Attachment 2 - AF Form 66.pdf
PDF 52 KB Posted
- Attached to
- FXSB 20-1063 Construct Canopy and Pad Bldg. 15380 - JBER, AK Federal contract opportunity
- Solicitation number
- FA500021R0025
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA500021R00250003 SF 30.pdf | ||
| Attachment 1 - Correction to Answer A1. of Question Q1. Submitted.pdf | ||
| Solicitation Amendment FA500021R00250002 SF 30.pdf | ||
| Attachment 2 - Site Visit Attendees.pdf | ||
| Attachment 3 -As-Built electrical panel.pdf | ||
| Attachment 1 - Answers to Submitted Questions.pdf | ||
| Attachment 2 - FXSB 20-1063 SOW and SPECS Revision 1.pdf | ||
| Attachment 1 - Amendment FA500021R00250001 FXSB 20 1063 Construct Canopy and Pad Bldg 15380.pdf | ||
| Attachment 1 - Price Schedule.pdf | ||
| Attachment 3 - Specifications and SOW.pdf | ||
| FA500021R0025 FXSB 20-1063 Construct Canopy and Pad Bldg 15380.pdf | ||
| Attachment 4 - Project Drawings.pdf | ||
| Attachment 5 - DD1354-fillable.pdf | ||
| Attachment 6 - Contractors Fire Safety Guide.pdf | ||
| Attachment 7 - Wage Determinatin.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
FXSB 20-1063
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT PREFERENCE, TYPE OF
SUBMITTAL
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
D R
A W
IN
G
S
P
LA
N
M S
D S
M A
N F'
R R
E C
O M
M E
N D
A
TI
O N
S
R E
Q U
E S
T
LE
TT
E
R
C A
TA
LO
G D
A
TA
R E
P O
R
TS
O
TH
E R
D A
TA
TE
S
T R
E S
U
LT
S
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTIN
G
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE DATE
FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL
FINAL APPROVAL REMARKS
Notice of Start of Work
10 days prior to start of any work
Record Drawings
30 days after completion of Work
Utility Outages
14 Days prior to start of start of work
Form 3
After completion of Form
Fence Plan
1 NTP +10 Days
Quality Control Plan
1 20 Days after
NTP
Lead Abatement Plan
1 20 Days after
NTP
Material Safety Data Sheet
30 days before brought on Base
Radioactive Usage Request
1 60 days prior to start of work
Fuel Spill Clean Up Plan
1 prior to work start
Record of Proper Disposal
After completion of Disposal
Operation of the On-Base Gravel Extraction 1
If used, submit before any extraction work
13 Geo Fabric Product Data 1 30 days prior to start of work
14 Structural Backfill Sieve Analysis 1 30 days prior to start of work
15 D-1 Sieve Analysis 1 30 days prior to start of work
16 Compaction Test Results 1 3 Days after completion of test
Constuct Canopy and Pad Bldg 15380
SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
FXSB 20-1063
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT PREFERENCE, TYPE OF
SUBMITTAL
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
D R
A W
IN
G
S
P
LA
N
M S
D S
M A
N F'
R R
E C
O M
M E
N D
A
TI
O N
S
R E
Q U
E S
T
LE
TT
E
R
C A
TA
LO
G D
A
TA
R E
P O
R
TS
O
TH
E R
D A
TA
TE
S
T R
E S
U
LT
S
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTIN
G
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE DATE
FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL
FINAL APPROVAL REMARKS
Constuct Canopy and Pad Bldg 15380
17 Concrete Mix Designs 1 30 days prior to start of work
Concrete Reinforcement product data and shop drawings 1 1 30 days prior to start of work
Concrete Embed Epoxy Product Data 1 30 days prior to start of work
20 Geotechnical Report 1 NTP +15 Days
21 Canopy 65% Design Package 1 NTP +15 Days
Canopy 100% Design / Construction Drawings 1 NTP +45 Days
23 Paint Product Data 1 NTP +10 Days
Backer rod and Sealant Product Data 1 NTP +10 Days
25 Hand Rail Shop Drawings 1 1 NTP +60 Days
26 Special Inspection Reports 1 1 3 Days after completion of inspection