This solicitation requests quotations for ship repair services for the USCGC THUNDER BAY. The Coast Guard seeks a contractor to perform drydock repairs from April 11 to June 20, 2023 at their facilities. Services include repairs listed in the specification and scope of work attachments. The solicitation is set aside for small businesses with less than 1,250 employees and will result in a firm fixed-price contract awarded by February 3, 2023. Questions are due by December 6 and quotations by December 9. The homeport for the cutter is in Rockland, Maine.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 USCGC THUNDER BAY DD.pdf | ||
| Attachment 1 - SOS.xls | XLS spreadsheet | |
| Attachment 3 - Past Performance Information Form.docx | DOCX document | |
| J and A Vest Davit Redacted.pdf | ||
| J and A Wartsila Tech Redacted.pdf | ||
| Attachment 4 - Request for Clarification Form.docx | DOCX document | |
| CGC THUNDER BAY DD FY23 - Combined Synopsis Solicitation.doc | DOC document | |
| Attachment 5 - USCG Ombudsman Notice.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC THUNDER BAY (WTGB 108)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2023
Developed By: Johnny B Thomas (Rev-0, 22-Sep-2022)
TABLE OF CONTENTS
ivRevisions Record vConsolidated List of References ixConsolidated List of Government-furnished Property xiConsolidated List of Critical Inspection Items xiiPrincipal Characteristics - Tug, IceBreaking
1General Requirements
12WORK ITEM 1: Hull Plating, Side Scan, Ultrasonic Testing
16WORK ITEM 2: Hull Plating, U/W Body, Inspect
20WORK ITEM 3: U/W Body, Preserve, 100 percent
24WORK ITEM 4: Hull Plating Freeboard, Preserve, Partial
28WORK ITEM 5: Hull Plating Freeboard, Preserve, 100 Percent
31WORK ITEM 6: Bubbler Channels, Inspect
33WORK ITEM 7: Appendages, U/W, Leak Test
36WORK ITEM 8: Propulsion Shaft Rope Guards, Inspect
38WORK ITEM 9: Appendages, U/W, Internal, Preserve
40WORK ITEM 10: Tank (Water Mist), Clean And Inspect
43WORK ITEM 11: Chain Lockers, Clean and Inspect
45WORK ITEM 12: Tanks, MP Fuel Stowage and Overflow, Clean and Inspect
49WORK ITEM 13: Tanks, MP Fuel Service, Clean and Inspect
53WORK ITEM 14: Tanks, Potable Water, Clean and Inspect
56WORK ITEM 15: Tanks, Ballast, Clean and Inspect
59WORK ITEM 16: Tanks, Dirty Oil and Waste, Clean and Inspect
62WORK ITEM 17: Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew
66WORK ITEM 18: Propulsion Shafting; Remove, Inspect, and Reinstall
71WORK ITEM 19: Propulsion Shaft Bearings, External, Check Clearances
73WORK ITEM 20: Stern Tube Interior Surfaces, Preserve, 100 Percent
7WORK ITEM 21: Propeller , Remove, Inspect, and Reinstall
80WORK ITEM 22: Propeller, Minor Repairs and Reconditioning, Perform
84WORK ITEM 23: Circuit Breakers (60 Hz), Inspect and Test
88WORK ITEM 24: Fathometer Transducer, Renew
92WORK ITEM 25: Sea Valves and Waster Pieces, Overhaul Or Renew
98WORK ITEM 26: Sea Strainers, Simplex, All Sizes, Clean and Inspect
101WORK ITEM 27: Rudder Assembly, Remove, Inspect And Reinstall
106WORK ITEM 28: Anchor Chains and Ground Tackle, Inspect and Repair
114WORK ITEM 29: Grey Water Holding Tanks, Clean and Inspect
118WORK ITEM 30: Tank (Water Mist), Preserve (100%)
121WORK ITEM 31: Tanks, Ballast, Preserve, 100 Percent
124WORK ITEM 32: Tanks, Ballast, Preserve, Partial
127WORK ITEM 33: Chain Locker, Preserve, 100 Percent
129WORK ITEM 34: Chain Lockers, Preserve, Partial
131WORK ITEM 35: Tanks, Dirty Oil and Waste, Preserve, 100 Percent, 134WORK ITEM 36: Tanks, Dirty Oil and Waste, Preserve, Partial, 137WORK ITEM 37: Tanks, Grey Water Holding, Preserve, 100 Percent
140WORK ITEM 38: Tanks, MP Fuel Service, Preserve, Partial
144WORK ITEM 39: Tanks, MP Fuel Storage and Overflow, Preserve, Partial
148WORK ITEM 40: Tanks, MP Fuel Storage and Overflow, Preserve 100 Percent
152WORK ITEM 41: Tanks, Potable Water Preserve, 100 Percent
156WORK ITEM 42: Tanks, Potable Water, Preserve, Partial, 160WORK ITEM 43: Cathodic Protection, Zinc Anodes, Renew, 163WORK ITEM 44: Drydock
168WORK ITEM 45: Temporary Services, Provide - Tender
171WORK ITEM 46: Sea Trial Performance, Support, Provide
175WORK ITEM 47: Bilges, Preserve
177WORK ITEM 48: Seawater Temperature Control Valves and Controller, Replace
183WORK ITEM 49: Both Main Deisel and Generator Resilient Mount, Renew
WORK ITEM 50: Propulsion Shaft Bearings (Upper and Lower), Renew 197WORK ITEM 51: Point of Use Potable Water Filters, Install
200WORK ITEM 52: Single Point Davit, Inspect and Service
205WORK ITEM 53: Decks – Topside, Exterior, 100% Renew (“Flight Deck Non-Skid System”)
WORK ITEM 54: Lifelines and Stanchions, Renew…………………………………………………….210 WORK ITEM 55: Boat Cleats Install…...……………………………………………………………….213 WORK ITEM 56: Boat Deck Lighting, Install……………………………….………………………….216 WORK ITEM 57: Fan Room, Preserve…………………………………...……………………………..224
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 140 WTGB 111-001, Rev -, Shell Expansion
Coast Guard Drawing 140 WTGB 114-001, Rev D, Rudder Guard Coast Guard Drawing 140 WTGB 114-002, Rev -, Bubbler Structure
Coast Guard Drawing 140 WTGB 114-003, Rev -, Rudder Guard
Coast Guard Drawing 140 WTGB 116-001, Rev -, Longitudinal Framing and Side Girder
Coast Guard Drawing 140 WTGB 117-001, Rev -, Transverse Frames
Coast Guard Drawing 140 WTGB 120-001, Rev -, Structural Bulkheads
Coast Guard Drawing 140 WTGB 123-002, Rev B, Structural Mods Incidental to Water Mist Tank 4-24-1-W
Coast Guard Drawing 140 WTGB 149-001, Rev -, Tank Tops and Flats
Coast Guard Drawing 140 WTGB 182-002, Rev -, Foundations, Engine Room & Strainer Compartment FDN Motor Room 4-61-0-E
Coast Guard Drawing 140 WTGB 184-003, Rev -, Fathometer Transducer Install
Coast Guard Drawing 140 WTGB 192-001, Rev -, Compartment Testing Diagram
Coast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement
Coast Guard Drawing 140 WTGB 233-001, Rev -, Sway Brace, Propulsion Diesel Coast Guard Drawing 140 WTGB 243-002, Rev B, Propulsion Shafting Arrangement
Coast Guard Drawing 140 WTGB 243-003, Rev -, Stern Tube Seal (TYPE FSE)
Coast Guard Drawing 140 WTGB 245-002, Rev A, Propeller & Offsets 140 Ft Wytm Cutter (All)
Coast Guard Drawing 140 WTGB 245-003, Rev -, One Single Blade 140 Ft Wytm Cutter Alum Patt
Coast Guard Drawing 140 WTGB 256-001, Rev A, Sea Water Circulating Cooling System Diagram
Coast Guard Drawing 140 WTGB-320-001, Rev L, Power System One-Line Wiring Diagram
Coast Guard Drawing 140 WTGB 401-001, Pilothouse Arrangement
Coast Guard Drawing 140 WTGB 426-001, Gyrocompass Ripout/Instl, Arr, Wiring & Details
Coast Guard Drawing 140-WTGB 514-001, Rev A, HVAC Diagram Incidental to Chill Water Install
Coast Guard Drawing 140 WTGB 521-002, Rev -, Firemain System, Arrangements and Details Coast Guard Drawing 140 WTGB 521-003, Rev A, Firemain, System Diagram Coast Guard Drawing 140 WTGB 528-002, Rev -, Sanitary & Deck Drains Diag
Coast Guard Drawing 140 WTGB 528-003, Rev -, Sanitary & Deck Drains A&D
Coast Guard Drawing 140 WTGB 528-004, Rev -, Grey Water Mods & Tank Transition
Coast Guard Drawing 140 WTGB 529-002, Rev -, Bilge and Clean Ballast, System Diagram Coast Guard Drawing 140 WTGB 529-004, Rev -, Bilge and Ballast, Arrangements and Details Coast Guard Drawing FL 533-001, Rev B, Placard Potable Water Flush Coast Guard Drawing FL 533-002, Rev A, Point of Use Water Filter Install
Coast Guard Drawing 140 WTGB 533-003, Rev A, Potable Water System Diagram Coast Guard Drawing 140 WTGB 555-002, Rev C, Water Mist System Installation A&D
Coast Guard Drawing 140 WTGB 555-004, Rev C, Water Mist System Diagram
Coast Guard Drawing 140 WTGB 561-001, Steering System Control, Alarms & Autopilot
Coast Guard Drawing 140 WTGB 562-001, Rev -, Rudder Coast Guard Drawing 140 WTGB 562-002, Rev E, Rudder Stock Bearing Details
Coast Gard Drawing 140 WTGB 581-001, Rev -, Anchor Handling A & D Coast Guard Drawing 140 WTGB 612-001, Rev -, Liferails, A&D
Coast Guard Drawing 140 WTGB 633-001, Rev -, Cathodic Protection
Coast Guard Drawing 140 WTGB 801-001, Rev B, Outboard Profile
Coast Guard Drawing 140 WTGB 801-003, Rev -, Booklets of General Plans
Coast Guard Drawing 140 WTGB 801-004, Rev -, General Arrangement Below Main Deck Coast Guard Drawing 140 WTGB 801-005, General Arrangement Main Deck & Above
Coast Guard Drawing 140 WTGB 801-008, Rev -, Docking Plan
Coast Guard Drawing 140 WTGB 801-009, Rev -, Curves of Form Coast Guard Drawing 140 WTGB 839-002, Rev -, Lines and Offsets Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly Coast Guard Drawing FL 533-001, Rev B, Placard Potable Water Flush Coast Guard Drawing FL 533-002, Rev A, Point of Use Water Filter Install
Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes WYTM Line shaft Alignment Analysis, Report No. 7715, 12/27/77
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Coast Guard Technical Publication (TP) E-423-029, Integrated & Fluxgate Heading Sensors - Model PG-500 & C-500 - Operator's Manual
Coast Guard Technical Publication (TP) 3478, Dec 2020, Manufacturer's Instruction Book-SWBS Group(s) 324 Coast Guard Technical Publication (TP) 4593C, 25-JAN-08, Seal, Shaft - Type F.S.E Coast Guard Technical Publication (TP) 4674A, AutoPilot – Pilotstar D – Type AP02-S01
Coast Guard Technical Publication (TP) 6451 Remote Display Unit- Model RD-33 Coast Guard Technical Publication (TP) 10000, May 2015, Manufacturer's Instruction Book - SWBS Group(s) 583, Single Point Davit, – Model PLA-2000
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2020, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2020, Temporary Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2020, Temporary Hull Accesses
OTHER REFERENCES
American Bureau of Shipping (ABS) 2, Rule Requirements for Survey After Construction, 2014, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings American Bureau of Shipping (ABS) Approved Chain, Accessory and Bar Manufacturing Facilities List, Oct 2016 American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2020, Recommended Practice for Personal Qualification and Certification in Nondestructive Testing American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and Welding End APM: If work is being done in DD, no cofferdam is needed; delete cofferdam protective measures paragraph 3.1.3 and above NAVSEA ref. Above NAVSEA ref is accessible on-line ASTM International (ASTM) B280, 2008, Standard Specification for Seamless Copper Tube for Air Conditioning and Refrigeration Field Service ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D3951, Reapproved 2010, Standard Practice for Commercial Packaging ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component Adhesives (AN) ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-Petrolatum Commercial Item Description (CID) A-A-59316, Nov 2016, Abrasive Materials for Blasting Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper-Aluminum Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, And Structural and Special Shaped Sections Federal Specification (Fed Spec) RR-C-271, Rev E, Mar 2016, Chains and Attachments, Carbon and Alloy Steel International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-58, 2009, Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2020 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418) MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning MIL-C-24633, Oct 2014, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of Reliability Is Required MIL-DTL-23549, Sep 2016, Grease, General Purpose MIL-PRF-1149, Rev D; Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness, 6/10/98 MIL-PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application MIL-PRF-24647, Jan 2020, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited) Military Standard MIL-S-19622/17D, Dec 1992, Stuffing Tube, Nylon, and Packing Assemblies, General Specification Military Standard MIL-STD-2003/3A (SH), Sep 2009, Electrical Plant Installation Standard Methods for Surface Ships and Submarines National Electrical Manufacturers Association (NEMA) Stds, Pub. No. AB4, 2017, Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit Breakers Used in Commercial and Industrial Applications Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-PRO-160, Nov 2011, Chapter 16, Cofferdams Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183B, 2019, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets Society of Automotive Engineers (SAE) AMS-G-6032, August 2012, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power-Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Metal Blast Cleaning Underwriters Laboratories Inc. (UL) 489, May 2016, Molded Case Circuit Breaker Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 17 |
| N |
| Wartsila FSE H76463-01 Major Overhaul Kit PN: WLP001419-001 |
| NSN: 2010-01-540-3303 |
| 1 ea. |
| 22,217.10 |
| 18 |
| Y |
| **Propeller shaft |
| NSN: 2010-01-089-8123 |
| 1 ea. |
| 7,874.50 |
| 21 |
| Y |
| **Propeller |
| NSN: 2010-01-078-8216 |
| 1 ea. |
| 42,842.00 |
| 24 |
| N |
| ***Fathometer Transducer, Shallow Water, 50-200 kHz |
| NSN: 5845-01-470-2500 |
| 1 ea. |
| 343.63 |
| 27 |
| Y |
| **Rudder |
| NSN: 2040-01-115-3498 |
| 1 ea. |
| 186,806.00 |
| 27 |
| Y |
| **Rudder Stock |
| NSN: 2040-01-115-5203 |
| 1 ea. |
| 56,742.00 |
| 44 |
| N |
| *Transducer Cover Plate |
| N/A |
| 1 ea. |
| 50.00 |
| 48 |
| Y |
| Leslie Valve: 8” IPS 3- Way Rotary Valve, RVB, 150#/220 Deg. (F) Bronze Body/Trim, Air Acting, Port A Open |
| 3395-1JSZ |
| 1 ea. |
| 21,195.00 |
| 48 |
| Y |
| 8” IPS 3- Way Rotary Valve, RVB, 150#/220 Deg. (F) Bronze Body/Trim, Air Acting, 8” Bronze Body/Trim, Port B Open |
| 3395-JT2N |
| 1 ea. |
| 21,195.00 |
| 48 |
| Y |
| Leslie Valve: 6” RVBX |
| N/A |
| 2 ea. |
| 4,881.00 |
| 48 |
| Y |
| Controller (Temperature Pilot), RTP-2 Bronze w/ 7” Probe |
| N/A |
| 2 ea. |
| 1,820.00 |
| 49 |
| N |
| 5B5000 resilient mount |
| NSN: 5340-00-543-3867 |
| 24 ea. |
| 800.00 |
| 49 |
| N |
| Conical Auxiliary Snubber Element |
| NSN: 5340-00-653-3518 |
| 16 ea. |
| 500.00 |
| 49 |
| N |
| **Sway Brace Adjustable Shock Mount ; Fairbanks-Morse |
| PN: 99999-888 |
| 2 ea. |
| 800.00 |
| 50 |
| N |
| ** Rubber Stave Bearing |
| NSN: 2010-01-118-1008 |
PN: L-1214-1512X10 (Johnson Rubber Co)
| 1 ea. |
| 3,753.00 |
| 50 |
| N |
| ** Pintle Bearing |
| NSN: 2010-01-F17-4974 |
PN: F113075055 (Thordon)
| 1 ea. |
| 4,000.00 |
| 50 |
| N |
| ** Upper Roller Bearing |
| NSN: 3110-01-165-1405 |
PN: JHM840449-JHM840410 (Timken)
| 2 ea. |
| 495.00 |
| 51 |
| N |
| Water Filter Assembly, (3M) |
(ACN) 44330-01-F20-5959
PN: DWS160-L
NSN:
| 3 ea. |
| 160.00 |
| 51 |
| N |
| Water Filter Element (3M) |
| PN: 56134-44 |
| 3 ea. |
| 180.00 |
| 51 |
| N |
| Placard – Potable Water Flush |
| N/A |
| 7 ea. |
| 50.00 |
| 52 |
| N |
| Parts Kit, Boat Davit 5-Year Inspection/Overhaul |
| NSN: 2030-01-F18-5589 |
PN: 18379
| 1 ea. |
| 16,325.00 |
| 56 |
| N |
| SturdiLED, 29W, 2400 lumens, 45 deg. beam angle. (Optional with 28 deg. SPLT beam angle, mounting Harp Kit (STL-HRP) and Visor (STL-VIS))*** |
| NSN: N/A |
PN: STL-MED-45-UNIVBLK
| 1 Ea. |
| $599.00 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars):
| Work Item |
| Title |
| 1 |
| Hull Plating, Side Scan, Ultrasonic Testing |
| 3 |
| U/W Body, Preserve, 100 percent |
| 6 |
| Bubbler Channels, Inspect |
| 7 |
| Appendages, U/W, Leak Test |
| 12 |
| Tanks, MP Fuel Stowage and Overflow, Clean and Inspect |
| 15 |
| Tanks, Ballast, Clean and Inspect |
| 17 |
| Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew |
| 18 |
| Propulsion Shafting; Remove, Inspect, and Reinstall |
| 19 |
| Propulsion Shaft Bearings, External, Check Clearances |
| 21 |
| Propeller, Remove, Inspect and Reinstall |
| 26 |
| Sea Strainers, Simplex, All Sizes, Clean and Inspect |
| 27 |
| Rudder Assembly, Remove, Inspect And Reinstall |
| 28 |
| Anchor Chains and Ground Tackle, Inspect and Repair |
| 44 |
| Drydock |
Bilges, Preserve 52 Single Point Davit, Inspect and Service 57 Fan Room, Preserve
Principal Characteristics - Tug, IceBreaking 140’ WTGB (TUG, Icebreaking)
Physical
| Length overall |
| 140' 0" |
| Length between perpendiculars |
| 130' 0" |
| Breadth, extreme |
| 37' 7-1/4" |
| Depth, molded |
| 18' 2-3/8" |
| Frame spacing |
| 1' 6" |
| Full load (Winter) draft (at ) |
| 12' 1-1/2" |
| Full load (winter) displacement |
| 687 Long tons (LT) |
Full load (winter) center of gravity
| Above base (kg) |
| 13' 1" |
| Full load trimming moment (forward) |
| 75.6 Ft-LT |
| Min. operating condition draft (at ) |
| 11' 6-3/8" |
| Min. operating condition displacement |
| 640 Long tons |
Min. operating condition center of gravity
| Above base (kg) |
| 13' 4-1/4" |
Min. operating condition trimming moment
| Forward |
| 76.8 Ft-LT |
| Height of vessel above DWL |
| Approx. 62' 0" |
Machinery
Main Propulsion
| Engine Type |
| Diesel-electric |
| Number of units: |
| 2 |
| Total shaft horsepower: |
| 2500 |
Propeller
| Number of propellers |
| 1 |
| Number of blades |
| 4 |
| Diameter of propeller |
| 8' 6" |
| Pitch |
| Fixed |
NOTE
Stability values above are for representative tug. Draft and longitudinal lever values provided above are for tugs in fresh water. Longitudinal lever values are provided to adjust tug's design drag of 1.0 feet by the stern.
00000_0521_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (0121) General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
Coast Guard Drawings None Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures Other References None
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.1.1 NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents. Contractors can apply to NAVSEA headquarters directly for copies.
3.2 Contractor-provided fire watch personnel and equipment. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. Small quantity – exempt.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
· Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
· National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
· Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor must be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor must be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, and must be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. The Contractor must refer to site (e.g. Base) Regulations and Instructions for details regarding local policies (e.g. crane services, parking, or facility usage).
3.7 SFLC Standard Specification approved changes. The Contractor must be aware that the following are approved changes to published SFLC 2020 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 8636. Add missing paragraphs between 3.2 and 3.5 of Std Spec 8636 as follows:
“3.3 Access cut boundaries. The Contractor shall ensure that access cuts comply with the requirements and restrictions detailed in the following and in SFLC Std Spec 0740, and referenced codes.
3.3.1 Location of boundaries. Boundaries of access cuts and closure plates shall, in general, be located between principal ship framing, bulkheads, and other structural members and shall be at least three inches from any of these members or from the toes of other welds. A reduction in this three inch minimum may be approved by the KO on a case by case basis provided sufficient clearance is maintained for welding and inspection requirements. The boundaries of access cuts and closure plates should land on existing butts or seams, wherever practicable. The boundaries of prior access cuts should be utilized wherever possible. Boundaries may extend across one or more frames as required for the size of the opening.
3.3.2 Access hole dimensions and arrangements. Holes or access cuts shall be the minimum size necessary and shall be in accordance with the following:
· Rectangular access cuts and closure plates welded into primary hull structure shall be at least 12 inches wide in the lesser dimension.
· For circular access cuts, the minimum diameter shall be 4T, where T = thickness of the involved structural member, but not less than three inches.
· Circular closure plates for access cuts less than two feet in diameter shall be dished 1/16 to 1/8 inch to allow for shrinkage when welded.
· Corners of rectangular access cuts and closure plates shall have a minimum radius of 6 inches except when a boundary lands on an existing hull longitudinal seam or transverse butt weld.
· Corners at an existing seam or butt shall intersect at a 90 degree angle.
· Cuts that are to cross existing butts or seams shall do so at an angle of 90 degrees plus or minus 15 degrees.
· In primary hull structure, existing welds forming the boundary of a cut shall be cut back 3 inches beyond the toe of the access cut, except that the cut back shall not intersect or cross an existing weld, frame, or structural member. In which case, the cut back may be reduced to a minimum of two inches in length.
· Existing welds crossed by the cut shall not be cut back.
3.3.3 Primary hull structure. Primary Hull Structure includes the shell, main strength decks, principal longitudinal bulkheads, vertical keel, deep web girders and stiffeners designed to withstand the ship bending stress.
3.3.4 Mechanically fastened joints. Welding closer than six inches to a mechanically fastened joint should be avoided. When access cuts cross or come within six inches of a mechanically fastened joint, the fasteners shall be checked for tightness and if necessary, loose fasteners shall be seal welded or removed, and replaced for a distance of 6 inches beyond the edge of the cut. When a cut crosses a mechanically fastened seam the cut plates shall be repaired using single V welds backed with glass tape (MIL-C-20079) to prevent fusion between the mechanically fastened plates.
3.4 Ship integrity maintenance. The Contractor shall maintain safety and ship integrity by installing temporary guarding and coaming, in addition to weathertight and watertight closures. Remove these temporary fabrications after closing the hull access, and grind surfaces flush in way of removals. For shell plating cuts made at or below the waterline where temporary closures are impractical, the Contractor shall secure each vulnerable compartment and subdivision to minimize potential damage to the extent permitted by the scope and urgency of the work.
3.4.1 Guarding. Install temporary guards in accordance with 29 CFR 1915.73.
3.4.2 Coaming. Ensure that in areas where flammable liquids may be stored, a 4 inch high metal coaming shall be installed on the surface of the deck with tack welds and fully sealed with caulking compound. The coaming shall encircle the access cut in the deck.
3.4.3 Weathertight and contamination closures. Fabricate temporary closures, using fire retardant material, before cutting access openings and install closures whenever access is not in use. Closures shall be:
· Constructed to protect the access from inclement weather and entry of contaminants (shall include a coaming or dam on the deck to redirect rain runoff away from the opening).
· Fitted with fasteners that permit rapid installation and removal.
· Able to support a minimum of 150 pounds per square foot for horizontal deck closures.
· Where the access opening is in way of a removed hatch, scuttle or door, the closure shall be configured to allow normal passage of ship’s personnel and equipment.
3.4.4 Watertight closures. Ensure that access openings created four feet or less above the maximum anticipated waterline shall include temporary watertight closures when the vessel is waterborne.
NOTE
NAVSEA S0600-AA-PRO-160/CH16 provides requirements for design, fabrication, and installation of temporary watertight closures.”
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
| SSPC-SP-10/NACE No. 2 |
| ( |
| SSPC-SP WJ-1/NACE WJ-1 |
| ( |
| SSPC-SP WJ-2/NACE WJ-2 |
| ( |
| SSPC-SP WJ-3/NACE WJ-3 |
| ( |
| SSPC-SP WJ-4/NACE WJ-4 |
| ( |
| SSPC-SP-3 |
| ( |
| SSPC-SP-11 |
| ( |
| SSPC-SP-11 (inaccessible area) |
| ( |
| Brush-blasting (non-metallic substrate) |
| ( |
Abrasive Manufacturer:
Abrasive Sieve Size:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
| SSPC-SP-10/NACE No. 2 |
| ( |
| SSPC-SP WJ-1/NACE WJ-1 |
| ( |
| SSPC-SP WJ-2/NACE WJ-2 |
| ( |
| SSPC-SP WJ-3/NACE WJ-3 |
| ( |
| SSPC-SP WJ-4/NACE WJ-4 |
| ( |
| SSPC-SP-3 |
| ( |
| SSPC-SP-11 |
| ( |
| SSPC-SP-11 (inaccessible area) |
| ( |
| Brush-blasting (non-metallic substrate) |
| ( |
Abrasive Manufacturer:
Abrasive Sieve Size:
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.
| Date |
| Test Locations |
| Conductivity (Microsiemens/CM) |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
11000_SideScan_ESD_1021_FLT REC_11000_Side_Scan_FLT_140 WTGB- ALL (0121) WORK ITEM 1: Hull Plating, Side Scan, Ultrasonic Testing
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform thickness measurements of underwater (u/w) hull plating by ultrasonic side scan method.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 140 WTGB 801-003, Rev -, Docking Plan Coast Guard Drawing 140 WTGB 111-001, Rev-, Shell Expansion COAST GUARD Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Other References American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2020, Recommended Practice for Personal Qualification and Certification in Nondestructive Testing
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):
· 3.3 Side scan requirements and procedures.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
· Hull zinc anode system
· Docking blocks.
3.2 Work coordination and preparation. The Contractor must plan all specified vessel work detailed in this specification package to ensure the side scan survey does not necessitate a work stoppage. The Contractor must abide by the following guidance, to facilitate the ultrasonic survey:
· Ensure that all u/w body surface preparation and primer coat application tasks are completed within ten days of lifting the vessel.
· Provide a continuous supply of fresh water at .50 gpm within 50 feet of the vessel with standard hose bib fitting.
· Provide 110 VAC electrical power, and scaffolding or other suitable means of access to bring inspection personnel within one foot of all the body surface inspection areas that are five feet above ground level.
· After completion of the hull survey, and authorized hull repairs, resume/complete u/w body preservation process by applying the second coat of the anti-corrosive coating system, and all anti-fouling paint coats.
· Pay close attention to manufacturer’s recommended practices in regards to paint system overcoat time limitations and required degree of surface cleanliness prior to resuming u/w body coating application.
3.3 Side scan requirements and procedures. The Contractor must ensure the following referring to the Coast Guard drawings listed in Section 2 (References) herein as guidance during the performance of the tasks specified below and submit a CIR.
3.3.1 Testing company and personnel. Provide the services of a qualified ultrasonic testing company, with suitable side scan equipment, to conduct a “Scanning Crawler Automated Test” of the vessel’s u/w hull plating for the presence of metal corrosion and deterioration. Ensure the following:
· All scanning operations are completed by personnel meeting the personnel qualification and certification, as required by contractor process. This contractor-developed personnel qualification and certification process must meet, at a minimum, ASNT Recommended Practice No. SNT-TC-1A.
· An SNT Level III Analyst is on site, to oversee the project and evaluate the collected data.
· An SNT Level III or II Analyst is on site, to verify with a hand held gauge all areas on the hull identified as thinner than the specified criteria, in order to expedite all repair procedures.
· Qualified personnel are provided to complete all on-site corrosion inspections.
3.3.2 Coast Guard notification. Accomplish all required tasks within 10 calendar days of the start of the availability.
3.3.2.1 Provide a daily update to the COR on all areas inspected and potential issues or schedule changes.
3.3.2.2 Notify the COR at least 3 days prior to completion for an onsite review of readings and repair areas.
3.3.3 Scanning parameters. Use the following parameters during the course of this inspection:
· Automated scanning resolution must be set to 0.5” x 0.5”
· Plates where scan data indicating wastage greater than or equal to 25% nominal plate thickness must be highlighted in “RED” and designated “repair areas”.
· Plates where scan data indicating wastage greater than or equal to 15% to 24% of nominal plate thickness must be highlighted in “YELLOW”.
· Plates where scan data indicating wastage greater than or equal to 10% to 14% of nominal plate thickness must be highlighted in DARK GREEN.
· Hand held UT readings must be taken to verify bad metal areas found with the side scan equipment. All readings must be provided to the COR and the lowest reading marked on the hull at the bad metal location.
· Areas that are accessible but cannot be reached by the automated scanner must be scanned with a hand-held meter at a resolution of 2” x 2”. Any repair areas found during the hand scan must be marked on the ships hull and their approximate positions recorded on the plate drawings and report summary.
3.3.3.1 Any scanning parameter or scope of work changes must be approved by the KO.
3.3.3.2 The echo to echo transducer is not authorized due to inconsistent readings and technical difficulties.
3.3.3.3 There must be no deviation from the color scheme specified above.
3.3.4 Ensure that the side scan inspection area includes the Port, Starboard, and Transom exterior shell plate below the water line, but excludes the following list.
· Areas under and within 6-inches of blocks and side blocks (areas that are accessible 6 inches from blocks and side blocks must be hand scanned.)
· Areas up to 6-inches around any obstacle on the hull including sea suctions, discharges, rudderposts, knuckle, bow stem, stabilizer tubes, and stern tubes, as applicable.
· Any areas blocked by immovable scaffolding or shipyard activity.
3.4 Side scan reports. The Contractor must submit to the COR a final report within 3 working days after the side scan inspection is completed. A copy of all repair areas shall be clearly marked, in yellow or white, on the provided shell plate drawing(s), and provide a summary document of same areas. Submit two hard copies of the report with two CD’s containing the electronic (raw) data, as part of the CIR submission prior to departing the job site. Ensure the reports include:
· Inspection overview.
· Data sheets for each plate with designated repair areas outlined in blue. Each data sheet must contain at least one longitudinal reference (e.g. frame or bulkhead number) and one athwartships reference (e.g. hull stringer number).
· Mosaic of scanned data overlaid semi-transparently on Coast Guard Drawing 101 WTGB 111-1.
3.4.1 Photos.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .