Attachment 3 Pricing Worksheet.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Engineering Technician
- Solicitation number
- W911QY-21-R-0031
About this file
This document includes a pricing worksheet template and solicitation for engineering technician services. The solicitation requests proposals by July 26, 2021 for a firm-fixed-price contract to provide engineering technician support at locations in Natick, Massachusetts and the contractor's place of business. The period of performance is one base year followed by four option years, with an anticipated start date of September 1, 2021. The solicitation is a total small business set-aside for NAICS code 541690 with a size standard of $16.5 million. Proposals should be submitted electronically to the points of contact listed. The award will be made to the responsible offeror providing the best overall value based on evaluation criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 5 CDRL - Monthly Progress Report - Engineering Technician.pdf | ||
| Attachment 4 QASP Engineering Technician.doc | DOC document | |
| Attachment 2 Statement of Work - Engineering Technician - Final.docx | DOCX document | |
| Attachment 1 SOLICITATION - W911QY-21-R-0031.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor
Pricing Worksheet
| Company Name | |||||||||||||||
| Project Title: | JF&ET Engineering Technician | ||||||||||||||
| Point of Contact | |||||||||||||||
| Date: | |||||||||||||||
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | |||||||||||
| Labor Category | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Labor Total | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 |
Fringe Benefits % $0.00 $0.00 $0.00 $0.00
Overhead % $0.00 $0.00 $0.00 $0.00 $0.00
Materials $0.00 $0.00 $0.00 $0.00 $0.00
Travel $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
G&A % $0.00 $0.00 $0.00 $0.00 $0.00
Profit/Fee % $0.00 $0.00 $0.00 $0.00 $0.00
| Grand Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor Categories. Enter all proposed labor categories for the project and the estimated hours for each related task. |
Materials. Itemize all items needed to perform the contract (See Materials tab)
Travel. Use an overall estimated cost for travel, combining such elements as air fare, per diem, and local travel multiplied by the number of trips.
| Other Direct Costs. Itemize any additional Direct Costs, if applicable. These items may include special test equipment, packaging and packing, telephone charges, etc. |
| Escalation factor. For option years, include escalation factor based on a reputable source, such as Global Insights, for each option year, if applicable. |
| Reference Material: Attach supportive documentation for support preparation, historical data, assumptions, etc. |
Prepared by:
| _____________________________________ |
| Preparer's Name, Position, Telephone number and Date |
Materials Materials Estimate - add lines as necessary.
Project Title:
Date:
| Item | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| Materials total | $0.00 |
File details come from the government source that posted it. Updated .