Attachment_2_QALI.pdf

PDF 127 KB Posted

Attached to
C-17 Arm-Fire Initator Federal contract opportunity
Solicitation number
FA8213-21-R-3040-Solicitation
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document includes a quality assurance letter of instruction and related federal contract solicitation. The quality assurance letter outlines inspection requirements for a contractor producing C-17 arm-fire initiators under contract number 21-51271, with a final delivery date of an unspecified future date. Inspection points include verification of explosive weight, leak testing, radiographic film reviews, lot acceptance testing sample selection and implementation, test equipment calibration, paperwork reviews, and energetic material certifications. The related solicitation is from the Department of the Air Force Materiel Command seeking C-17 arm-fire initiators, with Pacific Scientific Energetic Materials Company as the anticipated sole-source provider under the authority of FAR 6.302-1.

View the file

Other files for this federal contract opportunity

Other files attached to C-17 Arm-Fire Initator, newest first.
File Type Posted
Attachment_4_SOW_Appendix_A_29April21.pdf PDF
FA821321R3040.pdf PDF
Attachment_5_ExhibitA_CDRLS.pdf PDF
Attachment_3_REPSHIP.pdf PDF
Attachment_9_AFMC_Form_158.pdf PDF
Attachment_6_Special_Packaging_Instructions.pdf PDF
Attachment_7_SOW_SPI.pdf PDF
Attachment_8_Transportation_Instructions.pdf PDF
Attachment_1_Item_Marking_Instr_Ver1_5-20190501.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or email

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 21-51271
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: C-17
DODIC: SP82
undefined: V
undefined_2: V
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: V
undefined_8: V
undefined_9: N
undefined_10:
undefined_11:
undefined_12:
Text19: PSEMC
Text20: 06331
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.

2. Verify gross/fine leak checks are performed per ATP requirements

3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2021-04-08T08:04:43-0600
TANNER.MATTHEW.W.1379435919
Text46: 2021-04-08
Text49:
Type name_1:
Type name_4:
Part Number:
Noun: 824355-1

File details come from the government source that posted it. Updated .