Attachment 3 - Price Breakout 653-24-101.xlsx

XLSX spreadsheet 301 KB Posted

Attached to
Y1DA--CON 653-24-101 Remodel Building 57
Solicitation number
36C26024R0005
Issued by

About this file

This document contains a price breakdown template for a federal contract solicitation to remodel Building 57 at the VA Roseburg Health Care System. The template includes line items for various construction divisions and facility services with instructions to leave non-applicable lines blank or enter $0. The solicitation number is 36C26024R0005 and is seeking pricing for base items including repainting interior walls and ceilings, demolishing and replacing flooring, and renovating restrooms to add showers. Offerors are instructed to provide fixed pricing for the highlighted line items and include calculations for overhead rates, profit percentages, and bonding or taxes that may apply to the work.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS

1Awardee is Responsible for determining accuracy of formulas to calculate SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.
6For an offer to be considered responsive, all highlighted lines must be priced as applicable. If highlighted line is not applicable to indicated SLIN, enter $0.00 or N/A. Any lines not highlighted or indicated as N/A should be left as-is.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
653-24-101 Remodel Building 57

VA Roseburg Health Care System

SLIN 0001-AASLIN 0001-ABSLIN 0001-ACSLIN 0001-AD
RatesBase ItemBase ItemBase ItemBase Item
General Requirements & Facility ConstructionPricePricePricePrice
Division Item 1 General RequirementsN/A$0.00$0.00$0.00$0.00
Division Item 2 Existing Conditions (demolition)N/A$0.00$0.00$0.00$0.00
Division Item 3 Concrete (furnish and install)N/A$0.00$0.00$0.00$0.00
Division Item 4 Masonry (furnish and install)N/AN/AN/AN/AN/A
Division Item 5 Metals (furnish and install)N/AN/AN/AN/AN/A
Division Item 6 Woods, Plastic and Composites (furnish and install)N/AN/AN/AN/AN/A
Division Item 7 Thermal and Moisture Protection (furnish and install)N/AN/AN/AN/AN/A
Division Item 8 Openings (furnish and install)N/A$0.00$0.00$0.00$0.00
Division Item 9 Finishes (furnish and install)N/A$0.00$0.00$0.00$0.00
Division Item 10 Specialties (furnish and install)N/AN/AN/AN/AN/A
Division Item 11 Equipment (furnish and install)N/AN/AN/AN/AN/A
Division Item 12 Furnishes (furnish and install)N/AN/AN/AN/AN/A
Division Item 13 Special Construction (furnish and install)N/AN/AN/AN/AN/A
Division Item 14 Conveying Equipment (furnish and install)N/AN/AN/AN/AN/A
Facility Services Subgroup
Division Item 21 Fire Suppression (furnish and install)N/AN/AN/AN/AN/A
Division Item 22 PlumbingN/A$0.00$0.00$0.00$0.00
Division Item 23 Heating, Ventilating and A/C (furnish and install)N/AN/AN/AN/AN/A
Division Item 25 Integrated AutomationN/AN/AN/AN/AN/A
Division Item 26 ElectricN/AN/AN/AN/AN/A
Division Item 27 CommunicationsN/AN/AN/AN/AN/A
Division Item 28 Electronic Safety & SecurityN/AN/AN/AN/AN/A
Site & Infrastructure Subgroup
Division Item 31 EarthworkN/AN/AN/AN/AN/A
Division Item 32 Exterior ImprovmentsN/AN/AN/AN/AN/A
Division Item 33 UtilitiesN/AN/AN/AN/AN/A
Division Item 34 TransportationN/AN/AN/AN/AN/A
Division Item 35 Waterway & Marine ConstructionN/AN/AN/AN/AN/A
Process Equipment Subgroup
Division Item 40 Process InterconnectionsN/AN/AN/AN/AN/A
Division Item 41 Material Processing & Handling EquipmentN/AN/AN/AN/AN/A
Division Item 42 Process Heating, Cooling, & Drying EquipmentN/AN/AN/AN/AN/A
Division Item 43 Process Gas & Liquid HandlingN/AN/AN/AN/AN/A
Division Item 44 Pollution & Waste Control EquipmentN/AN/AN/AN/AN/A
Division Item 45 Industry Specific Mfg. EquipmentN/AN/AN/AN/AN/A
Division Item 46 Water & Wastewater EquipmentN/AN/AN/AN/AN/A
Division Item 48 Electrical Power GenerationN/AN/AN/AN/AN/A

TOTAL DIVISIONS $0.00 $0.00 $0.00 $0.00

Insurance / BondsN/A$0.00$0.00$0.00$0.00
Taxes / Other Fees (provide itemized list)N/A$0.00$0.00$0.00$0.00
O&M Manuals and Red Line DrawingsN/A$0.00$0.00$0.00$0.00
OverheadRate _______%N/AN/AN/AN/A
Overhead (daily rate)Per Day $0.00N/AN/AN/AN/A
SubContract Mark-UpRate _______%N/AN/AN/AN/A
ProfitRate _______%N/AN/AN/AN/A
SubTotals$0.00$0.00$0.00$0.00

Other Items not Requested Above (provide itemized list) $0.00 $0.00 $0.00 $0.00

CONTRACT TOTALS$0.00$0.00$0.00$0.00
TOTAL$0.00

Items

Item NumberSLINDescriptionRef CLINCommentInclude Comments in DocumentContract PeriodPop BeginPop EndQuantityUnit of MeasurePackaging MultipleReceipt TypeLine Item IsUnit PriceItem Discount Type NameItem DiscountDate UpdatedAddress1Address2Address3CityStateZipZip4CountryMark ForContact NameContact PhoneContact EmailDelivery DateFOBSpecial InstructionsInclude Instructions/Comments in DocumentPRINCIPAL NAICS CODEPRODUCT/SERVICE CODEUNSPSCSIC CODEMANUFACTURER PART NUMBER (MPN)NATIONAL STOCK NUMBERLOCAL STOCK NUMBERDM DOC IDDELIVERY REF. COUNTERUNIT TEXT/DESCRIPTIONDELIVERY REFERENCEITEM MASTER FILE NUMBEREXPENDABLE/NON-EXPENDABLEQUANTITY REQUESTEDUNIT OF PURCHASE CODEUNIT OF PURCHASE TEXT/DESC.
0001Remodel Building 57Base1JBNSP236220Z2DA
0001AARepainting interior walls and ceilingBase1JBPriced236220Z2DA
0001ABDemo and replacement of flooringBase1JBPriced236220Z2DA
0001ACRenovate men’s room to add showerBase1JBPriced236220Z2DA
0001ADRenovate closet into women’s restroom with showerBase1JBPriced236220Z2DA