Attachment 2 QASP - FINAL.pdf
PDF 113 KB Posted
- Attached to
- Fighter Jet Services Federal contract opportunity
- Solicitation number
- N0042119R0011
About this file
This document outlines a Quality Assurance Surveillance Plan (QASP) for a fighter jet services contract. The Naval Air Systems Command (NAVAIR) Program Manager Air (PMA) 226 Specialized and Proven Aircraft Program Office, Contracted Air Services (IPT) has a requirement for Contractor Owned Contractor Operated (COCO) fighter jet aircraft to provide services to the Department of the Navy (DoN), United States Marine Corps (USMC) Fleet customers, and other Department of Defense (DoD) agencies. The single-award, indefinite-delivery/indefinite-quantity contract will have a four-year period of performance and be awarded on a firm-fixed-price basis. The QASP describes how the government will monitor contractor performance against critical standards in the areas of aircraft certification and operational mission requirements, data reporting, and incentives. It outlines roles for the contracting officer, contracting officer's representative, and performance evaluation methods including the Contractor Performance Assessment Reporting System and quality assurance checklists to be maintained in the government's quality assurance file.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-19-R-0011 Attachment 2
Quality Assurance Surveillance Plan (QASP)
For Contracted Air Services (CAS)
Fighter Jet Services
1. Purpose
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to ensure the systematic quality assurance methods are used in the administration of the performance based service tasks under the planned contract. The intent is to ensure that the Contractor performs in accordance with the performance metrics, the Government receives the quality of services required under the contract, and that the actual performance results are documented in accordance with this plan.
This QASP describes how the Government will observe, evaluate and document the contractor's performance in meeting the critical performance standards identified in the contract and task orders.
Specifically, the QASP will identify the Government resources responsible for monitoring performance and surveillance methods that will be utilized in determining the quality level of services and products delivered under the contract. The intent is to establish and properly execute a QASP that will assist the Government in obtaining services from the contractor.
Naval Air Systems Command (NAVAIR) Program Manager Air (PMA) 226 Specialized and Proven Aircraft Program Office, Contracted Air Services (CAS) Integrated Product Team (IPT) has a requirement for Fighter Jet Services to provide Contractor Owned Contractor Operated (COCO) aircraft to the Department of the Navy (DoN) and United States Marine Corp (USMC) Fleet customers and other Department of Defense (DoD) agencies.
The resultant contract vehicle anticipated for this effort is a performance-based, Firm Fixed Price (FFP) Single Award, Indefinite-Delivery/Indefinite-Quantity (IDIQ) type contract. The contract will have a four-year, 364-day ordering period. A properly executed and administered QASP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this QASP is provided under Contract Section E - Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in the contract, to be executed by the Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP. The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract.
The QASP on the other hand, is put in place to provide Government surveillance and oversight of the Contractor's efforts to assure that they are timely, effective, and are delivering the results specified in the order.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is AIR 2.5.1.13. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
5. Responsibilities
The following Government resources shall have responsibility for the implementation of this QASP:
Contracting Officer - The Contracting Officer shall monitor performance of all necessary actions for effective contracting, ensure compliance with the terms of the contract and safeguard the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor's performance.
Contracting Officer's Representative (COR) - The COR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor's performance. In addition to the continuous monitoring of performance, the COR will also submit an annual assessment in the Navy's Contractor Performance Assessment Reporting System (CPARS). In CPARS, the COR assesses general quality of product or service, schedule, cost control, business relations, management, small business compliance, and other important areas. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government's behalf. Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.
6. Methods of Quality Assurance (QA) Surveillance
Contractor Performance Assessment Reporting System (CPARS) - CPARS reports will impact the determination to issue task orders under this contract and will impact the contractor's ability to compete on future DoD contracts. As such, the successful offeror has a vested interest in the Government generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed annually. This evaluation will be one determinant in the continuation of issuing task orders under this contract. The Government for this procurement will address the quality of product or service, schedule, cost control, management, and other areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.
QASP - The below listed methods of surveillance shall be used by the COR in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of QA surveillance is the Surveillance Activity Checklist provided as Enclosure (4) herein.
7. Surveillance
Enclosures (1), (2), and (3) sets forth the Fleet Fighter Jet Services Misson/Performance Standards, Data
Performance Standards, and Contractor Incentives. Enclosure (4) provides the checklist and means for the COR to document, on a monthly basis, the results of surveillance, which shall be provided to the Contracting Officer on a quarterly basis.
8. Documentation
In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government's performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of each task order.
9. Enclosures
Enclosure (1) – Fighter Jet Services Mission/Performance Standards Enclosure (2) - CDRL Data Performance Standards Enclosure (3) - Incentives Enclosure (4) – Fighter Jet Services Activity Checklist
N00421-19-R-00011
FIGHTER JET SERVICES
MISSION/PERFORMANCE STANDARDS
PBWS Task Description
Performance Standards Required and Tied to
CPARS Ratings
Surveillance Method/Measure
Incentives
Aircraft Certification and Operational Mission Requirements and Qualified Personnel:
Provide Fighter Jet Services Contracted Air Support in support of USN Fleet and other DoD customers utilizing aircraft which meet the performance requirements within the
PBWS.
Metric 1 Provide the prescribed aircraft and required crew & payload 95% of the time to be mission effective.
95% = Exceptional 90% = Very Good 85% = Satisfactory 80% = Marginal <80% = Unsatisfactory
100% Inspection by COR and customer feedback.
Example:
Mission Effectiveness is the total sorties flown in which the aircraft’s function as required by the PBWS and in accordance with scheduled flights / sorties prescribed by Scheduling Officer (SO) / NAWDC or USMC Course Coordinator divided into the total sorties scheduled to achieve percentage (e.g. 49 flown/50 scheduled = 98%). Excludes canceled sorties by customer or due to weather related occurrences.
See enclosure 3.
Maintain Accountability of Government Furnished Property (GFP) IAW the PBWS and DI- MGMT- 81947B
Metric 2 Contractor shall account for 100% of GFP. Reports shall be submitted semi- annually and in compliance with Dl-MGMT- 81947B.
100% = Satisfactory <100% = Unsatisfactory
Government- performed random on-site physical audits combined with 100% inspection by COR of customer GFP reports submitted per DI-MGMT-81947B of Contractor assigned GFP against the contract master list of assigned
GFP.
Example:
Take total number of GFP items issued from the Government to the Contractor compared to the 1149 list and complete reports submitted, then divide the total GFP items accounted for during physical audit and divide by total GFP issued by Government to derive percentage (299/300 = 99.7%).
Enclosure (1)
Safety Program Compliance: Establis h, Maintain and Comply with GFR approved flight and ground operating procedures and an Aviation Safety and Mishap Prevention Program in accordance with the PBWS and DCMA
INST 8210.1C.
Metric 3
Contractor shall maintain compliance with all safety requirements by category:
1. Aircraft air & ground mishaps
2. Non-compliance with hazmat policy.
Contractor goal is 100% compliance with a Satisfactory metric of 98%
100% = Exceptional 99% = Very Good 98% = Satisfactory 97% = Marginal <97% = Unsatisfactory
100% Inspection by COR and customer feedback. Example:
Take total number of days that the Contractor is unable to provide mission support due to safety related incidents in the reporting cycle and subtract that total from the total number of days in the CPARS cycle (example: 365 – 5 = 360)...then divide that number by total number of days in the CPARS cycle to derive percentage (example 360/365 = 98.6%).
Fuel Accountability Compliance in accordance with the
PBWS.
Metric 4 Contractor shall maintain accurate fuel consumption tracking between fuel (AIR) cards, fuel receipts, flight logs, and fuel receipts, with a goal of 100% accurate tracking and a Satisfactory metric of 95%.
100% = Exceptional 97% = Very Good 95% = Satisfactory 90% = Marginal <90% = Unsatisfactory
100% Inspection by COR and customer feedback.
Example:
Provide evidence that the fuel (AIR) card charge receipts match with flight log and fuel receipts.
Take total fuel transactions (receipt amounts and gallons dispensed) and compare/match aggregate cost, gallons, fuel log, and flight log information.
Perform sample audit each month of transaction IAW MIL-STD-105D using normal, single sample plan using Acceptable Quality Level (AQL) 0.4 or 4%. Use table I General Inspection Level II for sample size determination. Use table II-A for sample plan. Aggregate 12 months of audits into % compliance. Take each months results (pass/fail) 12/12=100% compliance.
Enclosure (1)
CDRL DATA PERFORMANCE STANDARDS
PBWS/CDRL #
Standard
Performance Standards
Required Surveillance Method/
Measure
Incentives
CDRL A001-
Airworthiness and Related Substantiation Data
Submission is in accordance with the Data Item Description (DID) cited in the
CDRL
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by COR and/or technical points of contacts as indicated on CDRL
See enclosure 3.
CDRL A002-
Management Plan
Submission is in accordance with the DID cited in the CDRL
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by COR and/or technical points of contacts as indicated on CDRL
See enclosure 3.
CDRL A003-
Fuel Chit Report
Submission is in accordance with the DID cited in the CDRL
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by COR and/or technical points of contacts as indicated on CDRL.
See enclosure 3.
CDRL A004-
Contractor's Progress, Status and Management Report
Submission is in accordance with the DID cited in the CDRL
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by COR and/or technical points of contacts as indicated on CDRL
See enclosure 3.
CDRL A005-
Government Furnished Property (GFP) Inventory and Forcasting Report
Submission is in accordance with the DID cited in the CDRL
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by COR and/or technical points of contacts as indicated on CDRL.
See enclosure 3.
CDRL A006-
Operations Security (OPSEC) Plan
Submission is in accordance with the DID cited in the CDRL
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by COR and/or technical points of contacts as indicated on CDRL
See enclosure 3.
CDRL A007 –Integrated Master Schedule (IMS)
Submission is in accordance with the DID cited in the CDR
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by COR and/or technical points of contacts as indicated on CDRL
See enclosure 3.
Enclosure (2)
INCENTIVES
The following incentives shall apply to performance under this contract:
Assessment Period
Acceptable Performance
Definition
How Measured Incentives
Year 1
All measurement areas rated** "Satisfactory" or above.
Annual Assessment Period: (12th month into contract period).
Evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for issuance of task orders in Year 2* (+) Receives a positive assessment (CPARS), appropriate for the quality of service provided.
(-) Does not meet the acceptable performance definition as a condition for issuance of task orders in Year 2* (-) Receives a negative assessment (CPARS), appropriate for the quality of service provided.
Year 2 areas rated** "Satisfactory" or above.
Annual Assessment Period: (24th month into contract period).
Evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for issuance of task orders in Year 3* (+) Receives a positive assessment (CPARS), appropriate for the quality of service provided.
(-) Does not meet the acceptable performance definition as a condition for issuance of task orders in Year 3*
Year 3 areas rated** "Satisfactory" or above.
Annual Assessment Period: (36th month into contract period).
Evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for issuance of task orders in Year 4* (+) Receives a positive assessment (CPARS), appropriate for the quality of service provided.
(-) Does not meet the acceptable performance definition as a condition for issuance of task orders in Year 4*
Year 4 areas rated** "Satisfactory" or above.
Annual Assessment Period: (48th month into contract period).
Evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for issuance of task orders in Year 5* (+) Receives a positive assessment (CPARS), appropriate for the quality of service provided.
(-) Does not meet the acceptable performance definition as a condition for issuance of task orders in Year 5*
Year 5 areas rated** "Satisfactory" or above.
Annual Assessment Period: (60th month into contract period).
Evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition - Receives a positive final assessment (CPARS), appropriate for the quality of service provided.
(-) Does not meet the acceptable performance definition - Receives a negative final assessment (CPARS), appropriate for the quality of service provided.
*The Government reserves the right to not issue task orders unless all regulatory requirements are met and the contractor meets the acceptable performance definition.
**Evaluation Ratings will be in accordance with FAR 42.1503. Enclosure (3)
FIGHTER JET SERVICES
ACTIVITY CHECKLIST
Monthly Surveillance Format Used:
The COR will perform a monthly assessment of Quality, Schedule, Cost Control, Management Responsiveness, Utilization of Small Business, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure (3).
Description Surveillance
Method/Measure Date Planned
Date Completed
Quality Metric =
Schedule Metric =
Cost Control Metric =
CPARS
Mgmt.
Metric
CPARS
Utilization of Small Business (yes/no)
Other Areas
As described above and in Enclosures 1&
100% Inspection by COR and customer feedback
TBD
100% Inspection by COR and customer feedback
100% Inspection by COR and customer feedback
Enclosure (4)
Monthly Summary of Ratings:
Quality Number of Exceptional_____ Number of Very Good_____ Number of Satisfactory_____ Number of Marginal_____ Number of Unsatisfactory__
Schedule Number of Exceptional_____ Number of Very Good_____ Number of Satisfactory_____ Number of Marginal_____ Number of Unsatisfactory___
Cost Control Number of Exceptional_____ Number of Very Good_____ Number of Satisfactory_____ Number of Marginal_____ Number of Unsatisfactory_____
Management Responsiveness Number of Exceptional_____ Number of Very Good_____ Number of Satisfactory_____ Number of Marginal_____ Number of Unsatisfactory_____
Utilization of Small Business Number of Exceptional_____ Number of Very Good_____ Number of Satisfactory_____ Number of Marginal_____ Number of Unsatisfactory_____
Other Areas Number of Exceptional_____ Number of Very Good_____ Number of Satisfactory_____ Number of Marginal_____ Number of Unsatisfactory_____
Surveillance:
The COR will perform an annual assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in Enclosure (3) and the monthly summary of ratings.
Description Surveillance Method/ Measure
Date Planned Date Completed Summary Rating Results
Quality of Product or Service
Review of Monthly Ratings.
Metric = CPARS ratings
Schedule
Ratings.
Cost Control
Ratings
Management Responsiveness
Utilization of Small Business Concerns
(Yes/No)
Other Areas
Enclosure (4)
| 1. Purpose |
| 2. Authority |
| 3. Scope |
| 4. Government Resources |
| 6. Methods of Quality Assurance (QA) Surveillance |
| 7. Surveillance |
| 8. Documentation |
| 9. Enclosures |
| FIGHTER JET SERVICES |
| CDRL DATA PERFORMANCE STANDARDS |
| FIGHTER JET SERVICES |