in the case of concrete work or with approved excavated material when under hardcore beds.
3.13 Excess Excavations
Should any excavation be made below the depths shown or required to obtain a solid bottom, the Contractor shall fill up the excess excavation in the same manner as described for Soft Spots - Clause 3.12.
3.14 Working Space
Where work carried out by other trades demand it, or when instructed by the Project Manager, the Contractor shall excavate working space sufficient to facilitate the proper carrying out of such work, i.e. vertical tanking, formwork to ground beams, etc.
Ministry of Works and Transport 15
3.15 Excavation in Rock
The Contractor‟s prices for all excavation work will be deemed to include for excavations in any material other than solid rock.
3.16 Definition of Solid Rock
Solid rock shall mean any naturally occurring material found in ledges or masses in its original position which can only be extracted by the use of compressors or by blasting, and also solid boulders or detached pieces of rock in size:-
(i) Exceeding 0.25 m in trenches.
(ii) Exceeding 1.25 m in general excavation
3.17 Determination of Rock Excavation
The Contractor shall inform the Project Manager as soon as solid rock is exposed so that the Project Manager can inspect and determine that the material is in accordance with the definition in Clause 3.16 above and then instruct the Contractor to remove it or cause a redesign of the affected foundation works as he sees fit.
3.18 Payment for Rock Excavation
The Contractor shall be paid extra for the removal of solid rock so defined at the rates inserted by him in the Contract Documents or, in the absence of such rates, by rates to be agreed with the Project Manager. The “extra” rates for rock excavation shall include for excavating with compressors or for blasting, if allowed, and the extra cost of leveling, trimming and disposal.
3.19 Blasting
Blasting shall be allowed only when expressly authorized by the Project
If in his opinion it would be dangerous to persons or adjacent buildings to blast or if blasting has been authorised and is being carried out in a reckless or dangerous manner he may prohibit it and order the rock to be excavated by other means.
The greatest care shall be taken by the contractor when blasting to ensure that no injury be done to persons or any finished work. The shorts shall be properly loaded and covers and lonely moderate charges shall be used and where directed by the Project Manager the Contractor shall provide heavy mesh blasting nets or blast mounds. Blasting shall be restricted to such times as the Project Manager shall direct.
The Contractor shall make good at his own expense any damage resulting from blasting operations irrespective of whether the Project Manager has directed that special precautions be taken or not.
3.20 Returning, Filling and Ramming
The Contractor shall return and fill selected excavated material around foundations, to backs of walls etc., up to formation level or as directed by the Project Manager, in layers not exceeding 230 mm thick, ram, consolidate and water it as required. No back filling shall be done until the foundation work
Ministry of Works and Transport 16 has been inspected and approved by the Project Manager.
3.21 Filling to Make-up Levels
Filling to make up levels under floors, terraces and the like shall be done using selected excavated material. The material shall be wheeled from wherever it is located on the site and filled in layers not exceeding 150 mm thick each, watered as required and well rammed and consolidated up to the required levels.
3.22 Borrow Pits
Where there is insufficient filling material arising from the excavations the Contractor shall be required to obtain it from other sources to make up the required quantity. The Contractor shall open up a suitable borrow pit, excavate as necessary, transport the material to site and deposit and fill as previously described.
3.23 Replacement of Vegetable Soil
The Contractor shall remove vegetable soil from spoil heaps and wheel and deposit it over the area of excavated and filled areas around buildings including sloping faces of embankments to a finished depth of not less than 150 mm or to such other depth as directed by the Project Manager.
Any surplus vegetable soil shall be deposited, spread and leveled on site where directed. Under no circumstances is the contractor to sell, remove from site or otherwise dispose of vegetable soil.
3.24 Disposal of Surplus Excavated Material
All surplus excavated material shall be wheeled, deposited, spread and leveled on site where directed by the Project Manager, or where otherwise expressly provided in these documents to be removed from the site to a tip to be provided by the Contractor who is required to pay any fees and charges in connection therewith.
3.25 Definition of “Get out”
The term “get out” shall be construed as meaning all basketting out, and any re-excavation from spoil heaps which may be required in connection with items of filling and disposal.
3.26 Planking and Strutting
The Contractor shall include for maintaining and upholding the sides of all excavations by means of planking and strutting or such other method as he deems necessary, including excavations next public roadways, filled areas and existing hardcore or any other material. No claim for additional excavation, concrete or other material required due to the Contractor‟s failure to observe this clause shall be allowed.
Ministry of Works and Transport 17
3.27 Keeping Excavations Free of Water
The Contractor shall keep the whole of the excavations free from water, slop and mud arising from surface water, rain, drains, floodwater or any other similar cause by baling pumping, temporary drains or otherwise until completion of the Works. Where hidden underground springs are encountered or where foundations extend below the level of the water table which requires continuous pumping, the Contractor will, where this is properly authorised in writing by the Project Manager be paid for this at rates to be agreed for the use of such pumps.
3.28 Hardcore
The Contractor shall provide and lay hardcore beds under all concrete beds,, pavings, etc., to the thickness as shown on the drawings.
Hardcore shall consist of approved hard dry broken brick rubble or crushed stone to pass a 65mm ring, laid in layers not exceeding 150 mm thick and each well watered, rammed and consolidated and leveled or finished to falls as shown on the drawings, blinded with fine stuff to receive concrete or other topping.
The Contractor shall form all sinking for ducts and thickenings in floor to the dimensions as indicated on the drawings.
3.29 Temporary Retaining Boards
The Contractor shall supply and maintain all temporary retaining boards for hardcore beds.
3.30 Anti-termite treatment
Pre - Construction Chemical Treatment In The Buildings
Scope:
This specification covers the general requirements for anti-termite constructional measures, chemical treatment of soils for the protection of buildings from attack by subterranean termites, chemicals to be used with their minimum rates of application and procedure to be followed while the building is under construction.
General:
The contractor shall furnish all tools, plants, instruments, qualified supervisory personnel, labour, materials, any temporary works, consumables, and everything necessary whether or not such items are specifically stated herein for completion of the job in accordance with specification requirements.
All work shall be done in the order of progress required by Owner‟s construction programme. The contractor shall take all necessary precautions to prevent any accident in connection with the performance of the work. On final completion of all the work, the contractor shall leave the entire premises within the site of his operation clean and free from all rubbish resulting from his operation.
The owner reserves the right to inspect, check and direct any or all operations at any stage of the work and to require unsatisfactory work to be remedied at the contractor‟s expense. No work shall be carried out under
Ministry of Works and Transport 18 unsuitable weather conditions viz. when raining or when the soil is wet due to rain or sub-soil water.
Chemicals shall be brought to site of work is sealed…
This is the start of the file's text. The full file is on GovTribe.