Attachment_2_-_Scoping_Documents.pdf
PDF 382 KB Posted
- Attached to
- JORDAN FS CQ HVAC RELOCATION Federal contract opportunity
- Solicitation number
- 140L3624Q0012
About this file
This document package includes scoping documents and architectural plans for the Jordan FS CQ HVAC Relocation project solicited under Solicitation Number 140L3624Q0012 by the Department of the Interior Bureau of Land Management. The project involves replacing and relocating HVAC equipment from the crawl space to the mechanical room of an existing building. Architectural plans show the demolition and framing changes needed to relocate an access door. Mechanical plans depict the proposed layout of new HRV units, fans, ductwork and controls in the crawl space and mechanical room. Ductwork will be reconnected to the existing system in the attic. Elevations illustrate the orientation of new equipment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_01_0001.pdf | ||
| Sol_140L3624Q0012_Amd_0001.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| Attachment_4_-_Jordan_FS_Crew_Quarters_CD_Drawings.pdf | ||
| Attachment_8_-_Past_Performance_Questionnaire.doc | DOC document | |
| Attachment_6_-_BLM_Codes_and_Standards_2023-04-01.pdf | ||
| Attachment_7_-_Davis_Bacon_Wage_Rates.pdf | ||
| Sol_140L3624Q0012.pdf | ||
| Attachment_3_-_Jordan_CQ_D30_HVAC.pdf | ||
| Attachment_5_-_Mech_Drawings_w-HRV.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MUD
ROOM
LAUNDRYRoom
KITCHEN
LIVINGDINING
BDRM BATH BATH BDRM BDRM BDRM BDRM BDRM
BDRMBDRMBDRMBDRM
BATHBATH
ELEC.
JAN.
HALL
MECH.
ROOM
OPEN PORCH
OPEN PORCH
A1
ENLARGED PLAN
NOTE: FLOOR PLAN IS FOR REFERENCE ONLY. REFER
TO ENLARGED PLANS FOR PROJECT INFORMATION
N
ATIO
N
AL O
PER
ATIO
N S C
EN
TER
-D B
S -B R
AN
C
H O
F AR
C
H
ITEC
TU
R
E &
EN
G
IN
EER
IN
G
B
LM
O C
-671 PLAN
N
IN
G
, D
ESIG
N & C
O N
STR
U
C
TIO
N
4/25/2023 10:25:16 AM
A0 - Overall Floor PlanJordan, MT CQ HVAC Replacement & Relocation
MECH.
ROOM
EXISTING CRAWL
ACCESS HATCH
EXISTING WATER
HEATERS TO REMAIN
HALLREMOVE EXISTING ACCESS
LADDER - REPLACE EXISTING
HATCH W/ FIXED PAINTED
DRYWALL PANEL & 1x4
PAINTED WOOD TRIM -
PROPOSED MECHANICAL
EQUIPMENT - REFER TO
MECHANICAL PLANS FOR
MORE INFORMATION
REMOVE EXISTING DOOR &
FRAME & SAVE FOR RE-USE
REINSTALL EXISTING DOOR
& FRAME. PATCH & FINISH
PROVIDE NEW ABA
COMPLIANT DOOR
THRESHOLD TO MEET
CARPET & TILE
4' - 8" CL PATCH & FILL WALL WHERE DOOR
IS TO BE REMOVED. MATCH WALL
THICKNESS & DRYWALL FINISH.
PAINT TO MATCH EXISTING COLOR.
PROVIDE TRIM INFILL TO MATCH
EXISTING
INSTALL NEW ATTIC ACCESS
HATCH - PROVIDE REMOVAL
PAINTED PLYWOOD HATCH W/ 1x4
WOOD FRAMING TO CONCEAL
EDGES. EXISTING INSULATION
FROM THIS LOCATION TO BE
RELOCATED ABOVE THE
ABANDONED HATCH LOCATION IN
THE MECHANICAL ROOM
A2 ELEVATIONS
N
ATIO
N
AL O
PER
ATIO
N S C
EN
TER
-D B
S -B R
AN
C
H O
F AR
C
H
ITEC
TU
R
E &
EN
G
IN
EER
IN
G
B
LM
O C
-671 PLAN
N
IN
G
, D
ESIG
N & C
O N
STR
U
C
TIO
N
4/25/2023 10:25:16 AM
A1 - Architectural Enlarged PlanJordan, MT CQ HVAC Replacement & Relocation 0 8 124
Graphic Scale (Feet)
Rx PORTION OF SILL PLATE
FOR NEW DOOR
INSTALLATION - VERIFY
ACTUAL DIMENSION W/
DOOR
Rx VERTICAL STUDS &
ASSOCIATED BLOCKING
AS NEEDED FOR NEW
DOOR
NOTES:
1. FRAMING AS SHOWN IS APPROXIMATE
AND MAY VARY FROM ACTUAL
CONDITIONS ON SITE. THE G.C. IS
RESPONSIBLE FOR CONFIRMING
SPACING OF STUDS WITHIN WALL, AS
WELL AS ENSURING THAT ALL ELEMENTS
OF THE WALL ARE NON-LOAD BEARING
PRIOR TO COMMENCING DEMOLITION.
LEGEND
TO BE DEMOLISHED
EXISTING FRAMING
NEW FRAMING
ABANDON EXISTING
DOOR FRAMING &
HEADER IN PLACE
FLOOR
CEILING
EXISTING
DOOR
OPENING
4' - 8"
CL
FIELD VERIFY WIDTH
N
ATIO
N
AL O
PER
ATIO
N S C
EN
TER
-D B
S -B R
AN
C
H O
F AR
C
H
ITEC
TU
R
E &
EN
G
IN
EER
IN
G
B
LM
O C
-671 PLAN
N
IN
G
, D
ESIG
N & C
O N
STR
U
C
TIO
N
A2 - Framing DEMOLITIONJordan, MT CQ HVAC Replacement & Relocation
FLOOR
CEILING
INSTALL NEW JACK
STUDS & KING STUDS
FOR NEW DOOR
INSTALL NEW NON-
STRUCTURAL 2X4
HEADER W/ (3) CRIPPLE
STUDS
INSTALL NEW STUDS W/
BLOCKING IN FORMER
DOOR OPENING - MAX
SPACING 16" O.C.
INSTALL NEW SILL PLATE
INFILL AT FORMER DOOR
LOCATION
NOTES:
1. FRAMING AS SHOWN IS APPROXIMATE
AND MAY VARY FROM ACTUAL
CONDITIONS ON SITE. THE G.C. IS
RESPONSIBLE FOR CONFIRMING
SPACING OF STUDS WITHIN WALL, AS
WELL AS ENSURING THAT ALL ELEMENTS
OF THE WALL ARE NON-LOAD BEARING
PRIOR TO COMMENCING DEMOLITION.
2. HORIZONTAL BLOCKING NOT SHOWN -
PROVIDE MIN. (1) STUD BLOCKING
BETWEEN VERTICAL MEMBERS
3. RE-USE EXISTING WALL INSULATION
LEGEND
TO BE DEMOLISHED
EXISTING FRAMING
NEW FRAMING
N
ATIO
N
AL O
PER
ATIO
N S C
EN
TER
-D B
S -B R
AN
C
H O
F AR
C
H
ITEC
TU
R
E &
EN
G
IN
EER
IN
G
B
LM
O C
-671 PLAN
N
IN
G
, D
ESIG
N & C
O N
STR
U
C
TIO
N
A3 - Framing PROPOSEDJordan, MT CQ HVAC Replacement & Relocation
22X8
M
X
26X10
110CFM
X
18X8
" D
IA
30X10 RETURN
DUCT
12X6
X 8 8 X
CFM 75
CFM10X4
SD
CFM
CFM10X4
SD
D
IA
0X4
22X 20X8
X 6 1 X
10X610X4
X
X
X
X
N
ATIO
N
AL O
PER
ATIO
N S C
EN
TER
-D B
S -B R
AN
C
H O
F AR
C
H
ITEC
TU
R
E &
EN
G
IN
EER
IN
G
B
LM
O C
-671 PLAN
N
IN
G
, D
ESIG
N & C
O N
STR
U
C
TIO
N
4/25/2023 9:30:01 AM
Scoping Document / M1 - Crawl SpaceJordan, MT CQ HVAC Replacement & Relocation
1/4" = 1'-0"1 Crawl Space Enlarged Plan
RECONNECT THIS
SUPPLY TO THE
MECHANICAL ROOM
RELOCATE TO
ACCOMODATE DOOR
MOVING OVER
UP TO FC-1
UP TO FC-2
CONNECT TO
EXISTING
CONNECT TO
EXISTING
PLAN ACTUAL
T
T
C C
CFM
CFM10X4
SD
C
EF-175
CFM
10X4
20X8
10X6
10X6
RETURN AIR INTAKE
FOR FC-1 HRV-1
RETURN AIR
INTAKE FOR
FC-2 HRV-2
FC-1 HRV-1
CONTROLLER
FC-2 HRV-2
CONTROLLER
N
ATIO
N
AL O
PER
ATIO
N S C
EN
TER
-D B
S -B R
AN
C
H O
F AR
C
H
ITEC
TU
R
E &
EN
G
IN
EER
IN
G
B
LM
O C
-671 PLAN
N
IN
G
, D
ESIG
N & C
O N
STR
U
C
TIO
N
4/25/2023 9:30:05 AM
M2 - Mech Rm Enlarged PlanJordan, MT CQ HVAC Replacement & Relocation
1/4" = 1'-0"1 Mech Rm Enl Plan
HRV-1 OA INTAKE UP
HRV-1 EA OUTLET UP
FC-1
FC-2
HRV-2 OA INTAKE UP
HRV-2 EA OUTLET UP
HRV-2 OA
CONNECTION TO
RETURN AIR
UPSTREAM OF FC
INTAKE
HRV-1 OA CONNECTION TO RETURN AIR
UPSTREAM OF FC INTAKE
HRV-1
HRV-2
ROUTE DUCT BTWN
LIGHTS
PLAN ACTUAL
RECONNECT ALL HRV DUCTS AT
CEILING TO DUCT IN ATTIC (TYP 4)
FIRST FLOOR
0' - 0"
CEILING
8' - 0"
CRAWL
-5' - 1 5/8"
First Floor 0' - 0"
FIRST FLOOR
0' - 0"
CEILING
8' - 0"
CRAWL
-5' - 1 5/8"
CRAWL
-5' - 1 5/8"
Crawl Space -5' - 1 5/8"
N
ATIO
N
AL O
PER
ATIO
N S C
EN
TER
-D B
S -B R
AN
C
H O
F AR
C
H
ITEC
TU
R
E &
EN
G
IN
EER
IN
G
B
LM
O C
-671 PLAN
N
IN
G
, D
ESIG
N & C
O N
STR
U
C
TIO
N
4/25/2023 9:30:09 AM
M3 - Mech Rm Elevations AJordan, MT CQ HVAC Replacement & Relocation
1/4" = 1'-0"1 MECH RM LOOKING W
1/4" = 1'-0"2 MECH RM LOOKING N
HRV-1
HRV-2
FC-2
FIRST FLOOR
0' - 0"
CEILING
8' - 0"
CRAWL
-5' - 1 5/8"
CRAWL
-5' - 1 5/8"
FIRST FLOOR
0' - 0"
CEILING
8' - 0"
CRAWL
-5' - 1 5/8"
CRAWL
-5' - 1 5/8"
Crawl Space -5' - 1 5/8"
N
ATIO
N
AL O
PER
ATIO
N S C
EN
TER
-D B
S -B R
AN
C
H O
F AR
C
H
ITEC
TU
R
E &
EN
G
IN
EER
IN
G
B
LM
O C
-671 PLAN
N
IN
G
, D
ESIG
N & C
O N
STR
U
C
TIO
N
4/25/2023 9:30:13 AM
M4 - Mech Rm Elevations BJordan, MT CQ HVAC Replacement & Relocation
1/4" = 1'-0"1 MECH RM LOOKING E
1/4" = 1'-0"2 MECH RM LOOKING S
FC-1 DOWNFLOW
ORIENTATION
FC-2 DOWNFLOW
ORIENTATION
HRV-2
HRV-1
WIDE DUCTS TO FIT BTWN
FLR JOISTS (TYP)
| Attachment A - Scoping Docs ARCH |
| Sheets |
| A0 - A0 - Overall Floor Plan |
| A1 - A1 - Architectural Enlarged Plan |
| A2 - A2 - Framing DEMOLITION |
| A3 - A3 - Framing PROPOSED |
| Jordan CQ Furnace Mech Att A Final |
| MT-Jordan CQ Mech - Sheet - M1 - Scoping Document - M1 - Crawl Space |
| Sheets |
| M1 - Scoping Document / M1 - Crawl Space |
| M2 - M2 - Mech Rm Enlarged Plan |
| M3 - M3 - Mech Rm Elevations A |
| M4 - M4 - Mech Rm Elevations B |
| MT-Jordan CQ Mech - Sheet - M2 - M2 - Mech Rm Enlarged Plan |
| Sheets |
| M1 - Scoping Document / M1 - Crawl Space |
| M2 - M2 - Mech Rm Enlarged Plan |
| M3 - M3 - Mech Rm Elevations A |
| M4 - M4 - Mech Rm Elevations B |
| MT-Jordan CQ Mech - Sheet - M3 - M3 - Mech Rm Elevations A |
| Sheets |
| M1 - Scoping Document / M1 - Crawl Space |
| M2 - M2 - Mech Rm Enlarged Plan |
| M3 - M3 - Mech Rm Elevations A |
| M4 - M4 - Mech Rm Elevations B |
| MT-Jordan CQ Mech - Sheet - M4 - M4 - Mech Rm Elevations B |
| Sheets |
| M1 - Scoping Document / M1 - Crawl Space |
| M2 - M2 - Mech Rm Enlarged Plan |
| M3 - M3 - Mech Rm Elevations A |
| M4 - M4 - Mech Rm Elevations B |
File details come from the government source that posted it. Updated .