This document outlines minimum materials, engineering, and construction requirements for replacing and relocating the heating, ventilating, and air conditioning systems at Jordan Crew Quarters in Montana. Key requirements include installing new energy efficient direct expansion heat pump systems using R410A refrigerant and sized to provide the necessary sensible and total cooling and heating capacities. The systems must be designed in accordance with applicable codes and standards including ASHRAE, SMACNA, and IECC. Ductwork must meet SMACNA guidelines and have no more than 5 feet of flexible duct. Controls must allow for unit circulation in compliance with ASHRAE 62.2. Testing and balancing of all air systems must be done per NEBB or AABC standards. A minimum 65% efficient heat recovery ventilator is also required for each air-to-air heat pump unit. Related to this is federal contract opportunity number 140L3624Q0012 for the Jordan FS Crew Quarters HVAC Relocation being conducted by the Department of the Interior Bureau of Land Management.

View the file

Other files for this federal contract opportunity

Other files attached to JORDAN FS CQ HVAC RELOCATION, newest first.
File Type Posted
Amendment_01_0001.pdf PDF
Sol_140L3624Q0012_Amd_0001.pdf PDF
Attachment_2_-_Scoping_Documents.pdf PDF
Attachment_7_-_Davis_Bacon_Wage_Rates.pdf PDF
Attachment_1_-_Statement_of_Work.pdf PDF
Attachment_4_-_Jordan_FS_Crew_Quarters_CD_Drawings.pdf PDF
Attachment_8_-_Past_Performance_Questionnaire.doc DOC document
Attachment_6_-_BLM_Codes_and_Standards_2023-04-01.pdf PDF
Sol_140L3624Q0012.pdf PDF
Attachment_5_-_Mech_Drawings_w-HRV.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JORDAN CREW QUARTERS HVAC REPLACEMENT & RELOCATION ATTACHMENT B-2

JORDAN, MONTANA

MINIMUM MATERIALS, ENGINEERING AND CONSTRUCTION REQUIREMENTS - Page 1

D30 Heating, Ventilating, and Air-Conditioning Performance Specifications

1.0 GENERAL REQUIREMENTS

The requirements indicated here are minimum performance requirements. The Contractor is encouraged to exceed the minimum requirements.

In general, unless otherwise indicated, provide all labor, equipment and materials necessary to complete the work required for the contract. All work must be in conformance with all applicable referenced criteria, construction standards, laws and regulations, including applicable building fire and life safety codes.

1.1 MATERIALS AND METHODS OF CONSTRUCTION

Only new materials and equipment are to be installed in the work. All materials, equipment and appliances must be of the current manufacturers' products. Do not use obsolete or discontinued materials, equipment, and appliances.

1.2 APPLICABLE CODES AND STANDARDS

The design and construction must be in accordance with established construction practices, and the latest revision/edition of the following referenced codes and standards. Reference to the "authority having jurisdiction" is to be construed to mean "Contracting Officer".

2021 International Mechanical Code (IMC)

2021 International Energy Conservation Code (IECC)

ASHRAE 62.2-2022, “Ventilation for Acceptable Indoor Air Quality in Residential Buildings” [https://www.ashrae.org/technical-resources/standards-and-guidelines/read-only-versions-of-ashrae-standards]

2005 Sheet Metal and Air Conditioning Contractors’ National Association (SMACNA), “HVAC Duct Construction Standards, Third Edition”.

1.3 EQUIPMENT SELECTION PARAMETERS

Outdoor Design Conditions: ASHRAE weather data for Jordan Airport, MT was used in the load calculations for the HVAC replacement project and is as follows:

Summer 99% condition: 92.5 deg F DB / 63.3 deg F WB

Winter 1% condition: -15.6 deg F

Load calculation results and BLM Basis of Design for this project is as shown in the table below.

Basis of Design product is a non-binding selection. Unit selected by the contractor shall provide

MINIMUM MATERIALS, ENGINEERING AND CONSTRUCTION REQUIREMENTS - Page 2 the minimum sensible and total cooling and heating capacities required. Unit manufacturer shall have maintenance service representation serving Jordan, MT, or the nearby area.

BLM Load Calculation Result BLM Basis of Design Equipment cfm Sensible Capacity

Reqd.

Total Capacity

Reqd.

Daikin FIT v2 Selection

FC-1/CU-1 1,130 Cooling: 24.6 MBH

Cooling: 26.0 MBH Heating: 36.8 MBH

AHU: DV36FECD14A

CU: DZ17VSA361B

With 14.4 kW ERH

FC-2/CU-2 1,261* Cooling: 26.6 MBH

Cooling: 28.1 MBH Heating: 38.3 MBH

AHU: DV48FECD14A*

CU: DZ17VSA421B

With 14.4 kW ERH

Note: * Plans indicate FC-2 supplies 1,700 cfm while the load calculations indicate that 1,261 cfm will suffice. To avoid complications with existing supply air distribution an AHU was selected that can supply closer to the existing cfm.

1.4 DISCREPANCIES

When discrepancies in the referenced standards and the contract requirements occur, the more stringent requirements govern. The word "should" in all NFPA publications is to be interpreted as a requirement. The Authority Having Jurisdiction in the interpretation of the codes and standards, and approving the exceptions allowed in the referenced standards, is the Contracting Officer, and the parties designated by the Contracting Officer.

MINIMUM MATERIALS, ENGINEERING AND CONSTRUCTION REQUIREMENTS - Page 3

2.0 PERFORMANCE TECHNICAL SPECIFICATIONS

D30 HEATING, VENTILATION AND AIR CONDITIONING (HVAC)

SYSTEMS

All equipment, appliances, ductwork and accessories must comply with applicable codes and standards. For small (less than 65,000 Btuh) air-cooled heat pumps, Energy Star requires a minimum 14 SEER, 11 EER, and 8.0 HSPF.

1. Equipment Clearance: Provide working space around all equipment. Provide all required fittings, connections and accessories required for a complete and usable system. All equipment shall be installed per the manufacturer's recommendations.

Where the word "should" is used in manufacturer's instructions, substitute the word "shall".

2. Material and Equipment Qualifications: All materials and equipment must have been in satisfactory commercial or industrial use for 2 years prior to the bid opening. The 2-year use must include applications of equipment and materials under similar circumstances and of similar size. The product must have been for sale on the commercial market through advertisements, manufacturer's catalogs, or brochures during the 2-year period.

3. Motors: Single-phase fractional-horsepower alternating-current motors must be high efficiency types corresponding to the applications listed in NEMA MG 11. Select polyphase motors based on high efficiency characteristics relative to the applications as listed in NEMA MG 10.

4. Equipment Support: Provide housekeeping pads and vibration isolators under all floor-mounted equipment.

5. Coatings: Mechanical equipment casings must have painted finishes that pass a salt-spray test conducted per ASTM B117 for duration of at least 500 hours.

6. Insulation: Insulate refrigerant piping and ductwork per 2021 International Energy

Conservation Code (IECC).

D303002 DIRECT EXPANSION SYSTEMS

1. Direct expansion systems: Provide units factory assembled, designed, tested, with ducted air distribution and rated in accordance with ARI 210/240 or ARI 340/360.

Refrigerant piping size must be per the manufacturer's recommendations. Insulate refrigerant piping suction lines and condensate drain.

2. Refrigerants: The use of Ozone Depleting Substances (ODS) as well as the qualifications and credentials of personnel servicing equipment that contains ODS is restricted. Refrigerants must have an Ozone Depletion Potential (ODP) of 0.0 with exception to R-123. The ODP must be in accordance with the "Montreal Protocol on Substances That Deplete the Ozone Layer", September 1987, as amended through 2000, sponsored by the United Nations Environment Programme.

MINIMUM MATERIALS, ENGINEERING AND CONSTRUCTION REQUIREMENTS - Page 4

3. Air-to-Air or Air-Cooled Heat Pump systems: The system must consist of heat pump units, controllers, fan coil units with electric resistance heat, filter section, and associated controls. The heat pump unit(s) must be inverter driven and must utilize R410A refrigerant.

Given the extreme cold condition and the required hours of heating in the crew quarters, BLM is interested in installing an air-to-air heat pump (AAHP) with the strong performance in cold weather. The provided AAHP shall be rated either as ENERGY STAR certified cold climate which requires testing down to 5 deg F or produce usable heat at -10 deg F according to the manufacturer’s testing documentation.

Provide fan coil with MERV 13 filtration and electric resistance heater capable of 100% of the calculated heating capacity. Include annual maintenance services as required to fulfill warranty requirements.

The system must be designed to provide the facility with year-round heating and cooling.

Provide manufacturer's minimum recommended clearance around condensing units and provide with a complete set of snow guards.

Insulate refrigerant piping suction lines and condensate drain. All refrigerant piping must be sized and installed in strict compliance with the manufacturer’s requirements.

Refrigerant piping must be clean, dry, and leak free. Prior to installation all refrigerant pipes must remain sealed. During installation and prior to filling, nitrogen must be used to maintain cleanliness and prevent oxidation and scaling while brazing.

D3040 DISTRIBUTION SYSTEMS

1. Ductwork: All ductwork must be provided in accordance with the latest SMACNA guidelines. Flexible duct lengths must not exceed 5 feet. Provide galvanized sheet metal ducts.

D3060 CONTROLS AND INSTRUMENTATION

1. General: Provide stand-alone controls for each heat pump system. Set the unit to circulate air to comply with ASHRAE 62.2-2022.

D3070 SYSTEMS TESTING AND BALANCING

All HVAC air systems, both new and retrofit, must be TABed in accordance with NEBB or AABC standards. As part of any TAB air balancing effort, acceptable air quantity variations must be 0 to +10% for supply air systems. Submit TAB results to Contracting Officer for review and approval.

D309090 OTHER SPECIAL MECHANICAL SYSTEMS

1. Heat Recovery Ventilator: Provide units factory assembled, designed, tested, and listed for service. Provide a minimum 65% heat recovery efficient heat recovery ventilator (HRV) for each air-to-air heat pump. HRV shall exchange heat between excess (not exhaust) air and outside air flow via crossflow polymer heat exchanger core with separate fan systems. Provide with minimum MERV 13 filtration.

HRV capacity and operation shall comply with ASHRAE 62.2. On-off control for each FC+HRV system(s) shall be provided on the occupant accessible hallway side of the

MINIMUM MATERIALS, ENGINEERING AND CONSTRUCTION REQUIREMENTS - Page 5

Mechanical Room wall in accordance with Section 4.4 of ASHRAE 62.2.