About this file

This document provides instructions for implementing a standardized past performance questionnaire (PPQ) process across the Naval Facilities Engineering Command (NAVFAC) and U.S. Army Corps of Engineers (USACE). The PPQ Form PPQ-0 from September 30, 2011 will be used for all procurements requiring a PPQ. Offerors should submit completed PPQs with their proposals, but are no longer required to have references send PPPs directly to the contracting office. Sample solicitation language is provided to notify offerors that the government may consider past performance information from other sources such as the Contractor Performance Assessment Reporting System in addition to PPQs. The instructions emphasize that the burden of providing detailed, accurate, and complete past performance information remains with the offeror.

The related federal contract opportunity is a solicitation from the USACE Wilmington District for design and construction of a Special Operations Forces operations facility annex to include administrative areas, storage, latrines, showers, laundry, a sensitive compartmented information facility, fire and security systems, and utilities. The facility must meet Department of Defense high performance building standards and incorporate low impact development features.

View the file

Other files for this federal contract opportunity

Other files attached to PN92793 - JSOC OPERATIONS FACILITY ANNEX, newest first.
File Type Posted
Conformed-AMDT0005-PN92793-SOF-OperationsBldg-Tech-Summary-Changes.pdf PDF
W912PM23R0003-0005 Conformed PN92793.pdf PDF
W912PM23R0003-0005 SF30 PN92793.pdf PDF
W912PM23R0003-0004 SF30 PN92793.pdf PDF
W912PM23R0003-0004 Conformed PN92793.pdf PDF
PN 92793 Site Visit Sign-In Sheet.pdf PDF
W912PM23R0003-0003 SF30 PN92793.pdf PDF
W912PM23R0003-0003 Conformed PN92793.pdf PDF
Conformed-AMDT0003-PN92793-SOF-OperationsBldg-Tech-Summary-Changes.pdf PDF
W912PM23R0003-0002 PN92793.pdf PDF
W912PM23R0003-0002 PN92793 Conformed.pdf PDF
USACE-SAW_PN92793 - RTA - VOLUME II (UnLocked).pdf PDF
USACE-SAW_PN92793 - RTA - VOLUME I (UnLocked).pdf PDF
PN92793_-_READY_TO_ADVERTISE_-_geotechnical_report.pdf PDF
W912PM23R0003-0001 PN92793.pdf PDF
W912PM23R0003 PN92793 Construct JSOC Ops Fac Annex.pdf PDF
USACE-SAW_PN92793 - RTA - VOLUME I (Locked).pdf PDF
Attachment 4 - Small Business Participation Plan.pdf PDF
PN92793 - READY TO ADVERTISE - SPECIFICATIONS-VOL I.pdf PDF
USACE-SAW_PN92793 - RTA - VOLUME II (Locked).pdf PDF
Attachment 1 - Proposal Data Sheet.pdf PDF
Attachment 3 - NAVFAC-USACE PPQ (fillable).pdf PDF
Attachment 2 - Corporate Relevant Specialized Experience Template.pdf PDF
PN92793 - READY TO ADVERTISE - SPECIFICATIONS-VOL II.pdf PDF
PN92793-RTA-FF and E Specifications-VOL III.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE DESK GUIDE

ATTACHMENT 4 – NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE

(PPQ) INSTRUCTIONS AND FORM

NAVFAC / USACE Past Performance Questionnaire (PPQ) Form PPQ -0 (9/30/11)

INSTRUCTIONS FOR IMPLEMENTATION OF

NAVFAC/USACE PAST PERFORMANCE QUESIONNAIRE (PPQ) FORM

1. Background: In many source selections and MATOC task order evaluations, the RFP encourages the Offeror to have their clients provide a completed PPQ directly to the contract specialist. In addition, throughout USACE, various formats of PPQs are being utilized. Industry expressed concern regarding the process by which PPQs are submitted, that completing multiple PPQs for the same type projects over time places a significant burden on their clients, and seeking a standard process and format to be implemented across USACE and NAVFAC.

2. Discussion: Based on input from industry, NAVFAC and USACE will still allow Offerors to submit PPQs with their proposal but will not require them to be sent directly from the client to the contracting office. In addition, NAVFAC and USACE will utilize a standard PPQ format for all requirements, when required as part of an evaluation. The standard PPQ form and process will allow Offerors to obtain clients’ completed PPQ at the completion of a contract or task order, and the Offeror may retain PPQs in its files for submission on future procurements. In cases where the validity of the completed PPQ is questioned, the contract specialist/contracting officer may contact the reference for verification or additional information. The standard PPQ for NAVFAC and USACE is Form PPQ-0 (9/30/11). NAVFAC/USACE does not intend to create and maintain a database of PPQs submitted by Offerors. Therefore, it will be the Offerors responsibility to insure the submission of the relevant PPQs in its files for each solicitation. Alternatively, the Offeror may obtain an updated/new PPQ from its client(s) for submission. This new process does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation as a source of information.

Also, as the completion of Contractor Performance Assessment Reports (CPARS) is required, Contracting Officers should search CPARS to determine if a relevant and recent evaluation is on file when one is not provided by the offeror. Recognizing CPARS evaluations are just one tool for assessing past performance, these evaluations are expected to be considered by the Contracting Officer. Discrepancies between CPARS evaluations and information provided in PPQs will be resolved by the Contracting Officer during the source selection evaluation process.

In completing the PPQ form, representatives that have direct knowledge of the Offerors past performance are encouraged to complete the PPQ (i.e., Administrative Contracting Officers, Contracting Officer Representatives, Project Engineers, etc., who had direct oversight/involvement with the project).

ACTIONS: Effective immediately, for all procurements that are using PPQs in the evaluation process:

1. Form PPQ-0 shall be utilized for all evaluations that require a PPQ. Offerors shall submit the PPQ with their proposal submission to the Contracting Office designated proposal submission location. The contract specialist or Contracting Officer shall not require the PPQ to be sent directly from the client. Solicitations that have previously been issued do not need to be amended to include this requirement.

2. RFPs utilizing PPQs shall incorporate language from the “Sample Solicitation Submittal Requirement” (below) stating, at a minimum, the following: “Completed Past Performance Questionnaires should be submitted with your proposal as required by RFP Section XXXXX. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. This does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. ”

NAVFAC / USACE Past Performance Questionnaire (PPQ) Form PPQ -0 (9/30/11)

3. When Past Performance Questionnaires are being permitted/sought, the following sample language will be tailored to the specific acquisition and included in the solicitation:

Sample Solicitation Submittal Requirement:

“The Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor ____ (insert the applicable factor number, usually as “Factor 4” and insert the factor title, usually “Past Performance for the Prime Contractor”). Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment _____), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, ______________ via email at ________________________ prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Also include performance recognition documents received within the last ____ (insert the number of years) such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.”

members to submit to the client for each project the offeror includes in its proposal for Factor:
to the Governments point of contact:
via email at:
Also include performance recognition documents received within the last:
Text2:

File details come from the government source that posted it. Updated .