Attachment 2 - Pricing Worksheet.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Haul and Install for TT/MHU DR4610-CA Federal contract opportunity
- Solicitation number
- 70FBR922Q00000002
About this file
This combined synopsis and solicitation requests quotes for haul and install services of travel trailers and manufactured homes in support of disaster relief operations for California wildfires. FEMA requires haul and install of approximately 6 travel trailers and 2 manufactured homes to commercial sites within California under a one month period of performance. The solicitation is set aside for small businesses with a NAICS code of 484110 and is subject to wage determinations 2015-5677 Rev 16 and 2015-5679 Rev 16. Quotes are due by 3:00pm PST on October 22nd and shall include completion of the pricing worksheet attachment. Evaluation criteria in descending order are technical capability, price, and past performance. The solicitation requires active SAM registration and submission of contractor assurance information with the quote.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 3 - Statement of Work.pdf | ||
| Attachment 1 - Provisions Clauses.pdf | ||
| Contractor Assurance Certification.docx | DOCX document | |
| Technical Evaluation Rating.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Period of Performance (Months) | 100 | 1 | BASE | ||||
| CLIN TITLE | DESCRIPTION | VALUE OF ISSUE | TYPE | UNIT OF ISSUE | Quantity | Unit Price | TOTAL PRICE |
| MH/PM/TT TRANSPORTATION & STAGING | |||||
| TT TRANSPORTATION FOR INSTALL (ADDITIONAL MILES) | Additional miles for installation of TT in a private or commercial site. Note: First 100 miles are included in the appropriate install CLIN. | NTE | FUP | MI | 1800 |
| MH / PM TRANSPORTATION FOR INSTALL (ADDITIONAL MILES) | Additional miles for installation of a MH/PM in a private/commercial/group site. Note: First 100 miles are included in the appropriate install CLIN. | NTE | FUP | MI | 600 |
| SITE INSPECTIONS | |||||
| PRIORITY PRIVATE / COMMERCIAL SITE INSPECTION | Perform a Priority Private Site or Commercial Park Pad Inspection. For use in Commercial Parks when there are four or less pads to be inspected. Each pad is inspected individually. | NTE | FUP | EA | 1 |
| PRIORITY COMMERCIAL PARK FEASIBILITY | Perform a Priority Commercial Park Feasibility Inspection (For use when more than four pads are to be inspected in a park). Includes pad assessment | NTE | FUP | EA | 1 |
| UTILITY LOCATOR FEE | In the event that the Contractor pays for the service required for MHU installation, the Government will reimburse the Contractor at actual expense (receipt and/or proper documentation required). | NTE | FUP | EA | 8 |
| INSTALLATION | |||||
| TEMPORARY INSTALLATION PERMITS | Bonds and Permits for Temporary Installation | NTE | FUP | EA | 8 |
| PRIVATE INSTALL MH / PM | Basic Manufactured Home / Park Model Installation on a private site. Includes one set of stairs installed at the rear entrance ONLY. Includes transportation for install (up to 400 miles), basic site preparation, blocking, strapping and anchoring, electrical/water/sewer connection/installation (up to 50 feet), HVAC installation, skirting, and clean and make ready for occupancy. For Park Model units, the Contractor may, at their option, use a single porch bridging between both doors, provided that the Park Models have both entrance/exit doors on the same side of the unit, with a single set of stairs or platform stair servicing the porch. | ||||
| NTE | FUP | EA | 2 | ||
| PRIVATE INSTALL TT | Basic Manufactured Travel Trailer Installation on private site. Includes transportation for install (up to 400 miles), basic site preparation, blocking, strapping and anchoring, electrical / water/sewer connection / installation (up to 50 feet), and Clean and Make Ready for Occupancy. This CLIN DOES NOT include steps. | ||||
| NTE | FUP | EA | 6 | ||
| MH / PM COMMERCIAL / GROUP BASIC INSTALL | Basic Manufactured Home / Park Model installation at a commercial or group site. Includes one set of stairs installed at the rear entrance. Includes: transportation for install (up to 400 miles). | NTE | FUP | EA | 2 |
| TT COMMERCIAL / GROUP BASIC INSTALL | Basic Manufactured Travel Trailer Installation at commercial or group site. Include: Transportation for install (up to 400 miles). This CLIN DOES NOT include stairs, steps or ramp. |
| NTE | FUP | EA | 6 | |||
| TPS Installation (MHU only) | EA | 2 | ||||
| STEPS / STAIRS MH / PM | Standard Steps for MH/PM (Price per additional entrance, i.e. Front Stairs) | NTE | FUP | EA | 2 | |
| STEPS / STAIRS TT | Standard Steps for travel trailer. | NTE | FUP | EA | 12 | |
| MH / PM UFAS RAMP | Manufactured Home UFAS Ramp (up to 40 feet of ramp- see description in C.4.3.3) | NTE | FUP | EA | 1 | |
| TT UFAS RAMP | Travel Trailer UFAS Ramp (up to 30 feet of ramp- see description in C.4.3.3) | NTE | FUP | EA | 1 | |
| ADDITIONAL RAMP | Additional per foot ramp | NTE | FUP | LF | 100 | |
| PLATFORM STEPS/STAIRS FOR MH/PM | Platform Steps For MH/PM | NTE | FUP | EA | 1 | |
| PLATFORM STEPS / STAIRS FOR TT | Platform Steps for TT | NTE | FUP | EA | 1 | |
| ADDITIONAL SEWER LINE (ABOVE GROUND) | 4-Inch Lateral Sewer Line, Above ground (over basic install included sewer line). | NTE | FUP | LF | 15 | |
| WATER TAP FEE | Municipal Water Tap Fee. | NTE | ACT | EA | 8 | |
| ADDITIONAL BURIED WATER LINE | 3/4 inch Water Line Extension, Buried (over basic install included buried water line). | NTE | FUP | LF | 15 | |
| ADDITIONAL WATER LINE FOR TT | Provide additional RV grade polyurethane hose that is RoHS compliant. | NTE | FUP | LF | 15 | |
| WELL PUMP | Direct Wiring of Well Pump. | NTE | FUP | EA | 1 | |
| ELECTRIC TAP FEE | Electric Tap Fee. | NTE | ACT | EA | 1 | |
| POWER POLE | Power Pole and Meter Loop. | NTE | FUP | EA | 1 | |
| INTERIM (INTERMEDIATE) POWER POLE | Power Pole without a meter loop that supports overhead electrical lines | NTE | FUP | EA | 1 | |
| POWER PEDESTAL | Single Power Pedestal & Meter Loop. | NTE | FUP | EA | 1 | |
| ADDITIONAL WIRING | Additional wiring over basic install | NTE | FUP | LF | 15 | |
| LIQUID PROPANE (LP) INSTALLATION | May be used in conjunction with a separate contract to provide delivery, rental, maintenance of tanks and fuel. | EA | 6 | |||
| LP INITIAL FILL | Initial fill of liquid propane tanks. | EA | 6 | |||
| PREVENTIVE MAINTENANCE & REPAIRS | ||||||
| PMIR | Preventive Maintenance Inspection and Repairs (includes minor repair labor and materials). | NTE | FUP | PER UNIT | 8 | |
| CALL CENTER | Maintenance Call Center. | NTE | FUP | MONTHLY | 1 | |
| ROUTINE REPAIRS | Repairs that are serious but do not present an imminent danger to the health, safety or security of the unit occupant or property. Routine repairs are up to a $250.00 material. Labor for routine repairs is included in PMIR. | |||||
| NTE | FUP | EA | NTE | |||
| MAJOR REPAIRS | Major Repairs Items. As required by the COR in writing prior to any work being done. Maintenance in excess of $250 for materials and/or $250 in labor but less than $3500 will require COR approval. CO approval required if >$3,500. | NTE | FUP | EA | NTE | |
| EMERGENCY REPAIR MHU VISIT AND DETERMINATION | Use this CLIN to cover the Inspection and Determination of an Emergency Repair MHU. Includes Labor and Travel to the site. | NTE | FUP | EA | NTE | |
| EMERGENCY REPAIRS LABOR | Emergency Repair Labor: Labor for emergency repairs performed. The contractor shall make repairs to the extent there is no longer a safety hazard, life or death situation, or emergency issue. The Contractor shall respond and initiate the repair within two hours. Contractor shall notify the COR by the next day. | NTE | FUP | FIXED HOURLY RATE | NTE | |
| EMERGENCY REPAIR, ODC MATERIAL, AND EQUIPMENT | Emergency Maintenance Repair Equipment and Material. This CLIN is used to cover the actual costs for material and equipment only used during the Emergency Repair. The contractor shall use this CLIN for the material and equipment used to respond to Emergency Repairs to the extent there is no longer a safety hazard, life or death situation, or emergency issue. The Contractor shall respond and initiate the repair within two hours. Contractor shall notify the COR by the next day. | ACT | ACT | EA | NTE | |
| LP REFILL /REFILLING | Refill/refilling of liquid propane tanks. | NTE | FUP | EA | 6 | |
| EMERGENCY UNIT ENTRY SERVICE | Perform Emergency Unit Entry Service for occupants unable to gain access to a unit. | NTE | FUP | EA | NTE | |
| MAINTENANCE MISCELLANOUS | During the “maintenance” of an THU there may be issues that cannot be foreseen but are required to complete the “maintenance”. This CLIN is only to be used if the work required does not fit within the definition of any other “maintenance” CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review. COR approval required. CO approval required if >$3,500. | NTE | FUP | EA | NTE | |
| TPS Monthly Maintenance | TPS Monthly Maintenance | EA | 2 | |||
| MHU MAINTENANCE TRANSFER AND INSPECTION | MHU custodial transfer from the giving contractor to the receiving contractor and/or to the COR or COR’s designee. Physical inspection at the option of the receiving contractor. | NTE | FUP | EA | 8 | |
| COVID SANITATION | At the instruction of the COR, contractor will sanitize unit of COVID | NTE | FUP | EA | 8 | |
| $ - 0 |