Attachment 2 - Specifications.pdf

PDF 363 KB Posted

Attached to
Thorne Bay Duplex Renovations Federal contract opportunity
Solicitation number
1240BH23R0024
Issued by
Department of Agriculture Forest Service

About this file

This is a solicitation for renovations to a duplex property in Thorne Bay, Alaska. The solicitation is seeking bids for selective demolition, interior finish carpentry, building insulation, wood siding, flush wood doors, folding wooden doors, sectional wood garage doors, vinyl windows, door hardware, gypsum board, vinyl flooring, exterior painting, staining, residential appliances, residential casework, plastic-laminate countertops, domestic water piping, sanitary waste piping specialties, and domestic-water heaters. Bids are due by May 4, 2023. The solicitation is issued by the US Department of Agriculture Forest Service for renovations of a duplex property located in Thorne Bay, Alaska.

View the file

Other files for this federal contract opportunity

Other files attached to Thorne Bay Duplex Renovations, newest first.
File Type Posted
Amendment 2 -1240BH23R0024.pdf PDF
Amendment 1 - 1240BH23R0024.pdf PDF
SOW Appendix 1 - Drawings.pdf PDF
Attachment 4 - Relevant Past Performance Template.pdf PDF
SOW Appendix 3 - 1984 As-Builts.pdf PDF
SF24-BidBond.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
SOW Appendix 2 - Photo Packet.pdf PDF
Attachment 3 - AK20230005 04142023.pdf PDF
1240BH23R0024 - Solicitation Packet.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2 – SPECIFICATIONS

Specifications Index- By Section

Section 024119 Selective Demolition Section 062023 Interior Finish Carpentry

Section 072100 Building Insulation

Section 074601 Wood Siding

Section 082110 Flush Wood Doors

Section 083513 Section 083613

Folding Wooden Doors Sectional Wood Garage Doors

Section 085313 Vinyl Windows

Section 087100 Door Hardware

Section 092900 Gypsum Board

Section 096500 Vinyl Flooring

Section 099113 Exterior Painting

Section 099300 Staining

Section 113013 Residential Appliances

Section 123530 Residential Casework

Section 123623.13 PLAM Countertops

Section 221101 PEX

Section 221319 Sanitary Waste Piping

Section 223500 Section 224100 Section 235223 Section 238236 Section 262726.33 Section 262726.37

Domestic Water Heat Exchangers Bathroom Fixtures Cast-Iron Boilers Baseboard Radiation Heaters General Grade Duplex Straight Blade Receptacles Receptacles with Arc-Fault/Ground Fault Protectors

SELECTIVE DEMOLITION 024119 - 1

SECTION 024119 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Demolition and removal of selected portions of building or structure.

2. Demolition and removal of selected site elements.

3. Salvage of existing items to be reused or recycled.

1.2 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

1. Any removed copper water pipe shall be held for the Government at their discretion to salvage.

1.3 INFORMATIONAL SUBMITTALS

A. Schedule of selective demolition activities with starting and ending dates for each activity.

B. Pre-demolition photographs or video.

1.4 CLOSEOUT SUBMITTALS

A. Inventory of items that have been removed and salvaged.

1.5 FIELD CONDITIONS

A. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

B. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

1. Hazardous materials will be removed by Owner before start of the Work.

2. If suspected hazardous materials are encountered, do not disturb; immediately notify

Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.

D. Storage or sale of removed items or materials on-site is not permitted.

SELECTIVE DEMOLITION 024119 - 2

E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Inventory and record the condition of items to be removed and salvaged.

3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. Arrange to shut off utilities with utility companies.

2. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.

a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.

c. Equipment to Be Removed: Disconnect and cap services and remove equipment.

d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.

e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.

SELECTIVE DEMOLITION 024119 - 3

f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.

g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.

3.3 PROTECTION

A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

C. Remove temporary barricades and protections where hazards no longer exist.

3.4 SELECTIVE DEMOLITION

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping.

Temporarily cover openings to remain.

2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

4. Maintain fire watch during and for at least one hour after flame-cutting operations.

5. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

6. Dispose of demolished items and materials promptly.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

C. Removed and Salvaged Items:

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers.

3. Store items in a secure area until delivery to Owner.

4. Transport items to Owner's storage area on-site.

5. Protect items from damage during transport and storage.

SELECTIVE DEMOLITION 024119 - 4

D. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.

3.5 CLEANING

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Burning: Do not burn demolished materials.

C. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

INTERIOR FINISH CARPENTRY 062023 - 1

SECTION 062023 – INTERIOR FINISH CARPENTRY

1.1 SUMMARY

A. Section Includes:

1. Interior trim, including baseboards and window openings.

PART 2 - PRODUCTS

2.1 INTERIOR TRIM

A. Match existing.

B. Fasteners

a. Use galvanized finish nails designed for the fastening of trim

PART 3 - EXECUTION

3.1 PREPARATION

A. Clean substrates of projections and substances detrimental to application.

3.2 INSTALLATION, GENERAL

A. Install interior finish carpentry level, plumb, true, and aligned with adjacent materials.

1. Use concealed shims where necessary for alignment.

2. Scribe and cut interior finish carpentry to fit adjoining work. Refinish and seal cuts as recommended by manufacturer.

3. Where face fastening is unavoidable, countersink fasteners, fill surface flush, and sand unless otherwise indicated.

3.3 INSTALLATION OF STANDING AND RUNNING TRIM

A. Install trim with minimum number of joints as is practical, using full-length pieces from maximum lengths of lumber available.

1. Do not use pieces less than 24 inches (610 mm) long, except where necessary.

2. Stagger joints in adjacent and related standing and running trim.

INTERIOR FINISH CARPENTRY 062023 - 2

3. Cope or Miter at returns, miter at outside corners, and cope at inside corners to produce tight-fitting joints with full-surface contact throughout length of joint.

4. Use scarf joints for end-to-end joints.

5. Plane backs of casings to provide uniform thickness across joints where necessary for alignment.

6. Install trim after gypsum-board joint finishing operations are completed.

7. Install without splitting; drill pilot holes before fastening where necessary to prevent splitting.

8. Fasten to prevent movement or warping.

9. Countersink fastener heads on exposed carpentry work and fill holes.

END OF SECTION 062023

072100 ‐ 1

BUILDING INSULATION

SECTION 072100 - BUILDING INSULATION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Perimeter wall insulation (supporting backfill).

2. Cavity-wall insulation.

3. Concealed building insulation.

4. Loose-fill building insulation.

5. Vapor retarders.

1.2 DEFINITIONS

A. Mineral-Fiber Insulation: Insulation composed of rock-wool fibers, slag-wool fibers, or glass fibers; produced in boards and blanket with latter formed into batts (flat-cut lengths) or rolls.

1.3 PERFORMANCE REQUIREMENTS

A. Plenum Rating: Provide glass-fiber insulation where indicated in ceiling plenums whose test performance is rated as follows for use in plenums as determined by testing identical products per "Erosion Test" and "Mold Growth and Humidity Test" described in UL 181, or on comparable tests from another standard acceptable to authorities having jurisdiction.

1. Erosion Test Results: Insulation shows no visible evidence of cracking, flaking, peeling, or delamination of interior surface of duct assembly, after testing for 4 hours at 2500-fpm (13-m/s) air velocity.

2. Mold Growth and Humidity Test Results: Insulation shows no evidence of mold growth, delamination, or other deterioration due to the effects of high humidity, after inoculation with Chaetomium globosium on all surfaces and storing for 60 days at 100 percent relative humidity in the dark.

1.4 QUALITY ASSURANCE

A. Source Limitations: Obtain each type of building insulation through one source from a single manufacturer.

B. Fire-Test-Response Characteristics: Provide insulation and related materials with the fire-test-response characteristics indicated, as determined by testing identical products per test method indicated below by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency.

1. Surface-Burning Characteristics: ASTM E 84.

2. Fire-Resistance Ratings: ASTM E 119.

3. Combustion Characteristics: ASTM E 136.

1.5 DELIVERY, STORAGE, AND HANDLING

072100 ‐ 2

BUILDING INSULATION

A. Protect insulation materials from physical damage and from deterioration by moisture, soiling, and other sources. Store inside and in a dry location. Comply with manufacturer's written instructions for handling, storing, and protecting during installation.

B. Protect plastic insulation as follows:

1. Do not expose to sunlight, except to extent necessary for period of installation and concealment.

2. Protect against ignition at all times. Do not deliver plastic insulating materials to Project site before installation time.

3. Complete installation and concealment of plastic materials as rapidly as possible in each area of construction.

PART 2 - PRODUCTS

2.1 GLASS-FIBER BLANKET INSULATION

A. Available Manufacturers:

1. CertainTeed Corporation.

2. Guardian Fiberglass, Inc.

3. Johns Manville.

4. Knauf Fiber Glass.

5. Owens Corning.

B. Faced, Glass-Fiber Blanket Insulation: ASTM C 665, Type III (blankets with reflective membrane facing), Class A (membrane-faced surface with a flame-spread index of 25 or less);

Category 1 (membrane is a vapor barrier), faced with foil-scrim-kraft, foil-scrim, or foil-scrim-polyethylene vapor-retarder membrane on 1 face.

C. Where glass-fiber blanket insulation is indicated by the following thicknesses, provide blankets in batt or roll form with thermal resistances indicated:

1. 5-1/2 inches (140 mm) thick with a thermal resistance of 21 deg F x h x sq. ft./Btu at 75 deg F (3.7 K x sq. m/W at 24 deg C).

2.2 VAPOR RETARDERS

A. Polyethylene Vapor Retarders: ASTM D 4397, 6 mils (0.15 mm) thick, clear with maximum permeance rating of 0.13 perm (7.5 ng/Pa x s x sq. m).

B. Vapor-Retarder Tape: Pressure-sensitive tape of type recommended by vapor-retarder manufacturer for sealing joints and penetrations in vapor retarder.

2.3 AUXILIARY INSULATING MATERIALS

A. Vapor-Retarder Tape: Pressure-sensitive tape of type recommended by insulation manufacturers for sealing joints and penetrations in vapor-retarder facings.

B. Adhesive for Bonding Insulation: Product with demonstrated capability to bond insulation securely to substrates indicated without damaging insulation and substrates.

PART 3 - EXECUTION

072100 ‐ 3

BUILDING INSULATION

3.1 EXAMINATION

A. Examine substrates and conditions, with Installer present, for compliance with requirements of Sections in which substrates and related work are specified and for other conditions affecting performance.

1. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Clean substrates of substances harmful to insulation or vapor retarders, including removing projections capable of puncturing vapor retarders or of interfering with insulation attachment.

3.3 INSTALLATION, GENERAL

A. Comply with insulation manufacturer's written instructions applicable to products and application indicated.

B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed at any time to ice, rain, and snow.

C. Extend insulation in thickness indicated to envelop entire area to be insulated. Cut and fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.

D. Water-Piping Coordination: If water piping is located within insulated exterior walls, coordinate location of piping to ensure that it is placed on warm side of insulation and insulation encapsulates piping.

E. For preformed insulating units, provide sizes to fit applications indicated and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units to produce thickness indicated unless multiple layers are otherwise shown or required to make up total thickness.

3.4 INSTALLATION OF GENERAL BUILDING INSULATION

A. Apply insulation units to substrates by method indicated, complying with manufacturer's written instructions. If no specific method is indicated, bond units to substrate with adhesive or use mechanical anchorage to provide permanent placement and support of units.

B. Seal joints between foam-plastic insulation units by applying adhesive, mastic, or sealant to edges of each unit to form a tight seal as units are shoved into place. Fill voids in completed installation with adhesive, mastic, or sealant as recommended by insulation manufacturer.

C. Set vapor-retarder-faced units with vapor retarder to warm side of construction, unless otherwise indicated.

1. Tape joints and ruptures in vapor retarder, and seal each continuous area of insulation to surrounding construction to ensure airtight installation.

3.5 INSTALLATION OF VAPOR RETARDERS

A. General: Extend vapor retarder to extremities of areas to be protected from vapor transmission.

Secure in place with adhesives or other anchorage system as indicated. Extend vapor retarder to

072100 ‐ 4

BUILDING INSULATION

cover miscellaneous voids in insulated substrates, including those filled with loose-fiber insulation.

B. Seal vertical joints in vapor retarders over framing by lapping not less than two wall studs. Fasten vapor retarders to wood framing at top, end, and bottom edges; at perimeter of wall openings; and at lap joints. Space fasteners 16 inches (400 mm) o.c.

C. Seal joints caused by pipes, conduits, electrical boxes, and similar items penetrating vapor retarders with vapor-retarder tape to create an airtight seal between penetrating objects and vapor retarder.

D. Repair tears or punctures in vapor retarders immediately before concealment by other work.

Cover with vapor-retarder tape or another layer of vapor retarder.

3.6 PROTECTION

A. Protect installed insulation and vapor retarders from damage due to harmful weather exposures, physical abuse, and other causes. Provide temporary coverings or enclosures where insulation is subject to abuse and cannot be concealed and protected by permanent construction immediately after installation.

END OF SECTION 072100

072100 ‐ 1

WOOD SIDING

SECTION 074601- WOOD SIDING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Exterior Trim.

2. Lumber siding.

1.2 SUBMITTALS

A. Product Data: For each type of product involving selection of colors, profiles, or textures.

B. Samples: Full-size units of each type of siding and trim indicated for each color, texture and pattern specified.

1.3 QUALITY ASSURANCE

A. Qualifications: Engage an experienced installer who has completed siding installations similar in material, design and extent to that indicated.

B. Regulatory Requirements and Approvals:

1. International Conference of Building Officials (ICBO):

a. Report No. ICBO-ES ER1962.

C. Mock-Ups: Before installing siding, construct sample wall panels to verify selections made under sample submittals and to demonstrate aesthetic effects and qualities of materials and execution.

1.4 DELIVERY, STORAGE & HANDLING

A. Delivery: Deliver materials in manufacturer’s original, unopened, undamaged containers with identification labels intact.

B. Storage and Protection: Store materials protected from exposure to harmful environmental conditions and at temperature and humidity conditions recommended by the manufacturer.

C. Stack lumber, plywood, and other panels flat with spacers between each bundle to provide air circulation. Protect materials from weather by covering with waterproof sheeting, securely anchored. Provide for air circulation around stacks and under coverings.

1.5 FIELD CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecast weather conditions permit work to be performed and at least one coat of specified finish can be applied without exposure to rain, snow, or dampness.

B. Do not install finish carpentry materials that are wet, moisture damaged, or mold damaged.

1. Indications that materials are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

072100 ‐ 2

WOOD SIDING

2. Indications that materials are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

PART 2 - PRODUCTS

2.1 MATERIALS, GENERAL

A. Lumber: Rough cut Cedar

B. Factory mark each piece of lumber with grade stamp of inspection agency indicating grade, species, moisture content at time of surfacing, and mill.

a. For exposed lumber, mark grade stamp on end or back of each piece.

C. Softwood Plywood: DOC PS 1.

D. Hardboard: ANSI A135.4.

2.2 LUMBER SIDING

A. Provide kiln-dried lumber siding complying with DOC PS 20 with no more than 15% moisture content.

B. Species and Grade: Coordinate with COR to match existing wood species and grade: Red Cedar;

NeLMA, NLGA, WCLIB, or WWPA premium grade.

2.3 MISCELLANEOUS MATERIALS

A. Building Paper:

1. Material: Dupont Tyvek Drain Wrap or approved equal.

B. Fasteners for Exterior Finish Carpentry: Provide nails or screws, in sufficient length to penetrate not less than 1-1/2 inches (38 mm) into wood substrate.

1. For exposed wood, provide stainless steel screws.

2. For concealed wood, provide epoxy coated steel fasteners.

C. Sealants: Latex, complying with ASTM C 834 Type OP, Grade NF recommended by sealant manufacturer and manufacturer of substrates for intended application.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance.

B. Examine finish carpentry materials before installation. Reject materials that are wet, moisture damaged, and mold damaged.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

072100 ‐ 3

WOOD SIDING

3.2 PREPARATION

A. Prime lumber and moldings to be painted, including both faces and edges, unless factory primed.

Cut to required lengths and prime ends.

3.3 INSTALLATION, GENERAL

A. Do not use materials that are unsound, warped, improperly treated or finished, inadequately seasoned, or too small to fabricate with proper jointing arrangements.

B. Install exterior finish carpentry level, plumb, true, and aligned with adjacent materials. Use concealed shims where necessary for alignment.

1. Scribe and cut exterior finish carpentry to fit adjoining work. Refinish and seal cuts as recommended by manufacturer.

2. Install to tolerance of 1/8 inch in 96 inches (3 mm in 2438 mm) for level and plumb. Install adjoining exterior finish carpentry with 1/32-inch (0.8-mm) maximum offset for flush installation and 1/16-inch (1.5-mm) maximum offset for reveal installation.

3. Coordinate exterior finish carpentry with materials and systems in or adjacent to it. Provide cutouts for mechanical and electrical items that penetrate exterior finish carpentry.

3.4 STANDING AND RUNNING TRIM INSTALLATION

A. Install trim with minimum number of joints practical, using full-length pieces from maximum lengths of lumber available. Do not use pieces less than 24 inches (610 mm) long except where necessary.

1. Use scarf joints for end-to-end joints.

2. Stagger end joints in adjacent and related members.

B. Fit exterior joints to exclude water. Cope at returns and miter at corners.

3.5 SIDING INSTALLATION

A. Install siding to comply with manufacturer's written instructions and warranty requirements.

B. Horizontal Lumber Siding: Apply starter strip along bottom edge of sheathing or sill. Install first course of siding with lower edge at least 1/8 inch (3 mm) below starter strip and subsequent courses lapped 1 inch (25 mm) over course below. Nail at each stud. Do not allow nails to penetrate more than one thickness of siding.

1. Leave 1/8-inch (3-mm) gap at trim and corners unless otherwise recommended by manufacturer, and apply sealant COATING

C. Drive nails flush with siding surface, penetrating studs at least 1/2 inch (12.7 mm).

3.6 ADJUSTING

A. Replace exterior finish carpentry that is damaged or does not comply with requirements. Exterior finish carpentry may be repaired or refinished if work complies with requirements and shows no evidence of repair or refinishing. Adjust joinery for uniform appearance.

3.7 CLEANING

072100 ‐ 4

WOOD SIDING

A. Clean exterior finish carpentry on exposed and semi-exposed surfaces.

3.8 PROTECTION

A. Protect installed products from damage from weather and other causes during construction.

B. Remove and replace finish carpentry materials that are wet, moisture damaged, and mold damaged.

1. Indications that materials are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that materials are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

END OF SECTION 072100

FLUSH WOOD DOORS 08211‐1

SECTION 082110 - FLUSH WOOD DOORS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Solid-core doors with wood-veneer, faces.

2. Factory finishing flush wood doors.

3. Factory fitting flush wood doors to frames and factory machining for hardware.

1.3 SUBMITTALS

A. Product Data: For each type of door. Include details of core and edge construction, louvers, and trim for openings. Include factory-finishing specifications.

1.4 QUALITY ASSURANCE

A. Source Limitations: Obtain flush wood doors through one source from a single manufacturer.

B. Quality Standard: Comply with NWWDA I.S.1-A, "Architectural Wood Flush Doors."

1.5 DELIVERY, STORAGE, AND HANDLING

A. Comply with requirements of referenced standard and manufacturer's written instructions.

1.6 PROJECT CONDITIONS

A. Environmental Limitations: Do not deliver or install doors until building is enclosed, wet work is complete, and HVAC system is operating and will maintain temperature and relative humidity at occupancy levels during the remainder of the construction period.

1.7 WARRANTY

A. Special Warranty: Manufacturer's standard form, signed by manufacturer, Installer, and Contractor, in which manufacturer agrees to repair or replace doors that are defective in materials or workmanship, have warped (bow, cup, or twist) more than 1/4 inch (6.4 mm) in a 42-by-84-inch (1067-by-2134-mm) section, or show telegraphing of core construction in face veneers exceeding 0.01 inch in a 3-inch (0.25 mm in a 75-mm) span.

1. Warranty shall also include installation and finishing that may be required due to repair or replacement of defective doors.

2. Warranty shall be in effect during the following period of time from date of Substantial Completion:

FLUSH WOOD DOORS 08211‐2

a. Solid-Core Interior Doors: Life of installation.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. Flush Wood Doors:

a. Algoma Hardwoods Inc.

b. Ampco Products, Inc.

c. Buell Door Company.

d. Chappell Door Co.

e. Eagle Plywood & Door Manufacturing, Inc.

f. Eggers Industries; Architectural Door Division.

g. GRAHAM Manufacturing Corp.

h. Haley Brothers, Inc.

i. Ideal Wood Products, Inc.

j. IPIK Door Company.

k. Lambton Doors.

l. Mohawk Flush Doors, Inc.

m. Oshkosh Architectural Door Co.

n. Southwood Door Co.

o. Vancouver Door Company, Inc.

p. VT Industries Inc.

q. Weyerhaeuser Company.

2. Metal Louvers for Doors:

a. Air Louvers, Inc.

b. Anemostat Door Products.

c. Gulfport Industries, Inc.

d. Hiawatha, Inc.

e. Leslie-Locke, Inc.

2.2 DOOR CONSTRUCTION, GENERAL

A. Adhesives: Do not use adhesives containing urea formaldehyde.

B. Doors for Transparent Finish:

1. Grade: Economy

2. Species and Cut: Light Colored, plain sliced.

3. Match between Veneer Leaves: Book match.

4. Pair and Set Match: Provide for doors hung in same opening or separated only by mullions.

5. Transom Match: Continuous match.

FLUSH WOOD DOORS 08211‐3

6. Stiles: Same species as faces or a compatible species.

2.3 SOLID-CORE DOORS

A. Particleboard Cores: Comply with the following requirements:

1. Particleboard: ANSI A208.1, Grade LD-1 or LD-2.

a. Use particleboard made with binder containing no urea-formaldehyde resin.

2. Blocking: Provide wood blocking in particleboard-core doors as needed to eliminate through-bolting hardware.

3. Provide doors with either glued-block or structural composite lumber cores instead of particleboard cores at locations where exit devices are indicated.

B. Interior Veneer-Faced Doors:

1. Core: Particleboard.

2. Construction: Five plies with stiles and rails bonded to core, then entire unit abrasive planed before veneering.

2.4 FABRICATION

A. Factory fit doors to suit frame-opening sizes indicated, with the following uniform clearances and bevels, unless otherwise indicated:

1. Comply with clearance requirements of referenced quality standard for fitting. Comply with requirements in NFPA 80 for fire-rated doors.

B. Factory machine doors for hardware that is not surface applied. Locate hardware to comply with DHI-WDHS-3. Comply with final hardware schedules, door frame Shop Drawings, DHI A115- W series standards, and hardware templates.

1. Coordinate measurements of hardware mortises in metal frames to verify dimensions and alignment before factory machining.

2. Metal Astragals: Premachine astragals and formed-steel edges for hardware for pairs of fire-rated doors.

C. Transom and Side Panels: Fabricate matching panels with same construction, exposed surfaces, and finish as specified for associated doors. Finish bottom edges of transoms and top edges of rabbeted doors same as door stiles.

1. Fabricate door and transom panels with full-width, solid-lumber meeting rails. Provide factory-installed spring bolts for concealed attachment into jambs of metal door frames.

2.5 FACTORY FINISHING

A. General: Comply with referenced quality standard for factory finishing.

B. Finish doors at factory.

C. Finish doors at factory that are indicated to receive transparent finish. Field finish doors indicated to receive opaque finish.

FLUSH WOOD DOORS 08211‐4

D. Finish doors at factory where indicated in schedules or on Drawings as factory finished.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine doors and installed door frames before hanging doors.

1. Verify that frames comply with indicated requirements for type, size, location, and swing characteristics and have been installed with level heads and plumb jambs.

2. Reject doors with defects.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. Hardware: For installation, see Division 8 Section "Door Hardware."

B. Manufacturer's Written Instructions: Install doors to comply with manufacturer's written instructions, referenced quality standard, and as indicated.

1. Install fire-rated doors in corresponding fire-rated frames according to NFPA 80.

C. Factory-Fitted Doors: Align in frames for uniform clearance at each edge.

D. Factory-Finished Doors: Restore finish before installation if fitting or machining is required at Project site.

3.3 ADJUSTING

A. Operation: Rehang or replace doors that do not swing or operate freely.

B. Finished Doors: Replace doors that are damaged or do not comply with requirements. Doors may be repaired or refinished if work complies with requirements and shows no evidence of repair or refinishing.

END OF SECTION 082110

FOLDING DOORS 083513 - 1

SECTION 083513 - FOLDING DOORS

1.1 SUMMARY

A. Section Includes:

1. Folding wooden closet doors

PART 2 - PRODUCTS

2.1 PANEL FOLDING DOORS

A. Description: Top-supported, horizontal-sliding, manually operated panel folding doors, with panels joined by continuous hinge connectors for the full height of panels.

B. Panel Facing:

1. Wood-Veneer Facing: Match interior door wood veneer, with manufacturer's standard clear transparent finish.

C. Carriers: Four-wheel carriers at lead post and two-wheel carriers at intermediate spacing.

D. Tracks: Limit track deflection, independent of structural supporting system, to no more than 80 percent of bottom clearance. Provide the following features:

1. Recessed mounting.

2. Ceiling guard.

E. Hardware:

1. Finish: Manufacturer's standard.

PART 3 - EXECUTION

3.1 INSTALLATION

A. General: Install folding doors complying with manufacturer's written installation instructions.

Install track in one piece.

FOLDING DOORS 083513 - 2

B. Standard Floor Clearances: 1/4 to 3/4 inch (6.4 to 19 mm) maximum (above floor finish).

END OF SECTION 083513

VINYL WINDOWS 085313 - 1

SECTION 083613 - SECTIONAL WOOD GARAGE DOORS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Sectional-door assemblies.

1.2 ACTION SUBMITTALS

A. Product Data: For each type and size of sectional door and accessory.

B. Shop Drawings: For each installation and for components not dimensioned or detailed in manufacturer's product data.

C. Samples: For each exposed product and for each color and texture specified.

1.3 INFORMATIONAL SUBMITTALS

A. Sample warranties.

1.4 CLOSEOUT SUBMITTALS

A. Maintenance data.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer for both installation and maintenance of units required for this Project.

B. Regulatory Requirements: Comply with provisions in the U.S. Department of Justice's "2010 ADA Standards for Accessible Design" applicable to sectional doors.

1.6 WARRANTY

A. Manufacturer's Warranty: Manufacturer agrees to repair or replace components of sectional doors that fail in materials or workmanship within specified warranty period.

1. Warranty Period: Two years from date of Substantial Completion.

VINYL WINDOWS 085313 - 2

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. General Performance: Provide sectional doors that comply with performance requirements specified without failure from defective manufacture, fabrication, installation, or other defects in construction.

1. Garage doors shall match size and color of existing doors.

2. Doors shall be manual operation and include track installation.

3. Clopay Classic Wood Collection Model 44 Raised Panels or approved similar.

4. Doors can be factory primed.

B. Structural Performance, Exterior Doors: Capable of withstanding the wind loads for the location.

1. Testing: In accordance with ASTM E330/E330M.

2.2 SECTIONAL-DOOR ASSEMBLY

A. Wood Sectional Door: Provide sectional door formed with hinged sections and fabricated so that finished door assembly is rigid and aligned with tight hairline joints; free of warp, twist, and deformation; and complies with requirements in DASMA 102.

1. Hemlock, Cedar, or Redwood species for door panels.

2. Short Panel 3.

B. Operation Cycles: Door components and operators capable of operating for not less than 10,000 operation cycles. One operation cycle is complete when door is opened from closed position to the open position and returned to closed position.

1. Door-Section Thickness: 1-3/8 inches (35 mm).

a. Bottom Section: Reinforce section with a continuous channel or angle conforming to bottom-section profile and allowing installation of astragal (weatherseal).

b. Hardware Locations: Provide reinforcement for hardware attachment.

2. Short panel design

C. Track: Manufacturer's standard, galvanized-steel, standard-lift track system. Provide complete system including brackets, bracing, and reinforcement to ensure rigid support of ball-bearing roller guides.

1. Material: Galvanized steel, ASTM A653/A653M, minimum G60 (Z180) zinc coating.

2. Size: As recommended in writing by manufacturer for door size, weight, track configuration and door clearances.

3. Track Reinforcement and Supports: Provide galvanized-steel members to support track without sag, sway, and vibration during opening and closing of doors. Slot vertical sections of track spaced 2 inches (51 mm) apart for door-drop safety device.

D. Weatherseals: Replaceable, adjustable, continuous, compressible weather-stripping gaskets of flexible vinyl, rubber, or neoprene fitted to bottom of door.

VINYL WINDOWS 085313 - 3

E. Hardware: Heavy-duty, corrosion-resistant hardware, with hot-dip galvanized, stainless steel, or other corrosion-resistant fasteners, to suit door type.

1. Hinges: Heavy-duty, galvanized-steel hinges of not less than 0.079-inch (2.01-mm) nominal coated thickness at each end stile and at each intermediate stile, in accordance with manufacturer's written recommendations for door size.

a. Attach hinges to door sections through stiles and rails with bolts and lock nuts or lock washers and nuts. Use rivets or self-tapping fasteners where access to nuts is impossible.

2. Rollers: Heavy-duty rollers with steel ball bearings in case-hardened steel races, mounted to suit slope of track. Extend roller shaft through both hinges where double hinges are required. Match roller-tire diameter to track width.

a. Roller-Tire Material: Case-hardened steel.

3. Push/Pull Handles: Equip each door with galvanized-steel lifting handles on each side of door, finished to match door.

F. Manual Door Operator:

1. Push-Up Operation: Lift handles and pull rope for raising and lowering doors located on inside and outside of bottom section; with counterbalance mechanism designed so that required lift or pull for door operation does not exceed 25 lbf (111 N).

G. Wood Finish:

1. Paint to match existing garage doors.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install sectional doors and operating equipment complete with necessary hardware, anchors, inserts, hangers, and equipment supports; in accordance with manufacturer's written instructions.

B. Tracks:

1. Fasten vertical track assembly to opening jambs and framing with fasteners spaced not more than 24 inches (610 mm) apart.

2. Hang horizontal track assembly from structural overhead framing with angles or channel hangers attached to framing by welding or bolting, or both. Provide sway bracing, diagonal bracing, and reinforcement as required for rigid installation of track and door-operating equipment.

C. Accessibility: Install sectional doors, switches, and controls along accessible routes in compliance with regulatory requirements for accessibility.

VINYL WINDOWS 085313 - 4

3.2 DEMONSTRATION

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain sectional doors.

END OF SECTION 083613

VINYL WINDOWS 085313 - 5

SECTION 085313 - VINYL WINDOWS

PART 1 – GENERAL

1.1 SUMMARY

A. Section includes vinyl-framed windows – horizontal slider.

1.2 SUBMITTALS

A. Product Data and Specifications

a. Vinyl windows - Include construction details, material descriptions, glazing and fabrication methods, dimensions of individual components and profiles, hardware, and finishes for vinyl windows.

b. Qualification Data: For manufacturer and installer.

c. Product Test Reports: For each type of vinyl window, for tests performed by a qualified testing agency.

d. Field quality-control reports.

e. Sample Warranties: For manufacturer's warranties.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Meeting – Conduct meeting at project site to address the following:

a. Review and finalize construction schedule and verify availability of materials, contractor personnel, equipment, and facilities needed to make progress and avoid delays.

b. Review and discuss the sequence of work required to construct a watertight and weathertight exterior building envelope and any questions relating to the window installation.

c. Discuss coordination of building occupants with work schedule

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: For manufacturer and installer.

B. Product Test Reports: For each type of vinyl window, for tests performed by a qualified testing agency.

C. Field quality-control reports.

D. Sample Warranties: For manufacturer's warranties.

1.5 WARRANTY

A. Manufacturer's Warranty: Manufacturer agrees to repair or replace vinyl windows that fail in materials or workmanship within specified warranty period. B. Failures include, but are not limited to, the following:

VINYL WINDOWS 085313 - 6

a. Failure to meet performance requirements.

b. Structural failures including excessive deflection, water leakage, and air infiltration.

c. Faulty operation of movable sash and hardware.

d. Deterioration of materials and finishes beyond normal weathering.

e. Failure of insulating glass. C. Warranty Period:

a. Window: 10 years from date of Substantial Completion.

b. Glazing Units: 10 years from date of Substantial Completion.

1.6 DELIVERY, STORAGE and HANDLING

A. Comply with Manufacturer’s/Dealer’s ordering instructions and lead time requirements to avoid construction delays.

B. Delivery: Deliver materials in Manufacturer’s standard packaging for protection of product.

C. Storage & Protection: Store products away from exposure to environmental conditions that may be harmful to materials.

D. Store materials off ground in an upright position. Provide cover from weather and construction activity.

E. Follow Manufacturer’s instructions on label applied to units.

2 PART 2 – PRODUCTS

2.1 MANUFACTURER

A. Products supplied by the following manufacturer or approved equal:

Milgard Manufacturing, Inc.

1010 54th Avenue East

Tacoma, WA 98424

(800)-Milgard (645-4273) milgard.com

B. Window Series: Milgard Tuscany® Series

2.2 WINDOW TYPE – HOROZONAL SLIDER

A. Frame: 3-1/4” minimum depth. Multi-chambered vinyl profile.

B. Sash: 1-1/4” minimum depth. Multi-chambered vinyl profile, includes vent stops located in fixed sash.

C. Sightlines: Equal for operating and fixed sash.

D. Structural Class:

a. 71-1/2” X 59-1/2” and smaller: HS-C40. E.

Hardware:

VINYL WINDOWS 085313 - 7

b.SmartTouch® direct action locking mechanism.

c. Nylon rollers with stainless steel axles, extruded vinyl snap-on monorail roller track.

d.Dual pull rails.

F. Weather-stripping: Fin seal polypropylene pile.

2.3 GLAZING SYSTEM

A. Manufacturer’s standard factory-glazing system that produces weathertight seal.

2.4 INSECT SCREENS: Provide tight fitting screen (with hardware) for operating windows A. Screen Frame:

A. Rolled Formed Aluminum Frame – Standard B. Screen Mesh.

B. Steel Screens – may have to be ordered separate from windows

2.5 FABRICATION

A. Fabricate frames and sash with mitered and fusion welded corners and joints.

B. Trim and finish corners and welds to match adjacent surfaces.

C. Provide concealed metal reinforcements in sash frame for attachment of lock mechanism.

D. Factory interior glaze with snap-on mitered PVC glazing stops matching bevels on the sash and frame. Insulated glass units shall be reglazable without dismantling sash framing.

2.6 FINISH

A. Frame Color:

a. Exterior: Match existing

b. Interior matched to exterior on White, Clay and Tan only. All other exterior finish colors have white interior. B. Screen Frame Color:

c. Matched to exterior frame color

2.7 SOURCE QUALITY CONTROL:

A. Inspect windows in accordance with Manufacturer's Quality Control Program as required by AAMA Gold Label Certification.

3 PART 3 – EXECUTION

3.1 EXAMINATION

A. Examine openings in which windows will be installed.

VINYL WINDOWS 085313 - 8

a. Verify that framing complies with AAMA 2400 (Mounting Flange Installation) & AAMA 2410 (Flush Fin Installation).

b. Verify rough opening dimensions, levelness of sill plate, and operational clearances.

c. Verify that fasteners in framed walls are fully driven and will not interfere with window installation.

d. Examine wall flashings, vapor retarders, water and weather barriers, and other built-in components to ensure weathertight window installation B. Coordinate with responsible entity to correct unsatisfactory conditions.

C. Commencement of work by installer is acceptance of substrate conditions.

3.2 INSTALLATION

A. Install windows in framed walls in accordance with AAMA 2400 (“Mounting Flange

Installation”) and/or AAMA 2410 (“Flush Fin Installation”).

B. Install windows level, plumb, square, true to line, without distortion, anchored securely in place to structural support, and in proper relation to wall flashing and other adjacent construction to produce weathertight construction. C. Do not remove temporary labels.

D. Install insect screens on operable windows.

3.3 CLEANING AND FINISHING

A. Remove temporary labels and retain for Closeout Submittals.

B. Clean soiled painted surfaces and glass using a mild detergent and warm water solution with soft, clean cloths.

END OF SECTION 085313

DOOR HARDWARE 087100 - 1

SECTION 087100 - DOOR HARDWARE

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Mechanical door hardware for the following:

a. Swinging exterior front doors.

b. Swinging interior doors

2. Cylinders for door hardware specified in other Sections.

3. Electrified door hardware.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Door hardware schedule.

C. Keying schedule.

1.3 INFORMATIONAL SUBMITTALS

A. Sample warranty.

1.4 CLOSEOUT SUBMITTALS

A. Maintenance data.

PART 2 - PRODUCTS

2.1 HINGES

A. Hinges: BHMA A156.1.

2.2 MECHANICAL LOCKS AND LATCHES

A. Lock Functions: As indicated in door hardware schedule.

DOOR HARDWARE 087100 - 2

B. Bored Locks: BHMA A156.2; Grade 1; Series 4000.

C. Mortise Locks: BHMA A156.13; Operational Grade 1; stamped steel case with steel or brass parts; Series 1000.

2.3 LOCK CYLINDERS

A. Lock Cylinders: Tumbler type, constructed from brass or bronze, stainless steel, or nickel silver.

B. Standard Lock Cylinders: BHMA A156.5; Grade 1 permanent cores; face finished to match lockset.

1. Core Type: Interchangeable.

C. Construction Master Keys: Provide cylinders with feature that permits voiding of construction keys without cylinder removal. Provide 2 construction master keys.

D. Construction Cores: Provide construction cores that are replaceable by permanent cores. Provide 2 construction master keys.

2.4 KEYING

A. Keying System: Factory registered, complying with guidelines in BHMA A156.28, appendix.

Provide one extra key blank for each lock.

1. No Master Key System: Only change keys operate cylinders.

a. Provide three cylinder change keys.

2. Existing System:

a. Master key or grand master key locks to Owner's existing system.

b. Re-key Owner's existing master key system into new keying system.

B. Keys: Brass.

1. Stamping: Permanently inscribe each key with a visual key control number and include the following notation:

a. Notation: "DO NOT DUPLICATE."

b. Provide 3 keys for each exterior door.

2.5 MECHANICAL STOPS AND HOLDERS

A. Wall- and Floor-Mounted Stops: BHMA A156.16.

DOOR HARDWARE 087100 - 3

2.6 THRESHOLDS

A. Thresholds: BHMA A156.21; fabricated to full width of opening indicated.

2.7 FOLDING DOOR HARDWARE

A. General: BHMA A156.14; complete sets including overhead rails, hangers, supports, bumpers, floor guides, and accessories indicated.

2.8 AUXILIARY DOOR HARDWARE

A. Auxiliary Hardware: BHMA A156.16.

2.9 FINISHES

A. Provide finishes complying with BHMA A156.18 as indicated in door hardware schedule.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Mounting Heights: Mount door hardware units at heights to comply with the following unless otherwise indicated or required to comply with governing regulations.

1. Wood Doors: DHI's "Recommended Locations for Architectural Hardware for Wood Flush

Doors."

B. Install each door hardware item to comply with manufacturer's written instructions. Where cutting and fitting are required to install door hardware onto or into surfaces that are later to be painted or finished in another way, coordinate removal, storage, and reinstallation of surface protective trim units with finishing work. Do not install surface-mounted items until finishes have been completed on substrates involved.

C. Hinges: Install types and in quantities indicated in door hardware schedule, but not fewer than the number recommended by manufacturer for application indicated or one hinge for every 30 inches (750 mm) of door height, whichever is more stringent, unless other equivalent means of support for door, such as spring hinges or pivots, are provided.

D. Lock Cylinders: Install construction cores to secure building and areas during construction period.

1. Replace construction cores with permanent cores.

3.2 ADJUSTING

A. Adjust and check each operating item of door hardware and each door to ensure proper operation or function of every unit. Replace units that cannot be adjusted to operate as intended. Adjust

DOOR HARDWARE 087100 - 4

door control devices to compensate for final operation of heating and ventilating equipment and to comply with referenced accessibility requirements.

END OF SECTION 087100

GYPSUM BOARD 092900 - 1

SECTION 092900 GYPSUM BOARD

1.1 SUMMARY

A. Section Includes:

1. Interior gypsum board.

2. Exterior gypsum board for ceilings and soffits.

3. Texture finishes.

1.2 ACTION SUBMITTALS

A. Product Data: For the following:

1. Gypsum wallboard.

2. Gypsum ceiling board.

3. Gypsum board, Type C.

4. Exterior gypsum soffit board.

5. Joint treatment materials.

6. Laminating adhesive.

7. Textured finishes.

B. Sustainable Design Submittals:

C. Samples: For each texture finish indicated on same backing indicated for Work.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Fire-Resistance-Rated Assemblies: For fire-resistance-rated assemblies, provide materials and construction identical to those tested in assembly indicated according to ASTM E119 by an independent testing agency.

B. STC-Rated Assemblies: For STC-rated assemblies, provide materials and construction identical to those tested in assembly indicated according to ASTM E90 and classified according to ASTM E413 by an independent testing agency.

2.2 GYPSUM BOARD, GENERAL

A. Size: Provide maximum lengths and widths available that will minimize joints in each area and that correspond with support system indicated.

GYPSUM BOARD 092900 - 2

2.3 INTERIOR GYPSUM BOARD

A. Gypsum Wallboard: ASTM C1396/C1396M.

1. Thickness: 1/2 inch (12.7 mm).

2. Long Edges: Tapered

B. Gypsum Board, Type X: ASTM C1396/C1396M.

1. Thickness: 5/8 inch (15.9 mm).

2. Long Edges: Tapered.

C. Gypsum Ceiling Board: ASTM C1396/C1396M.

1. Thickness: 1/2 inch (12.7 mm).

2. Long Edges: Tapered.

2.4 EXTERIOR GYPSUM BOARD FOR CEILINGS AND SOFFITS

A. Exterior Gypsum Soffit Board: ASTM C1396/C1396M,…