Attachment 2 - KANKAKEE (WLR 75F) DD SPEC.pdf

PDF 2 MB Posted

Attached to
USCGC KANKAKEE (WLR-75F) DD FY21
Solicitation number
70Z085-21-Q-P45074
Issued by

About this file

This solicitation seeks proposals for various unplanned dry dock repairs of the USCGC KANKAKEE, a 75-foot inland buoy tender, and its accompanying 130-foot barge. The contractor will provide all necessary labor, materials, services, equipment and supplies to perform ship repair and associated support work in accordance with the specification. The scope of services includes work items listed in the specification as well as any additional work that arises. The contractor must have the capability to perform tasks such as hull repairs, machinery maintenance, electrical work, and coating preservation. The Department of Homeland Security Coast Guard will award the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC KANKAKEE (WLR 75500)

USCG 130 BARGE (13074)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2021

Developed By: Robert E. Ozment

(Rev-0, 02 October 2020)

USCGC KANKAKEE (WLR-75F) DRYDOCK AVAILABILITY FY2021

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property ................................................................................. ix Consolidated List of Critical Inspection Items .............................................................................................. x Principal Characteristics - Tender ................................................................................................................ xi Principal Characteristics - Barge ................................................................................................................ xii General Requirements WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing - Tender WORK ITEM 2: Hull Plating (U/W Body), Inspect - Tender WORK ITEM 3: U/W Body, Preserve (100%) - Tender WORK ITEM 4: Hull Plating Freeboard, Preserve “100%” - Tender WORK ITEM 5: Voids (Non-Accessible), Leak Test - Tender WORK ITEM 6: Voids (Non-Accessible), Internal Surfaces, Preserve - Tender WORK ITEM 7: Tanks (MP Fuel Service), Clean and Inspect - Tender WORK ITEM 8: Propulsion Shafting; Remove, Inspect, and Reinstall WORK ITEM 9: Stern Tube Interior Surfaces, Preserve 100% WORK ITEM 10: Propulsion Shafting, Straighten WORK ITEM 11: Propeller Shaft Sleeve(s), Renew WORK ITEM 12: Propulsion Shaft Bearings (External), Check Clearances WORK ITEM 13: Propulsion Shaft Bearings (External), Renew WORK ITEM 14: Propulsion Intermediate Shaft(s); Remove, Inspect, and Reinstall WORK ITEM 15: Propulsion Shafting, Optical or Laser Alignment Check WORK ITEM 16: Propellers, Remove, Inspect, and Reinstall WORK ITEM 17: Propeller, Minor Repairs and Reconditioning, Perform WORK ITEM 18: Keel Coolers, Clean, Inspect and Hydro - Tender WORK ITEM 19: Fathometer Transducer, General Maintenance - Tender WORK ITEM 20: Rudder Assembly; Remove, Inspect And Reinstall WORK ITEM 21: Rudder(s), Preserve (“100%”) WORK ITEM 22: Spuds, Overhaul - Tender WORK ITEM 23: Spud Wells, Preserve - Tender WORK ITEM 24: Cathodic Protection / Magnesium Anodes, Renew - Tender WORK ITEM 25: Drydock - Tender WORK ITEM 26: Temporary Services, Provide – Tender and Barge WORK ITEM 27: Sea Trial Performance, Support, Provide WORK ITEM 28: Hull Plating (Side Scan), Ultrasonic Testing - Barge WORK ITEM 29: Hull Plating (U/W Body), Inspect - Barge WORK ITEM 30: U/W Body, Preserve (100%) - Barge WORK ITEM 31: Hull Plating Freeboard, Preserve “100%” - Barge WORK ITEM 32: Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect - Barge WORK ITEM 33: Voids (Non-Accessible), Leak Test - Barge WORK ITEM 34: Voids (Non-Accessible), Internal Surfaces, Preserve - Barge WORK ITEM 35: Keel Coolers, Clean, Inspect and Hydro - Barge WORK ITEM 36: Fathometer Transducer, General Maintenance - Barge WORK ITEM 37: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test - Barge WORK ITEM 38: Spuds, Overhaul - Barge WORK ITEM 39: Spud Wells, Preserve - Barge WORK ITEM 40: Decks – Exterior (Buoy or Construction Deck), Preserve 100% WORK ITEM 41: Cathodic Protection / Magnesium Anodes, Renew - Barge

USCGC KANKAKEE (WLR-75F) DRYDOCK AVAILABILITY FY2021

iii (Rev-0)

WORK ITEM 42: Drydock - Barge WORK ITEM 43: Boat Davit Winch, Shrink Wrap WORK ITEM 44: Buoy and Cargo Handling Crane, Shrink Wrap WORK ITEM 45: Hull and Structural Plating (General) -10.2-Pound Steel, Renew - Tender WORK ITEM 46: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew - Tender WORK ITEM 47: Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew - Tender WORK ITEM 48: Hull and Structural Plating (General) - Degraded Weld (Steel), Repair - Tender WORK ITEM 49: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew - Barge WORK ITEM 50: Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew - Barge WORK ITEM 51: Hull And Structural Plating (General) - 20.4-Pound Steel Plate, Renew - Barge WORK ITEM 52: Hull and Structural Plating (General) - Degraded Weld (Steel), Repair - Barge WORK ITEM 53: Deck Covering (Interior Wet/Dry), Renew WORK ITEM 54: Galley Ventilation System, Clean WORK ITEM 55: Padeye Renew WORK ITEM 56: 01 Level Deck, Repair WORK ITEM 57: Stanchion Sleeve, Renew WORK ITEM 58: Sewage Tank Interior Coating, Renew WORK ITEM 59: Ladder Rungs, Repair WORK ITEM 60: Stern Tube Cooling Water Piping, Renewal WORK ITEM 61: Weather Deck Stuffing Tubes, And Electrical Cable Stand-Offs, Remove & Install . 190 WORK ITEM 62: Hull Plate Repair, Barge WORK ITEM 63: Transducer Tubes Renew, Barge WORK ITEM 64: Wing-wire Bracket Renew, Barge WORK ITEM 65: Engine Coolant System, Clean and Flush

USCGC KANKAKEE (WLR-75F) DRYDOCK AVAILABILITY FY2020

iv (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

v (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 130 CGB 111-002, Rev 9, Details, Side Shell Plating and Framing

Coast Guard Drawing 130 CGB 530-002, Rev 3, Cooling Water Piping Schematic

Coast Guard Drawing 130 CGB 633-001, Rev -, Cathodic Protection

Coast Guard Drawing 130 CGB 71-77 085-001, Rev B, General Arrangements and Profile

Coast Guard Drawing 130 CGB67 111-001, Rev 9, Hull Details – Bottom & Main Deck Plating and

Framing Details

Coast Guard Drawing 130 CGB68 111-001, Rev 3, Hull Details – Bottom & Main Deck Plating and

Framing Details

Coast Guard Drawing 130 CGB69 111-001, Rev 3, Hull Details – Bottom & Main Deck Plating and

Framing Details

Coast Guard Drawing 130 CGB70 111-001, Rev -, Hull Details – Bottom & Main Deck Plating and

Framing Details

Coast Guard Drawing 130 CGB71-77 085-004, Rev 1, Docking Plan

Coast Guard Drawing 130 CGB71-77 085-005, Rev -, Body Plan

Coast Guard Drawing 130 CGB71-77 085-006, Rev -, Curves of Form

Coast Guard Drawing 130 CGB71-77 123-001, Rev -, Spud Well Bhds & Spud Details

Coast Guard Drawing 130 CGB71-77-085-004, Rev 1, Docking Plan

Coast Guard Drawing 130-CGB71-77-611-001, Rev -, Deck Fittings, Spray Shields &

Handrail Details

Coast Guard Drawing 130-CGB71-77 85-2, Rev -, Compartment & Access – Plan, Hold, Mn Dk &

Dkhse

Coast Guard Drawing 130-CGB74-77 111-1, Rev A, Hull Details Bottom & Main Deck Plating &

Framing & Dets

Coast Guard Drawing 130-CGB71-77 111-2, Rev -, Hull Details Side Shell Plating & Framing

Coast Guard Drawing 130-CGB67 123-2, Rev 2, Transducer Well Details

Coast Guard Drawing 130-CGB74-77 85-001, Rev C, General Arrangement Main Deck Plan

Coast Guard Drawing 130-CGB71-77 85-001, Rev -, Compartment & Access - Plan and Hold, Mn. Dk.

& Dk. Hse

Coast Guard Drawing 130-CGB71-77 123-002, Rev -, Transducer Well Details

Coast Guard Drawing 75F-WLR 582-5, Rev A, WLR Tender Barge Interface System vi (Rev-0)

Coast Guard Drawing 75F WLR 070-001, Rev 2, Booklet Of General Plans

Coast Guard Drawing 75F WLR 085-001, Rev A, Curves of Form

Coast Guard Drawing 75F WLR 085-008, Rev 2, Lines Plan

Coast Guard Drawing 75F WLR 085-012, Rev -, 75FT “F” Class Towboat Docking Block Arrangement

Coast Guard Drawing 75F WLR 085-012, Rev -, Docking Block Arrangement (‘F’ Class)

Coast Guard Drawing 75F WLR 110-1, Rev 3, Shell Expansion

Coast Guard Drawing 75F WLR 116-001, Rev 5, Longitudinal Structural Framing

Coast Guard Drawing 75F WLR 117-003, Rev 2, Transverse Structural Frames 15-16-17-19-20

Coast Guard Drawing 75F WLR 117-004, Rev 2, Transverse Structural Frames 21-22-23-24-25-26

Coast Guard Drawing 75F WLR 121-001, Rev 2, Longitudinal Structural Bulkheads

Coast Guard Drawing 75F WLR 122-001, Rev 4, Transverse Structural Bulkhead

Coast Guard Drawing 75F-WLR 136-01, Rev 7, Raised Main Deck

Coast Guard Drawing 75F-WLR 137-01, Rev 3, 01 Level Deck

Coast Guard Drawing 75F WLR 243-001, Rev 3, Shafting Arrangement

Coast Guard Drawing 75F WLR 243-002, Rev 6, Shaft Details

Coast Guard Drawing 75F WLR 243-006, Rev-, Intermediate Shaft Modification

Coast Guard Drawing 75F-WLR 243-005, Rev 3, Stern Tube Cooling Wtr Piping Diag

Coast Guard Drawing 75F WLR 245-003, Rev 2, Propeller, Fairwater & Guard (6-blade)

Coast Guard Drawing 75F-WLR-423-003 Arrangement of Electronic Equipment

Coast Guard Drawing 75F WLR 532-002, Rev 3, Engine Cooling Details

Coast Guard Drawing 75F WLR 532-003, Rev 1, Keel Cooler Details

Coast Guard Drawing 75F-WLR 506-1, Rev 6, Vents & Sounds

Coast Guard Drawing 75F WLR 562-001, Rev 1, Rudder Arrangements

Coast Guard Drawing 75F WLR 562-003, Rev 4, Steering Rudders and Stocks

Coast Guard Drawing 75F WLR 562-005, Rev 6, Flanking Rudders and Stocks

Coast Guard Drawing 75F WLR 582-002, Rev 2, Mooring and Spud Arrangements

Coast Guard Drawing 75F WLR 582-003, Rev 5, Spud Details

Coast Guard Drawing 75F-WLR 593-1, Rev 9, Sewage Sys Arrangement

Coast Guard Drawing 75-WLR-F 623-001, Rev 3, Stairs and Ladders

Coast Guard Drawing 75F WLR 633-001, Rev -, Cathodic Protection

Coast Guard Drawing 75F-WLR 634-01, Rev -, Deck Covering

Coast Guard Drawing FL 1204-3, Rev A, Welded Padeyes & Links

Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly

Coast Guard Drawing75F WLR 070-001, Rev 2, Booklet of General Plans, Sheet 6/8

Coast Guard Drawing 905-WMEC 611-03, Rev D, Padeyes Outside Machinery Spaces A & D

Coast Guard Fleet Drawing FL 2602-10, Rev R, Spud Arrangements and Details

Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem

Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters

NAVSEA Drawing 803-2145807, Rev C, Propulsion Shafting And Components

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINS) M10360.3 (series), Coatings and Color Manual vii (Rev-0)

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2018, Auxiliary

Machine Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2018, Drydocking

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2018, Temporary

Services

Coast Guard Technical Publication (TP) 3174, Manufacturer's Instruction Book-SWBS Group(s) 261-625

OTHER REFERENCES

American Bureau of Shipping (ABS) 2, Rule Requirements for Survey After Construction, 2014, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings

The American Bureau of Shipping (ABS), 2007, Guide for Shipbuilding and Repair Quality Standards for

Hull Structure During Construction (ABS Pub 87)

American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended Practice for

Personal Qualification and Certification in Nondestructive Testing

ASTM International (ASTM) B 843, 2007, Standard Specification for Magnesium Alloy Anodes for

Cathodic Protection

ASTM International (ASTM) D1709, 2008, Standard Test Methods for Impact Resistance of Plastic Film by the Free-Falling Dart Method

ASTM International (ASTM) D1922, 2008, Standard Test Method for Propagation Tear Resistance of

Plastic Film and Thin Sheeting by the Pendulum Method

ASTM International (ASTM) D3951, Reapproved 2010, Standard Practice for Commercial Packaging

ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means

ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component

Adhesives (AN)

ASTM International (ASTM) D882, 2009, Standard Test Method for Tensile Properties of Thin Plastic

Sheeting

Commercial Item Description (CID) A-A-52624, Nov 2008, Antifreeze, Multi Engine Type, Ethylene

Glycol (For Caterpillar applications, use CAT Extended Life Pre-Mix coolant.)

Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-

Petrolatum

Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections

Fernstrum Gridcooler Installation and Maintenance Manual, 2013, Form 175

International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller -

Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive

MIL PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application

MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning viii (Rev-0)

MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of

Reliability Is Required

MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited)

MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main

Propulsion Shafting

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and

Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning

The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough

Cleaning

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation

Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning

The Society for Protective Coatings SSPC-SP 10/NACE No.2, Jan 2007, Near-White Blast Cleaning

The Society for Protective Coatings SSPC-SP 11, Jul 2012, Power Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 16 (SSPC-SP 16), 2010, Brush-Off Blast Cleaning of Coated and Uncoated Galvanized Steel, Stainless Steels, and

Non-Ferrous Metals ix (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

8 Y **Propulsion Tail Shaft NSN: 3040-01-501-2508 2 ea. 16,000.00

8 N Air Seal Ring PN: 880410146 2 ea. 250.00

8 N Air Valve Kit PN: 880000007 2 ea. 30.00

11 N **Sleeve, Shaft, Aft &

Fwd

NSN: 2010-01-501-5183 1ea. $4,000.00

14 Y **Propulsion Line

Shaft

NSN: 3040-01-501-2646 2 ea. $17,700.00

16 Y **Propeller, RH NSN: 2010-01-501-5459 1 ea. 14,000.00

16 Y **Propeller, LH NSN: 2010-01-501-5465 1 ea. 14,000.00

16 N **Prop Nut -Fairwater NSN: 2010-01-670-3028 2 ea. 4,200.00

16 N Seal Ring, Hub, Propeller

NSN: 2010-01-644-6873 2 ea. 625.00

16 N Seal Ring, Hub, Propeller

NSN: 2010-01-644-6886 2 ea. 700.00

19 N ***Fathometer

Transducer, Shallow

Water, 50-200 kHz

(Airmar Technology

SS505)

NSN: 5845-01-518-7245 1 ea. 343.63

20 Y **Steering Rudder NSN: 2040-01-503-0291 2 ea. 2,700.00

20 Y **Flanking Rudder NSN: 2040-01-501-9601 4 ea. 2,700.00

36 N ***Fathometer

Transducer, Shallow

Water, 50-200 kHz

(Furuno 520-BLD)

NSN: 5845-01-521-8278 2 ea. 197.23

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter x (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000):

Work

Item Title

1 Hull Plating (Side Scan), Ultrasonic Testing - Tender

3 U/W Body, Preserve (100%) - Tender

5 Voids (Non-Accessible), Leak Test - Tender

7 Tanks (MP Fuel Service), Clean and Inspect - Tender

8 Propulsion Shafting; Remove, Inspect, and Reinstall

11 Propulsion Shaft Bearings (External), Check Clearances

12 Propulsion Shaft Bearings (External), Renew

17 Rudder Assembly; Remove, Inspect And Reinstall

25 Hull Plating (Side Scan), Ultrasonic Testing - Barge

27 U/W Body, Preserve (100%) - Barge

29 Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect - Barge

30 Voids (Non-Accessible), Leak Test - Barge xi (Rev-0)

PRINCIPAL CHARACTERISTICS - TENDER

75’ WLR (F-CLASS), INLAND RIVER BUOY TENDER

PHYSICAL

Length overall 75' 8-5/8"

Depth 8' 0"

Maximum beam 24' 0"

Height of highest projection N/A

Full load draft 5' 0 7/16" LCF Draft

Full load displacement 176.25 Long Tons SW

Shore tie voltage requirements 220VAC/3PH/60HZ/200AMP

Frame spacing 1' 6"

MACHINERY

Number of propellers 2

Number of blades 6

Diameter of propeller 46"

Pitch 51" fixed

RPM 450

xii (Rev-0)

PRINCIPAL CHARACTERISTICS - BARGE

130' CGB, BARGE

PHYSICAL

Length overall 130' 0"

Depth 7' 6"

Maximum beam 30' 0"

Frame spacing 15" - 30"

Full load draft 4’ 3" (LCF Draft)

Full load displacement 240.76 Long Tons SW

Shore tie voltage requirements 220VAC/3PH/60HZ/100AMP

1 (Rev-0)

00000_0618_FLT

REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and

'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is

Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction(COMDTINS) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-0)

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec

6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes

(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at

Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an

NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The

3 (Rev-0)

Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility

Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System

(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste

Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the

Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the

Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For

Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2018 Edition Standard Specifications and supersede published content:

3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint

Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of

SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”

3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay

(RRL) wire rope or Dyform-18, rotation resistant wire rope."

3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"

4 (Rev-0)

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

6 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL #

WORK ITEM

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

7 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /

8 (Rev-0)

TIME

9 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading

(mils)

Mean Reading (mils) IAW ASTM DD4417).

10 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK ITEM

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

11 (Rev-0)

12 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL #

WORK ITEM

COATING MFG PRODUCT NAME

BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5

AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic

Pull-Off (Type I/Banana) Gauge Is

Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

13 (Rev-0)

11000_SideScan_0617_FLT

REC_11000_Side_Scan_FLT_75 WLR (‘F’ Class: Hulls 75500-75501) (1211)

WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing - Tender

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform thickness measurements of underwater (u/w) hull plating by ultrasonic side scan method.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 75F WLR 085-012, Rev -, 75FT “F” Class Towboat Docking Block

Arrangement

Coast Guard Drawing 75F WLR 110-1, Rev 3, Shell Expansion

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements

OTHER REFERENCES

American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended

Practice for Personal Qualification and Certification in Nondestructive Testing

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

3.2 Side scan requirements and procedures.

3.1.2 Tech Rep.

Not applicable.

14 (Rev-0)

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Hull zinc anode system

Docking blocks.

3.2 Work coordination and preparation. The Contractor shall plan all specified vessel work detailed in this specification package to ensure the side scan survey does not necessitate a work stoppage. The Contractor shall abide by the following guidance, to facilitate the ultrasonic survey:

Ensure that all u/w body surface preparation and primer coat application tasks are completed within ten days of lifting the vessel.

Provide a continuous supply of fresh water at .50 gpm within 50 feet of the vessel with standard hose bib fitting.

Provide 110 VAC electrical power, and scaffolding or other suitable means of access to bring inspection personnel within one foot of all the body surface inspection areas that are five feet above ground level.

After completion of the hull survey, and authorized hull repairs, resume/complete u/w body preservation process by applying the second coat of the anti-corrosive coating system, and all anti-fouling paint coats.

Pay close attention to manufacturer’s recommended practices in regards to paint system overcoat time limitations and required degree of surface cleanliness prior to resuming u/w body coating application.

3.3 Side scan requirements and procedures. The Contractor shall ensure the following referring to the

Coast Guard drawings listed in Section 2 (References) herein as guidance during the performance of the tasks specified below and submit a CIR.

3.3.1 Testing company and personnel. Provide the services of a qualified ultrasonic testing company, with suitable side scan equipment, to conduct a “Scanning Crawler Automated Test” of the vessel’s u/w hull plating for the presence of metal corrosion and deterioration. Ensure the following:

All scanning operations are completed by personnel meeting the personnel qualification and certification, as required by contractor process. This contractor developed personnel qualification and certification process must meet, at a minimum, ASNT Recommended

Practice No. SNT-TC-1A.

An SNT Level III Analyst is on site, to oversee the project and evaluate the collected data.

An SNT Level III or II Analyst is on site, to verify with a hand held gauge all areas on the hull identified as thinner than the specified criteria, in order to expedite all repair procedures.

Qualified personnel are provided to complete all on-site corrosion inspections.

3.3.2 Coast Guard notification. Accomplish all required tasks within 10 calendar days of the start of the availability.

15 (Rev-0)

3.3.2.1 Provide a daily update to the COR on all areas inspected and potential issues or schedule changes.

3.3.2.2 Notify the COR at least 3 days prior to completion for an onsite review of readings and repair areas.

3.3.3 Scanning parameters. Use the following parameters during the course of this inspection:

Automated scanning resolution shall be set to 0.5” x 0.5”

Plates where scan data indicating wastage greater than or equal to 25% nominal plate thickness shall be highlighted in “RED” and designated “repair areas”.

Plates where scan data indicating wastage greater than or equal to 15% to 24% of nominal plate thickness shall be highlighted in “YELLOW”.

Plates where scan data indicating wastage greater than or equal to 10% to 14% of nominal plate thickness shall be highlighted in DARK GREEN.

Hand held UT readings shall be taken to verify bad metal areas found with the side scan equipment. All readings shall be provided to the COR and the lowest reading marked on the hull at the bad metal location.

Areas that are accessible but cannot be reached by the automated scanner shall be scanned with a hand-held meter at a resolution of 2” x 2”. Any repair areas found during the hand scan shall be marked on the ships hull and their approximate positions recorded on the plate drawings and report summary..

3.3.3.1 Any scanning parameter or scope of work changes must be approved by the KO.

3.3.3.2 The echo to echo transducer is not authorized due to inconsistent readings and technical difficulties.

3.3.3.3 There shall be no deviation from the color scheme specified above.

3.3.4 Ensure that the side scan inspection area includes the Port, Starboard, and Transom exterior shell plate below the water line, but shall exclude the following list.

Areas under and within 6-inches of blocks and side blocks (areas that are accessible 6 inches from blocks and side blocks must be hand scanned.)

Areas up to 6-inches around any obstacle on the hull including sea suctions, discharges, rudderposts, knuckle, bow stem, stabilizer tubes, and stern tubes, as applicable.

Any areas blocked by immovable scaffolding or shipyard activity.

3.4 Side scan reports. The Contractor shall submit to the COR a final report within 3 working days after the side scan inspection is completed. A copy of all repair areas shall be clearly marked, in yellow or white, on the provided shell plate drawing(s), and provide a summary document of same areas. Submit two hard copies of the report with two CD’s containing the electronic (raw) data, as part of the CIR submission prior to departing the job site. Ensure the reports include:

Inspection overview.

Data sheets for each plate with designated repair areas outlined in blue.

Mosaic of scanned data overlaid on Coast Guard Drawing 75F WLR 110-1.

3.4.1 Photos. Provide digital photos of all designated repair areas.

16 (Rev-0)

3.4.2 Electronic files. Ensure CD’s contain a complete copy of the report, interactive data files, and digital pictures. All electronic files shall be compatible with standard USCG workstation operating software.

Electronic files format shall be such that the CG has the capability to change the percent of wastage

(format conditioning) per plate. Electronic files shall be capable of being opened using MS Word, MS

Excel, or PDF software. Digital pictures shall be recorded in JPEG format.

This section is not applicable to this work item.

17 (Rev-0)

11000_1016_FLT

REC_11000_UWHIB_FLT_75 WLR (‘F’ Class: Hulls 75500-75501) (1211)

WORK ITEM 2: Hull Plating (U/W Body), Inspect - Tender

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect/survey the vessel’s

Under Water (U/W) hull plating, including U/W appendages and coating system.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 75F WLR 085-012, Rev -, 75FT “F” Class Towboat Docking Block

Arrangement

Coast Guard Drawing 75F WLR 562-003, Rev 4, Steering Rudders and Stocks

Coast Guard Drawing 75F WLR 562-005, Rev 6, Flanking Rudders and Stocks

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements

OTHER REFERENCES

ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film

Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means

The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2

(PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

18 (Rev-0)

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Inspection. The Contractor shall accompany the Underwater Hull Inspection Board (UWHIB) in the performance of the below inspection tasks, as applicable, using the drawings listed in Section 2

(References) as guidance. The Contractor shall provide the following, to facilitate the UWHIB in assessing the condition of the designated U/W hull components and systems:

A hull repair supervisor and a marker.

Temporary staging and other necessary equipment, as applicable, for ensuring safe access to all areas of the U/W hull.

NOTES

1. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.

2. Some of the components and/or systems addressed in this work item may not be applicable to all vessel classes.

3.2.1 Hull plating. Inspect the condition of the hull plating (including thruster tunnel plating, as applicable), for the presence of marine growth, deformation, and any evidence of major corrosion or electrolytic action.

3.2.1.2 Inspect the hull and keel areas, report on the condition of butt-welded seams, doubler plates, lap seams, and for any signs of damaged plating or unusual waviness in the plating.

3.2.2 Sea chests and all other cooling system intake components. Inspect all sea chests, sea beam arrays, tunnels, hull openings, and grates for general appearance, loose, damaged, or missing grates, loose or missing fasteners, condition of sea strainers and lockwire on bolts, marine growth on grating slots, and any obstructions in the openings that might prevent proper suction and discharge of water.

3.2.3 Rudders. Check general condition, condition around the drain plugs, and check for pitting, if any, on the leading and trailing edges.

3.2.4 Propeller and shaft associated components. Inspect the condition of propellers for signs of corrosion, pitting, erosion, fouling, cracks, dings, and nicks by side and blade; inspect fairwaters, rope guards, shafts, and mechanical seals - look for missing screws, physical damage to the blades, pitting, condition of dunce caps, and condition of securing devices.

3.2.5 Transducers. Check general condition for cuts, cracks, corrosion, and surface defects around the openings. Check transducer securing nuts for tightness, and inspect cables for chafing and other damage.

19 (Rev-0)

3.2.6 Zinc anodes. Remove all marine growth and oxide coating from all hull, rudder, shaft strut, sea chest, sea beam array, z-drive, and thruster tunnel zinc anodes, or water jet drives anodes, as applicable, using a light-wire brush.

3.2.6.1 Visually inspect all zinc anodes; check the soundness of mounting strap and stud welds, missing fasteners, and percentage of remaining material.

3.2.7 Coating system inspections. Accomplish the below inspections, in conjunction with the underwater hull inspection conducted by the Underwater Hull Inspection Board (UWHIB). Document the condition found as “Partial - Condition A”, “Partial - Condition B”, or “100%”, as applicable (see 4.1

(Definitions)). Submit a CFR.

NOTE

The following inspections are for determining the existing condition of the coating system for the underwater body surfaces, which are deemed “Critical-coated” surfaces; they must be carried out by a SSPC-QP-1 certified contractor/sub-Contractor or a NACE Inspector – see SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.2.7.1 Visual. Perform a visual inspection of the existing U/W body coating system.

3.2.7.2 Dry film thickness (DFT) measurements. Take total DFT measurements of the U/W body coating system, in accordance with SSPC-PA 2.

4. NOTES

4.1 UWHIB convention. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.

20 (Rev-0)

63130_0617_FLT

REC_63130_100Percent_FLT_75’ WLR (‘F’ Class: Hulls 75500, 75501) (0413)

WORK ITEM 3: U/W Body, Preserve (100%) - Tender

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to preserve U/W body surfaces.

NOTES

1. The purpose of the preservation tasks covered by this item is to completely remove all existing coatings and recoat the U/W body surfaces with a new coating system.

2. U/W body surfaces are as defined in 4.1 (Definitions) and exclude areas covered by docking blocks, unless the vessel is fleeted for the express purpose of preserving blocked areas.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing75F WLR 070-001, Rev 2, Booklet of General Plans, Sheet 6/8

COAST GUARD…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .