Attachment 3_Quote Sheet_FA813223Q0036_X-Ray Producing System Maintenance.pdf

PDF 213 KB Posted

Attached to
X-Ray Producing System Maintenance Federal contract opportunity
Solicitation number
FA813223Q0036
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X-RAY PRODUCING SYSTEM

PREVENTIVE AND REMEDIAL MAINTENANCE

Tinker AFB, OK Solicitation # FA813223Q0036

Offerors are REQUIRED to return the portion of this CSS below with the completed information and authorized signature. Offeror may provide their company’s quotation sheet in addition to this response page.

SECTION 1 – OFFEROR INFORMATION

Company Name Address

CAGE Code and UEI Number

The Government cannot enter into contracts or agreements with contractors not registered in SAM. For registration information, visit the SAM website (https://www.sam.gov/) and follow the instructions in the Quick Start Guide For SAM Registration, which can be found under the Help Tab and User Guides submenu.

Small Business Size Web Page URL Point of Contact POC Phone # and email address

SECTION 2 – SERVICES AND PRICE

BASE YEAR

CLIN

Description/Product

Qty

Unit Price

Total Annual Price

0001AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

AMXG

BASE YEAR: 1 Aug 2023 – 31 Jul 2024

NON-PERSONAL SERVICES: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform Preventive Maintenance (PM) on the 76th Aircraft Maintenance Group’s (76 AMXG) X-Ray Producing Systems in the Oklahoma City Air Logistics Complex (OC-ALC), Tinker AFB, OK, in accordance with (IAW) with the Performance Work Statement (PWS; Attachment 1). Equipment to be serviced is listed in the Equipment List. (Attachment 2)

The Contractor shall be responsible for ensuring all services, parts, and Original Equipment Manufacturer (OEM) components provided under this contract are IAW the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and the PWS.

2 EA $ $

CLIN Description/Product Qty Unit Price Total Annual Price

0001AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

AMXG

BASE YEAR: 1 Aug 2023 – 31 Jul 2024

NON-PERSONAL SERVICES: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform Remedial Maintenance (RM) on the 76th Aircraft Maintenance Group’s (76 AMXG) X-Ray Producing Systems in the Oklahoma City Air Logistics Complex (OC-ALC), Tinker AFB, OK, in accordance with (IAW) with the Performance Work Statement (PWS; Attachment 1). Equipment to be serviced is listed in the Equipment List. (Attachment 2)

LABOR RATE: $ _______________

Estimated 5 hours of RM per Year.

Rate must be a fully-burdened labor rate.

OVERTIME LABOR RATE: $ _______________

This rate has no bearing on evaluation for award.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

Prior to any RM request work, approval must be granted by the Contracting Officer (CO) before the Contractor can start work.

The Contractor shall be responsible for ensuring all services and parts provided under this contract are IAW the terms and conditions outlined in the contract and its attachments and conform to the manufacturer's equipment specifications.

The Contractor may be required to ship broken parts back to Contractor's facility for repair, if necessary.

All reimbursements will be paid in arrears of RM services.

Advance payments will not be authorized.

The Contractor is not entitled to the entire amount of this CLIN, but only in the amount approved by the CO.

Invoicing – The Contractor shall submit invoices in arrears of services provided using the Wide Area Workflow e-Business Suite (WAWF) Online Application, which can be found in the Procurement Integrated Enterprise Environment (PIEE;

https://wawf.eb.mil). Complete invoicing information will be found in DFARS Clause 252.232-7006, Wide Area Workflow Payment Instructions.

1 Lot DO NOT

COMPLETE THIS

BLOCK.

MULTIPLY YOUR

LABOR RATE

TIMES THE EST RM

HOURS FOR THE

YEAR (IN RED IN

THE DESCRIPTION

COLUMN) AND

PUT THE TOTAL

ANNUAL PRICE

COLUMN TO THE

RIGHT.

CLIN Description/Product Qty Unit Price Total Annual Price

0002AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

CMXG

BASE YEAR: 1 Aug 2023 – 31 Jul 2024

NON-PERSONAL SERVICES: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform Preventive Maintenance (PM) on the 76th Commodities Maintenance Group’s (76 CMXG) X-Ray Producing Systems in the Oklahoma City Air Logistics Complex (OC-ALC), Tinker AFB, OK, in accordance with (IAW) with the Performance Work Statement (PWS; Attachment 1). Equipment to be serviced is listed in the Equipment List. (Attachment 2)

The Contractor shall be responsible for ensuring all services, parts, and Original Equipment Manufacturer (OEM) components provided under this contract are IAW the terms

0002AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

CMXG

BASE YEAR: 1 Aug 2023 – 31 Jul 2024

NON-PERSONAL SERVICES: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform Remedial Maintenance (RM) on the 76th Commodities Maintenance Group’s (76 CMXG) X-Ray Producing Systems in the Oklahoma City Air Logistics Complex (OC-ALC), Tinker AFB, OK, in accordance with (IAW) with the Performance Work Statement (PWS; Attachment 1). Equipment to be serviced is listed in the Equipment List. (Attachment 2)

LABOR RATE: $ _______________

Estimated 25 hours of RM per Year.

Rate must be a fully-burdened labor rate.

OVERTIME LABOR RATE: $ _______________

This rate has no bearing on evaluation for award.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

Prior to any RM request work, approval must be granted by the Contracting Officer (CO) before the Contractor can start work.

The Contractor shall be responsible for ensuring all services and parts provided under this contract are IAW the terms and

1 Lot DO NOT

COMPLETE THIS

BLOCK.

MULTIPLY YOUR

LABOR RATE

TIMES THE EST RM

HOURS FOR THE

YEAR (IN RED IN

THE DESCRIPTION

COLUMN) AND

PUT THE TOTAL

ANNUAL PRICE

COLUMN TO THE

conditions outlined in the contract and its attachments and conform to the manufacturer's equipment specifications.

The Contractor may be required to ship broken parts back to Contractor's facility for repair, if necessary.

All reimbursements will be paid in arrears of RM services.

Advance payments will not be authorized.

The Contractor is not entitled to the entire amount of this CLIN, but only in the amount approved by the CO.

Invoicing – The Contractor shall submit invoices in arrears of services provided using the Wide Area Workflow e-Business Suite (WAWF) Online Application, which can be found in the Procurement Integrated Enterprise Environment (PIEE;

https://wawf.eb.mil). Complete invoicing information will be found in DFARS Clause 252.232-7006, Wide Area Workflow Payment Instructions.

The Contractor may be required to ship broken parts back to Contractor's facility for repair, if necessary.

0003AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

PMXG

BASE YEAR: 1 Aug 2023 – 31 Jul 2024

NON-PERSONAL SERVICES: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform Preventive Maintenance (PM) on the 76th Propulsion Maintenance Group’s (76 PMXG) X-Ray Producing Systems in the Oklahoma City Air Logistics Complex (OC-ALC), Tinker AFB, OK, in accordance with (IAW) with the Performance Work Statement (PWS; Attachment 1). Equipment to be serviced is listed in the Equipment List. (Attachment 2)

The Contractor shall be responsible for ensuring all services, parts, and Original Equipment Manufacturer (OEM) components provided under this contract are IAW the terms

0003AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

PMXG

BASE YEAR: 1 Aug 2023 – 31 Jul 2024

NON-PERSONAL SERVICES: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform Remedial Maintenance (RM) on the 76th Propulsion Maintenance Group’s (76 PMXG) X-Ray Producing Systems in the Oklahoma City Air Logistics Complex (OC-ALC), Tinker AFB, OK, in accordance with (IAW) with the Performance Work Statement (PWS; Attachment 1). Equipment to be serviced is listed in the Equipment List. (Attachment 2)

1 Lot DO NOT

COMPLETE THIS

BLOCK.

MULTIPLY YOUR

LABOR RATE

TIMES THE EST RM

HOURS FOR THE

YEAR (IN RED IN

THE DESCRIPTION

COLUMN) AND

PUT THE TOTAL

ANNUAL PRICE

OPTION YEAR 1

LABOR RATE: $ _______________

Estimated 10 hours of RM per Year.

Rate must be a fully-burdened labor rate.

OVERTIME LABOR RATE: $ _______________

This rate has no bearing on evaluation for award.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

Prior to any RM request work, approval must be granted by the Contracting Officer (CO) before the Contractor can start work.

The Contractor shall be responsible for ensuring all services and parts provided under this contract are IAW the terms and conditions outlined in the contract and its attachments and conform to the manufacturer's equipment specifications.

The Contractor may be required to ship broken parts back to Contractor's facility for repair, if necessary.

All reimbursements will be paid in arrears of RM services.

Advance payments will not be authorized.

The Contractor is not entitled to the entire amount of this CLIN, but only in the amount approved by the CO.

Invoicing – The Contractor shall submit invoices in arrears of services provided using the Wide Area Workflow e-Business Suite (WAWF) Online Application, which can be found in the Procurement Integrated Enterprise Environment (PIEE;

https://wawf.eb.mil). Complete invoicing information will be found in DFARS Clause 252.232-7006, Wide Area Workflow Payment Instructions.

CLIN

Description/Product

Qty

Unit Price

Total Annual Price

1001AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

AMXG

OPTION 1: 1 Aug 2024 – 31 Jul 2025

*Please refer to CLIN 0001 (base year) for description of services.

1001AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

AMXG

OPTION 1: 1 Aug 2024 – 31 Jul 2025

LABOR RATE: $ _______________

Estimated 5 hours of RM per Year.

1 LOT DO NOT

COMPLETE THIS

BLOCK.

MULTIPLY YOUR

LABOR RATE

Rate must be a fully-burdened labor rate.

OVERTIME LABOR RATE: $ _______________

This rate has no bearing on evaluation for award.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

TIMES THE EST RM

HOURS FOR THE

YEAR (IN RED IN

THE DESCRIPTION

COLUMN) AND

PUT THE TOTAL

ANNUAL PRICE

COLUMN TO THE

RIGHT.

1002AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

CMXG

OPTION 1: 1 Aug 2024 – 31 Jul 2025

*Please refer to CLIN 0002 (base year) for description of services.

1002AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

CMXG

OPTION 1: 1 Aug 2024 – 31 Jul 2025

LABOR RATE: $ _______________

Estimated 25 hours of RM per Year.

Rate must be a fully-burdened labor rate.

OVERTIME LABOR RATE: $ _______________

This rate has no bearing on evaluation for award.

TRAVEL LABOR RATE: $ _______________

1 LOT DO NOT

BLOCK.

MULTIPLY YOUR

LABOR RATE

TIMES THE EST RM

HOURS FOR THE

YEAR (IN RED IN

THE DESCRIPTION

COLUMN) AND

PUT THE TOTAL

ANNUAL PRICE

1003AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

PMXG

OPTION 1: 1 Aug 2024 – 31 Jul 2025

*Please refer to CLIN 0002 (base year) for description of services

1003AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

PMXG

OPTION 1: 1 Aug 2024 – 31 Jul 2025

LABOR RATE: $ _______________

Estimated 10 hours of RM per Year.

Rate must be a fully-burdened labor rate.

OVERTIME LABOR RATE: $ _______________

This rate has no bearing on evaluation for award.

TRAVEL LABOR RATE: $ _______________

1 LOT DO NOT

BLOCK.

MULTIPLY YOUR

LABOR RATE

TIMES THE EST RM

HOURS FOR THE

YEAR (IN RED IN

THE DESCRIPTION

COLUMN) AND

PUT THE TOTAL

ANNUAL PRICE

COLUMN TO THE

PRICING SUMMARY

Payment Terms / Discount Terms

NET 30 / _______% In _______ Days After Invoice Submission in WAWF

NOTES:

All quotes are valid for no less than 90 days.

SECTION 3 – CERTIFICATION OF RESPONSE

NAME OF OFFEROR’S REPRESENTATIVE TITLE

SIGNATURE DATE

Contractor is REQUIRED to sign this document and return 1 copy to issuing office. Contractor agrees to furnish and deliver all items set forth or otherwise identified above and on any additional sheets subject to the terms and conditions specified herein. Contractor is required to provide commercial product literature for all items quoted above as required/requested.

BASE YEAR

OPTION YEAR 1

TOTAL PRICE

Base Year + Option Year

File details come from the government source that posted it. Updated .