QA NIH Project.docx
DOCX document 16 KB Posted
- Attached to
- RENOVATION OF NIH LABORATORY - ENTEBBE, UGANDA Federal contract opportunity
- Solicitation number
- 19UG5021R0007
- Issued by
- Department of State
About this file
This document contains questions and answers regarding a renovation project for a laboratory at the National Institute of Health in Entebbe, Uganda. The construction works detailed in the attached documents include renovating a laboratory building located at the Uganda Virus Research Institute campus. Bidders are directed to quote according to the quantities provided in the bill of quantities and find their own dumping site as stated in the description. Demolition of a solid wall is included but the quantity is unspecified and bidders are asked to confirm.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA from Site Visit.docx | DOCX document | |
| Attachement 1 BOQ (Breakdown of Price by Divisions of Specifications).pdf | ||
| Attachement 4 Code for Electrical Installations in Buildings.pdf | ||
| SF1442 - Cover Page.pdf | ||
| Attachment 3 Standard Specifications.pdf | ||
| Attachment 2 Drawings.pdf | ||
| Solicitation Document.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
| Question: | We would like to request for structural details for RC frame columns and substructure. |
| Answer: | Please quote as per the quantities given in the BOQ |
| Question: | Description & Quantity in Bill No. 5 Section A & E are contradictory. Please confirm the quantity of the items |
| Answer: | Please quote as per the quantities given in the BOQ. |
| Question: | During the site visit, we were told about demolition of solid wall. Please confirm the quantity of the solid wall to be demolished. Please also reflect the same in the BOQ….. |
| Answer: | Please quote as per the quantities given in BOQ. |
| Question: | Please confirm the dumping site location. |
| Answer: | Dumping site to be found by the contractor himself as stated in BOQ description. |