Attachment 2 Data Requirements.pdf
PDF 635 KB Posted
- Attached to
- Circular Geometry Measuring Machine Federal contract opportunity
- Solicitation number
- FA2263-20-Q-0011
About this file
This is a solicitation for a Circular Geometry Measuring Machine. The Air Force Materiel Command Lifecycle Management Center at Wright Patterson Air Force Base is seeking to award a firm fixed price contract for the purchase of a Circular Geometry Measuring Machine, along with a technical manual and calibration certificate. The machine must meet the requirements detailed in Purchase Description 20M-201A-DI dated February 7, 2020. Offers are due by July 10, 2020 and must include pricing for both the base year and option year quantities. The NAICS code for this procurement is 334516 and the business size standard is 1,000 employees. This is an unrestricted solicitation conducted under simplified acquisition procedures.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PD Rev1_20M-201A-DI_Circular Geometry Measuring Machine.docx | DOCX document | |
| FA226320Q0011 Amendment 0001.docx | DOCX document | |
| Solicitation Amendment FA226320Q00110001.pdf | ||
| PD Rev1_20M-201A-DI_Circular Geometry Measuring Machine.docx | DOCX document | |
| Attachment 1 PD 20M-201A-DI_Circular Geometry Measuring Machine.docx | DOCX document | |
| FA226320Q0011.docx | DOCX document | |
| Attachment 1 PD 20M-201A-DI_Circular Geometry Measuring Machine.pdf | ||
| Attachment 5 Total Evaluated Price Worksheet.docx | DOCX document | |
| Solicitation - FA226320Q0011 060920.pdf | ||
| Attachment 3 Anticipated Delivery Locations.doc | DOC document | |
| Attachment 4 Instruction to Offerors.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
1_DATA_ITEM_NO: A002
2_TITLE_OF_DATA_ITEM: Calibration Certificate
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit: DI-QCIC-80798C
5_CONTRACT_REFERENCE: PD 20M-201A-DI Atch
6_REQUIRING_OFFICE: AFLCMC/WNMM
7_DID_250_REQ: N/A
8_APP_CODE: N/A
DIST_STATEMENT: D
10_FREQUENCY: ASREQ
11_AS_OF_DATE: ASREQ
12_DATE_OF_FIRST_SUBMISSI: See BLK 16
13_DATE_OF_SUBSEQUENT_SUB: See BLK 16 addressee1:
draft1:
reg1:
repro1:
addressee2: Ship with unit draft2:
reg2: 6 repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_repro: 0
16_REMARKS: Blk 12: Concurrent with delivery of each production unit, the contractor shall furnish and pack 1 calibration certificate with each unit. Ship with unit.
17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE: 3/3/2020
1_APPROVED_BY:
J_DATE: 3/3/2020
Page: 2 reg38t: 6
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: A(FY 20)
TDP:
TM: x
OTHER:
DSYSTEMITEM: Circular Geometry Measuring Machine
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 5
Reset:
2020-03-03T09:55:59-0500
CAPUANO.FRANK.R.1403209658
2020-03-03T10:44:34-0500
SKINNER.KEVIN.L.II.1024227223
DD FORM 1423-2, AUG 96
(2 Data Items)
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
TDP ________ TM _______ OTHER _________________________
11. AS OF DATE 13. DATE OF SUBSEQUENT
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Page ____ of ____ Pages
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: B(FY 21, 22, 23)
TDP: Off
TIM: Yes
OTHER:
D_SYSTEMITEM: Circular Geometry Measuring Machine
E_CONTRACTPR_NO:
FCONTRACTOR:
1_DATA_ITEM_NO1: B001
2_TITLE_OF_DATA_ITEM1: Technical Manual Contract Requirements (TMCR)
3_SUBTITLE1:
4_AUTHORITY1: TM-86-01
5_CONTRACT_REFERENCE1: PD 20M-201A-DI Atch
6_REQUIRING_OFFICE1: AFLCMC/WNMM
7_DD_250_REQ1: N/A
8_APP_CODE1: N/A
9_dist1: D
10_FREQUENCY1: ASREQ
11_AS_OF_DATE1: ASREQ
12_DATE_OF_FIRST_SUB1: See BLK 16
13_DATE_OF_SUBSEQUENT_SUB1: See BLK 16 addr1_1:
draft1_1:
reg1_1:
repro1_1:
1_DATA_ITEM_NO2: B002
2_TITLE_OF_DATA_ITEM2: Calibration Certificate
3_SUBTITLE2:
4_AUTHORITY2: DI-QCIC-80798C
5_CONTRACT_REFERENCE2: PD 20M-201A-DI Atch
6_REQUIRING_OFFICE2: AFLCMC/WNMM
7_DD_250_REQ2: N/A
8_APP_CODE2: N/A
9_dist2: D
10_FREQUENCY2: ASREQ
11_AS_OF_DATE2: ASREQ
12_DATE_OF_FIRST_SUB2: See BLK 16
13_DATE_OF_SUBSEQUENT_SUB2: See BLK 16 addr2_1:
draft2_1:
reg2_1:
repro2_1:
addr1_2: Ship with unit draft1_2:
reg1_2: 26 repro1_2:
addr1_3:
draft1_3:
reg1_3:
repro1_3:
addr1_4:
draft1_4:
reg1_4:
repro1_4:
addr1_5:
draft1_5:
reg1_5:
repro1_5:
addr1_6:
draft1_6:
reg1_6:
repro1_6:
addr1_7:
draft1_7:
reg1_7:
repro1_7:
addr1_8:
draft1_8:
reg1_8:
repro1_8:
addr1_9:
draft1_9:
reg1_9:
repro1_9:
addr1_10:
draft1_10:
reg1_10:
repro1_10:
addr1_11:
draft1_11:
reg1_11:
repro1_11:
addr1_12:
draft1_12:
reg1_12:
repro1_12:
addr1_13:
draft1_13:
reg1_13:
repro1_13:
addr1_14:
draft1_14:
reg1_14:
repro1_14:
15_total_Draft1: 0
15_TOTALReg1: 26
15_TOTALRepro1: 0
16_REMARKS1: Blk 12&13: Concurrent with delivery of each production unit, the contractor shall furnish and pack 1 set of manuals with each unit. Manuals shall be on CD/DVD in Indexed Portable Document Format (iPDF). Ship with unit.
The listed number of copies is the maximum amount for the acquisition. Specific quantities will be identified by issuance of a modification to exercise option quantities.
17_PRICE_GROUP1:
18_totalprice1:
addr2_2: Ship with unit addr2_3:
addr2_4:
16_REMARKS2: BLK 12: Concurrent with delivery of each production unit, the contractor shall furnish and pack one (1) calibration certificate with each unit. Ship with unit.
The listed number of copies is the maximum amount for the acquisition. Specific quantities will be identified by issuance of a modification to exercise option quantities.
17_PRICE_GROUP2:
18_totalprice2:
addr2_5:
addr2_6:
addr2_7:
addr2_8:
addr2_9:
addr2_10:
addr2_11:
addr2_12:
addr2_13:
addr2_14:
draft2_2:
reg2_2: 26 repro2_2:
draft2_3:
reg2_3:
repro2_3:
draft2_4:
reg2_4:
repro2_4:
draft2_5:
reg2_5:
repro2_5:
draft2_6:
reg2_6:
repro2_6:
draft2_7:
reg2_7:
repro2_7:
draft2_8:
reg2_8:
repro2_8:
draft2_9:
reg2_9:
repro2_9:
draft2_10:
reg2_10:
repro2_10:
draft2_11:
reg2_11:
repro2_11:
draft2_12:
reg2_12:
repro2_12:
draft2_13:
reg2_13:
repro2_13:
draft2_14:
reg2_14:
repro2_14:
15_total_Draft2: 0
15_TOTALReg2: 26
15_TOTALRepro2: 0
G_PREPARED_BY:
H_DATE: 3/3/2020
1_APPROVED_BY:
J_DATE: 3/3/2020
Page: 3 of_pages: 5
Reset:
2020-03-03T09:57:17-0500
CAPUANO.FRANK.R.1403209658
2020-03-03T10:45:29-0500
SKINNER.KEVIN.L.II.1024227223
DATA ITEM DESCRIPTION
Title: CALIBRATION CERTIFICATE/REPORT
Number: DI-QCIC-80798C Approved Date: 20170123 AMSC Number: F9766 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 36 Project Number: QCIC-2017-003 Applicable Forms: N/A Use/Relationship: The Calibration Certificate/Report documents calibration certificates or reports accompanying the calibrations performed on Department of Defense (DoD) test, measurement, and diagnostic equipment.
a. This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
b. This DID is applicable to contracts requiring calibration of test equipment prior to delivery.
This DID is consistent with ISO/IEC 17025, General requirements for the competence of testing and calibration laboratories, requirements for calibration reports or certificates.
(Copies of this document are available online at http://www.iso.org.)
c. This DID supersedes DI-QCIC-80798B.
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. Contractor format is acceptable.
3. Content. The calibration certificate or report shall include:
a. Title (e.g., calibration certificate or calibration report);
b. The name and address of the laboratory and the location where the calibrations were carried out, if different from the address of the laboratory;
c. Unique identification of the calibration certificate or test report (such as the serial number), and on each page an identification in order to ensure that the page is recognized as a part of the test report or calibration certificate, and a clear identification of the end of the calibration certificate or test report;
d. The name and address of the client or customer;
e. Identification of the method used;
f. A description of, the condition of, and the unambiguous identification of the item(s) tested or calibrated;
g. The date of receipt of the test or calibration item(s) where this is critical to the validity and application of the results, and the date(s) of performance of the test or calibration;
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.
DI-QCIC-80798C
h. Reference to the sampling plan and procedures used by the laboratory or other bodies where these are relevant to the validity or application of the results;
i. The test or calibration results with, where appropriate, the units of measurement;
j. The name(s), function(s) and signature(s) or equivalent identification of person(s) authorizing the calibration certificate or test report;
k. Where relevant, a statement to the effect that the results relate only to the items tested or calibrated;
l. The conditions (e.g., environmental) under which the calibrations were made that have an influence on the measurement results;
m. The uncertainty of measurement or a statement of compliance with an identified metrological specification or clauses thereof;
n. Evidence that the measurements are traceable.
End of DI-QCIC-80798C.
TM-86-01Q 27 Oct 2017 1-01: AF TMSS Linear TMs
Air Force Technical Manual Contract Requirements (TMCR) for
AIR FORCE CALIBRATION AND METROLOGY (AFMETCAL) PROGRAM
Circular Geometry Measuring Machine
ATTACHMENT DD FORM 1423, TO CDRL SEQUENCE NUMBER 001, EXHIBIT A REQUEST FOR
PROPOSAL/CONTRACT:
Date: 2 June 2020
SECTION 1. TECHNICAL ORDER (TO) PROGRAM REQUIREMENTS
1. TMCR Tailoring. This TMCR has been tailored by the program office, including the associated tables, matrices and Specification/Standard Interface Records (SIRs). The Contractor may propose and submit, in writing, additional tailoring to the Technical Order Manager Agency/Agent (TOMA), Government
Program Manager (PM), and Procuring Contracting Officer (PCO) for consideration. The tailored TMCR shall be attached to the Contract Data Requirements List (CDRL) for Technical Order (TO) delivery, and shall be included in the proposal as a separate exhibit, referenced in the proposal Statement Of Work
(SOW). Air Force (AF) TO Acquisition procedures, including procedures for tailoring this document, are found in TO 00-5-3, AF Technical Order Life Cycle Management, located at http://www.tinker.af.mil/Home/TechnicalOrders.aspx. A copy may also be obtained from the Program
TO Manager. Any terms or procedures found in this document may be researched there.
2. TO Program Scope. The Contractor shall develop and deliver technical manuals in accordance with
(IAW) this TMCR that supports the AFMETCAL requirements for technically usable manuals. The technical manuals will include Operation and Maintenance Instructions, Illustrated Parts Breakdown, and
Calibration Process/Procedure in a Portable Document Format (PDF). PDF TO Publications may be produced and distributed as physical media (Paper/CD) or electronically via Enhanced Technical
Information Management System (ETIMS) electronic TO Viewer (eTOV).
3. Commercial Manuals. Contractors shall recommend the use of existing commercial manuals to the maximum extent possible without impairing program support objectives. All proposed commercial manuals are subject to Government review and approval. Contractors shall use Data Item Description
(DID) DI-TMSS-80067C, Technical Manual (TM) Contractor Furnished Aeronautical Equipment or
Contractor Furnished Equipment (CFAE/CFE) Notices, to provide recommendation data. A copy is available through ASSIST at http://quicksearch.dla.mil/qsSearch.aspx.
3.1. The AF requests the ability to electronically store, print, distribute, update and decollate the commercial manual to allow for printing. Commercial manuals shall be delivered as Portable
Document Format (PDF) unless otherwise specified.
3.2. Approved Commercial-Off-The-Shelf (COTS) Manuals shall be delivered with an Identifying
TO Publication Sheet (ITPS), IAW MIL-PRF-32216, Performance Specification: Evaluation Of
Commercial Off-The-Shelf (COTS) Manuals And Preparation Of Supplemental Data. All PDF files of commercial data shall be non-password protected to allow the AF to decollate the manual for printing.
http://www.tinker.af.mil/Home/TechnicalOrders.aspx http://quicksearch.dla.mil/qsSearch.aspx
3.3. If the proposed COTS data is found to be insufficient after review by the Government, the
Contractor shall prepare supplemental data for the COTS manual as required IAW Military Standard
(MIL-STD)-38784. If the COTS data cannot be supplemented sufficiently the Contractor may be tasked to develop new TM data IAW the applicable TMSS listed in Section 2, Table 1.
4. Technical Manual Specifications and Standards (TMSS) Tailoring. The contractor shall develop all
TMs IAW most current version of applicable TMSS for the type manual being developed and comply with the Specification/Standard Interface Records (SIRS) provided within Section 3.
5. Subsequent TO/Data Requirements. (Deleted)
6. TO Development. TOs shall be written to a scope and depth of coverage to support the AFMETCAL operations and maintenance concepts.
6.1. Standard Generalized Markup Language (SGML) tagged TO files shall include required illustration (graphics) files in an approved graphics exchange format. Illustration files developed and delivered for other purposes shall be used in lieu of developing special TM illustration files whenever possible. All delivered graphics shall conform to the approved graphic creation and format guidelines listed in Attachment 1, Graphics Format Guidelines. For assistance with illustration requirements contact AF TMSS via (e-mail: SGMLSupport@us.af.mil).
6.2. (Deleted)
7. TO Numbering. (Deleted)
8. Data Rights. Contractors shall comply with 10 U.S.C. 2320 and cognizant Defense Federal Acquisition
Regulation Supplement (DFARS) provisions and clauses in providing Unlimited Rights for all source data, TO publications, and TO updates prepared specifically for the contract. Government rights in data are specified in the DFARS, 252.227-7013, Rights in Technical Data, Noncommercial Items, 252.227-
7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software
Documentation, and 252.227-7015, Technical Data-Commercial Items. The Government shall be given
Unlimited Rights for all Government-funded business rules (tailoring and application methods and procedures) and documented business processes developed under the contract for the purpose of TO development. For all data delivered to the Government with other than Unlimited Rights, the Contractor shall assert their data rights IAW DFARS 252.227-7017, Identification and Assertion of Use, Release, or
Disclosure Restrictions. The Contractor shall pass through and enforce all requirements in this TMCR to all sub-Contractors.
9. Classification, Distribution, Destruction, Disclosure, Export Control Notices, and Cyber Security.
Contractors shall recommend the correct markings and controls for classified and restricted distribution data and TOs IAW the program’s Security Classification Guide (SCG) and Department of Defense
Manual (DODM) 5200.01, Department of Defense Instruction (DODI) 5230.24, Department of Defense
Directive (DODD) 5230.25, Air Force Instruction (AFI) 16-1404, and MIL-STD-38784 (available at http://www.e-publishing.af.mil/ or https://assist.dla.mil/online/start/index.cfm). The markings and notices shall be reviewed during In-Process Reviews (IPR). The Contractor shall also apply policy and procedures for Cyber Security Protection IAW AFI 33-200, Information Assurance (IA) Management, AFMAN 17-1301, Computer Security (COMPUSEC), and MPTO 00-33B-5008, Remanence Security for
Information Systems. NOTE: Distribution limitations will be determined on a case-by-case basis as TOs are developed, dependent upon TO content.
mailto:SGMLSupport@us.af.mil http://www.e-publishing.af.mil/ https://assist.dla.mil/online/start/index.cfm
10. TO Quality. Contractor proposals shall describe how the Government will be allowed to interact with the Contractor’s TO development team. The Contractors shall ensure prepared TOs are: a) technically accurate and safe; b) written to a scope and depth of coverage to support the operations and maintenance concepts; c) properly classified and marked with export control and distribution limitation statements.
11. TO Delivery. TO file delivery requirements are located in Section 2, Table 3 of this document.
11.1. MIL-SPEC (SGML) Tagged Files. The Contractor shall parse all SGML files required for the
TOs prior to Government delivery and shall verify the SGML is compliant with the appropriate DTD.
NOTE: The Government will parse the files prior to acceptance using the public domain SGML parser (http://www.jclark.com/sp/).
12. Source Data Maintenance. (Deleted)
13. TO Maintenance. (Deleted)
14. Schedules. (Deleted)
15. Time Compliance Technical Orders (TCTOs). (Deleted) http://www.jclark.com/sp/
SECTION 2. TM TYPE AND DELIVERY REQUIREMENTS
NOTES:
Mark the TM Type Selection Tables indicating the applicable TO types and related specifications.
(NEW DEVELOPMENT) LINEAR TM TYPE (PUBLICATION) SELECTION TABLES.
TABLE 1
TMSS REQUIREMENTS FOR THE AFMETCAL
(Circular Geometry Measuring Machine)
Title or Type of Manuals Specification Required
1. Inspection TOs MIL-DTL-5096
a. Inspection and Maintenance Requirements (-6) Manual
b. Acceptance and Functional Check Flight (FCF) Procedures (-6CF)
Manual
c. Acceptance and Functional Check Flight (-6CL) Checklist
d. Inspection Workcards (-6WC)
e. Maintenance/Operations Checklists
2. Cargo Aircraft Loading and Offloading TOs MIL-DTL-5288
a. Loading Instructions Manual
b. Nuclear Weapon Cargo Loading Manual
c. Checklists
3. Weight and Balance (Aircraft) MIL-DTL-5920
a. Loading Data Manual
b. Sample Basic Weight Checklists
4. Flight Manuals MIL-DTL-7700
a. Flight Manual
b. Performance Data Manual
c. Mission Crew Manual
d. Supplemental Manual
e. Abbreviated Flight Crew Checklist
5. List of Applicable Publications MIL-DTL-8031
6. Structural Repair Manuals (for Aircraft) MIL-DTL-9854
7. Munitions/Weapons Loading Procedures, Non- nuclear and Nuclear TOs MIL-DTL-9977
a. Nuclear Weapons Basic Information and Loading Procedures
b. Nuclear Weapons Loading Procedures
c. Non-nuclear Munitions Basic Information
d. Non-nuclear Loading Procedures
e. Non-nuclear Munitions Loading Standard Data Packages (SDPs)
f. Loading Procedures Checklist
g. Single Loading Procedures Checklist
h. Integrated Loading Procedures Checklists
i. Family Group Loading Procedures Checklist
j. Nuclear Weapons Loading Procedure Checklists
k. Functional Check Procedures Checklist
l. NATO Stage B Cross-Servicing Checklists
m. End of Runway (EOR) Procedures Checklist
8. Space Operations and Support Documentation TOs
-- MIL-SPEC (Intercontinental Ballistic Missiles)
-- MIL-SPEC (Space)
MIL-PRF-38311
MIL-PRF-38314
a. Operations Manual
b. Operations Checklists
c. Technical Manuals and Related Checklists
9. Nuclear and Non-nuclear Weapon Delivery and Aircrew Procedures
Manuals and Checklists
MIL-DTL-38384
a. Non-nuclear Weapon Delivery Manual
b. Aircrew Nuclear Bomb Delivery Manual (Strategic Bomber Aircraft)
c. Aircrew Nuclear Missile Delivery Manual (Strategic Bomber Aircraft)
d. Aircrew Nuclear Bomb Delivery Manual (Tactical Aircraft)
e. Non-nuclear Weapon Delivery Checklist
f. Nuclear Weapon Delivery Checklist (Strategic Bomber Aircraft)
g. Aircrew Nuclear Bomb Delivery Checklist (Tactical Aircraft)
h. Non-nuclear Weapon Delivery Source Data Packages
10. Work Unit Code Manual
a. Standard WUC Manual
b. Two Chapter Manual
c. Three Chapter Manual
MIL-DTL-38769
11. Calibration Procedures MIL-DTL-38793
12. Time Compliance Technical Orders (TCTOs)
a. TCTO
b. TCTO Supplement
MIL-DTL-38804
13. Aircraft Battle Damage Assessment and Repair TOs MIL-DTL-87158
14. Illustrated Parts Breakdown MIL-DTL-38807
15. On-Equipment Organizational Maintenance Manual Set MIL-DTL-83495
a. General Equipment (GE) Manual
b. General System (GS) Manuals
c. Combined GE & GS Manual
d. Job Guide (JG) Manuals
e. Fault Reporting (FR) Manual
f. Fault Isolation (FI) Manual
g. Wiring Data (WD) Manual
h. Schematic Diagram (SD) Manual
16. Operation and Maintenance Instructions in Work Package Format MIL-DTL-87929
a. Maintenance Manuals
(1) Organizational Maintenance
(2) Intermediate Maintenance
(3) Depot Maintenance
(4) Combined (I&D) Maintenance
(5) On Condition Maintenance
b. Operation & Maintenance Instruction Manuals
c. Special Manuals
(1) Aircraft Engine Testing and Trending Procedures
(2) Aircraft Power Package Testing Procedures
(3) Static Firing of Missile Motors
(4) System Peculiar Corrosion Control
(5) Nondestructive Inspection (NDI)
(6) Aircraft Structural Integrity Program (ASIP)
(7) ATE Operator Test Procedures
(8) Special Requirements for Storage and Maintenance Procedures;
AUR Munitions/Launchers and Associated Support Equipment, Conventional Components and CMBR Agents
(9) Parachute Packing Procedures
(10) Operators Instructions (Hand-Held Flight Computers)
(11) Installation-Engineering Facility (Ground C-E Equipment)
d. Checklists (IAW MIL-DTL-5096)
e. With Illustrated Parts Breakdown
17. Commercial Manuals (Evaluate according to MIL-PRF-32216)
18. Aircraft Cross-servicing Guide MIL-DTL-22202
TABLE 3 – LINEAR TM DELIVERY REQUIREMENTS
FOR THE AFMETCAL
Circular Geometry Measuring Machine
NOTES:
For Paper media delivery indicate required quantity
DELIVERY SCHEDULE
Event Number of days data required prior to event
Technical
Review(s)
(30 DACA)
First
Article/First
Production
Unit
(60 DACA)
Administrative
(Logistics)
(10
DAFAOK)
Final TO
Distribution
(Ship With
Prod Units)
(90
DAFAOK)
Enter physical mailing address, electronic delivery location or web access point
Legend: DACA - After Contract Award
DAFAOK - Days after First Article accepted (passes
Acceptance testing)
Engineering (Draft) Copy
AFLCMC/WNMRP/AFMETCAL Division
ATTN: Mike Hickey michael.hickey.2@us.af.mil 813 Irving Wick Drive West, Bldg 2
Heath, Ohio 43056
IPDF / 1 IPDF / IPDF / IPDF /
First Production Copies (ship w/1st Prod.)
Bionetics Transportation
ATNN: Carol Cooperrider
813 Irving Wick Drive West, Bldg 4, Door 15
IPDF / IPDF / 2 IPDF / IPDF /
Administrative (Logistics) Copies
AFLCMC/WNMRP/AFMETCAL Division
ATTN: Mike Hickey michael.hickey.2@us.af.mil 813 Irving Wick Drive West, Bldg 2
IPDF / IPDF / IPDF / 1 IPDF /
Final (Production) Copies (ship w/ unit)
Bionetics Transportation
ATNN: Carol Cooperrider
813 Irving Wick Drive West, Bldg 4, Door 15
IPDF / IPDF / IPDF / IPDF / 31
Total Paper Copies Required: 1 2 1 31
SECTION 3. DELETED
DD FORM 1423-1, FEB 2001
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
TDP ________ TM _______ OTHER
Page of Pages
1_DATA_ITEM_NO: A001
2_TITLE_OF_DATA_ITEM: Technical Manual Contract Requirements (TMCR)
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit: TM-86-01
5_CONTRACT_REFERENCE: PD 20M-201A-DI Atch
6_REQUIRING_OFFICE: AFLCMC/WNMM
7_DID_250_REQ: N/A
8_APP_CODE: N/A
DIST_STATEMENT: D
10_FREQUENCY: ASREQ
11_AS_OF_DATE: ASREQ
12_DATE_OF_FIRST_SUBMISSI: See BLK 16
13_DATE_OF_SUBSEQUENT_SUB: See BLK 16 addressee1:
draft1:
reg1:
repro1:
addressee2: 1. AFMETCAL draft2:
reg2:
repro2:
addressee3: Attn: Mike Hickey draft3:
reg3:
repro3:
addressee4: 813 Irving Wick Dr., W. Horton Building draft4: 1 reg4:
repro4:
addressee5: Heath, OH 43056 draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12: Ship to addressee draft12:
reg12: 1 repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17: 1 repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21: 5 repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25: 1 repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 1 total_repro: 0
16_REMARKS: BLK 8: No later than 30 days after award, 1 copy of the draft manual is due. The Government has 15 calendar days to review the preliminary draft. The contractor has 10 calendar days after receipt of Government comments to prepare and deliver revised data. Criteria for approval shall meet the Government comments. Reference the contract number in all correspondence. Final approval after first production acceptance.
BLK 9: The following statement shall be included on the manuals:
DISTRIBUTION STATEMENT D: DoD and US DoD contractors only
Blk 12: No later than 60 days after contract award, 1 copy(ies) of the final manual is(are) required on CD/DVD in indexed Portable Document Format (iPDF). Ship to addressee #1 listed in BLK 14a. If manuals are available electronically, the file or web link may be sent to michael.hickey.2@us.af.mil. Reference contract number in all correspondence.
Blk 13: No later than 10 days after after First Production Unit is accepted, 1 copy (ies) of the final manual is required. Manual shall be on CD/DVD in indexed Portable Document Format (iPDF). Ship to addressee #1 listed in BLK 14a.
Blk 13: Concurrent with delivery of production units contractor shall furnish and pack 1 set of the manuals with each unit. Manual shall be on CD/DVD in indexed Portable Document Format (iPDF). Ship with unit.
Blk 13: No later than 60 days after contract award, concurrent with delivery of first production unit, the contractor shall furnish and pack 1 set of manuals with each of the first production unit. Manual shall be on CD/DVD in Indexed Portable Document Format (iPDF). Ship with unit.
17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE: 3/3/2020
1_APPROVED_BY:
J_DATE: 3/3/2020
Page: 1 reg38t: 8
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: A(FY 20)
TDP:
TM: x
OTHER:
DSYSTEMITEM: Circular Geometry Measuring Machine
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 5
Reset:
2020-03-03T09:54:56-0500
CAPUANO.FRANK.R.1403209658
2020-03-03T10:43:58-0500
SKINNER.KEVIN.L.II.1024227223
File details come from the government source that posted it. Updated .