Attachment 2 QASP.pdf
PDF 76 KB Posted
- Attached to
- NCAH Window Washing Federal contract opportunity
- Solicitation number
- 12505B24Q0109
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a Performance Based Service Contract (PBSC) for window washing services at three USDA NCAH buildings in Ames, Iowa. The QASP outlines the government's plan to monitor and inspect the contractor's performance to ensure the required services are delivered on time and meet the contract requirements. It defines the roles and responsibilities of the Contracting Officer and Contracting Officer's Representative, and the methods of surveillance including customer feedback, periodic inspections, and 100% inspection. The standards of service are specified in the Performance Work Statement. The key performance requirements are to clean windows, ledges, and other affected areas, with work to be completed within 45 days during the May-September timeframe each year.
The related federal contract opportunity is a Request for Quote (RFQ) for an NCAH Window Washing Annual Service Contract. This is a 100% Small Business Set-Aside with a NAICS code of 561720 (Janitorial Services). The contract will be Firm Fixed Price, with an anticipated award for the base year and four option years. Quotes must include pricing, technical specifications, and completed FAR provision 52.212-3. Award will be made to the lowest priced, technically acceptable quote. Quotes are due via email by the date specified, with questions accepted until March 15, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pictures from SOW for Building 21.pdf | ||
| Pictures from the SOW for Buidling 20.pdf | ||
| Attachmnet 3 Wage Determination 2015-4975 Rv 21.pdf | ||
| Attachment 1 Statement of Work .pdf | ||
| RFQ 12505B24Q0109 Window Washing.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
NCAH BUILDINGS 20,24, AND 21 WINDOW WASHING
1. PURPOSE. This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract and in subsequent task orders issued there under. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
The QASP has been developed by the requiring activity. It is designed to provide direction to personnel performing contract surveillance activities. Personnel surveying the contract terms and conditions and SOW requirements will periodically review the QASP throughout the life of the contract.
The Contracting Officer’s Representative (COR) will monitor the performance of the contractors as related to window washing. The surveillance plan is site-specific and is designed to provide monitoring, inspecting, and reporting of all contractor service support in aspects of the performance for window washing for buildings 20, 21, and 24 for the
USDA NCAH at Ames, Iowa.
2. SCOPE. The QASP is put in place to provide Government surveillance oversight of the
Contractor’s quality control efforts to ensure the products/results specified in the PR&C or task order are delivered on time and meet the requirements of the PR&C or task order. The
QASP is not intended to duplicate the Contractor’s Management Plan.
3. GOVERNMENT RESOURCES. The following definitions for Government resources are applicable to this plan:
Contracting Officer. A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the
Government.
Contracting Officer’s Representative (COR). An individual designated in writing by the
Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.
4. RESPONSIBILITIES. The Government resources shall have responsibilities for the implementation of this QASP as follows:
Contracting Officer. The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the
Contracting Officer that ensures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer’s Representative (COR). The COR is responsible for technical administration of the project and ensures proper Government surveillance of the
Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.
5. METHODS OF QA SURVEILLANCE. The below listed methods of surveillance shall be used in the administration of this QASP.
Customer Feedback. Customer feedback may be obtained from random customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the
COR. The COR shall maintain a summary log of all formally received customer complaints as well as a copy of each complaint in a documentation file.
Periodic Inspection. The COR shall conduct periodic inspections of both performance of repairs and maintenance. For the potential tasks identified in the Performance Work
Statement, the COR typically performs the periodic inspection after each day.
100% Inspection. The method used to evaluate the contractor when required by the contract Performance Requirements Summary (PRS) as noted in Attachment 1. Using this method of inspection, all the parts of the service or requirement are monitored for evaluation. This will be completed after final building is completed.
6. LEVELS AND STANDARDS OF SERVICE. The standards of services are held to and comply with the standards specified in the PR&C, commercial/industry, and military/government standards.
7. IDENTIFIED QA SURVEILLANCE ITEMS.
Performance requirements
Required services Performance objective Performance requirement
Window washing Clean windows, ledges, and other areas affected by the act of window cleaning
Start of work Window cleaning should be accomplished each year between the months of May – Sep.
Coordinated with COR for start dates for possible option years.
Work should be completed within
45 days of start date.
Coordination Coordination between COR and cleaning staff is essential for notices of areas being affected
Pre-coordination meeting at least 10 business days in advance
8. DOCUMENTATION. The COR shall, in addition to providing documentation to the
Contracting Officer, maintain a complete Quality Assurance file. All such records will be retained for the life of this contract.
File details come from the government source that posted it. Updated .