Attachment 2 Peformance Work Statement.pdf
PDF 179 KB Posted
- Attached to
- Potato Processing Floor Polishing
- Solicitation number
- 126612-20-R-0009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 ARS-371.pdf | ||
| Attachment 5 Deviation.pdf | ||
| Attachment 1 Wage Determination.pdf | ||
| 126612-20-R-0009.pdf | ||
| Attachment 4 ARS-372.pdf | ||
| Attachment 6 Existing Equipment.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) Project: Potato Processing Floor Polishing_USDA-ARS, East Grand Forks MN
GENERAL INFORMATION
1.0 Performance Work Statement: The concrete processing floor (4650 square feet) will be polished.
The existing surface is ground to remove grease and paint, a penetrating sealant is applied, and floor surface is treated with an 800 grit polishing finisher. The floor will routinely be exposed to vegetable oil, potato wastewater, food processing steam, and pallet jack/forklift wheel traffic. The contractor supplied sealant and finished polished surface will permit routine cleaning with a neutral pH detergent and corded janitorial buffer/scrubbing machines.
2.0 Background: Existing floor covering is peeling that has resulted in areas of exposed concrete intermixed with patches of painted floor surfaces. The exposed concrete floor is difficult to properly clean and the processing floor is aesthetically unappealing to host required stakeholder tours and field days.
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks:
A. Contractor will grind the concrete surface to remove all existing grease and paint coverings in the processing area. The total floor area is 4,650 square feet.
Note that contractor will be required to work around several fixed potato processing structures.
B. Contractor will repair surface cracks that may impede sealant application and polishing treatment.
C. Contractor will supply and apply a penetrating floor sealant and implement surface polishing to an 800 grit medium polish finish.
4.0 Government Furnished:
A. USDA-ARS staff will remove facility items that are not anchored to the processing area floor. This includes temporary removal of storage cabinets, gravity water tank, feed and product conveyors, potato washers, and floor grates. Items not removed include: steam peeler, stainless steel cutting head with vibratory shaker and survey platform, 200 gallon blancher, vegetable oil heat exchanger, oil fryer conveyor lines, potato flaker, walk-in blast freezer and autoclave.
B. Photographs of the area are shown in attachment 1.
5.0 Deliverables / Schedule:
Item No.
Deliverable
Objective
Due
1 Processing floor surface preparation (grinding), sealant application and finish polishing at USDA-ARS, East Grand Forks, MN
30 days
6.0 Travel: Not applicable
7.0 Contractor’s Key Personnel:
A. On site Superintendent’s name.
B. Operator’s certification or license on any equipment utilized for this project.
8.0 Security Requirements: On-site superintendent and foreman must show a valid
U.S. government identification or a driver’s license.
9.0 Data Rights: Not Applicable.
10.0 Section 508 – Electronic and Information Technology Standards: Any electronic documentation provided to the government must be in an adobe acrobat pdf format.
Attachments: Photographs of the construction are found in attachment 1.
| CONTRACTOR REQUIREMENTS |
| 3.0 Technical Requirements/Tasks: |
| A. Contractor will grind the concrete surface to remove all existing grease and paint coverings in the processing area. The total floor area is 4,650 square feet. Note that contractor will be required to work around several fixed potato processing str... |
| B. Contractor will repair surface cracks that may impede sealant application and polishing treatment. |
| 6.0 Travel: Not applicable |