Attachment 2 - Cost Forms.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- B777-200ER Viewport Installations
- Solicitation number
- 80LARC23R0018
About this file
This document contains multiple cost breakdown templates for a federal contract solicitation to install viewports on Boeing 777-200ER aircraft for NASA Langley Research Center. The solicitation number is 80LARC23R0018 and involves 14 Contract Line Item Numbers (CLINs) covering labor, materials, equipment, subcontracts, and other direct costs for tasks including viewport removal and installation, aircraft modifications, testing, data collection, and project management. Offerors are instructed to complete the cost templates with pricing information that correlates to their technical approach narrative in the price volume of their proposal. Pricing is to be fully burdened direct labor costs plus itemized other direct costs by element, with an overall fixed price for each CLIN and a total not-to-exceed amount of $3,073,345 for all work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Cost Breakdown by CLIN Project: B777-200ER Viewport Installations
Offeror: ______________________________________
| Summary Cost Breakdown by Contract Line Item Number (CLIN) | ||||||||||||||||
| Cost Element | CLIN 1 | CLIN 2 | CLIN 3 | CLIN 4 | CLIN 5 | CLIN 6 | CLIN 7 | CLIN 8 | CLIN 9 | CLIN 10 | CLIN 11 | CLIN 12 | CLIN 13 | CLIN 14 | CLIN 15 | Total Price |
| Prime Contractor's Direct Labor Costs (A) |
| Other Direct Costs |
| Equipment |
| Facility |
| Material |
| Subcontracts |
| Travel |
Total Other Direct Costs (B)
Subtotal Direct Costs (A) + (B) = (C)
Fee (D)
| Total Price (C) + (D) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| COST FORM INSTRUCTIONS | |||||||||||||||
| 1. It's the offeror's responsibility to ensure that its calculations in the spreadsheet are calculated correctly. | |||||||||||||||
| 2. It's the offeror's responsilibity to ensure that its proposed price adequately reflects its proposed technical approach. | |||||||||||||||
| 3. Please read instructions in solicitation A.15 Price Volume III (Factor 2). The Cost Forms should correlate with the narrative in Price Volume III. | |||||||||||||||
| 4. The offeror shall calculate its total direct labor costs by multiplying its proposed fully-burdened labor rates to its proposed labor hours. | |||||||||||||||
| 5. The offeror shall disclosed its proposed Other Direct Costs (ODCs) by cost element type (e.g. travel, subcontracts, etc.). | |||||||||||||||
| NOTE: In the spreadsheet, the Government listed different cost element types for Other Direct Costs as examples. The Offeror | |||||||||||||||
| can add additional or delete any cost element type disclosed under Other Direct Costs to reflect its actual proposed ODCs. | |||||||||||||||
| 6. The proposed price for CLIN 15 is a Not-to-Exceed (NTE) amount per SOW Section 7.2. Currently, the amount is TBD. |
| Total Cumulative Budget |
| 3073345 |
SOW 6.1 Cost Breakdown Project: B777-200ER Viewport Installations
Offeror: ______________________________________
| SOW Section 6.1 Cost Breakdown | |||||
| Cost Element | CLIN 1 | CLIN 2 | CLIN 3 | CLIN 4 | Total Price |
| Prime Contractor's Direct Labor Costs (A) | |||||
| Other Direct Costs | |||||
| Equipment | |||||
| Facility | |||||
| Material | |||||
| Subcontracts | |||||
| Travel | |||||
| Total Other Direct Costs (B) | |||||
| Subtotal Direct Costs (A) + (B) = (C) | |||||
| Fee (D) | |||||
| Total Price (C) + (D) | |||||
| COST FORM INSTRUCTIONS | |||||
| 1. It's the offeror's responsibility to ensure that its calculations in the spreadsheet are calculated correctly. | |||||
| 2. It's the offeror's responsilibity to ensure that its proposed price adequately reflects its proposed technical approach. | |||||
| 3. Please read instructions in solicitation A.15 Price Volume III (Factor 2). The Cost Forms should correlate with the narrative in Price Volume III. | |||||
| 4. The offeror shall calculate its total direct labor costs by multiplying its proposed fully-burdened labor rates to its proposed labor hours. | |||||
| 5. The offeror shall disclosed its proposed Other Direct Costs (ODCs) by cost element type (e.g. travel, subcontracts, etc.). | |||||
| NOTE: In the spreadsheet, the Government listed different cost element types for Other Direct Costs as examples. The Offeror | |||||
| can add additional or delete any cost element type disclosed under Other Direct Costs to reflect its actual proposed ODCs. |
| Total Cumulative Budget |
| 3073345 |
SOW 6.2 Cost Breakdown Project: B777-200ER Viewport Installations
Offeror: ______________________________________
| SOW Section 6.2 Cost Breakdown | |||
| Cost Element | CLIN 8 | CLIN 9 | Total Price |
| Prime Contractor's Direct Labor Costs (A) | |||
| Other Direct Costs | |||
| Equipment | |||
| Facility | |||
| Material | |||
| Subcontracts | |||
| Travel | |||
| Total Other Direct Costs (B) | |||
| Subtotal Direct Costs (A) + (B) = (C) | |||
| Fee (D) | |||
| Total Price (C) + (D) | |||
| COST FORM INSTRUCTIONS | |||
| 1. It's the offeror's responsibility to ensure that its calculations in the spreadsheet are calculated correctly. | |||
| 2. It's the offeror's responsilibity to ensure that its proposed price adequately reflects its proposed technical approach. | |||
| 3. Please read instructions in solicitation A.15 Price Volume III (Factor 2). The Cost Forms should correlate with the narrative in Price Volume III. | |||
| 4. The offeror shall calculate its total direct labor costs by multiplying its proposed fully-burdened labor rates to its proposed labor hours. | |||
| 5. The offeror shall disclosed its proposed Other Direct Costs (ODCs) by cost element type (e.g. travel, subcontracts, etc.). | |||
| NOTE: In the spreadsheet, the Government listed different cost element types for Other Direct Costs as examples. The Offeror | |||
| can add additional or delete any cost element type disclosed under Other Direct Costs to reflect its actual proposed ODCs. |
| Total Cumulative Budget |
| 3073345 |
SOW 6.3 Cost Breakdown Project: B777-200ER Viewport Installations
Offeror: ______________________________________
| SOW Section 6.3 Cost Breakdown | ||||
| Cost Element | CLIN 5 | CLIN 6 | CLIN 7 | Total Price |
| Prime Contractor's Direct Labor Costs (A) | ||||
| Other Direct Costs | ||||
| Equipment | ||||
| Facility | ||||
| Material | ||||
| Subcontracts | ||||
| Travel | ||||
| Total Other Direct Costs (B) | ||||
| Subtotal Direct Costs (A) + (B) = (C) | ||||
| Fee (D) | ||||
| Total Price (C) + (D) | ||||
| COST FORM INSTRUCTIONS | ||||
| 1. It's the offeror's responsibility to ensure that its calculations in the spreadsheet are calculated correctly. | ||||
| 2. It's the offeror's responsilibity to ensure that its proposed price adequately reflects its proposed technical approach. | ||||
| 3. Please read instructions in solicitation A.15 Price Volume III (Factor 2). The Cost Forms should correlate with the narrative in Price Volume III. | ||||
| 4. The offeror shall calculate its total direct labor costs by multiplying its proposed fully-burdened labor rates to its proposed labor hours. | ||||
| 5. The offeror shall disclosed its proposed Other Direct Costs (ODCs) by cost element type (e.g. travel, subcontracts, etc.). | ||||
| NOTE: In the spreadsheet, the Government listed different cost element types for Other Direct Costs as examples. The Offeror | ||||
| can add additional or delete any cost element type disclosed under Other Direct Costs to reflect its actual proposed ODCs. |
| Total Cumulative Budget |
| 3073345 |
SOW 6.4 Cost Breakdown Project: B777-200ER Viewport Installations
Offeror: ______________________________________
| SOW Section 6.4 Cost Breakdown | ||
| Cost Element | CLIN 10 | Total Price |
| Prime Contractor's Direct Labor Costs (A) | ||
| Other Direct Costs | ||
| Equipment | ||
| Facility | ||
| Material | ||
| Subcontracts | ||
| Travel | ||
| Total Other Direct Costs (B) | ||
| Subtotal Direct Costs (A) + (B) = (C) | ||
| Fee (D) | ||
| Total Price (C) + (D) | ||
| COST FORM INSTRUCTIONS | ||
| 1. It's the offeror's responsibility to ensure that its calculations in the spreadsheet are calculated correctly. | ||
| 2. It's the offeror's responsilibity to ensure that its proposed price adequately reflects its proposed technical approach. | ||
| 3. Please read instructions in solicitation A.15 Price Volume III (Factor 2). The Cost Forms should correlate with the narrative in Price Volume III. | ||
| 4. The offeror shall calculate its total direct labor costs by multiplying its proposed fully-burdened labor rates to its proposed labor hours. | ||
| 5. The offeror shall disclosed its proposed Other Direct Costs (ODCs) by cost element type (e.g. travel, subcontracts, etc.). | ||
| NOTE: In the spreadsheet, the Government listed different cost element types for Other Direct Costs as examples. The Offeror | ||
| can add additional or delete any cost element type disclosed under Other Direct Costs to reflect its actual proposed ODCs. |
| Total Cumulative Budget |
| 3073345 |
SOW 6.5 Cost Breakdown Project: B777-200ER Viewport Installations
Offeror: ______________________________________
| SOW Section 6.5 Cost Breakdown | |||
| Cost Element | CLIN 11 | CLIN 12 | Total Price |
| Prime Contractor's Direct Labor Costs (A) | |||
| Other Direct Costs | |||
| Equipment | |||
| Facility | |||
| Material | |||
| Subcontracts | |||
| Travel | |||
| Total Other Direct Costs (B) | |||
| Subtotal Direct Costs (A) + (B) = (C) | |||
| Fee (D) | |||
| Total Price (C) + (D) | |||
| COST FORM INSTRUCTIONS | |||
| 1. It's the offeror's responsibility to ensure that its calculations in the spreadsheet are calculated correctly. | |||
| 2. It's the offeror's responsilibity to ensure that its proposed price adequately reflects its proposed technical approach. | |||
| 3. Please read instructions in solicitation A.15 Price Volume III (Factor 2). The Cost Forms should correlate with the narrative in Price Volume III. | |||
| 4. The offeror shall calculate its total direct labor costs by multiplying its proposed fully-burdened labor rates to its proposed labor hours. | |||
| 5. The offeror shall disclosed its proposed Other Direct Costs (ODCs) by cost element type (e.g. travel, subcontracts, etc.). | |||
| NOTE: In the spreadsheet, the Government listed different cost element types for Other Direct Costs as examples. The Offeror | |||
| can add additional or delete any cost element type disclosed under Other Direct Costs to reflect its actual proposed ODCs. |
| Total Cumulative Budget |
| 3073345 |
SOW 6.6 Cost Breakdown Project: B777-200ER Viewport Installations
Offeror: ______________________________________
| SOW Section 6.6 Cost Breakdown | |||||||||
| Cost Element | CLIN 5 | CLIN 6 | CLIN 7 | CLIN 8 | CLIN 9 | CLIN 10 | CLIN 13 | CLIN 14 | Total Price |
| Prime Contractor's Direct Labor Costs (A) | |||||||||
| Other Direct Costs | |||||||||
| Equipment | |||||||||
| Facility | |||||||||
| Material | |||||||||
| Subcontracts | |||||||||
| Travel | |||||||||
| Total Other Direct Costs (B) | |||||||||
| Subtotal Direct Costs (A) + (B) = (C) | |||||||||
| Fee (D) | |||||||||
| Total Price (C) + (D) | |||||||||
| COST FORM INSTRUCTIONS | |||||||||
| 1. It's the offeror's responsibility to ensure that its calculations in the spreadsheet are calculated correctly. | |||||||||
| 2. It's the offeror's responsilibity to ensure that its proposed price adequately reflects its proposed technical approach. | |||||||||
| 3. Please read instructions in solicitation A.15 Price Volume III (Factor 2). The Cost Forms should correlate with the narrative in Price Volume III. | |||||||||
| 4. The offeror shall calculate its total direct labor costs by multiplying its proposed fully-burdened labor rates to its proposed labor hours. | |||||||||
| 5. The offeror shall disclosed its proposed Other Direct Costs (ODCs) by cost element type (e.g. travel, subcontracts, etc.). | |||||||||
| NOTE: In the spreadsheet, the Government listed different cost element types for Other Direct Costs as examples. The Offeror | |||||||||
| can add additional or delete any cost element type disclosed under Other Direct Costs to reflect its actual proposed ODCs. |
| Total Cumulative Budget |
| 3073345 |
SOW 6.7 & 6.8 Cost Breakdown Project: B777-200ER Viewport Installations
Offeror: ______________________________________
| SOW Sections 6.7 & 6.8 Cost Breakdown | |||||||||||||||
| Cost Element | CLIN 1 | CLIN 2 | CLIN 3 | CLIN 4 | CLIN 5 | CLIN 6 | CLIN 7 | CLIN 8 | CLIN 9 | CLIN 10 | CLIN 11 | CLIN 12 | CLIN 13 | CLIN 14 | Total Price |
| Prime Contractor's Direct Labor Costs (A) | |||||||||||||||
| Other Direct Costs | |||||||||||||||
| Equipment | |||||||||||||||
| Facility | |||||||||||||||
| Material | |||||||||||||||
| Subcontracts | |||||||||||||||
| Travel | |||||||||||||||
| Total Other Direct Costs (B) | |||||||||||||||
| Subtotal Direct Costs (A) + (B) = (C) | |||||||||||||||
| Fee (D) | |||||||||||||||
| Total Price (C) + (D) | |||||||||||||||
| COST FORM INSTRUCTIONS | |||||||||||||||
| 1. It's the offeror's responsibility to ensure that its calculations in the spreadsheet are calculated correctly. | |||||||||||||||
| 2. It's the offeror's responsilibity to ensure that its proposed price adequately reflects its proposed technical approach. | |||||||||||||||
| 3. Please read instructions in solicitation A.15 Price Volume III (Factor 2). The Cost Forms should correlate with the narrative in Price Volume III. | |||||||||||||||
| 4. The offeror shall calculate its total direct labor costs by multiplying its proposed fully-burdened labor rates to its proposed labor hours. | |||||||||||||||
| 5. The offeror shall disclosed its proposed Other Direct Costs (ODCs) by cost element type (e.g. travel, subcontracts, etc.). | |||||||||||||||
| NOTE: In the spreadsheet, the Government listed different cost element types for Other Direct Costs as examples. The Offeror | |||||||||||||||
| can add additional or delete any cost element type disclosed under Other Direct Costs to reflect its actual proposed ODCs. |
| Total Cumulative Budget |
| 3073345 |
CLIN 13 Cost Breakdown Project: B777-200ER Viewport Installations
Offeror: ______________________________________
| CLIN 13 Cost Breakdown | |||
| Cost Element | CLIN 5 | CLIN 8 | Total Price |
| Prime Contractor's Direct Labor Costs (A) | |||
| Other Direct Costs | |||
| Equipment | |||
| Facility | |||
| Material | |||
| Subcontracts | |||
| Travel | |||
| Total Other Direct Costs (B) | |||
| Subtotal Direct Costs (A) + (B) = (C) | |||
| Fee (D) | |||
| Total Price (C) + (D) | |||
| COST FORM INSTRUCTIONS | |||
| 1. It's the offeror's responsibility to ensure that its calculations in the spreadsheet are calculated correctly. | |||
| 2. It's the offeror's responsilibity to ensure that its proposed price adequately reflects its proposed technical approach. | |||
| 3. Please read instructions in solicitation A.15 Price Volume III (Factor 2). The Cost Forms should correlate with the narrative in Price Volume III. | |||
| 4. The offeror shall calculate its total direct labor costs by multiplying its proposed fully-burdened labor rates to its proposed labor hours. | |||
| 5. The offeror shall disclosed its proposed Other Direct Costs (ODCs) by cost element type (e.g. travel, subcontracts, etc.). | |||
| NOTE: In the spreadsheet, the Government listed different cost element types for Other Direct Costs as examples. The Offeror | |||
| can add additional or delete any cost element type disclosed under Other Direct Costs to reflect its actual proposed ODCs. |
| Total Cumulative Budget |
| 3073345 |
CLIN 14 Cost Breakdown Project: B777-200ER Viewport Installations
Offeror: ______________________________________
| CLIN 14 Cost Breakdown | ||||
| Cost Element | CLIN 6 | CLIN 8 | CLIN 9 | Total Price |
| Prime Contractor's Direct Labor Costs (A) | ||||
| Other Direct Costs | ||||
| Equipment | ||||
| Facility | ||||
| Material | ||||
| Subcontracts | ||||
| Travel | ||||
| Total Other Direct Costs (B) | ||||
| Subtotal Direct Costs (A) + (B) = (C) | ||||
| Fee (D) | ||||
| Total Price (C) + (D) | ||||
| COST FORM INSTRUCTIONS | ||||
| 1. It's the offeror's responsibility to ensure that its calculations in the spreadsheet are calculated correctly. | ||||
| 2. It's the offeror's responsilibity to ensure that its proposed price adequately reflects its proposed technical approach. | ||||
| 3. Please read instructions in solicitation A.15 Price Volume III (Factor 2). The Cost Forms should correlate with the narrative in Price Volume III. | ||||
| 4. The offeror shall calculate its total direct labor costs by multiplying its proposed fully-burdened labor rates to its proposed labor hours. | ||||
| 5. The offeror shall disclosed its proposed Other Direct Costs (ODCs) by cost element type (e.g. travel, subcontracts, etc.). | ||||
| NOTE: In the spreadsheet, the Government listed different cost element types for Other Direct Costs as examples. The Offeror | ||||
| can add additional or delete any cost element type disclosed under Other Direct Costs to reflect its actual proposed ODCs. |
| Total Cumulative Budget |
| 3073345 |