About this file
This is a statement of work for dockside repairs to the USCGC Isaac Mayo in fiscal year 2021. The Coast Guard requires cleaning and inspection of sewage, greywater, and ventilation systems; preservation of the mast and exterior surfaces; assessment of watertight closures; and thermographic inspection of electrical distribution systems. Repairs to soft patches and other discrepancies are also included. The contractor must submit cleaning plans, inspection reports, and ensure all work meets preservation standards. The closing date for the solicitation is April 5, 2021, with an anticipated award date of April 19, 2021. Pricing will be based on the provided price schedule.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 2- REV-0 3 APR 20-SPECIFICATION-STATEMENT OF WORK.pdf | ||
| ISAAC MAYO SOLICITATION 70Z080-21-Q-P4500800.pdf | ||
| ATTACHMENT 1-SCHEDULE OF SERVICES-BLANK PRICE SCHEDULE.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC ISAAC MAYO (WPC 1112)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2021
Developed By: Matthew W Kennedy
(Draft-1, 20 April 2020)
USCGC ISAAC MAYO (WPC-154) DOCKSIDE AVAILABILITY FY2021
ii (Draft-1)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. vi Consolidated List of Critical Inspection Items ........................................................................................... vii Principal Characteristics ............................................................................................................................ viii General Requirements WORK ITEM 1: U/W Body (waterborne), Clean and Inspect WORK ITEM 2: SSDG Plenum and Softpatch, Repair WORK ITEM 3: Mast (In Place), Partial Preserve WORK ITEM 4: Watertight Closures, Assess WORK ITEM 5: Electrical Power Distribution System, Thermographic Inspection (450 VAC And
Below) WORK ITEM 6: Machinery Ventilation System, Clean WORK ITEM 7: HVAC Duct System, Clean WORK ITEM 8: Sewage and Grey Water System, Clean and Inspect WORK ITEM 9: Grey Water Tank, Preserve (Opt) WORK ITEM 10: Interior Wet Deck Coverings, Reseal WORK ITEM 11: Topside Exterior Surfaces, Preserve (Partial) iii (Draft-1)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Draft-1)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 154 WPC 111-301, Rev B, Shell Expansion
Coast Guard Drawing 154 WPC 127-302, Rev C, Potable Water & Sewage Tank Fabrication Details
Coast Guard Drawing 154 WPC 131-301, Rev D, Scantlings – Main Deck
Coast Guard Drawing 154 WPC 161-301, Rev C, Skegs and Stern Tubes Support Structures
Coast Guard Drawing 154 WPC 171-201, Rev D, Mast A&D
Coast Guard Drawing 154 WPC 320-301, Rev E, 450V System Deck Plan
Coast Guard Drawing 154 WPC 330-301, Rev G, 120V System Deck Plan
Coast Guard Drawing 154 WPC 506-201, Rev A, Fills Vents, Sounds, and Overflows
Coast Guard Drawing 154 WPC 506-301, Rev -, Fills, Vents, Sounds, Overflows Diagram
Coast Guard Drawing 154 WPC 512-201, Rev -, HVAC Arrangement
Coast Guard Drawing 154 WPC 512-301, Rev B, HVAC System Diagram
Coast Guard Drawing 154 WPC 512-305, Rev -, HVAC Equipment List
Coast Guard Drawing 154 WPC 513-201, Rev B, Machinery Ventilation Arrangement
Coast Guard Drawing 154 WPC 513-301, Rev C, Machinery Ventilation Diagram
Coast Guard Drawing 154 WPC 528-301, Rev B, Grey Water System Diagram
Coast Guard Drawing 154 WPC 562-201, Rev A, Rudder Details
Coast Guard Drawing 154 WPC 565-201, Rev -, Fin Stabilizer System A & D
Coast Guard Drawing 154 WPC 568-201, Rev B, Bow Thruster System A & D
Coast Guard Drawing 154 WPC 593-201, Rev F, Sewage System Arrangement
Coast Guard Drawing 154 WPC 593-301, Rev C, Sewage System Diagram
Coast Guard Drawing 154 WPC 593-303, Rev A, Sewage Control System
Coast Guard Drawing 154 WPC 601-302, Rev D, General Arrangement
Coast Guard Drawing 154 WPC 631-301, Rev C, Paint and Preservation Schedule
Coast Guard Drawing 154 WPC 633-301, Rev C, Cathodic Protection System
Coast Guard Drawing 154 WPC 997-302, Rev -, Docking Plan
Coast Guard Drawing 154WPC 634-301, Rev B, Deck Covering Schedule
Coast Guard Drawing 154-WPC-167-201, Rev F, Schedule of Doors, Manholes, and Hatches v (Draft-1)
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 8123, 25 SEP 2019, Preliminary - Heating, Ventilation, and Air Conditioning System - Frc-514-P1
Surface Forces Logistics Center Maintenance Procedure Card B10015.D (MPC B10015.D), 10/31/19, Insp/Cln U/W Equipment (Hull Plate)
Surface Forces Logistics Center Maintenance Procedure Card B10018.D (MPC B10018.D), 2/29/2020, replace Underwater Zinc Anodes
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2018, Clean Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2018, Temporary Hull Accesses
OTHER REFERENCES
American Society for Nondestructive Testing, SNT-TC-1A: Personnel Qualification and Certification in Nondestructive Testing, 2016
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets vi (Draft-1)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
1 N Anode, stern tube P/N: Z0020202H3 NIIN:
016445483 16 ea 50
1 N Nut, Self-Lockin P/N: 90715A145 NIIN:
015085774
32 ea 5
1 N Annode, Sea Chest Grate
P/N: GA-4 NIIN: 016476179 4 ea 30
1 N Screw, Prop zinc plate P/N: 950756 NIIN:
016340210
8 ea 5
1 N Screw, stern tube covers
P/N: 90585A626 NIIN:
016161107
42 ea 5
1 N Zinc plate, propeller P/N: 950733 NIIN:
016278941
2 50
8 N **Sewage Tank Zinc Anode
NIIN: 014474686 2 142.19
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter vii (Draft-1)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item
Title
8 Sewage and Grey Water System, Clean and Inspect viii (Draft-1)
PRINCIPAL CHARACTERISTICS
154' WPC (SENTINEL CLASS)
PHYSICAL
Anchor ROCNA, anchor, 150 KG/ 331 LB, Stainless Steel Bulkheads (7), Watertight Bulkheads located below the Main Deck Displacement, delivery, light ship 302 Metric Tons Draft, full load 2.58 Meters (8.46 Feet) End of service life displacement 353 Metric Tons Framing Longitudinal Full load displacement 353 Metric Tons Height of highest projection 17.22 Meters (56.5 Feet) Length overall (loa) 46.80 Meters (153.5 Feet) Maximum beam 7.75 Meters (25.43 Feet) Minimum operating displacement 314 Metric Tons Waterline length (lwl) 44.35 Meters (145.5 Feet)
HULL
Hull/main weatherdeck material AH-36 Steel Superstructure 5456-H1111 Aluminum
MACHINERY
Bow thruster Schottel STT 60 LK Diameter of propeller 1900 mm Emergency service generator (edg) Cummins 6BTA5.9-DM Diesel with Stanford 93KW Generator Fin stabilizer (2), Quantum QC1500 Main propulsion (2), MTU 20V4000 M93L, Sequential Turbo-Charged Diesels Number of blades 6 Number of propellers (2) Michigan Wheel Marine Propeller pitch capability Fixed Propulsion shafts (2), Electralloy Nitronic 50HS (9430mm) Shafts Reduction gears (2), ZF 23560C/D Series Rudders (2), 316L Stainless Steel Shaft rotations per minute 478 Shaft(s) bearing, aft (2), Duramax Bearings Shaft(s) bearing, intermediate (2), Duramax Bearings Shaft(s) diameter 8 Inches Shaft(s) Seal (2), Wartsila Mechanical Seals Ship service generators (2), Cummins QSM11-DM Diesels with Stanford 317KW Generator
TANK CAPACITIES AT 95% LIQUID LOAD (22,958 TOTAL GALLONS)
Fresh water tank, port (3-38-2-w) 708 gal Fresh water tank, stbd (3-38-1-w) 756 gal Fuel oil edg day tank (1-10-1-f) 134 gal Fuel oil gen. ovrflw tnk, ctr. (3-40-0-f) 1,159 gal Fuel oil overflow tank, center (3-10-0-f)
616 gal
Fuel oil service tank, #1 port (3-17-2-f) 1,750 gal Fuel oil service tank, #1 stbd (3-17-1-f) 1,750 gal Fuel oil service tank, #2 port (3-40-2-f) 890 gal Fuel oil service tank, #2 stbd (3-40-1-f) 890 gal Fuel oil storage tank, #1 center (3-11-0- 5,040 gal ix (Draft-1)
f) Fuel oil storage tank, #2 center (3-23-0-f)
5,350 gal
TANK CAPACITIES AT 95% LIQUID LOAD (22,958 TOTAL GALLONS)
Grey water tank, (3-17-0-w) 2,668 gal.
Lube oil storage tank, (2-35-2-f) 146 gal.
Oily water tank, (3-34-1-w) 336 gal.
Sewage collection tank, (3-6-0-w) 429 gal.
Waste oil tank, (3-34-2-f) 336 gal.
1 (Draft-1)
00000_0220_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Draft-1)
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
Or
Or
A-Team Note: Determine whether the Contractor or the Coast Guard will provide fire watches; then select applicable paragraph 3.2 above (fire watch, fire extinguisher s, or a combination of both requirements), and delete the others. Under normal circumstances, for all cutters, fire watch personnel for contract work will be provided by ship's force with the contractor providing fire extinguishers. For situations involving a small cutter crew (such as WLIC and WLR tenders) and an inordinate amount of hot work or multiple shift work, the A-team may consider the requirement for contractor provided fire watch personnel or a combination of both fire watch and fire extinguishers.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
WMEC 270B class cutters APM:
270’s APM: Add the “NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure” to the References Section, if this package is for a 270 “B- Class” cutter.
The following paragraphs 3.4.1, 3.4.2 and 3.4.3 are for 270B cutters only!
Change the following content of these three (3) paragraphs, and the follow-on “NOTE” box to the Normal, Paragraph Title, Note Title, and Note Body styles when included in this General Requirements WI.
3.4.1 HY-130 material substitution. The Contractor shall be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material
3 (Draft-1) properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 shall be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-130.
3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with NAVSEA TP 1688. The Contractor shall be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-Class” cutters, the Contractor shall provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s shall be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor shall ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 shall be considered the same as those for welding HY-130.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
APM: Select the appropriate 3.5.1 paragraph(s) for the location of the planned availability. Delete the other 3.5.1 paragraph(s).
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
Or
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
4 (Draft-1)
APM: For availabilities to be conducted at Coast Guard facilities, the Contractor must be provided the USCG Activity Generator Status for the Coast Guard Facility.
Provide the Generator Status code in paragraph 3.5.1.1, and other applicable environmental permits in paragraph 3.5.1.2 below.
Ensure the CG Base or Sector Environmental POC for this is actively engaged in the early planning for this availability to ensure the Facility can accommodate the planned work.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is _________.
APM: If applicable, provide the list of unit-specific plans and permits required, and provide description of the specifics of these plans in paragraph 3.5.1.2. Otherwise delete paragraph 3.5.1.2.
CG Base or Sector Environmental POC must provide these details.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
APM: Retain further 3.5 paragraphs for all availabilities.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a
5 (Draft-1) collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC Standard Specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2018 Edition Standard Specifications and supersede published content:
None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
6 (Draft-1)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
7 (Draft-1)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
8 (Draft-1)
QA-3A - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
9 (Draft-1)
QA-3B - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
10 (Draft-1)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
11 (Draft-1)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
12 (Draft-1)
11001_JLW_0319_154WPC
WORK ITEM 1: U/W Body (waterborne), Clean and Inspect
1. Scope
1.1 Intent. This work item describes the requirements for the Contractor to clean the vessel’s U/W body and to renew zinc anodes, while the vessel is moored pier side.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
N Anode, stern tube P/N: Z0020202H3
NIIN: 016445483
16 ea 50
N Nut, Self-Lockin P/N: 90715A145
NIIN: 015085774
32 ea 5
N Annode, Sea Chest Grate P/N: GA-4
NIIN: 016476179
4 ea 30
N Screw, Prop zinc plate P/N: 950756
NIIN: 016340210
8 ea 5
Screw, Sea Chest Grate
Anode, P/N: 93190A634, NIIN: 016197182
4 ea 5
N Screw, stern tube covers P/N: 90585A626
NIIN: 016161107
42 ea 5
N Zinc plate, propeller P/N: 950733
NIIN: 016278941
2 50
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 154 WPC 111-301, Rev B, Shell Expansion
Coast Guard Drawing 154 WPC 161-301, Rev C, Skegs and Stern Tubes Support Structures
Coast Guard Drawing 154 WPC 562-201, Rev A, Rudder Details
Coast Guard Drawing 154 WPC 565-201, Rev -, Fin Stabilizer System A & D
Coast Guard Drawing 154 WPC 568-201, Rev B, Bow Thruster System A & D
Coast Guard Drawing 154 WPC 997-302, Rev -, Docking Plan
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
13 (Draft-1)
Surface Forces Logistics Center Maintenance Procedure Card B10015.D (MPC B10015.D), 10/31/19, Insp/Cln U/W Equipment (Hull Plate)
Surface Forces Logistics Center Maintenance Procedure Card B10018.D (MPC B10018.D), 2/29/2020, replace Underwater Zinc Anodes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not Applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Requirements. The Contractor shall submit video highlights of underwater body surfaces (e.g. bow thruster, propellers, rudders, transducers, heavily fouled hull areas, etc.) before and after cleaning.
Referring to drawings listed in Section 2, the Contractor shall clean the U/W body surfaces free of all marine growth, debris, and all other surface contaminants in accordance with MPC B10015.D. Renew Government-furnished components listed below paragraph 1.2. in accordance with MPC B10018.D.
Ensure all transducer surfaces are cleaned with only hand held brushes, without the use of power attachments. Ensure that existing u/w body coating system or non-coated surfaces do not incur any damage during cleaning process.
4. NOTES
This section is not applicable to this work item
14 (Draft-1)
13100_JLW_0919_154WPC
WORK ITEM 2: SSDG Plenum and Softpatch, Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the seal between SSDG aluminum softpatches and the steel main deck plating as designated below. While the softpatch(es) are removed identify and correct all other discrepancies associated with the softpatches and surrounding structure that can be performed most economically while the softpatches are removed.
TABLE 1 – KNOWN DISCREPANCIES
SOFTPACH DISCRIPTION OF DISCREPANCIES
PORT DISCREPANCY: Both soft patches are failing, allowing water intrusion into the generator room on both sides, with more extensive damage on the STBD side. There is water dripping onto the generator and corrosion on the deck and patch itself. About 1/4 of the entire gasket is visibly damaged as identified from the weather deck. Corrosion is apparent along approximately 20' of the gasket. Estimated 2" on either side of the gasket need PPP, likely including the lip where the patch rests. Without removing the non-skid, an estimated total of 10 sqft of metal needs PPP.
On the port side, there is salt buildup on the overhead in the generator room, indicating the gasket is failing, an estimated total of 2 sqft of metal that needs PPP.
STBD DISCREPANCY: Same as PORT, see above.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 154 WPC 131-301, Rev D, Scantlings – Main Deck
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes
15 (Draft-1)
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
N/A
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.3.1 Tenting. While softpatches are removed take all necessary precautions (e.g. erect tenting, covers, etc.) to ensure no foreign materials (e.g. water, dust, etc.) enter the vessel.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Softpatch seal renewal. The Contractor shall remove the soft patch or patches designated in Table 1 above, renew the disturbed seal assemblies (e.g. rubber gasket, RTV, etc.) and all associated hardware and fasteners. After removal conduct a visual inspection of all softpatch surfaces and surrounding structure to identify all discrepancies. Submit a CFR describing all discrepancies and recommended repairs. Existing discrepancies may be identified in Table 1 above, include those discrepancies in the CFR with any appropriate modification to those descriptions. After the completion of all authorized repairs reinstall the softpactahes with new seal assemblies and fasteners. Where stainless steel fasteners contact aluminum surfaces, install neoprene, nylon, or PTFE (Teflon) washers or apply a layer of marine sealant to prevent galvanic corrosion.
3.2.1 Repairs. If the KO releases a Change Request/Modification, perform all authorized repairs specified therein.
3.3 Boundary test, water hose. The Contractor shall inspect and perform a water hose test of all affected boundaries in accordance with SFLC Std Spec 0740, Appendix C. Submit a CFR.
16 (Draft-1)
3.4 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs).
None.
17 (Draft-1)
17010_JLW_0319_154WPC
WORK ITEM 3: Mast (In Place), Partial Preserve
1. SCOPE
NOTE TO EPOs/DeckDept, PEs, and APMs
TDB
1.1 Intent. This work item describes the requirements for the Contractor to partially preserve the mast.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 154 WPC 171-201, Rev D, Mast A&D
Coast Guard Drawing 154 WPC 601-302, Rev D, General Arrangement
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
3.1.2 Tech Rep.
18 (Draft-1)
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Coast Guard removal of mast mounted items in way mast preservation work. Immediately after installation of staging or other measures allowing access to the mast, the Contractor shall allow Coast Guard reps. up to 4 days access to the mast so that most items (e.g. radars, antennae, lights, cable, etc.)
may be removed. Notify the COR after preservation work is complete, leaving staging in place, and grant Coast Guard reps. mast access for an additional 7 days so that items that were removed can be reinstalled.
NOTE
The Coast Guard will remove most of the interferences in way of mast partial preservation. Some items may be left on their foundations, pending coatings inspections, if removal is not warranted. These details will be discussed and finalized during the inspection detailed in paragraph 3.3 below.
Any additional minor interferences shall be handled by the contractor.
3.1.5 Interferences. The Contractor shall handle all other interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Staging. To facilitate complete and unobstructed access to MDE soft patches located on the 01 Level aft of the pilot house, any staging that is installed concurrently with any MDE rigging evolutions shall not extend more than 3 LF aft of the aft-most point of the pilot house roof. Staging shall comply with all OSHA regulations.
3.3 Inspection. After installation of staging, and in the presence of the COR or other Coast Guard reps., inspect all mast surfaces for discrepancies (e.g. failed coatings, damage, corrosion, etc.). Submit a CFR detailing any additional discrepancies not already covered by the scope description provided herein.
NOTE
The Contractor is reminded that after all damaged coatings have been repaired that a coat of spar paint shall be applied to the entire mast, i.e. every square inch of existing spar paint on the mast shall be over-coated with a fresh coat of spar paint, i.e. apply "top-coat" of spar paint over the entire mast after all other coating repairs have been performed.
3.4 Preservation requirements. Referring to Coast Guard Drawing 154 WPC 171-201 and 154 WPC 601-302, the Contractor shall prepare and coat the aluminum mast, using the system specified in SFLC Std Spec 6310 for "Freeboard/Superstructure/Mast (Freeboard/Superstructure, Aluminum or Galvanized Aluminum), Option I", Appendix A (Cutters and Boats Painting Systems). Select Spar (10371) as the top/finish color by performing touch-ups and minor coating repairs to all failed areas, up to 33% of the
19 (Draft-1) mast surface (for pricing purposes), and then apply one finish coat, 6 mils or less, to the entire mast for aesthetic purposes. Abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph titled "Preservation requirements – general”.
NOTE
Surfaces being preserved are considered "critical-coated surfaces".
3.5 Weather proofing of connections and reinstallation. The Contractor shall verify that final electrical re-connections of all removed equipment are weather tight. At a minimum, perform the following.
3.5.1 Weather proofing of coaxial cable connectors. Clean the entire plug. Apply a commercially available dielectric compound (e.g. Dow Corning #4 or equivalent) to the interior and exterior including the insulation portion and the threads. Do not fill the air space in the plug with dielectric compound as this will change the impedance and cause a mismatch. Assemble the plug finger tight and tightly wrap a single layer of a commercially available ¾” wide synthetic resin tape with a 50% overlay over the entire plug and for a distance of two inches on each side. Then apply a layer of friction tape and at least 3 coats of a commercially available sealing compound (e.g. 3M™ Scotchkote™ Electrical Coating or equivalent).
3.5.2 Weather proofing of Non coaxial electrical or electronic connectors. Apply a commercially available dielectric compound (e.g. Dow Corning #4 or equivalent) to the interior portion of the connector threads. Encapsulate the connector termination and at least 3 inches of the interconnecting cable and/or MS series panel mount connector with a commercially available plastic electrical insulating adhesive tape. Seal this transition with a commercially available multi-purpose silicone sealing compound (e.g.
Dow Corning 732 Multi-Purpose silicone sealing compound or equivalent) that conforms to MIL-A- 46106. Do not apply silicone sealing compound directly to the metal connector surfaces as a slight corrosion will occur.
20 (Draft-1)
16700_JLW_0319_154WPC
WORK ITEM 4: Watertight Closures, Assess
APM: Do not edit any part of the Work Item Title.
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform a condition assessment of all installed watertight closures listed in Table 1.
TABLE 1
WATERTIGHT DOORS LOCATIONS (11)
1 Mid-Main Deck Stbd 1-27-1 (Passage 1-17-0-L) 2 Mid-Main Deck Port 1-27-2 (Passage 1-17-0-L) 3 FWD DC Locker 1-11-2 4 Aft DC Locker 1-35-1 5 Magazine Room 1-8-1 6 Emergency Generator Room 1-10-1 7 Generator Room 3-35.5-1 8 Passage 2-25.5-0 9 Passage 2-17-0 10 Main Engine Room 3-27-1 11 FWD Aux. Space 2-10-0
WEATHERTIGHT DOORS LOCATIONS (3)
12 Mid “01” Weather Deck Starboard (Pilot House) 01-22-1 13 Mid “01” Weather Deck Port (Pilot House) 01-22-2 14 Aft “01” Weather Deck (Pilot House) 01-27-0
HATCH LOCATIONS (13)
15 Forward “01” Weather Deck 1-15-1 16 Pilot House Fwd Lockers 01-19-1 17 Pilot House Fwd Lockers 01-19-2 18 Pilot House Fwd Lockers 01-19-3 19 Pilot House Fwd Lockers 01-19-4 20 Fwd Main Deck Boatswain Storage 21 Fwd Aux. Space 1-6-1 22 Aft Main Deck Main Engine Room 1-34-2 23 Aft Main Deck Generator Room 1-39-2 24 Aft Main Deck Port Steering Gear Room 1-41-1 25 Aft Main Deck Stbd Steering Gear Room 1-41-2 26 Passage 1-16-1 27 Mess Deck 1-17-1
MANHOLE LOCATIONS (2)
28 Boatswain Storage (Void Space) 1-2-2 29 Gun Foundation
21 (Draft-1)
1.2 Government-furnished property.
2. REFERENCES
APM: If editing a WI's References, change the same reference in the Spec's Consolidated List of References and send feedback to the WI's Developer.
COAST GUARD DRAWINGS
Coast Guard Drawing 154-WPC-167-201, Rev F, Schedule of Doors, Manholes, and Hatches
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.1.5 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and non-destructive examination (NDE) in accordance with SFLC Std Spec 0740.
22 (Draft-1)
3.2. Watertight closure assessment. Using Coast Guard Drawing 154-WPC-167-201 as reference, the Contractor shall perform an assessment of all watertight closures listed in Table 1 as follows. Submit CFR with results of inspections including recommendations for repair or renewal:
3.2.1 Inspect all watertight closures for loose, missing or damaged parts; wear of hinge pins and striker plates; and clogged drain lines where applicable.
3.2.2 Operate closures through complete dogging cycle, checking for binding and/or difficult operation.
3.2.3 Inspect closure gasket for the following:
3.2.3.1 Paint/foreign matter, cracks, or deterioration.
3.2.3.2 Uneven or excessive depression (greater than 1/8”).
3.2.3.3 Gaps greater than 1/16” where ends meet, or any ends that meet in a radius (except for round closures).
3.2.4 Apply grease to all intact grease fittings. Note any missing or broken fittings.
3.2.5 Inspect closure knife edge for nicks and gouges. Minor gouges shall be repaired by filing smooth.
NOTE
If the nick or gouge has a gap greater than 1/16”, the knife edge may require weld buildup prior to filing smooth in order to keep the knife edge fair.
3.2.6 Chalk test. Perform a chalk test of all inspected closures in accordance with SFLC Std Spec 0740, Appendix C.
3.2.7 Water hose test. Perform a water hose test of all watertight closure boundaries in accordance with SFLC Std Spec 0740, Appendix C.
3.3 Repair change request authorization. If a Change Request has been authorized and released by the Contracting Officer (KO), the Contractor shall execute minor repairs as identified by CFR to return closure(s) to operable condition and/or restore watertight integrity. Minor repairs are defined as adjustments, spare parts renewals, hinge bracket renewal/relocation, and knife edge repairs.
3.4 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been repaired to be in satisfactory operating condition.
3.5 Personnel training. While conducting assessments, the Contractor shall provide training on maintenance and repair of watertight closures to Ship’s Force personnel designated by cutter Engineering Petty Officer (EPO).
This is the start of the file's text. The full file is on GovTribe.