Attachment 2 - OKC Data Center Construction Documents.pdf

PDF 13 MB Posted

Attached to
Y1DA--635-23-706 EHRM Data Center Construction Oklahoma City
Solicitation number
36C77623B0061
Issued by

About this file

This federal contract opportunity solicitation requests proposals for the construction of a new data center in Oklahoma City for the Department of Veterans Affairs Technology Acquisition Center Austin. Offerors are invited to submit proposals under solicitation number 36C77623B0061 by January 15, 2023 for the design and construction of a new EHRM data center facility. Proposals shall include plans, specifications, and pricing to design and build the data center building and all necessary mechanical, electrical, and IT infrastructure in accordance with the requirements in Attachment 2, which provides 13MB of construction documents and specifications. The award is a firm fixed-price contract with a period of performance through December 2024. The new data center will support increased demand for health records management and clinical applications serving veterans across Oklahoma and surrounding states.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EHRM Infrastructure Upgrades –

Data Center at the Oklahoma City VA Health Care System, Oklahoma City, OK

100% SUBMITTAL

CONSTRUCTION DOCUMENT PLANS

C O N T R A C T NO. : V A 2 5 6 – 1 6 – D - 0 2 1 7

V A P R O J E C T NO. : 6 3 5 – 2 1 - 7 0 6

August 31, 2022

U.S. DEPARTMENT OF

VETERANS AFFAIRS

EHRM INFRASTRUCTURE UPGRADES - DATA CENTER

AT THE OKLAHOME CITY VA HEALTHCARE SYSTEM

921 NE 13TH STREET

OKLAHOMA CITY, OKLAHOMA 73104

VA PROJECT NUMBER: 635-21-706

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1

5/

:5 4:

P

M

100% CONSTRUCTION DOCUMENTS

08/31/2022 PMRD

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

635-21-706

OKC-EHRM DATA CENTER

COVER SHEET

G-000

PROJECT LOCATION

NORTH

N

E-000 ELECTRICAL LEGEND AND ABBREVIATIONS

SHEET LIST TABLE

SHEET NUMBER SHEET TITLE

G-000 COVER SHEET

M-000 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS

M-001 CRAC PIPING AND CONTROL DETIAL, MECHANICAL SCHEDULES & DETAILS

E-001 EXISTING PANEL SCHEDULES POWER DEMOLITION

E-002 EXISTING PANEL SCHEDULES NEW POWER

NUMBER

FP-100

FIRE SPRINKLER PLANFP-101

CLEAN AGENT PLAN

E-003 ELECTRICAL DETAILS

E-004 IT POWER SCHEMATIC

E-005 IT GROUNDING AND BONDING SCHEMATIC

E-100 DATA CENTER DEMOLITION AND NEW LAYOUT PLANS

E-101 DATA CENTER POWER AND SPECIAL SYSTEMS PLANS

E-102 ROOF, UPS ROOM, AND MAIN ELECTRICAL ROOM PLANS

MD-100 MECHANICAL DEMOLITION PLANS

M-100 MECHANICAL NEW PLANS

M-002 AIR CURTAIN DETAILS4

AutoCAD SHX Text

FOURFRONT DESIGN, INC.

AutoCAD SHX Text

517 7TH STREET

AutoCAD SHX Text

RAPID CITY, SOUTH DAKOTA 57701

AutoCAD SHX Text

PH: (605) 342-9470

AutoCAD SHX Text

FAX: (605) 342-2377

AutoCAD SHX Text

WWW.FOURFRONTDESIGN.COM

AutoCAD SHX Text

FOUR

AutoCAD SHX Text

FRONT

AutoCAD SHX Text D E S I G N I N C.

AutoCAD SHX Text SUMMIT FIRE CONSULTING 575 MINNEHAHA AVE WEST ST. PAUL, MINNESOTA 55103 (651) 251-1880

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text

RAYMOND E. DAWES

S

ABBREVIATIONS:

AC ALTERNATING CURRENT

ADJ. ADJUSTABLE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

BHP BRAKE HORSEPOWER

BMS BUILDING MANAGEMENT SYSTEM

CA COMPRESSED AIR

CFM CUBIC FEET PER MINUTE

C/L CENTERLINE

CO CLEANOUT

COEF COEFFICIENT

COMLINK COMMUNICATION LINK

COND CONDENSATION

CONFIG CONFIGURED

COR CONTRACTING OFFICER'S REPRESENTATIVE

CV CONTROL VALVE

CV FLOW COEFFICIENT

DAMP. DAMPER

DC DIRECT CURRENT

DEG DEGREES

DIFF. DIFFERENTIAL

(E) EXISTING

EA EXHAUST AIR

ECC ENERGY CONTROL CENTER

ELECT. ELECTRICAL

ELEV ELEVATION

ENT ENTERING

F FAHRENHEIT

FD FLOOR DRAIN

FS FLOOR SINK

FILT. FILTER

FPM FEET PER MINUTE

FT FEET

GAL GALLONS

G.C. GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

HP HORSEPOWER

HR HOUR

HVAC HEATING, VENTILATION, AND AIR CONDITIONING

HX HEAT EXCHANGER

Hz HERTZ

IBC INTERNATIONAL BUILDING CODE

IECC INTERNAIONAL ENERGY CONSERVATION CODE

IFB INTEGRAL FACE AND BYPASS

IMC INTERNATIONAL MECHANICAL CODE

I/O INPUT/OUTPUT

IPC INTERNATIONAL PLUMBING CODE

L LENGTH

LA LABORATORY EQUIPMENT COMPRESSED AIR

LBS POUNDS

MA MEDICAL AIR

MAX MAXIMUM

MBH

THOUSAND BRITISH THERMAL UNITS PER HOUR

MC MECHANICAL CONTRACTOR

MECH MECHANICAL

MFG MANUFACTURER

MIN MINIMUM

MIN MINUTE

mm MILLIMETER

MV MEDICAL VACUUM

N.C. NORMALLY CLOSED

NC NOISE CRITERIA LEVEL

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NG NATURAL GAS

N.O. NORMALLY OPEN

NPT NATIONAL PIPE THREAD

O2 OXYGEN

ORD OVERFLOW ROOF DRAIN

OSHA

Pa PASCAL

PD PRESSURE DROP

PRESS. PRESSURE

PSIG POUNDS PER SQUARE INCH - GAUGE

QUANT. QUANTITY

RA RETURN AIR

RC REHEAT STEAM COIL - AHU

RD ROOF DRAIN

RE RESIDENT ENGINEER

REQ'D REQUIRED

RPM REVOLUTIONS PER MINUTE

S SUPPLY

SF SQUARE FEET

SPEC SPECIFICATION

SS STAINLESS STEEL

T THERMOSTAT

TYP TYPICAL

V VOLTS

VAC MEDICAL VACUUM

W/ WITH

WB WET BULB

WG INCHES OF WATER

ZAP ZONE ALARM PANEL

ZVB ZONE VALVE BOX

B

T

A

3-WAY CONTROL VALVE

2-WAY CONTROL VALVE

CHECK VALVE

FLOW CONTROL VALVE

PRESSURE REDUCING VALVE

REDUCED PRESSURE ZONE VALVE

SOLENOID VALVE

PRESSURE RELIEF VALVE

PRESSURE GAUGE

THERMOMETER

CONCENTRIC REDUCER

PIPE UNION

TEST PLUG

VALVE GLOBE VALVE

BALANCING VALVE

TEMPERATURE SENSOR

GLOBE VALVE -MANUAL

GLOBE VALVE - ON/OFF

GLOBE VALVE - MODULATING

PLUMBING SYMBOLS

POINT OF CONNECTION

POINT OF DISCONNECTION

TO BE DEMOLISHED

2 PLUMBING PLAN NOTE

PIPE DOWN

PIPE UP

PIPE TEE DOWN

TEE

GENERAL MECHANICAL NOTES:

ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF

THE INTERNATIONAL BUILDING CODE (IBC), INTERNATIONAL MECHANICAL CODE

(IMC), INTERNATIONAL PLUMBING CODE (IPC), INTERNATIONAL FUEL GAS CODE

(IFGC), NFPA 99, NFPA 101 LIFE SAFETY CODE, AND ANY AUTHORITY HAVING

JURISDICTION. THIS IS A FEDERAL PROJECT, AS SUCH ALL CODE REQUIREMENTS

ARE REQUIRED.

ALL EQUIPMENT, MATERIALS, AND ARTICLES INCORPORATED IN THE WORK SHALL BE

NEW AND OF COMPARABLE QUALITY AS SPECIFIED. ALL WORKMANSHIP SHALL BE

FIRST-CLASS AND SHALL BE PERFORMED BY MECHANICS SKILLED AND REGULARLY

EMPLOYED IN THEIR RESPECTIVE TRADES.

ALL WORK SHALL BE COORDINATED WITH ALL AFFECTED TRADES PRIOR TO

STARTING WORK. REWORK REQUIRED DUE TO COORDINATION ISSUES SHALL BE

PERFORMED BY THE INSTALLATION CONTRACTOR WITHOUT INCREASED COST TO

THE OWNER.

THESE DRAWINGS ARE GENERAL IN NATURE. ALTHOUGH EVERY ATTEMPT HAS BEEN

MADE TO INDICATE THE EXACT ROUTING AND LOCATION OF PROPOSED SYSTEMS,

NOT ALL OFFSETS, REQUIRED FITTINGS AND/OR CONDITIONS CAN BE SHOWN. THE

CONTRACTOR SHALL COORDINATE WORK AND MAKE REQUIRED CHANGES TO THE

ROUTING IN ORDER TO AVOID CONFLICTS WITHOUT ANY INCREASED COST TO THE

OWNER.

SYSTEMS DESIGNATED TO BE PROVIDED AND INSTALLED WITHIN THESE CONTRACT

DOCUMENTS ARE INTENDED TO BE COMPLETE AND OPERATIONAL. PROVIDE

EVERYTHING ESSENTIAL FOR THE COMPLETION OF THE WORK TO MAKE THE SYSTEM

READY FOR NORMAL AND PROPER OPERATION, INCLUDING ALL WORK OR

MATERIALS NOT DIRECTLY SHOWN ON THE DRAWINGS OR IN THE SPECIFICATIONS,

BUT NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.

MECHANICAL CONTRACTOR IS RESPONSIBLE FOR ENSURING PROPER MAINTENANCE

CLEARANCES ARE MAINTAINED. CORRIDORS SHALL NOT BE COMPLETELY BLOCKED

BY DUST BARRIERS. AT LEAST HALF OF THE CORRIDORS SHALL BE OPEN. CLOSE

COORDINATION WILL BE REQUIRED WITH THE MECHANICAL PIPING, HVAC, FIRE

PROTECTION, ELECTRICAL CONTRACTOR AND VA COR.

TURN OVER REMOVED EQUIPMENT AND SENSORS TO THE VA FOR SPARE PARTS OR

DISPOSE OFF IF NOT WANTED BY FARGO VA BIOMED STAFF.

THE CONTRACTOR WILL BE ADDING NEW WALL PENETRATIONS IN A VARIETY OF WALL TYPES

TO COMPLETE THIS PROJECT. ALL PENETRATIONS WILL BE SEALED MINIMALLY FOR SMOKE

AND FIRE SPREAD. FOR RATED WALLS, THE CONTRACTOR SHALL SUBMIT AND PROVIDE UL

LISTED PENETRATION FOR EACH APPROPRIATE RATED ASSEMBLY PENETRATION. ALL

PENETRATIONS SHALL BE SEALED AT THE END OF WORK SHIFT TO AVOID LEAVING AN

OPENING OVERNIGHT.

ZC VALVE OR DAMPER CONTROLLER

DUCTWORK SYMBOLS

LIMIT OF DEMOLITION

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

ROUND AND SQUARE 4-WAY CEILING DIFFUSERS

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

EXHAUST OR RETURN REGISTER OR TOP GRILLE

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

RETURN DUCT (UP & DOWN)

SQUARE 3-WAY CEILING DIFFUSERS

SQUARE 2-WAY CEILING DIFFUSERS

LINEAR SLOT DIFFUSER

SQUARE 1-WAY CEILING DIFFUSERS

DUCTWORK SYMBOLS

BACK DRAFT DAMPER

SECTION.)

FLEXIBLE CONNECTION, EQUIPMENT,

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

EXISTING DUCT TO REMAIN

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL

FIRE DAMPER

DUCT WITH SOUND LINING

FLEXIBLE DUCTWORK (INSULATED)

MANUAL VOLUME DAMPER

EXISTING DUCT TO BE REMOVED

VIBRATION, OR SEISMIC

RETURN, NO SPLITTER (45° TAP)

STANDARD BRANCH SUPPLY OR

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1

5/

:5 4:

P

M

100% CONSTRUCTION DOCUMENTS

08/31/2022 PMRD

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

635-21-706

OKC-EHRM DATA CENTER

GENERAL NOTES,

ABBREVIATIONS AND SYMBOLS

M-000

AutoCAD SHX Text

(WALL TYPE)

AutoCAD SHX Text

(WALL TYPE)

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text D

AutoCAD SHX Text R

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

BDD

AutoCAD SHX Text

FC

AutoCAD SHX Text 10x8

AutoCAD SHX Text

FD

AutoCAD SHX Text

VD

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

RETURN

AutoCAD SHX Text 45%%d

AutoCAD SHX Text 45%%d

AutoCAD SHX Text

FOURFRONT DESIGN, INC.

AutoCAD SHX Text

517 7TH STREET

AutoCAD SHX Text

RAPID CITY, SOUTH DAKOTA 57701

AutoCAD SHX Text

PH: (605) 342-9470

AutoCAD SHX Text

FAX: (605) 342-2377

AutoCAD SHX Text

WWW.FOURFRONTDESIGN.COM

AutoCAD SHX Text

FOUR

AutoCAD SHX Text

FRONT

AutoCAD SHX Text D E S I G N I N C.

AutoCAD SHX Text SUMMIT FIRE CONSULTING 575 MINNEHAHA AVE WEST ST. PAUL, MINNESOTA 55103 (651) 251-1880

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

FROM STRUCTURE

SAME AS DIFFUSER

INLET: 5'-0" MAX

FLEXIBLE DUCT SIZE

LENGTH.

12"

CEILING

SUPPORT SADDLE

VOLUME DAMPER W/

LOCKING QUADSADDLE

SHEET METAL

CONICAL OUTLET

FOR CHANGE OF

DIRECTION GREATER

USE RIGID ELBOWS

THAN 45°

SEE SPECIFICATIONS FOR CLAMPS

AND SEALANT (TYP.)

NOTE:

MAXIMUM LENGTH OF FLEXIBLE DUCT ALLOWED TO BE 5' UNLESS FIELD

CONDITIONS ARE DETERMINED TO REQUIRE A LONGER LENGTH.

TYPICAL

DIFFUSER IN

LAY-IN CLG.

EXISTING

SUPPLY DUCT

22"x22" PLENUM OVER

NOZZLE SUPPLY

DIFFUSER TILE

12"Ø

CEILING

CONICAL OUTLET

SEE SPECIFICATIONS

FOR CLAMPS AND

SEALANT (TYP.)

TYPICAL

DIFFUSER IN

LAY-IN CLG.

EXISTING

SUPPLY DUCT

22"x22" PLENUM OVER

NOZZLE SUPPLY

DIFFUSER TILE

VOLUME DAMPER W/

LOCKING QUAD

NOTE:

MAXIMUM LENGTH OF FLEXIBLE DUCT ALLOWED TO BE 5' UNLESS FIELD

CONDITIONS ARE DETERMINED TO REQUIRE A LONGER LENGTH.

DATA ROOM COOLING UNIT SCHEDULE

EQUIPMENT

NO.

NOTES:

FAN MOTOR

VOLT.-PH.-CY.

MANUFACTURER & MODEL NOTES

AREA

SERVED

SUPPLY

CFM

HP

TOTAL SENSIBLE

COOLING CAPACITY

MBH

9A123aCRAC-4 4.15 (x2) LIEBERT - VS053ADC10I208-3-60 1,38000 185 170

1. PROVIDE WITH FACTORY CONTROL SYSTEM, TEMPERATURE AND HUMIDITY SENSORS. INTEGRATE INTO EXISTING BMS VIA JCI METASYS

FOR CONTROL, MONITORING, AND ALARMING.

2. PROVIDE WITH FACTORY SIZED DUAL CIRCUIT REFRIGERANT LINE KIT.

3. MANUFACTURER SHOWN AS BASIS OF DESIGN, OR EQUAL SUBMISSIONS WILL BE ACCEPTED FOR REVIEW AND APPROVAL.

CRAC

ELECTRICAL

MOCPFLA

109.2 125

HUMIDIFER

REFRIGERANT

LIEBERT - MCS056E8YD0A0VU-1- 208-3-60- 6.0 15CRAC-4 2,3CU-4 R-407C

CAPACITY (LB/HR)

DCW CONNECTION

1/4" R-407C

GRILLE/REGISTER/DIFFUSER SCHEDULE

TAG NO. NECK SIZE TYPE MANUFACTURER & MODEL MATL/FINISH OPTIONS & ACCESSORIES

SR=SUPPLYT REGISTER SD=SUPPLY DIFFUSER

SD-1

NOTES:

12"Ø 24"x24" CEILING SUPPLY LAY IN NOZZLE TILE PRICE AND-AT-6" ALUM.

1. PROVIDE WITH FACTORY 24"x24" CEILING MODULE WITH (x4) 6"Ø NOZZLES. CONTRACTOR TO PROVIDE SHEET METAL

PLENUM FOR TILE SUPPLY WITH 12"Ø INLET.

2. MANUFACTURER SHOWN AS BASIS OF DESIGN, OR EQUAL SUBMISSIONS WILL BE ACCEPTED FOR REVIEW AND APPROVAL.

1,2 RG-1 22"x22" 24"x24" CEILING RETURN GRILLE LAY IN PRICE 630-L-F-VCS3 ALUM. 2

GRD ID SCHEDULE #

01 665 12"Ø

TAG STYLE CFM NECK

SIZE

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

12"Ø 12"Ø 12"Ø 12"Ø 12"Ø 12"Ø 12"Ø 12"Ø 12"Ø 12"Ø 12"Ø

13 - 22"x22"

RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

RG-1

RG-1

RG-1

RG-1

- 22"x22"

- 22"x22"

- 22"x22"

- 22"x22"

CRAC

RAISED FLOOR (E)

CONCRETE FLOOR SLAB

SUPPLY

AIRFLOW

PACKAGED UNIT MOUNT

CONTROLLER/SENSOR:

-FAN ENABLE (BO)

-COOLING (BO)

-TEMP (BO)

-HUMIDITY (BO)

-ALARM (BO)

S T

PACKAGED REMOTE

MOUNT SENSOR (TYP):

-TEMP (BO)

EXISTING

NETWORK/BAS

CONTROLLER

EXISTING NAE

NETWORK

COMPUTER ROOM AIR CONDITIONING (CRAC) UNITS ENABLE

· THE BAS SHALL ENABLE THE CRAC-4 PLANT THROUGH A USER INPUT

FROM THE OPERATOR WORKSTATION TO OPERATE CONTINUOUSLY IN

COOLING MODE. FANS SHALL OPERATE CONTINUOUSLY.

COMPUTER ROOM AIR CONDITIONING (CRAC) UNITS - ROOM SETPOINTS

· THE BAS SHALL MONITOR ROOM TEMPERATURE SETPOINTS THROUGH

ALL CRAC SENSORS. ROOM TEMPERATURE SETPOINT FOR CONTROL

ACTION IS INITIALLY SET TO 72 DEG F (ADJUSTABLE) FOR NEW CRAC-4

AND EXISTING CRAC-1(E), 2(E), 3(E) UNITS.

DATA ROOM HUMIDITY - ROOM SETPOINT

· THE BAS SHALL MONITOR ROOM HUMIDITY SETPOINT THROUGH

CRAC-4 HUMIDITY SENSOR. ROOM HUMIDITY SETPOINT FOR CONTROL

ACTION IS INITIALLY SET TO 30 % RH (ADJUSTABLE) FOR NEW CRAC-4

AND EXISTING CRAC-1(E), 2(E), 3(E) UNITS.

CRAC COOLING MODE STAGING (NORMAL MODE)

· THE BAS SHALL ENABLE CRAC-4 (INITIALLY) COOLING MODE AND

SHALL OPERATE DX COOLING TO MAINTAIN 60-DEGREE (ADJUSTABLE)

DISCHARGE AIR TEMPERATURE OF CRAC-4.

WATER SENSOR-ALARM

· THE BAS SHALL MONITOR FOR WATER IN THE RAISED PLENUM FLOOR

SPACE. BAS SHALL ALARM IF SENSOR DETECTS WATER.

CRAC COOLING MODE STAGING (BACKUP OR EMERGENCY MODE)

· THE BAS SHALL ENABLE EXISTING CRAC-1(E), 2(E), 3(E) COOLING MODE

AND SHALL OPERATE DX COOLING TO MAINTAIN 60-DEGREE

(ADJUSTABLE) DISCHARGE AIR TEMPERATURE. THE BAS SHALL ADD

EQUIPMENT (CRAC-1(E), 2(E), 3(E)) BASED ON THE CRAC-1(E), 2(E), 3(E)

ROOM SENSORS SETPOINT (72 DEGREES SETPOINT INITIALLY) RISING

5 DEGREES ABOVE SETPOINT, OR CRAC-4 ALARM CONDITIONS.

CRAC-1(E), 2(E), 3(E) SHALL RETURN TO STANDBY STATUS WHEN NO

ALARMS EXISTING FROM CRAC-4, AND ROOM TEMPERATURE

SETPOINT IS SATISFIED.

POWER FAILURE RECOVERY

· THE BAS SHALL CONTAIN A POWER FAILURE RECOVERY MODE

(OPERATOR ADJUSTABLE). THE POWER FAILURE RECOVERY

CAPABILITY SHALL RETURN THE CRAC EQUIPMENT TO ITS LAST STATE

(BEFORE THE BUILDING CONTROLLER LOST POWER) AS QUICKLY AS

POSSIBLE, AFTER THE BUILDING CONTROLLER POWERS UP. CRAC

UNIT CONTROLLERS ARE TO BE RESET FROM BAS TO ENABLE NORMAL

OR EMERGENCY COOLING OPERATION, AND ALERT BAS INTERFACE OF

ERRORS INHERENT TO CRAC OPERATION.

SYSTEM STATUS DISPLAY

· THE BAS SHALL PROVIDE OPERATING STATUS FOR THE SYSTEM. THE

DISPLAY SHALL INCLUDE ALL POINTS INDICATED IN THE CONTROL

DIAGRAMS AND ANY OTHERS REQUIRED TO ACHIEVE THE SEQUENCE

OF OPERATIONS. THE BAS SHALL BE ABLE TO INTEGRATE INDIVIDUAL

EQUIPMENT DIAGNOSTICS INTO CONTROL ACTION DECISIONS. THIS

SHALL ALSO INCLUDE THE ABILITY TO DESIGNATE CRAC OR

HUMIDIFYING UNITS AS BEING IN MAINTENANCE MODE (HENCE

UNAVAILABLE FOR SEQUENCING) TO AVOID GENERATING

SEQUENCING ALARMS. ALL COOLING OPERATIONS AND CENTRAL

HUMIDITY CONDITIONS SHALL BE RECORDED. THE BAS, AT THE

OPERATOR'S SELECTION, CREATE EVENT LOG TO FACILITATE

TROUBLESHOOTING.

EQUIPMENT MAINTENANCE LOCKOUT

· THE OPERATOR SHALL BE ABLE TO REMOVE A CRAC OR HUMIDIFIER

FROM THE SEQUENCE BY SELECTING A BUTTON ON A STATUS SCREEN

(FOR EXAMPLE, IF MAINTENANCE IS REQUIRED FOR A SINGLE CRAC).

THIS SHALL PREVENT THE BAS FROM TRYING TO ENABLE THE

EQUIPMENT AND MARKING IT AS FAILED DURING THE TIME IT IS DOWN

FOR MAINTENANCE. THE EQUIPMENT SHALL BE MADE AVAILABLE

AGAIN BY RESELECTING A BUTTON ON THE STATUS SCREEN.

DATA CENTER SEQUENCE OF OPERATIONS

FACTORY WATER

SENSOR (TYP):

-ALARM (BO)

S W

RETURN

AIRFLOW

CRAC

1,2,3 (E)

DATA

CENTER

RACK

EXISTING UNIT MOUNT

CONTROLLER/SENSOR:

-FAN ENABLE (BO)

-COOLING (BO)

-TEMP (BO)

-HUMIDITY (BO)

-ALARM (BO)

CONNECT NEW CRAC-4 3/4"

CONDENSATE DRAIN TO

EXISTING CONDENSATE

DRAIN BELOW RAISED FLOOR

CONNECT NEW 1/4" DCW FOR

CRAC-4 HUMIDIFIER TO

EXISTING DCW BELOW

RAISED FLOOR

CONNECT EXISTING

CRAC-1(E),2(E),3(E)

CONTROLLER/SENSORS

TO EXISTING BAS

S T

S H

NEW ROOM

TEMPERATURE AND

HUMIDITY SENSORS :

-TEMPERATURE (BO)

-HUMIDITY (BO)

9TH FOOR ROOF

CU

NEW CONTROL WIRING

FROM CRAC-4 TO CU-4

ON ROOF, UTILIZE

EXISTING PATHWAY

FROM REMOVED

CRAC-4(E) AND CU-4(E)

RAISED FLOOR (E)

ACT CEILING

DATA RACK DATA RACK

TYPICAL CEILING SUPPLY LAY-IN

TILE W/ DIRECTIONAL NOZZLES.

665 CFM TO EACH SUPPLY TILE,

~166 CFM PER NOZZLE

AIM NOZZLES TOWARD THE MIDDLE OF THE

FRONT OF DATA RACKS TO ALLOW AIR TO

PASS THROUGH THE RACK OUT THE BACK

WARM AIR OUT THE

BACK OF DATA RACKS

THROUGH CEILING

RETURN GRILLES TO

RETURN TO CRAC-4

AIR FLOW:

- >140FPM TO THE

FLOOR.

- >150FPM TO THE

CENTER OF THE

RACKS 3' 2" AFF.

EXISTING

SUPPLY DUCT

WARM AIR OUT THE

BACK OF DATA RACKS

THROUGH CEILING

RETURN GRILLES TO

RETURN TO CRAC-4

NEW CEILING RETURN GRILLE

TO TRANSFER WARM AIR BACK

TO CRAC-4 RETURN (TYP)

RAISED FLOOR (E)

ACT CEILING

DATA RACK

EXISTING CRAC-1(E)

LOCATED INLINE

WITH DATA RACKS

WARM AIR OUT THE BACK

OF DATA RACKS

~4600 CFM OUT OF

THE FRONT OF EACH

EXISTING IN-ROW

CRAC-1,2,3(E)

CRAC

2,3(E)

DATA RACKS

LOCATED INLINE WITH

EXISTING CRAC-2,3(E)

AIRFLOW OUT OF EXISTING

CRAC-2,3(E) UNITS THROUGH

THE FRONT OF THE DATA RACKS

WARM AIR OUT THE BACK

OF DATA RACKS

CIRCULATES INTO THE

RETURN IN THE BACK OF

THE EXISTING CRAC-2,3(E)

NEW CEILING RETURN GRILLE

TO TRANSFER WARM AIR BACK

TO CRAC-4 RETURN (TYP)

RAISED FLOOR (E)

ACT CEILING

DATA RACK

EXISTING CRAC-1(E)

LOCATED INLINE

WITH DATA RACKS

WARM AIR OUT THE BACK

OF DATA RACKS

~4600 CFM OUT OF

THE FRONT OF EACH

EXISTING IN-ROW

CRAC-1,2,3(E)

CRAC

1(E)

DATA RACKS

LOCATED INLINE WITH

EXISTING CRAC-2,3(E)

AIRFLOW OUT OF EXISTING

CRAC-1(E) UNITS THROUGH THE

FRONT OF THE DATA RACKS

WARM AIR OUT THE BACK

OF DATA RACKS

CIRCULATES INTO THE

RETURN IN THE BACK OF

THE EXISTING CRAC-1(E)

NEW CEILING RETURN GRILLE

TO TRANSFER WARM AIR BACK

TO CRAC-4 RETURN (TYP)

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1

5/

:5 4:

P

M

100% CONSTRUCTION DOCUMENTS

08/31/2022 PMRD

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

635-21-706

OKC-EHRM DATA CENTER

CRAC PIPING AND CONTROL DETIAL,

MECHANICAL SCHEDULES & DETAILS

M-001

TYPICAL DUCT CONNECTION DETAIL

SCALE: NTS

M001

TYPICAL BOTTOM TAP DUCT CONNECTION DETAIL

SCALE: NTS

M001

DATA CENTER CRAC PIPING AND CONTROL DETAIL

SCALE: NTS

M001

DATA CENTER CRAC-4 AIRFLOW DETAIL (PRIMARY COOLING)

SCALE: NTS

M001

DATA CENTER EXISTING CRAC-2,3(E) AIRFLOW DETAIL (SECONDARY COOLING)

SCALE: NTS

M001

DATA CENTER EXISTING CRAC-1(E) AIRFLOW DETAIL (SECONDARY COOLING)

SCALE: NTS

M001

AutoCAD SHX Text

FOURFRONT DESIGN, INC.

AutoCAD SHX Text

517 7TH STREET

AutoCAD SHX Text

RAPID CITY, SOUTH DAKOTA 57701

AutoCAD SHX Text

PH: (605) 342-9470

AutoCAD SHX Text

FAX: (605) 342-2377

AutoCAD SHX Text

WWW.FOURFRONTDESIGN.COM

AutoCAD SHX Text

FOUR

AutoCAD SHX Text

FRONT

AutoCAD SHX Text D E S I G N I N C.

AutoCAD SHX Text SUMMIT FIRE CONSULTING 575 MINNEHAHA AVE WEST ST. PAUL, MINNESOTA 55103 (651) 251-1880

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

POLARGY POLARPLEX

SUSPENDED

CONTAINMENT CURTAIN

SYSTEM (OR EQUAL)

RAISED FLOOR (E)

GENERAL INFORMATION (SOUTH SIDE)

PANEL SIZES: WIDTH (APPROX 57' 6"), HEIGHT (APPROX 8' & 18")

WEIGHT (MOUNTING CHANNEL): 1.00 lb/LF WEIGHT (TWIN-WALL PANEL): 0.25 lb/SF

MOUNTING CHANNEL: EXTRUDED ANODIZED ALUMINUM

TOP OF PANEL: EXTRUDED ANODIZED ALUMINUM

PANEL: SEE BELOW

PANEL INSERT CHOICES

· 40 MIL SEIDEN CRYSTAL PVC FILM (CLEAR)

MOUNTING CHANNELS

· FLAT WALL MOUNT W/ P-CLIP T-BAR CEILING MOUNT

EXISTING

DATA

RACK

APPROX. 57' 6" WIDE

NOTE: CONTRACTOR TO FIELD

VERIFY DIMENSIONS BEFORE

PLACING ORDER FOR AIR

CONTAINMENT CURTAINS.

EXISTING

DATA

RACK

EXISTING

DATA

RACK

EXISTING

DATA

RACK

EXISTING

DATA

RACK

EXISTING

DATA

RACK

EXISTING

DATA

RACK

P-CLIP T-BAR MOUNTING

SYSTEM (TYP)

CUT 8" STRIPS IN CONTAINMENT CURTAIN BETWEEN DATA

RACKS FOR ACCESSIBILITY (TYP ALL GAPS BETWEEN RACKS)

SOUTH SIDE DATA RACKS

ACT CEILING

(E) (TYP)

ROOF DECK (E)

EXISTING

CORE

RACK

EXISTING

FIBER

RACK

EXISTING

FIBER

RACK

NEW

FIBER

RACK

EXISTING

CBOC

RACK

EXISTING

CBOC

RACK

EXISTING

CBOC

RACK 2(E)

CRAC

EXISTING

DATA

RACK

EXISTING

DATA

RACK3(E)

CRAC

EXISTING

DATA

RACK

EXISTING

DATA

RACK

ADD ASTM A461 BRACING WIRE (3.43mm/0.135" MIN DIA.) TO

EXISTING T-BAR CEILING CHANNEL SUPPORTING AIR CURTAIN

EVERY 2' FOR THE LENGTH OF THE CONTAINMENT CURTAIN.

SECURE TO ROOF DECK WITH CONCRETE ANCHORS. (TYP)

APPROX. 18"

AIR CONTAINMENT CURTAIN

TO TOP OF RACKS (TYP)

RAISED

FLOOR (E)

ACT CEILING

(E) (TYP)

EXISTING

DATA

RACK

EXISTING

DATA

RACK

EXISTING

DATA

RACK

EXISTING

DATA

RACK

NORTH SIDE DATA RACKS

APPROX. 33' WIDE

APPROX. 18"

P-CLIP T-BAR MOUNTING

SYSTEM (TYP)

CUT 8" STRIPS IN CONTAINMENT

CURTAIN BETWEEN DATA RACKS

FOR ACCESSIBILITY (TYP)

1(E)

CRAC

GENERAL INFORMATION (NORTH SIDE)

PANEL SIZES: WIDTH (APPROX 33'), HEIGHT (APPROX 8' & 18")

WEIGHT (MOUNTING CHANNEL): 1.00 lb/LF WEIGHT (TWIN-WALL PANEL): 0.25 lb/SF

MOUNTING CHANNEL: EXTRUDED ANODIZED ALUMINUM

TOP OF PANEL: EXTRUDED ANODIZED ALUMINUM

PANEL: SEE BELOW

PANEL INSERT CHOICES

· 40 MIL SEIDEN CRYSTAL PVC FILM (CLEAR)

MOUNTING CHANNELS

· FLAT WALL MOUNT W/ P-CLIP T-BAR CEILING MOUNT

ROOF DECK (E)

EXISTING

DATA

STORAGE

RACK

EXISTING

DATA

STORAGE

RACK

NEW

CERNER

RACK

NEW

CERNER

RACK

NEW

CERNER

RACK

NOTE: CONTRACTOR TO FIELD

VERIFY DIMENSIONS BEFORE

PLACING ORDER FOR AIR

CONTAINMENT CURTAINS. ADD ASTM A461 BRACING WIRE (3.43mm/0.135" MIN DIA.) TO

EXISTING T-BAR CEILING CHANNEL SUPPORTING AIR CURTAIN

EVERY 2' FOR THE LENGTH OF THE CONTAINMENT CURTAIN.

SECURE TO ROOF DECK WITH CONCRETE ANCHORS. (TYP)

AIR CONTAINMENT CURTAIN

TO TOP OF RACKS (TYP)

RAISED

FLOOR (E)

ACT CEILING

(E) (TYP)

WEST SIDE CURTAIN

APPROX. 11' WIDE

P-CLIP T-BAR MOUNTING

SYSTEM (TYP)

ROOF DECK (E)

GENERAL INFORMATION (WEST SIDE)

PANEL SIZES: WIDTH (APPROX 11'), HEIGHT (APPROX 8')

WEIGHT (MOUNTING CHANNEL): 1.00 lb/LF WEIGHT (TWIN-WALL PANEL): 0.25 lb/SF

MOUNTING CHANNEL: EXTRUDED ANODIZED ALUMINUM

TOP OF PANEL: EXTRUDED ANODIZED ALUMINUM

PANEL: SEE BELOW

PANEL INSERT CHOICES

· 40 MIL SEIDEN CRYSTAL PVC FILM (CLEAR)

MOUNTING CHANNELS

· FLAT WALL MOUNT W/ P-CLIP T-BAR CEILING MOUNT

NOTE: CONTRACTOR TO FIELD

VERIFY DIMENSIONS BEFORE

PLACING ORDER FOR AIR

CONTAINMENT CURTAINS.

ADD ASTM A461 BRACING

WIRE (3.43mm/0.135" MIN

DIA.) TO EXISTING T-BAR

CEILING CHANNEL

SUPPORTING AIR CURTAIN

EVERY 2' FOR THE LENGTH

OF THE CONTAINMENT

CURTAIN. SECURE TO ROOF

DECK WITH CONCRETE

ANCHORS. (TYP)

CUT 8" STRIPS IN

CONTAINMENT CURTAIN

FOR ACCESSIBILITY

RIGHT SIDE VIEW

NTS

FRONT VIEW

NTS

FLAT WALL MOUNT TO T-BAR MOUNTING DETAIL

NTS

S-HOOK HANGER

HOOKBEAD

MOUNTING LIP

MOUNTING

CHANNEL

SOFT

CURTAIN

S-HOOK HANGER TO

P-CLIP IN T-BAR CEILING

HOOKBEAD MOUNTING

LIP

MOUNTING

CHANNEL

SOFT

CURTAIN

P-CLIP

T-BAR CEILING

SUPPORT (E)

5" (MIN)

96" (MAX)

3.115"

MOUNTING

CHANNEL

PANEL

P-CLIP

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1

5/

:5 4:

P

M

100% CONSTRUCTION DOCUMENTS

08/31/2022 PMRD

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

635-21-706

OKC-EHRM DATA CENTER

AIR CURTAIN DETAILS

M-002

DATA CENTER SOUTH SIDE DATA RACK AIR CONTAINMENT CURTAIN DETAIL

SCALE: NTS

M002

DATA CENTER NORTH SIDE DATA RACK AIR CONTAINMENT CURTAIN DETAIL

SCALE: NTS

M002

DATA CENTER WEST SIDE AIR CONTAINMENT CURTAIN DETAIL

SCALE: NTS

M002

AIR CONTAINMENT CURTAIN T-BAR CEILING MOUNTING DETAIL

SCALE: NTS

M002

AutoCAD SHX Text

FOURFRONT DESIGN, INC.

AutoCAD SHX Text

517 7TH STREET

AutoCAD SHX Text

RAPID CITY, SOUTH DAKOTA 57701

AutoCAD SHX Text

PH: (605) 342-9470

AutoCAD SHX Text

FAX: (605) 342-2377

AutoCAD SHX Text

WWW.FOURFRONTDESIGN.COM

AutoCAD SHX Text

FOUR

AutoCAD SHX Text

FRONT

AutoCAD SHX Text D E S I G N I N C.

AutoCAD SHX Text SUMMIT FIRE CONSULTING 575 MINNEHAHA AVE WEST ST. PAUL, MINNESOTA 55103 (651) 251-1880

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

B B B B

B

F

F

CORE

DATA

STORAGE

CBOC CBOCCBOC F

DATA

STORAGE

IT IT IT IT

IT

IT

IT IT

IT

IT

CRAC

3(E)

CRAC

2(E)

CRAC

1(E)

CRAC

4(E)REMOVE EXISTING 12-TON

LIEBERT CRAC UNIT

(CRAC-4(E)), DISCONNECT

FROM EXISTING DCW AND

CONDENSATE DRAIN

REMOVE EXISTING CEILING

SUPPLY DIFFUSERS AND BRANCH

DUCT BACK TO MAIN (TYP)

EXISTING CEILING

SUPPLY DIFFUSER (TYP)

EXISTING IN-ROW CRAC

UNIT (TO REMAIN) (TYP)

REMOVE DUAL CIRCUIT

REFRIGERANT PIPING TO

CU-4(E) THE ROOF

REMOVE DUAL CIRCUIT

REFRIGERANT PIPING TO

CRAC-4(E)

REMOVE DUAL CIRCUIT

REFRIGERANT PIPING TO

CRAC-4(E) IN RAISED FLOOR

REMOVE EXISTING 12-TON

LIEBERT CONDENSING

UNIT (CU-4(E)) AND DUAL

CIRCUIT REFRIGERANT

PIPING TO CRAC-4(E)

CU

4(E)

CU

3(E)

CU

2(E)

CU

1(E)

EXISTING IN-ROW CRAC

CONDENSING UNIT (TO

REMAIN) (TYP)

REMOVE EXISTING

DUAL CIRCUIT RS/RL

PIPING THROUGH

CURB DOWN TO 9TH

FLOOR DATA

CENTER

CRAC

4(E)

NEW CERNER RACK

LOCATIONS

REMOVE EXISTING CRAC-4(E) AND

SUPPLY DUCT INTO CEILING

EXISTING SUPPLY DUCT IN CEILING

(TO REMAIN)

REMOVE EXISTING SUPPLY DUCT

AND SUPPLY DIFFUSER BACK TO

MAIN BRANCH

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1

5/

:5 4:

P

M

100% CONSTRUCTION DOCUMENTS

08/31/2022 PMRD

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

635-21-706

OKC-EHRM DATA CENTER

MECHANICAL

DEMOLITION PLANS

MD-100

DATA CENTER MECHANICAL DEMOLITION PLAN

SCALE: 1/4" = 1"

2 9TH FLOOR KEY PLAN

SCALE: 1/64" = 1"

9TH FLOOR DATA

CENTER AREA OF

WORK

9TH FLOOR ROOF KEY PLAN

SCALE: 1/64" = 1"

9TH FLOOR ROOF

AREA OF WORK

9TH FLOOR ROOF MECHANICAL DEMOLITION PLAN

SCALE: 1/8" = 1"

MD100MD100

MECHANICAL DEMOLITION ISO PLAN

SCALE: NTS

MD100

N N

N

N

GENERAL PHASING NOTES:

· EXISTING CRAC-4(E) IS TO REMAIN IN SERVICE UNTIL NEW CU-4 AND

REFRIGERANT PIPING ARE INSTALLED AND READY TO CONNECT TO NEW CRAC-4.

· THE EXISTING IN-ROW CRACS-1(E), 2(E), 3(E) WILL PROVIDE PRIMARY COOLING

WHILE EXISTING CRAC-4(E) IS DECOMMISSION/REMOVED AND NEW CRAC-4 IS

INSTALLED IN ITS PLACE (APPROX 2-3 DAYS).

GENERAL PHASING NOTES:

· EXISTING CU-4(E) IS TO REMAIN IN SERVICE UNTIL

NEW CU-4 AND REFRIGERANT PIPING ARE INSTALLED

AND READY TO CONNECT TO NEW CRAC-4

AutoCAD SHX Text

COMPUTER SERVER ROOM

AutoCAD SHX Text

OFFICE NETWORK ADMIN

AutoCAD SHX Text

ELEC CLOSET

AutoCAD SHX Text 9A123a

AutoCAD SHX Text 9A123c

AutoCAD SHX Text 9A123b

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text M

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

MENTAL HEALTH

AutoCAD SHX Text

ELEVATOR P-6

AutoCAD SHX Text

ELEVATOR P-5

AutoCAD SHX Text

ELEVATOR P-1

AutoCAD SHX Text

STAIR #5

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A1

AutoCAD SHX Text B

AutoCAD SHX Text B1

AutoCAD SHX Text C

AutoCAD SHX Text C1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 9a

AutoCAD SHX Text

AutoCAD SHX Text 11a

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text K

AutoCAD SHX Text P-7

AutoCAD SHX Text P-10

AutoCAD SHX Text P-9

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

7TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

(4TH FLR.)

AutoCAD SHX Text 8th FLOOR LEVEL

AutoCAD SHX Text

TRAP

AutoCAD SHX Text

DOOR

AutoCAD SHX Text 11a

AutoCAD SHX Text P11

AutoCAD SHX Text

PENTHOUSE

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text A

AutoCAD SHX Text

STAIR 8

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text I

AutoCAD SHX Text

OFFICE INTERIOR DESIGN

AutoCAD SHX Text

OFFICE PROJECT ENGINEER'S

AutoCAD SHX Text

IRM CLASSROOM

AutoCAD SHX Text

IRM CLASSROOM

AutoCAD SHX Text

OFFICE #1

AutoCAD SHX Text

MAS OFFICE

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

MAS OFFICE

AutoCAD SHX Text

DIRECTORS OFFICE

AutoCAD SHX Text

LOGISTICS

AutoCAD SHX Text

LOGISTICS

AutoCAD SHX Text

VOLUNTARY SERVICES

AutoCAD SHX Text

BREAK ROOM

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

COPY

AutoCAD SHX Text

DIRECTORS OFFICE

AutoCAD SHX Text

DIRECTORS OFFICE

AutoCAD SHX Text

NETWORK CLOSET

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

TOILET MALE

AutoCAD SHX Text

TOILET FEMALE

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

COMPUTER SERVER ROOM

AutoCAD SHX Text

OFFICE NETWORK ADMIN

AutoCAD SHX Text

OFFICE SUPERVISOR

AutoCAD SHX Text

OFFICE CHIEF

AutoCAD SHX Text

OFFICE ADMIN

AutoCAD SHX Text

OFFICE COMPUTER LAB

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

OFFICE IT SERVICE DESK

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TELE/ DATA

AutoCAD SHX Text

ELECTRICAL CLOSET

AutoCAD SHX Text

OFFICE CHIEF ENGINEER

AutoCAD SHX Text

OFFICE ENGINEERING RECEPTION/PURCHASING

AutoCAD SHX Text

OFFICE ASISTANT CHIEF ENGINEER

AutoCAD SHX Text

OFFICE CHIEF PROJECT ENGINEER

AutoCAD SHX Text

MECHANICAL EQUIPMENT

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

OFFICE CAD TECHNICIANS

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

LAB

AutoCAD SHX Text

OFFICE INDUSTRIAL HYGIENIST

AutoCAD SHX Text

SAFETY MANAGER

AutoCAD SHX Text

ENERGY MANAGER

AutoCAD SHX Text H.A.C.

AutoCAD SHX Text

OFFICE PROJECT ENGINEER

AutoCAD SHX Text

ELEC CLOSET

AutoCAD SHX Text

ELEC CLOSET

AutoCAD SHX Text

OFFICE TECHNICIANS

AutoCAD SHX Text

OFFICE SUPERVISOR

AutoCAD SHX Text

OFFICE COMPUTER LAB

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text H.A.C.

AutoCAD SHX Text

OFFICE PROJECT ENGINEER'S

AutoCAD SHX Text

TELE/ DATA

AutoCAD SHX Text 9B100f

AutoCAD SHX Text 9A103

AutoCAD SHX Text 9A104

AutoCAD SHX Text 9A105

AutoCAD SHX Text 9A107

AutoCAD SHX Text 9A106

AutoCAD SHX Text 9A108

AutoCAD SHX Text 9A109

AutoCAD SHX Text 9A110

AutoCAD SHX Text 9A111

AutoCAD SHX Text 9A112

AutoCAD SHX Text 9A113

AutoCAD SHX Text 9A114

AutoCAD SHX Text 9A115

AutoCAD SHX Text 9A116

AutoCAD SHX Text 9A117

AutoCAD SHX Text 9A119

AutoCAD SHX Text 9A118

AutoCAD SHX Text 9A120a

AutoCAD SHX Text 9A120b

AutoCAD SHX Text 9A120

AutoCAD SHX Text 9A120c

AutoCAD SHX Text 9A121

AutoCAD SHX Text 9A122

AutoCAD SHX Text 9A123

AutoCAD SHX Text 9A123a

AutoCAD SHX Text 9A123c

AutoCAD SHX Text 9A123d

AutoCAD SHX Text 9A123e

AutoCAD SHX Text 9A123f

AutoCAD SHX Text 9A123g

AutoCAD SHX Text 9A123h

AutoCAD SHX Text 9A123i

AutoCAD SHX Text 9A123j

AutoCAD SHX Text 9A123k

AutoCAD SHX Text 9A123l

AutoCAD SHX Text 9A123m

AutoCAD SHX Text 9A123b

AutoCAD SHX Text 9A124a

AutoCAD SHX Text 9A124

AutoCAD SHX Text 9A124b

AutoCAD SHX Text 9A125

AutoCAD SHX Text 9A126

AutoCAD SHX Text 9A101

AutoCAD SHX Text 9A102

AutoCAD SHX Text 9A100

AutoCAD SHX Text 9B101

AutoCAD SHX Text 9B100o

AutoCAD SHX Text 9B100

AutoCAD SHX Text 9B100n

AutoCAD SHX Text 9B100m

AutoCAD SHX Text 9B100l

AutoCAD SHX Text 9B100k

AutoCAD SHX Text 9B100j

AutoCAD SHX Text 9B100i

AutoCAD SHX Text 9B100e

AutoCAD SHX Text 9B100d

AutoCAD SHX Text 9B100c

AutoCAD SHX Text 9B100b

AutoCAD SHX Text 9B100a

AutoCAD SHX Text 9B100j1

AutoCAD SHX Text

ACCESS

AutoCAD SHX Text

PNL

AutoCAD SHX Text

PNL

AutoCAD SHX Text

ACCESS

AutoCAD SHX Text

INTERIOR DESIGN SUPERVISOR

AutoCAD SHX Text

STAIR #1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text Q

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text P

AutoCAD SHX Text Q

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ELEVATOR P-4

AutoCAD SHX Text

ELEVATOR P-3

AutoCAD SHX Text

ELEVATOR P-2

AutoCAD SHX Text

STAIR #2

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C1

AutoCAD SHX Text C

AutoCAD SHX Text B1

AutoCAD SHX Text B

AutoCAD SHX Text A1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 8a

AutoCAD SHX Text

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text K

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text G2

AutoCAD SHX Text P-8

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FL00R

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

STAIR 11

AutoCAD SHX Text

(4TH FLR.)

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

STAIR 12

AutoCAD SHX Text

UP

AutoCAD SHX Text

13'-3.5" ABOVE

AutoCAD SHX Text

OPEN TO EIGHTH FLOOR

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

7TH

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

8TH

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR SICU

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

MECHANICAL PENTHOUSE

AutoCAD SHX Text

ROOF SCUTTLE

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text Q

AutoCAD SHX Text P

AutoCAD SHX Text Q

AutoCAD SHX Text P

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text J

AutoCAD SHX Text F

AutoCAD SHX Text D

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text I

AutoCAD SHX Text K

AutoCAD SHX Text J

AutoCAD SHX Text

ELEV. P-3

AutoCAD SHX Text

ELEV. P-5

AutoCAD SHX Text

ELEV. P-2

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

MENTAL HEALTH

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FL00R

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

7TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

9TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

STAIR 11

AutoCAD SHX Text

(4TH FLR.)

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

STAIR 12

AutoCAD SHX Text

(4TH FLR.)

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

9TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

9TH FLOOR

AutoCAD SHX Text

PENTHOUSE

AutoCAD SHX Text L

AutoCAD SHX Text

MECHANICAL ROOM

AutoCAD SHX Text 10A101

AutoCAD SHX Text

COMPUTER ROOM

AutoCAD SHX Text 10A100

AutoCAD SHX Text 10A102

AutoCAD SHX Text 10A103

AutoCAD SHX Text 10A104

AutoCAD SHX Text 10A105

AutoCAD SHX Text 10A106

AutoCAD SHX Text

MECHANICAL ROOM

AutoCAD SHX Text

MECHANICAL ROOM

AutoCAD SHX Text

MECHANICAL ROOM

AutoCAD SHX Text

MECHANICAL ROOM

AutoCAD SHX Text

MECHANICAL ROOM

AutoCAD SHX Text

STAIR #1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ELEV. P-4

AutoCAD SHX Text

ELEV. P-6

AutoCAD SHX Text

ELEV. P-1

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

7TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

SICU

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

MECHANICAL PENTHOUSE

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

9TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

TENTH FLOOR

AutoCAD SHX Text

PENTHOUSE

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

PENTHOUSE

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

PENTHOUSE

AutoCAD SHX Text

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

9TH FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

FOURFRONT DESIGN, INC.

AutoCAD SHX Text

517 7TH STREET

AutoCAD SHX Text

RAPID CITY, SOUTH DAKOTA 57701

AutoCAD SHX Text

PH: (605) 342-9470

AutoCAD SHX Text

FAX: (605) 342-2377

AutoCAD SHX Text

WWW.FOURFRONTDESIGN.COM

AutoCAD SHX Text

FOUR

AutoCAD SHX Text

FRONT

AutoCAD SHX Text D E S I G N I N C.

AutoCAD SHX Text SUMMIT FIRE CONSULTING 575 MINNEHAHA AVE WEST ST. PAUL, MINNESOTA 55103 (651) 251-1880

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

B

B

B F F

CORE

DATA

STORAGE

CBOC CBOCCBOC F

DATA

STORAGE

IT

IT

IT IT

IT

IT IT

ITIT

CRAC

3(E)

CRAC

2(E)

1(E)

CRAC

DUAL CIRCUIT REFRIGERANT

PIPING TO CU-4 THE ROOF

EXISTING IN-ROW CRAC

UNIT (TO REMAIN) (TYP)

CRAC

NEW CEILING

SUPPLY NOZZLE

TILE (TYP)

04 05 06

12"Ø (TYP)

02 03

08 10 11 12

24"x30" SUPPLY

PLENUM

DUAL CIRCUIT REFRIGERANT

PIPING TO CRAC-4

DUAL CIRCUIT

REFRIGERANT PIPING TO

CRAC-4 ABOVE CEILING.

T T T T

CONNECT NEW 3/4" CONDENSATE

DRAIN AND 1/2" DCW FOR

HUMIDIFIER TO EXISTING IN

RAISED FLOOR. REFER TO 4-M-001

FACTORY CRAC-4 IN RACK

TEMPERATURE CONTROL

SENSOR (TYP) INSTALL PER

MFR. INSTRUCTIONS.

SUSPENDED PVC

CONTAINMENT CURTAIN. REFER

TO 1-M-002 SOUTH SIDE RACKS

FOR MOUNTING DETAILS

SUSPENDED PVC

CONTAINMENT CURTAIN. REFER

TO 3-M-002 NORTH SIDE RACKS

FOR MOUNTING DETAILS

CONNECT EXISTING

SUPPLY DUCT TO NEW

SUPPLY PLENUM

C C C

SUSPENDED PVC CONTAINMENT

CURTAIN. REFER TO 4-M-002 FOR

MOUNTING DETAILS

18 19 20 21 22 23 24 25

26 27 28 29

30 31

NEW CEILING RETURN

GRILLE (TYP)

T

H

NEW ROOM TEMPERATURE AND

HUMIDITY SENSORS, TIE INTO

EXISTING BAS

CU

NEW 15-TON LIEBERT

CONDENSING UNIT AND

REFRIGERANT PIPING

DOWN TO NEW CRAC-4

CU

3(E)

CU

2(E)

CU

1(E)

EXISTING IN-ROW CRAC

CONDENSING UNIT (TO

REMAIN) (TYP)

NEW RS/RL PIPING

THROUGH EXISTING

CURB DOWN TO 9TH

FLOOR DATA CENTERNEW RS/RL PIPING

ON ROOF, SUPPORT

WITH ROOFTOP

BLOX, STRUT AND

CLAMPS

EXISTING CU-4(E) TO BE REMOVED AFTER

NEW CU-4 AND REFRIGERANT PIPING IS

INSTALLEDCU

4(E)

24"x30" SUPPLY

PLENUM

18"x16" SUPPLY

FROM CRAC-4 INTO

BOTTOM OF SUPPLY

PLENUM (x2)

CRAC

NEW SUPPLY NOZZLE

TILE W/ PLENUM (TYP)

12"Ø (TYP)

CONNECT EXISTING SUPPLY DUCT

TO NEW SUPPLY PLENUM

BOTTOM TAP TAKEOFF W/

VOLUME DAMPER 12"Ø SUPPLY

FOR DIFFUSER. REFER TO

4-M-001. (TYP OF DIFFUSERS

01-06).

TAKEOFF W/ VOLUME DAMPER.

REFER TO 5-M-001 (TYP OF

DIFFUSERS 07-12)

EXISTING SUPPLY DUCT IN CEILING

(TO REMAIN)

RETURN AIR FLOW

GRD ID SCHEDULE #

01 665 12"Ø

TAG STYLE CFM NECK

SIZE

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

SD-1

12"Ø 12"Ø 12"Ø 12"Ø 12"Ø 12"Ø 12"Ø 12"Ø 12"Ø 12"Ø 12"Ø

13 - 22"x22"

RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

- 22"x22"RG-1

RG-1

RG-1

RG-1

RG-1

- 22"x22"

- 22"x22"

- 22"x22"

- 22"x22"

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1

5/

:5 4:

P

M

100% CONSTRUCTION DOCUMENTS

08/31/2022 PMRD

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

635-21-706

OKC-EHRM DATA CENTER

MECHANICAL

NEW PLANS

M-100

DATA CENTER MECHANICAL PLAN

SCALE: 1/4" = 1"

9TH FLOOR KEY PLAN

SCALE: 1/64" = 1"

9TH FLOOR DATA

CENTER AREA OF

WORK

9TH FLOOR ROOF KEY PLAN

SCALE: 1/64" = 1"

9TH FLOOR ROOF

AREA OF WORK

9TH FLOOR ROOF MECHANICAL PLAN

SCALE: 1/8" = 1"

M100

M100

DATA CENTER NEW MECHANICAL ISO PLAN

SCALE: NTS

M100

N

N N

N

GENERAL HVAC NOTE:

· INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS

SPACES (V3.1) SECTION 4.3.6.2 ALLOWS FOR USE OF

CEILING RETURN PLENUM IN EXISTING FACILITIES.

AutoCAD SHX Text

COMPUTER SERVER ROOM

AutoCAD SHX Text

OFFICE NETWORK ADMIN

AutoCAD SHX Text

ELEC CLOSET

AutoCAD SHX Text 9A123a

AutoCAD SHX Text 9A123c

AutoCAD SHX Text 9A123b

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text M

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

MENTAL HEALTH

AutoCAD SHX Text

ELEVATOR P-6

AutoCAD SHX Text

ELEVATOR P-5

AutoCAD SHX Text

ELEVATOR P-1

AutoCAD SHX Text

STAIR #5

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A1

AutoCAD SHX Text B

AutoCAD SHX Text B1

AutoCAD SHX Text C

AutoCAD SHX Text C1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 9a

AutoCAD SHX Text

AutoCAD SHX Text 11a

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text K

AutoCAD SHX Text P-7

AutoCAD SHX Text P-10

AutoCAD SHX Text P-9

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

7TH FLOOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH FLOOR

AutoCAD SHX Text

(4TH FLR.)

AutoCAD SHX Text 8th FLOOR LEVEL

AutoCAD SHX Text

TRAP

AutoCAD SHX Text

DOOR

AutoCAD SHX Text 11a

AutoCAD SHX Text P11

AutoCAD SHX Text

PENTHOUSE

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text A

AutoCAD SHX Text

STAIR 8

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text I

AutoCAD SHX Text

OFFICE INTERIOR DESIGN

AutoCAD SHX Text

OFFICE PROJECT ENGINEER'S

AutoCAD SHX Text

IRM CLASSROOM

AutoCAD SHX Text

IRM CLASSROOM

AutoCAD SHX Text

OFFICE #1

AutoCAD SHX Text

MAS OFFICE

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

MAS OFFICE

AutoCAD SHX Text

DIRECTORS OFFICE

AutoCAD SHX Text

LOGISTICS

AutoCAD SHX Text

LOGISTICS

AutoCAD SHX Text

VOLUNTARY SERVICES

AutoCAD SHX Text

BREAK ROOM

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

COPY

AutoCAD SHX Text

DIRECTORS OFFICE

AutoCAD SHX Text

DIRECTORS OFFICE

AutoCAD SHX Text

NETWORK CLOSET

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

TOILET MALE

AutoCAD SHX Text

TOILET FEMALE

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

COMPUTER SERVER ROOM

AutoCAD SHX Text

OFFICE NETWORK ADMIN

AutoCAD SHX Text

OFFICE SUPERVISOR

AutoCAD SHX Text

OFFICE CHIEF

AutoCAD SHX Text

OFFICE ADMIN

AutoCAD SHX Text

OFFICE COMPUTER LAB

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

OFFICE IT SERVICE DESK

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TELE/ DATA

AutoCAD SHX Text

ELECTRICAL CLOSET

AutoCAD SHX Text

OFFICE CHIEF ENGINEER

AutoCAD SHX Text

OFFICE ENGINEERING RECEPTION/PURCHASING

AutoCAD SHX Text

OFFICE ASISTANT CHIEF ENGINEER

AutoCAD SHX Text

OFFICE CHIEF PROJECT ENGINEER

AutoCAD SHX Text

MECHANICAL EQUIPMENT

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

OFFICE CAD TECHNICIANS

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

LAB

AutoCAD SHX Text

OFFICE INDUSTRIAL HYGIENIST

AutoCAD SHX Text

SAFETY MANAGER

AutoCAD SHX Text

ENERGY MANAGER

AutoCAD SHX Text H.A.C.

AutoCAD SHX Text

OFFICE PROJECT ENGINEER

AutoCAD SHX Text

ELEC CLOSET

AutoCAD SHX Text

ELEC CLOSET

AutoCAD SHX Text

OFFICE TECHNICIANS

AutoCAD SHX Text

OFFICE SUPERVISOR

AutoCAD SHX Text

OFFICE COMPUTER LAB

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text

OFFICE TECHNICIAN

AutoCAD SHX Text H.A.C.

AutoCAD SHX Text

OFFICE PROJECT ENGINEER'S

AutoCAD SHX Text

TELE/ DATA

AutoCAD SHX Text 9B100f

AutoCAD SHX Text 9A103

AutoCAD SHX Text 9A104

AutoCAD SHX Text 9A105

AutoCAD SHX Text 9A107

AutoCAD SHX Text 9A106

AutoCAD SHX Text 9A108

AutoCAD SHX Text 9A109

AutoCAD SHX Text 9A110

AutoCAD SHX Text 9A111

AutoCAD SHX Text 9A112

AutoCAD SHX Text 9A113

AutoCAD SHX Text 9A114

AutoCAD SHX Text 9A115

AutoCAD SHX Text 9A116

AutoCAD SHX Text 9A117

AutoCAD SHX Text 9A119

AutoCAD SHX Text 9A118

AutoCAD SHX Text 9A120a

AutoCAD SHX Text 9A120b

AutoCAD SHX Text 9A120

AutoCAD SHX Text 9A120c

AutoCAD SHX Text 9A121

AutoCAD SHX Text 9A122

AutoCAD SHX Text 9A123

AutoCAD SHX Text 9A123a

AutoCAD SHX Text 9A123c

AutoCAD SHX Text 9A123d

AutoCAD SHX Text 9A123e

AutoCAD SHX Text 9A123f

AutoCAD SHX Text 9A123g

AutoCAD SHX Text 9A123h

AutoCAD SHX Text 9A123i

AutoCAD SHX Text 9A123j

AutoCAD SHX Text 9A123k

AutoCAD SHX Text 9A123l

AutoCAD SHX Text 9A123m

AutoCAD SHX Text 9A123b

AutoCAD SHX Text 9A124a

AutoCAD SHX Text 9A124

AutoCAD SHX Text 9A124b

AutoCAD SHX Text 9A125

AutoCAD SHX Text 9A126

AutoCAD SHX Text 9A101

AutoCAD SHX Text 9A102

AutoCAD SHX Text 9A100

AutoCAD SHX Text 9B101

AutoCAD SHX Text 9B100o

AutoCAD SHX Text 9B100

AutoCAD SHX Text 9B100n

AutoCAD SHX Text 9B100m

AutoCAD SHX Text 9B100l

AutoCAD SHX Text 9B100k

AutoCAD SHX Text 9B100j

AutoCAD SHX Text 9B100i

AutoCAD SHX Text 9B100e

AutoCAD SHX Text 9B100d

AutoCAD SHX Text 9B100c

AutoCAD SHX Text 9B100b

AutoCAD SHX Text 9B100a

AutoCAD SHX Text 9B100j1

AutoCAD SHX Text

ACCESS

AutoCAD SHX Text

PNL

AutoCAD SHX Text

PNL

AutoCAD SHX Text

ACCESS

AutoCAD SHX Text

INTERIOR DESIGN SUPERVISOR

AutoCAD SHX Text

STAIR #1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text Q

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text P

AutoCAD SHX Text Q

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ELEVATOR P-4

AutoCAD SHX Text

ELEVATOR P-3

AutoCAD SHX Text

ELEVATOR P-2

AutoCAD SHX Text

STAIR #2

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C1

AutoCAD SHX Text C

AutoCAD SHX Text B1

AutoCAD SHX Text B

AutoCAD SHX Text A1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 8a

AutoCAD SHX Text

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text K

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text G2

AutoCAD SHX Text P-8

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

8TH…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .