Attachment_2_-_Scoping_Documents.pdf

PDF 382 KB Posted

Attached to
JORDAN FS CQ HVAC RELOCATION Federal contract opportunity
Solicitation number
140L3624Q0012
Issued by
Department of the Interior Bureau of Land Management

About this file

This document package includes scoping documents and architectural plans for the Jordan FS CQ HVAC Relocation project solicited under Solicitation Number 140L3624Q0012 by the Department of the Interior Bureau of Land Management. The project involves replacing and relocating HVAC equipment from the crawl space to the mechanical room of an existing building. Architectural plans show the demolition and framing changes needed to relocate an access door. Mechanical plans depict the proposed layout of new HRV units, fans, ductwork and controls in the crawl space and mechanical room. Ductwork will be reconnected to the existing system in the attic. Elevations illustrate the orientation of new equipment.

View the file

Other files for this federal contract opportunity

Other files attached to JORDAN FS CQ HVAC RELOCATION, newest first.
File Type Posted
Amendment_01_0001.pdf PDF
Sol_140L3624Q0012_Amd_0001.pdf PDF
Attachment_1_-_Statement_of_Work.pdf PDF
Attachment_4_-_Jordan_FS_Crew_Quarters_CD_Drawings.pdf PDF
Attachment_8_-_Past_Performance_Questionnaire.doc DOC document
Attachment_6_-_BLM_Codes_and_Standards_2023-04-01.pdf PDF
Attachment_7_-_Davis_Bacon_Wage_Rates.pdf PDF
Sol_140L3624Q0012.pdf PDF
Attachment_3_-_Jordan_CQ_D30_HVAC.pdf PDF
Attachment_5_-_Mech_Drawings_w-HRV.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MUD

ROOM

LAUNDRYRoom

KITCHEN

LIVINGDINING

BDRM BATH BATH BDRM BDRM BDRM BDRM BDRM

BDRMBDRMBDRMBDRM

BATHBATH

ELEC.

JAN.

HALL

MECH.

ROOM

OPEN PORCH

OPEN PORCH

A1

ENLARGED PLAN

NOTE: FLOOR PLAN IS FOR REFERENCE ONLY. REFER

TO ENLARGED PLANS FOR PROJECT INFORMATION

N

ATIO

N

AL O

PER

ATIO

N S C

EN

TER

-D B

S -B R

AN

C

H O

F AR

C

H

ITEC

TU

R

E &

EN

G

IN

EER

IN

G

B

LM

O C

-671 PLAN

N

IN

G

, D

ESIG

N & C

O N

STR

U

C

TIO

N

4/25/2023 10:25:16 AM

A0 - Overall Floor PlanJordan, MT CQ HVAC Replacement & Relocation

MECH.

ROOM

EXISTING CRAWL

ACCESS HATCH

EXISTING WATER

HEATERS TO REMAIN

HALLREMOVE EXISTING ACCESS

LADDER - REPLACE EXISTING

HATCH W/ FIXED PAINTED

DRYWALL PANEL & 1x4

PAINTED WOOD TRIM -

PROPOSED MECHANICAL

EQUIPMENT - REFER TO

MECHANICAL PLANS FOR

MORE INFORMATION

REMOVE EXISTING DOOR &

FRAME & SAVE FOR RE-USE

REINSTALL EXISTING DOOR

& FRAME. PATCH & FINISH

PROVIDE NEW ABA

COMPLIANT DOOR

THRESHOLD TO MEET

CARPET & TILE

4' - 8" CL PATCH & FILL WALL WHERE DOOR

IS TO BE REMOVED. MATCH WALL

THICKNESS & DRYWALL FINISH.

PAINT TO MATCH EXISTING COLOR.

PROVIDE TRIM INFILL TO MATCH

EXISTING

INSTALL NEW ATTIC ACCESS

HATCH - PROVIDE REMOVAL

PAINTED PLYWOOD HATCH W/ 1x4

WOOD FRAMING TO CONCEAL

EDGES. EXISTING INSULATION

FROM THIS LOCATION TO BE

RELOCATED ABOVE THE

ABANDONED HATCH LOCATION IN

THE MECHANICAL ROOM

A2 ELEVATIONS

N

ATIO

N

AL O

PER

ATIO

N S C

EN

TER

-D B

S -B R

AN

C

H O

F AR

C

H

ITEC

TU

R

E &

EN

G

IN

EER

IN

G

B

LM

O C

-671 PLAN

N

IN

G

, D

ESIG

N & C

O N

STR

U

C

TIO

N

4/25/2023 10:25:16 AM

A1 - Architectural Enlarged PlanJordan, MT CQ HVAC Replacement & Relocation 0 8 124

Graphic Scale (Feet)

Rx PORTION OF SILL PLATE

FOR NEW DOOR

INSTALLATION - VERIFY

ACTUAL DIMENSION W/

DOOR

Rx VERTICAL STUDS &

ASSOCIATED BLOCKING

AS NEEDED FOR NEW

DOOR

NOTES:

1. FRAMING AS SHOWN IS APPROXIMATE

AND MAY VARY FROM ACTUAL

CONDITIONS ON SITE. THE G.C. IS

RESPONSIBLE FOR CONFIRMING

SPACING OF STUDS WITHIN WALL, AS

WELL AS ENSURING THAT ALL ELEMENTS

OF THE WALL ARE NON-LOAD BEARING

PRIOR TO COMMENCING DEMOLITION.

LEGEND

TO BE DEMOLISHED

EXISTING FRAMING

NEW FRAMING

ABANDON EXISTING

DOOR FRAMING &

HEADER IN PLACE

FLOOR

CEILING

EXISTING

DOOR

OPENING

4' - 8"

CL

FIELD VERIFY WIDTH

N

ATIO

N

AL O

PER

ATIO

N S C

EN

TER

-D B

S -B R

AN

C

H O

F AR

C

H

ITEC

TU

R

E &

EN

G

IN

EER

IN

G

B

LM

O C

-671 PLAN

N

IN

G

, D

ESIG

N & C

O N

STR

U

C

TIO

N

A2 - Framing DEMOLITIONJordan, MT CQ HVAC Replacement & Relocation

FLOOR

CEILING

INSTALL NEW JACK

STUDS & KING STUDS

FOR NEW DOOR

INSTALL NEW NON-

STRUCTURAL 2X4

HEADER W/ (3) CRIPPLE

STUDS

INSTALL NEW STUDS W/

BLOCKING IN FORMER

DOOR OPENING - MAX

SPACING 16" O.C.

INSTALL NEW SILL PLATE

INFILL AT FORMER DOOR

LOCATION

NOTES:

1. FRAMING AS SHOWN IS APPROXIMATE

AND MAY VARY FROM ACTUAL

CONDITIONS ON SITE. THE G.C. IS

RESPONSIBLE FOR CONFIRMING

SPACING OF STUDS WITHIN WALL, AS

WELL AS ENSURING THAT ALL ELEMENTS

OF THE WALL ARE NON-LOAD BEARING

PRIOR TO COMMENCING DEMOLITION.

2. HORIZONTAL BLOCKING NOT SHOWN -

PROVIDE MIN. (1) STUD BLOCKING

BETWEEN VERTICAL MEMBERS

3. RE-USE EXISTING WALL INSULATION

LEGEND

TO BE DEMOLISHED

EXISTING FRAMING

NEW FRAMING

N

ATIO

N

AL O

PER

ATIO

N S C

EN

TER

-D B

S -B R

AN

C

H O

F AR

C

H

ITEC

TU

R

E &

EN

G

IN

EER

IN

G

B

LM

O C

-671 PLAN

N

IN

G

, D

ESIG

N & C

O N

STR

U

C

TIO

N

A3 - Framing PROPOSEDJordan, MT CQ HVAC Replacement & Relocation

22X8

M

X

26X10

110CFM

X

18X8

" D

IA

30X10 RETURN

DUCT

12X6

X 8 8 X

CFM 75

CFM10X4

SD

CFM

CFM10X4

SD

D

IA

0X4

22X 20X8

X 6 1 X

10X610X4

X

X

X

X

N

ATIO

N

AL O

PER

ATIO

N S C

EN

TER

-D B

S -B R

AN

C

H O

F AR

C

H

ITEC

TU

R

E &

EN

G

IN

EER

IN

G

B

LM

O C

-671 PLAN

N

IN

G

, D

ESIG

N & C

O N

STR

U

C

TIO

N

4/25/2023 9:30:01 AM

Scoping Document / M1 - Crawl SpaceJordan, MT CQ HVAC Replacement & Relocation

1/4" = 1'-0"1 Crawl Space Enlarged Plan

RECONNECT THIS

SUPPLY TO THE

MECHANICAL ROOM

RELOCATE TO

ACCOMODATE DOOR

MOVING OVER

UP TO FC-1

UP TO FC-2

CONNECT TO

EXISTING

CONNECT TO

EXISTING

PLAN ACTUAL

T

T

C C

CFM

CFM10X4

SD

C

EF-175

CFM

10X4

20X8

10X6

10X6

RETURN AIR INTAKE

FOR FC-1 HRV-1

RETURN AIR

INTAKE FOR

FC-2 HRV-2

FC-1 HRV-1

CONTROLLER

FC-2 HRV-2

CONTROLLER

N

ATIO

N

AL O

PER

ATIO

N S C

EN

TER

-D B

S -B R

AN

C

H O

F AR

C

H

ITEC

TU

R

E &

EN

G

IN

EER

IN

G

B

LM

O C

-671 PLAN

N

IN

G

, D

ESIG

N & C

O N

STR

U

C

TIO

N

4/25/2023 9:30:05 AM

M2 - Mech Rm Enlarged PlanJordan, MT CQ HVAC Replacement & Relocation

1/4" = 1'-0"1 Mech Rm Enl Plan

HRV-1 OA INTAKE UP

HRV-1 EA OUTLET UP

FC-1

FC-2

HRV-2 OA INTAKE UP

HRV-2 EA OUTLET UP

HRV-2 OA

CONNECTION TO

RETURN AIR

UPSTREAM OF FC

INTAKE

HRV-1 OA CONNECTION TO RETURN AIR

UPSTREAM OF FC INTAKE

HRV-1

HRV-2

ROUTE DUCT BTWN

LIGHTS

PLAN ACTUAL

RECONNECT ALL HRV DUCTS AT

CEILING TO DUCT IN ATTIC (TYP 4)

FIRST FLOOR

0' - 0"

CEILING

8' - 0"

CRAWL

-5' - 1 5/8"

First Floor 0' - 0"

FIRST FLOOR

0' - 0"

CEILING

8' - 0"

CRAWL

-5' - 1 5/8"

CRAWL

-5' - 1 5/8"

Crawl Space -5' - 1 5/8"

N

ATIO

N

AL O

PER

ATIO

N S C

EN

TER

-D B

S -B R

AN

C

H O

F AR

C

H

ITEC

TU

R

E &

EN

G

IN

EER

IN

G

B

LM

O C

-671 PLAN

N

IN

G

, D

ESIG

N & C

O N

STR

U

C

TIO

N

4/25/2023 9:30:09 AM

M3 - Mech Rm Elevations AJordan, MT CQ HVAC Replacement & Relocation

1/4" = 1'-0"1 MECH RM LOOKING W

1/4" = 1'-0"2 MECH RM LOOKING N

HRV-1

HRV-2

FC-2

FIRST FLOOR

0' - 0"

CEILING

8' - 0"

CRAWL

-5' - 1 5/8"

CRAWL

-5' - 1 5/8"

FIRST FLOOR

0' - 0"

CEILING

8' - 0"

CRAWL

-5' - 1 5/8"

CRAWL

-5' - 1 5/8"

Crawl Space -5' - 1 5/8"

N

ATIO

N

AL O

PER

ATIO

N S C

EN

TER

-D B

S -B R

AN

C

H O

F AR

C

H

ITEC

TU

R

E &

EN

G

IN

EER

IN

G

B

LM

O C

-671 PLAN

N

IN

G

, D

ESIG

N & C

O N

STR

U

C

TIO

N

4/25/2023 9:30:13 AM

M4 - Mech Rm Elevations BJordan, MT CQ HVAC Replacement & Relocation

1/4" = 1'-0"1 MECH RM LOOKING E

1/4" = 1'-0"2 MECH RM LOOKING S

FC-1 DOWNFLOW

ORIENTATION

FC-2 DOWNFLOW

ORIENTATION

HRV-2

HRV-1

WIDE DUCTS TO FIT BTWN

FLR JOISTS (TYP)

Attachment A - Scoping Docs ARCH
Sheets
A0 - A0 - Overall Floor Plan
A1 - A1 - Architectural Enlarged Plan
A2 - A2 - Framing DEMOLITION
A3 - A3 - Framing PROPOSED
Jordan CQ Furnace Mech Att A Final
MT-Jordan CQ Mech - Sheet - M1 - Scoping Document - M1 - Crawl Space
Sheets
M1 - Scoping Document / M1 - Crawl Space
M2 - M2 - Mech Rm Enlarged Plan
M3 - M3 - Mech Rm Elevations A
M4 - M4 - Mech Rm Elevations B
MT-Jordan CQ Mech - Sheet - M2 - M2 - Mech Rm Enlarged Plan
Sheets
M1 - Scoping Document / M1 - Crawl Space
M2 - M2 - Mech Rm Enlarged Plan
M3 - M3 - Mech Rm Elevations A
M4 - M4 - Mech Rm Elevations B
MT-Jordan CQ Mech - Sheet - M3 - M3 - Mech Rm Elevations A
Sheets
M1 - Scoping Document / M1 - Crawl Space
M2 - M2 - Mech Rm Enlarged Plan
M3 - M3 - Mech Rm Elevations A
M4 - M4 - Mech Rm Elevations B
MT-Jordan CQ Mech - Sheet - M4 - M4 - Mech Rm Elevations B
Sheets
M1 - Scoping Document / M1 - Crawl Space
M2 - M2 - Mech Rm Enlarged Plan
M3 - M3 - Mech Rm Elevations A
M4 - M4 - Mech Rm Elevations B

File details come from the government source that posted it. Updated .